Concrete Constru
章节目录
共 34 章- CHAPTER I.--METHODS AND COST OF SELECTING AND PREPARING
- CHAPTER II.--THEORY AND PRACTICE OF PROPORTIONING CONCRETE. 25
- CHAPTER III.--METHODS AND COSTS OF MAKING AND PLACING
- CHAPTER IV.--METHODS AND COST OF MAKING AND PLACING
- CHAPTER V.--METHODS AND COST OF DEPOSITING CONCRETE
- CHAPTER VI.--METHODS AND COST OF MAKING AND USING RUBBLE
- CHAPTER VII.--METHODS AND COST OF LAYING CONCRETE IN
- CHAPTER VIII.--METHODS AND COST OF FINISHING CONCRETE
- CHAPTER IX.--METHODS AND COST OF FORM CONSTRUCTION 136
- CHAPTER X.--METHODS AND COST OF CONCRETE PILE AND PIER
- CHAPTER XI.--METHODS AND COST OF HEAVY CONCRETE WORK
- CHAPTER XII.--METHODS AND COST OF CONSTRUCTING BRIDGE
- CHAPTER XIII.--METHODS AND COST OF CONSTRUCTING RETAINING
- CHAPTER XIV.--METHODS AND COST OF CONSTRUCTING CONCRETE
- CHAPTER XV.--METHODS AND COST OF CONSTRUCTING SIDEWALKS,
- CHAPTER XVI.--METHODS AND COST OF LINING TUNNELS AND
- CHAPTER XVII.--METHODS AND COST OF CONSTRUCTING ARCH
- CHAPTER XVIII.--METHODS AND COST OF CULVERT CONSTRUCTION 414
- CHAPTER XIX.--METHODS AND COST OF REINFORCED CONCRETE
- CHAPTER XX.--METHOD AND COST OF BUILDING CONSTRUCTION
- CHAPTER XXI.--METHODS AND COST OF AQUEDUCT AND SEWER
- CHAPTER XXII.--METHODS AND COST OF CONSTRUCTING RESERVOIRS
- CHAPTER XXIII.--METHODS AND COST OF CONSTRUCTING ORNAMENTAL
- CHAPTER XXIV.--MISCELLANEOUS METHODS AND COSTS 653
- CHAPTER XXV.--METHODS AND COST OF WATERP
- ~CABLEWAYS.~--Cableways arranged to span
- ~DESIGN AND CONSTRUCTION.~--The main poi
- [Illustration: Fig. 80.--Sketch Plan of
- A 1-2-5 natural cement and a 1-3-6 Portl
- Superintendent, 2 days at $5.83-1/3
- The materials were hauled about 1 mile f
- Offsets and molding decorations were eas
- Diameter, Thickness, Cost
- Two men at $2 per day each set five base