CHAPTER XIX.--METHODS AND COST OF REINFORCED CONCRETE

BUILDING CONSTRUCTION 433

Introduction--Construction, Erection and Removal of Forms: Column Forms;

Rectangular Columns; Polygonal Columns; Circular Columns; Ornamental

Columns--Slab and Girder Forms; Slab and I-Beam Floors; Concrete Slab

and Girder Floors--Wall Forms--Erecting Forms--Removing Forms,

Fabrication and Placing Reinforcement; Fabrication; Placing--Mixing,

Transporting and Placing Concrete: Mixing; Transporting; Bucket Hoists;

Platform Hoists; Derricks--Placing and Ramming--Constructing Wall

Columns for a Brick Building--Floor and Column Construction for a

Six-Story Building--Wall and Roof Construction for One-Story Car

Barn--Constructing Wall Columns for a One-Story Machine

Shop--Constructing One-Story Walls with Movable Forms and Gallows

Frames--Floor and Roof Construction for Four-Story Garage.

Concrete Construction: Methods and Costs · 第 19 / 34 章