Two men at $2 per day each set five bases in eight hours, making the

cost of setting 80 cts. per base. The bases were sunk to a depth of 3

ft. 3 ins. In many cases they were placed under poles without

interrupting service by sawing off the pole, dropping it into the

ground, placing the new base and setting the sawed-off pole on it and

bolting up the straps.

~MILE POST, CHICAGO & EASTERN ILLINOIS R. R.~--The dimensions of the post

are shown by Fig. 306. Each post weighs 498 lbs. They are made when

other concrete work is being done. The form is laid flat, with the molds

for the letters on the bottom, and bottom and sides are plastered with

mortar, which is backed up with a 1-1-2 stone concrete. The cost of the

post is given as follows:

¼ barrel of cement at $2 $0.50

267 lbs. crushed stone 0.01

133 lbs. sand 0.01

1-1/3 hours labor at 15 cts. 0.20

1/3 hour carpenter changing letters at 25 cts. 0.08

Coloring cement 0.02

-----

Total $0.82

~BONDING NEW CONCRETE TO OLD.~--Concrete which has set hard has a surface

skin or glaze to which fresh concrete will not adhere strongly unless

special effort is made to perfect the bond. Various ways of doing this

are practiced. The most common is to clean the hardened surface from all

loose material and give it a thorough wash of cement grout against which

the fresh concrete is deposited and rammed before the grout has had time

to set. Washing the old surface with a hose or scrubbing it with a brush

and water improves the bond, as does also the hard tamping of the

concrete immediately over the joint. Mortar may be used in place of

grout. The thorough cleansing of the surface is, however, quite as

essential as the bonding coat, in fact in the opinion of the authors it

is more essential. As a rule, a good enough joint for ordinary purposes

can be got by tamping the fresh concrete directly against the old

concrete, without grout or mortar coating, if the surface of the latter

is thoroughly cleaned by scrubbing and flushing. The secret of securing

a good bond between fresh concrete and concrete that has set lies

largely in getting rid of the glaze skin and the slime and dust which

forms on it. Washing will go far toward doing this. The glaze skin can

be removed entirely by acid solutions, but the acid wash must be flushed

free from the surface before placing the fresh concrete. Ransomite, made

by the Ransome Concrete Machinery Co., Dunellen, N. J., is a prepared

acid wash which to the authors' knowledge has given excellent success in

a number of cases. The glaze coat can also be removed by picking the

hardened surface, but the picking should be followed by washing to

remove all loose chips and dust.

~DIMENSIONS AND CAPACITIES OF MIXERS.~--In planning plant lay-outs it is

often desirable to know the sizes, capacities, etc., of various mixers

in order to make preliminary estimates. Tables XXII to XXXIII give these

data for a number of the more commonly employed machines. The Eureka,

the Advanced and the Scheiffler mixers are continuous mixers and the

others are batch mixers.

Table XXII--Sizes, Capacities and Weights of Advanced Mixers.

Cement Machinery Co., Jackson, Mich.

Height ground to hopper top 3' 6"

Width over all 3' 6"

Length over all on trucks 10' 6"

Capacity per hour, cu. yds. 25 to 75

Horsepower, engine 2

Weight:

On trucks, without power, lbs. 1,700

On trucks, steam engine 2,000

On trucks, gas engine 2,200

On trucks, steam engine and boiler 2,500

Table XXIII--Sizes, Capacities and Weights of Scheiffler Proportioning

Mixers. The Hartwick Machinery Co., Jackson, Mich.

Mixer Number. No. 2. No. 2½. No. 3.

Dimensions of hopper, ins. 55×33 53×33 60×40

Height, from ground to top of hopper, ins. 43 43 48

Width over all on trucks, ins. 46 46 46

Length over all on trucks, ins. 126 126 132

Hourly capacity in cubic yards 5-6 8 12-15

Horsepower required, gasoline engine 2 3 4

Horsepower required, steam engine. 3 4

Weights:

On trucks, without power, lbs. 2,400 2,900 3,300

On trucks, gasoline engine, lbs. 3,000 3,600 4,500

On trucks, steam engine, lbs. 2,800 3,330 4,000

On trucks, steam engine and boiler, lbs. 3,500 3,700 4,800

Table XXIV--Sizes, Capacities and Weights of Eureka Mixers.

Eureka Machine Co., Lansing, Mich.

-----------------------------------------------------------------

| | | |

Mixer Number | No. 81 | No. 82 | No. 83 |

-------------------------------|----------|----------|----------|

_ | | | |

| Sand | 18"×25½" | | |

Size hoppers, ins. | Cement | 17"×25½" | do | do |

|_ Stone | 30"×25" | | |

Height, ground to hopper top | 49" | 49" | 49" |

Width over all on trucks | 40" | 40" | 40" |

Length over all on trucks | 12'-9" | 10'-0" | 10'-0" |

Capacity per hour, cu. yds. | 10 to 18 | 10 to 18 | 10 to 18 |

Engine horsepower | 3 stm. | 3 stm. | 3½ gas |

Boiler horsepower | 4 | | |

Weight on trucks, no power | 1,980 | 1,980 | 1,980 |

Weight trucks steam engine | 2,800 | | |

Weight trucks gas engine | | | 2,300 |

Weight trucks, eng. and boiler | 3,000 | | |

-------------------------------|----------|----------|----------|

-----------------------------------------------------------------

| | |

Mixer Number | No. 84 | No. 25 | No. 23

-------------------------------|------------|----------|----------

_ | | |

| Sand | 18"×25½" | 18"×25½" | 18"×25½"

Size hoppers, ins. | Cement | 17"×25½" | 17"×25½" | 17"×25½"

|_ Stone | 30"×25" | |

Height, ground to hopper top | 49" | 49" | 49"

Width over all on trucks | 40" | 40" | 40"

Length over all on trucks | 10'-0" | 8'-0" | 8'-0"

Capacity per hour, cu. yds. | 10 to 18 | 10 to 18 | 2 to 4

Engine horsepower | 3 el. motr | Pulley. | Hand.

Boiler horsepower | | |

Weight on trucks, no power | 1,980 | 1,400 | 1,400

Weight trucks steam engine | | |

Weight trucks gas engine | | |

Weight trucks, eng. and boiler | | |

-------------------------------|------------|----------|----------

Table XXV--Sizes, Capacities and Weights of Snell Mixers.

R. Z. Snell Mfg. Co., South Bend, Ind.

Mixer Number. No. 0. No. 1. No. 2. No. 3.

Size batch, cu. ft. 3 7 11 24

Capacity per hour, cu. yds. 2½ 5 8 20

Speed revs. per min. 30 30 25 19

Weight on Skids:

With pulley, lbs. 480 800 900 2,000

With engine, lbs. 800 1,550 2,050 3,500

With eng. and boiler, lbs. 2,170 2,900 4,000

Weight on Wheels:

With engine, lbs. 1,100 2,200 3,450 4,700

With engine and boiler, lbs. 3,570 4,750 5,200

Engine:

Size cylinder, ins. 4×6 3½×4½ 4×5 5×6½

Rated horsepower 1½ 4 5 6

Boiler:

Size, ins. 24×60 26×60 30×60

Rated horsepower 5 6 8

Outside dimensions on skids 2'9"×4' 3'4"×5'6" 4'×6' 6'×9'

Total height on skids 3'8" 4'6" 5' 5'6"

Table XXVI--Sizes, Capacities and Horsepower of Ransome Mixers.

Ransome Concrete Machinery Co., Dunellen, N. J.

Mixer number. No. 1. No. 2. No. 3. No. 4.

Size batch, cu. ft. 10 to 14 20 30 40

Capacity per hr., cu. yds. 10 20 30 40

Speed, Revs. per min. 16 15 14½ 14

Weight on Skids:

Pulley or gear, lbs. 3,300 3,650 5,900 7,400

With engine, lbs. 4,600 5,050 7,700 9,250

With engine and boiler, lbs. 6,450 8,700 12,200 14,700

Weight on Wheels:

With engine, lbs. 5,100 5,550 8,200 9,750

With engine and boiler, lbs. 6,950 9,200 12,700 15,000

Engines:

Size cylinder, ins. 6×6 7×7 8×8 9×9

Rated horsepower 7 10 14 20

Boiler:

Size, ins. 36×69 42×75 42×87 48×93

Rated horsepower 10 15 20 30

Table XXVII--Sizes, Capacities and Horsepowers of Chicago Improved Cube

Mixers. Municipal Engineering and Contracting Co., Chicago, Ill.

Mixer No. No. No. No. No. No.

number. "Handy." 6. 11. 17. 22. 33. 64.

Size batch, cu. ft. 2½ 6 11 17 22 33 64

Capacity per hr., cu. yds. 5½ 13 24 40 50 70 120

Speed, revs. per min. 24 20 18 17 16 15 12

Weight on Skids:

Pulley or gear, lbs. 1,000 1,900 2,800 5,000 7,000 9,600 19,000

With engine, lbs. 2,500 3,600 6,100 8,200 12,000

With eng. and boiler, lbs. 3,100 4,300 7,800 10,000 16,000

Weight on Wheels:

With engine, lbs. 1,400 3,200 4,500 7,100 9,500 15,000

With eng. and boiler, lbs. 4,000 6,000 8,800 10,300 17,000

Engine:

Size cylinder, ins. 4×4 6×6 6½×7 7×8 8×9

Rated horsepower 2 3 6 8 12 15 30

Boiler, rated horsepower 4 8 10 15 18 35

Width over all 4'-5" 5'-10" 7'-1" 7'-8" 8'-6" 9'-8"

Length over all 4'-10" 6'-9" 8'-0" 8'-10" 10'-2" 13'-6"

Height bot. sill to

charging hopper 3'-4¼" 3'-5" 3'-10" 4'-7" 5'-0" 5'-9"

Additional height on

wheels 9-7/8" 1'-5-1/8" 1'-5-1/8" 6-3/8" 5½"

Table XXVIII--Sizes, Capacities and Horsepowers of Cropp Mixers.

A. J. Cropp, Concrete Machinery, Chicago, Ill.

Mixer number. No. 0. No. 1. No. 2. No. 3. No. 4.

Size batch, cu. ft. 7 to 8 10 13 16 20

Cap. per hr., cu. yds. 15 20 25 30 40

Speed, revs. per min. 12 10 10 10 10

Weight on Skids:

With engine, lbs. 1,375 1,650 1,700 1,975 2,100

With eng. and boiler, lbs. 2,575 2,950 3,000 3,775 3,900

Weight on Wheels:

With engine, lbs. 1,775 2,050 2,200 2,475 2,600

With eng. and boiler, lbs. 2,900 3,350 3,400 4,250 4,350

Engine:

Size cylinder, ins. 4×4 5×5 5×5 6×6 6×6

Rated horsepower 3 5 5 7 7

Boiler:

Size inside 24"×4' 24"×6' 24"×6' 30"×6' 30"×6'

Rated horsepower 4 6 6 9 9

Out. dimensions on skids 40" 40" 40" 48" 48"

Total height 50" 56" 56" 56" 62"

Height fr. ground on trucks:

Charging, ins. 20 20 20 20 20

Discharging, ins. 30 30 30 30 30

TABLE XXIX--SIZES, CAPACITIES AND HORSEPOWERS OF CHICAGO CONCRETE MIXERS.

Chicago Concrete Machinery Co., Chicago, Ill.

Number of mixer. No. 00. No. 0. No. 1. No. 2.

Standard charge in cu. ft. cement ½ 1 1 2

" " Sand 1½ 2½ 4 8

" " stone 3 5 8 16

Total unmixed batch in cu. ft 5 8½ 13 26

Mixed concrete per batch, loose in cu. ft. 3½ 6 9 18

Cubic yards of unmixed material per hour,

45 batches per hour 8 14 21 42

Cubic yards of mixed concrete per hour,

45 batches per hour 6 10 15 30

Minimum horsepower required 2 4 6 8

Revolutions of driving pulley per min 200 190 185 170

Revolutions of drum per min 20 18 15 13

Diameter and face of driving pulley 20×3½ 20×4½ 24×5½ 28×6½

Weight:

On skids with pulley, lbs. 1,550 2,150 2,900 4,850

On truck with pulley or gears, lbs. 1,800 2,550 3,500 5,150

On skids with st. engine only, lbs. ... 2,400 3,400 4,600

On truck with st. engine only ... 2,900 4,000 5,300

On skids with st. eng. and boiler, lbs. ... 2,800 4,700 6,000

On truck with st. eng. and boiler, lbs. 2,400 4,200 5,750 7,850

On skids with gasoline engine, lbs. 2,000 3,500 5,000 6,500

On truck with gasoline engine, lbs. 2,400 4,300 5,800 7,800

TABLE XXX--SIZES, CAPACITIES AND HORSEPOWERS OF KOEHRING MIXERS.

Koehring Machine Co., Milwaukee, Wis.

Mixer number. No. 0-B. No. 1-B. No. 2-B. No. 3-B.

Capacity per charge, in cu. ft 7 11 22 27

Capacity per hour in cu. yds 7 14 25 30

Horsepower, steam engine 4 6 8 10

Horsepower, steam boiler 5 8 10 14

Horsepower, gasoline engine 4 6 10 12

Horsepower, electric motor 5 6 7½ 10

Speed of drum 20 17 15 15

Speed of intermediate shaft 132 108 75 75

Weight of mixer on skids 1,800 2,800 5,200 5,500

Weight of mixer on skids, with steam eng. 2,300 3,550 6,500 7,000

Weight of mixer on skids, with steam

engine and boiler 3,300 5,000 8,000 9,300

Weight of mixer on skids, gasoline

engine and housing 3,000 4,400 7,500 8,600

Weight of trucks with pole 400 600 850 950

Weight of automatic loading bucket

complete 500 700 1,000 1,100

Weight of mixing through complete 200 250 400 400

TABLE XXXI--SIZES, CAPACITIES AND HORSEPOWERS OF SMITH MIXERS.

Contractors' Supply & Equipment Co., Chicago, Ill.

Mixer number. No. 0. No. 1. No. 2. No. 2½. No. 4. No. 5.

Stand. charge cu. ft. Cement 1 1 2 2 3 4

" " " " Sand 2½ 4 6 7½ 10½ 14

" " " " Stone 5 8 12 15 21 28

Total unmixed per batch,

cu. ft. 8½ 13 20 24½ 34½ 46

Mixed material per batch

(loose), cu. ft. 6 9 13½ 16½ 22 30

Cubic yards mixed per

hour, up to 9 20 30 39 46 62

Power required--H.P. 4 6 8 10 15 19

Revs. per minute of

driving pulley 218 180 173 162 160 125

Diameter and face of

driving pulley, ins. 20×4½ 24×5½ 28×5½ 28×6½ 36×6½ 48×7½

Weight on skids with

pulley only, lbs. 1,740 2,500 3,600 4,400 6,200 7,900

Weight on truck with

pulley or gears, lbs. 2,200 3,650 4,750 5,500 7,400 ....

Weight on truck with

steam eng. & boil., lbs. 3,750 5,600 7,200 8,600 11,400 ....

Weight on truck with

gasoline engine, lbs 4,000 5,100 7,400 9,300 .... ....

TABLE XXXII--SIZES, WEIGHTS AND CAPACITIES OF POLYGON MIXER.

Waterloo Cement Machinery Co., Waterloo, Iowa.

Mixer number. No. 4. No. 5. No. 6. No. 7.

Maximum charge, cu. ft. 6 10 12 16

Cubic yards mixed per day (10 hrs.) up to 60 190 130 180

Weight on skids with pulley (approx.) 1,600 2,200 3,500 4,000

Weight on skids with steam engine and

boiler (approx.) 3,100 3,900 5,500 6,200

Weight on skids with gasoline engine

(approx.) 2,900 3,900 5,100 5,700

Weight on trucks with steam engine and

boiler (approx.) 3,600 4,600 6,000 7,000

Weight on trucks with gasoline engine

(approx.) 3,400 4,650 5,700 6,750

~DATA FOR ESTIMATING THE WEIGHT OF STEEL IN REINFORCED

CONCRETE.~--Architects' and engineers' plans record the steel used in

reinforced concrete in various ways. Sometimes complete schedules of

shapes, dimensions and weights of the various reinforcing elements are

drawn up and submitted to bidders with the plans. In such cases the

estimating is usually a simple problem for the contractor. In other

cases the amount of steel that will be required is stated as a

percentage of the volume of the concrete. In still other cases the

detail drawings merely show the number, location and dimensions of the

reinforcing bars, stirrups, etc., and the contractor has to compile from

them his own schedule of quantities. The following tables and discussion

will aid the contractor in making his estimates. Before proceeding with

these data, however, the authors would strongly advise that to

facilitate rapid estimating the contractor should keep accurate records

of all reinforced concrete structures in such form as to show the

percentages of steel used. In doing this, however, he should be careful

to separate the foundations, etc., which are not reinforced from the

superstructure which is reinforced. A reinforced concrete arch bridge,

for example, usually rests on piers and abutments which are not

reinforced. Do not lump together all the concrete in recording the

weight of reinforcement used, but separate the reinforced arch from the

unreinforced portions.

~Method of Computing Weight from Percentage of Volume.~--In a cubic yard

of concrete there is 1 per cent. of 27 cu. ft. or 0.27 cu. ft. of steel

if the reinforcement is 1 per cent. Now a cubic foot of steel weighs 490

lbs., but for all practical purposes we can call it 500 lbs. Hence

reinforced concrete containing 1 per cent. of steel has 0.27 × 500 = 135

lbs. per cubic yard. Table XXXIII has been computed in this manner;

knowing the price of steel it is a matter of simple multiplication to

estimate from the table the cost of steel for any percentage of

reinforcement.

~Weights and Dimensions of Plain and Special Reinforcing Metals.~--Steel

for reinforcement is used in the shape of plain round and square bars,

deformed bars, woven and welded netting and metal mesh of various sorts.

Tables XXXIV to XXXVII show the weights, dimensions, etc., of these

various metals.

TABLE XXXIII--SHOWING WEIGHT OF STEEL PER CUBIC FOOT AND PER CUBIC YARD OF

CONCRETE FOR VARIOUS PERCENTAGES OF REINFORCEMENT.

Per cent Lbs. steel Lbs. steel

of steel. Per cu. ft. Per cu. yd.

0.20 1.00 27.0

0.25 1.25 33.8

0.30 1.50 40.5

0.35 1.75 47.3

0.40 2.00 54.0

0.45 2.25 60.8

0.50 2.50 67.5

0.55 2.75 74.3

0.60 3.00 81.0

0.65 3.25 87.5

0.70 3.50 94.5

0.75 3.75 101.3

0.80 4.00 108.0

0.85 4.25 114.8

0.90 4.50 121.5

0.95 4.75 128.3

1.00 5.00 135.0

TABLE XXXIV--WEIGHTS OF ROUND AND SQUARE BARS OF DIMENSIONS COMMONLY

USED FOR REINFORCING CONCRETE.

Thickness or Weight of square Weight of round

diameter in inches bars. Lbs. per ft. rods. Lbs. per ft.

1/16 0.013 0.010

1/8 0.053 0.042

3/16 0.119 0.094

¼ 0.212 0.167

5/16 0.333 0.261

3/8 0.478 0.376

7/16 0.651 0.511

½ 0.850 0.668

9/16 1.076 0.845

5/8 1.328 1.043

11/16 1.607 1.262

¾ 1.913 1.502

7/8 2.608 2.044

1 3.400 2.670

1-1/8 4.303 3.380

1¼ 5.312 4.172

1½ 7.650 6.008

1¾ 10.404 4.178

2 13.600 10.68

TABLE XXXV--DIMENSIONS AND WEIGHT OF EXPANDED METAL.

Mesh, Sectional area sq. Weight, lbs.

inches. ins. per ft. width. per sq. ft.

Standard ½ 0.209 0.74

Standard ¾ 0.225 0.80

Standard 1½ 0.207 0.70

Standard 2 0.166 0.56

Standard 3 0.083 0.28

Light 3 0.148 0.50

Standard 3 0.178 0.60

Heavy 3 0.267 0.90

Extra heavy 3 0.356 1.20

Standard 3 0.400 1.38

Standard 3 0.600 2.07

Old style 4 0.093 0.42

Standard 6 0.245 0.84

Heavy 6 0.368 1.26

TABLE XXXVI--DIMENSIONS AND WEIGHT OF KAHN RIB METAL.

Size Section area Weight per

No. per ft. width sq. ins. sq. ft. lbs.

2 0.54 2.13

3 0.36 1.43

4 0.27 1.08

5 0.22 0.87

6 0.18 0.72

7 0.15 0.62

8 0.14 0.55

TABLE XXXVII--WEIGHTS OF DEFORMED BARS OF DIMENSIONS COMMONLY USED FOR

REINFORCED CONCRETE.

Size. Weight, lbs. Area. Size Weight, lbs. Area

ins. per ft. sq. ins. ins. per ft. sq. ins.

[Illustration: Ransome Twisted Bar.] [Illustration: New Style Corrugated Bar.]

¼ 0.212 0.063 ¼ 0.24 0.06

½ 0.85 0.25 ½ 0.85 0.25

5/8 1.32 0.319 5/8 1.33 0.39

¾ 1.91 0.563 ¾ 1.91 0.56

7/8 2.6 0.765 7/8 2.60 0.77

1 3.4 1.000 1 3.40 1.00

1¼ 5.3 1.563 1¼ 5.30 1.56

[Illustration: Diamond Bar.] [Illustration: Universal Corrugated Bar.]

½ 0.85 0.25 ¼×1 0.73 0.19

5/8 1.33 0.39 5/16×1¼ 1.18 0.32

¾ 1.91 0.56 3/8×1-3/8 1.35 0.41

7/8 2.60 0.76 3/8×1¾ 1.97 0.54

1 3.40 1.00 3/8×2 2.27 0.65

1¼ 5.31 1.56 3/8×2½ 2.85 0.80

--No. 1 Mill-- [Illustration: Thatcher Bulb Bar.] --No. 2 Mill.--

¼ 0.16 0.047 ... ... ...

½ 0.61 0.18 ½ 0.58 0.17

5/8 0.95 0.28 5/8 0.92 0.27

¾ 1.39 0.41 ¾ 1.34 0.39

7/8 1.87 0.55 7/8 1.79 0.53

1 2.42 0.71 1 2.32 0.68

1¼ 3.74 1.10 1¼ 3.55 1.04

1½ 5.30 1.56 1½ 5.20 1.53

1¾ 7.07 2.08 .... .... ....

2 9.02 2.65 .... .... ....

[Illustration: Monolith Bar.] [Illustration: Twisted Lug Bar.]

0.4 0.55 0.25 ¼ 0.222 0.625

½ 0.85 0.32 ½ 0.87 0.250

... .... .... 5/8 1.35 0.3906

... .... .... ¾ 1.94 0.5625

0.8 2.18 0.64 7/8 2.64 0.7656

1 3.37 1.00 1 3.45 1.00

... .... .... 1¼ 5.37 1.5625

1½ 7.75 2.25 1½ 7.70 2.25

[Illustration: Cup Bar]

3/8 0.48 ....

½ 0.86 ....

5/8 1.35 ....

¾ 1.95 ....

7/8 2.65 ....

1 3.46 ....

1-1/8 4.38 ....

1¼ 4.51 ....

~RECIPES FOR COLORING MORTARS.~--The following recipes for coloring cement

mortar have been found reliable; the weights given being weight of

coloring matter per bag of cement and for a 1-2 mortar:

_Brown Stone_: 4 to 5 lbs. brown ochre or ½ lb. best quality roasted

iron oxide.

_Buff Stone_: 4 lbs. yellow ochre.

_Red Stone_: 5 lbs. raw violet iron oxide.

_Bright Red Stone_: 5½ to 7 lbs. English or Pompeiian red.

_Blue Stone_: 2 lbs. ultramarine blue.

_Dark Blue Stone_: 4 lbs. ultramarine blue.

_Slate_: Lamp black ½ lb. light slate; 4 lbs. dark blue slate.

_Light Terra Cotta_: 2 lbs. Chattanooga iron ore.

CHAPTER XXV.

METHODS AND COST OF WATERPROOFING CONCRETE STRUCTURES.

Resistance to penetration by water is desirable in all concrete

structures, and is essential in such structures as tanks, reservoirs,

vaults, subways, basements and roofs. Concrete, as it is ordinarily

made, is pervious to water, hence to secure concrete structures through

which water will not penetrate some method of waterproofing the concrete

must be employed. Many methods have been proposed and are being used;

none of these methods is without faults, the best one of them has not

yet been determined, and the evidence available as to their comparative

merits is biased and conflicting. For these reasons any discussion of

waterproofing for concrete is at the present time bound to be

unsatisfactory.

Methods of waterproofing may be roughly classified as follows: (1) Use

of mixtures so proportioned as to be impervious; (2) admixture of

substances designed to produce impermeability; (3) use of waterproof

coatings, washes or diaphragms. In succeeding sections enough examples

of each method are given to indicate current practice; no attempt has

been made to catalog all the waterproofing substances and systems being

promoted--there are too many of them.

The art of waterproofing concrete is in a transition stage. Outside of

the manufacturers of waterproofing material the art has received serious

study by comparatively few persons. No comparative tests by independent

investigators are available. Practical experience with most of the

materials used has not extended over a long enough period of time to

permit true conclusions to be drawn. Students of the subject are not

even agreed upon the broad questions whether it is better to work toward

developing an impervious concrete or toward perfecting a waterproof

covering for concrete. On the minor subdivisions there is no agreement

at all.

In the present state of the art one can lay fast hold to only three

things. The first is that waterproofing is one component of a system of

drainage; the second is that structures must, to get the best results,

be designed with the fact in mind that waterproofing is a component

structural element, and the third is that skilled and conscientious

workmanship are essential elements in the success of all waterproofing

materials and methods.

~IMPERVIOUS CONCRETE MIXTURES.~--The compounding of the regular concrete

materials so as to produce an impervious concrete has been made the

subject of numerous experiments. The most elaborate of these experiments

were those conducted over a period of five years by Mr. Feret, of the

Boulogne (France) Laboratory of the Ponts et Chaussees. Feret's

experiments led him to the following conclusions:

"That in all mortars of granulometric composition the most permeable are

those which contain the least quantity of cement.

"Of all mortars of the same richness, but of varying granulometric

composition, those which contain very few fine grains are much more

permeable. They are the more so where, with equal proportions of the

fine grains, the coarse grains predominate more in relation to the

grains of medium size.

"The minimum permeability is found in mortars where the proportion of

medium-sized grains is small, and the coarse and fine grains are about

equal to each other."

Mr. Feret also found that permeability decreased with time and that wet

mixtures were less permeable than dry mixtures.

Tests made by Messrs. J. B. McIntyre and A. L. True at the Thayer School

of Civil Engineering in 1902 gave the following results:

All the specimens composed of 1-1 mortar in the proportions of 30, 35,

40 and 45 per cent. of the whole mass were impermeable. Some of the

specimens composed of 1-2 mortar in the proportions of 40 and 45 per

cent. were also impermeable, as well as the 1-2-4 and 1-2½-4 mixtures.

All other mixtures leaked at the high pressure (80 lbs. per sq. in.) and

in a general way exhibited a degree of imperviousness in direct

proportion to the proportion of mortar in them, with the lower

pressures from 20 lbs. per sq. in. up as well as for the 80-lb.

pressure.

Other tests confirm those cited. In general we may conclude that those

mixtures richest in cement and mortar are the most impervious. It is

doubtless practicable by exercising proper care to proportion, mix and

place a concrete mixture which will be so nearly impervious that visible

leakage will be small. The task, however, is one difficult to perform in

actual construction work, and its accomplishment is never certain.

~STAR STETTIN CEMENT.~--Star Stettin cement is a Portland cement made by

grinding a clinker which has been "impregnated" with substances which

impart waterproofing properties to the ground product. The process is

the invention of Richard Liebold, and the cement is made by the Star

Stettin Portland Cement Works, Stettin, Germany. It is asserted that a

1-4 fine sand mortar made with this cement is impervious. To use it the

ordinary precautions adopted in the employment of Portland cement are

necessary, and in addition the following: The cement must be mixed with

moist instead of dry sand before the water is added; the sand should be

clean, sharp and fine of grain; the mortar must be more perfectly mixed

than ordinarily, and somewhat more water should be used than is

ordinarily used. Perfectly even mixing is essential to the best results.

~MEDUSA WATERPROOFING COMPOUND.~--This compound is a dry powder which is

mixed with the cement in proportions of from 1 per cent. to 2 per cent.

by weight, or from 4 lbs. to 8 lbs. per barrel of cement. The compound

costs 12 cts. per lb., so that its addition increases the cost from 48

to 96 cts. per barrel of cement. Thorough mixing of the compound with

the cement is of the utmost importance, otherwise none but the ordinary

precautions in the use of Portland cement is necessary. Absorption tests

on concrete blocks treated and untreated with the compound and nine

months old have shown the absorbtion of treated blocks to be about

one-fourth or one-fifth that of untreated blocks. The compound is made

by the Sandusky Portland Cement Co., Sandusky, Ohio.

~NOVOID WATERPROOFING COMPOUND.~--This compound is a dry powder which is

mixed dry with the cement in the proportion of 1 to 2 per cent. by

weight or about 1 to 2 lbs. per bag of cement. The compound costs 12

cts. per pound or about from 48 to 96 cts. per barrel of cement.

Directions for making waterproofing mortar are: To 100 lbs. of Portland

cement add 2 to 2½ lbs. of compound and 200 lbs. of clean and sharp sand

and mix the materials dry and very thoroughly. The water is then added

in the proportion necessary to make a good working mortar and the mortar

mixed and applied in the ordinary manner. Used as a wash 2 lbs. of

compound are thoroughly mixed dry with a bag of cement. Any portion of

the mixture is then mixed with water to produce a creamy grout, which is

applied to a thoroughly wet surface with a brush. This compound is made

by The Abbey-Dodge-Brooks Concrete Co., Newark, N. J.

~IMPERMEABLE COATINGS AND WASHES.~--The most common means employed for

rendering concrete structures waterproof is to coat or wash the surface

with some substance itself impervious to water or having the property of

closing the pores of the surface skin of concrete so that water cannot

penetrate.

~Bituminous Coatings.~--Bituminous coatings of one composition or another

are among the most commonly used of impermeable coatings. The bituminous

compound is used both alone and in combination with layers of a fabric

of some sort to form the coating. Where bituminous coatings are used on

surfaces exposed to the sun and frost attention must be given to the

fact that a compound of different properties is required where the range

of temperature is great than is required where this range is smaller.

Asphalt, for example, should have a flow point of 212° F. and a brittle

point of -15° F. when exposed directly to sun and frost as compared with

say a flow point of 185° F. and a brittle point of 0° F. when covered

from the direct action of sun and frost. Another point to be kept in

mind particularly in using exterior coatings is that the concrete

surface must be properly prepared to receive the coating or else it

will peel off. The following are examples from actual practice of

waterproofing with bituminous coatings.

The following method of waterproofing with asphalt coating is given by

W. H. Finley: The asphalt used must be of the best grade, free from coal

tar or any of its products, and must not volatilize more than 0.5 per.

cent, under a temperature of 100° F. for 10 hours. It must not be

affected by a 20 per cent. solution of ammonia, a 35 per cent. solution

of hydrochloric acid, a 25 per cent. solution of sulphuric acid, or a

saturated solution of sodium chloride. For structures underground a flow

point of 185° F. and a brittle point of 0° F. shall be required. If the

surface cannot be made dry and warm it should first be coated with an

asphalt paint made of asphalt reduced with naphtha. The asphalt should

be heated in a kettle to a temperature not exceeding 450° F. It has been

cooked enough when a piece of wood can be inserted and withdrawn without

the asphalt clinging to it. The first coat should consist of a thin

layer poured from buckets on the prepared surface and thoroughly mopped

over. The second coat should consist of a mixture of clean sand and

screenings, free from earthy admixtures, previously heated and dried,

and asphalt, in the proportion of 1 of asphalt to 3 or 4 of sand or

screenings by volume. This is to be thoroughly mixed in the kettle and

then spread out on the surface with warm smoothing irons, such as are

used in laying asphalt streets. The finishing coat should consist of

pure hot asphalt spread thinly and evenly over the entire surface, and

then sprinkled with washed roofing gravel, torpedo sand, or stone

screenings, to harden the top. The thickness of the coating will depend

on the character of the work and may vary from ¾ in. to 2 ins. in

thickness.

Several firms manufacture and sell ready made priming paints and mastics

for waterproofing concrete by substantially the above method. Sarco

compounds made by the Standard Asphalt & Rubber Co., of Chicago, Ill.,

are examples. Sarco waterproofing is a compound analyzing 99.7 per cent.

pure bitumen and having a range of ductility of 200° F. In waterproofing

large car barn roofs of concrete in Chicago, the concrete was first

swept clean and a coat of priming compound was thoroughly brushed in. On

the priming coat was mopped a coat of waterproofing compound, applied

hot, and covered with a layer of fine sand. The thickness of the

completed coating was 1/16 in. Where a heavier waterproofing is

necessary the waterproofing compound is covered with one or more 5/8-in.

coats of Sarco mastic.

The following bituminous coatings have been used in waterproofing

concrete fortifications by the U. S. Army Engineers:

_Mobile, Ala._--The top of the concrete was covered with a thin coat of

1-2 cement mortar and given a rough trowel finish. As soon as the

surface was dry it was covered with a layer of asphalt mastic 1 in.

thick and rubbed down to a finish with dry sand and cement in equal

parts. To prepare the mastic take 500 lbs. of Diamond T asphalt mastic,

broken into small pieces, 30 lbs. of Diamond T asphalt flux, and 5 lbs.

of petroleum residuum oil. When thoroughly melted add 400 lbs. clean,

dry torpedo gravel previously heated. Stir gravel and asphalt until

thoroughly mixed at a temperature of about 375° F.

_Key West, Fla._--The top of the concrete was covered with smooth

plaster, proper slope for drainage being given. Above this two layers of

asphalt of an aggregate thickness of ¾ in. were applied. The composition

of the asphalt was as follows: 440 lbs. rock asphalt mastic, 3 gallons

coal tar, and 5 gallons silicious sand.

_Delaware River Defenses._--The concrete was waterproofed with coal tar

and sand. The tar was made hot and applied to the surfaces with rubber

squeegees and then sanded. Joints were filled with the hot tar. A

surplus of sand was left on for a few days and then swept off. One

barrel of coal tar covered 2,279 sq. ft. with one coat and cost $4.25

per barrel delivered. The cost including material and labor was 0.74 ct.

per sq. ft.

_San Francisco Harbor._--The roof had a pitch of about 3 in 20 and was

covered with an earth fill. The concrete was troweled to a fairly smooth

surface, was mopped with a heavy coat of roofing asphaltum, or mastic,

then covered with the heaviest grade roofing felt laid 3 ply, starting

at the coping of the parade wall and made 4 ply in the gutter. On this

assumed watertight surface 3-in. book tile was laid with joints normal

to the gutter and cemented. The purpose of the tile was to afford a free

passage for the water as soon as it met the roof. The expectations were

fully realized and no water, or even a sign of moisture, has appeared in

this battery, or at another of the same type since built, after a fair

test of time.

The total cost of the work, including mastic, felt and tile, was 17 cts.

per sq. ft. for 6,200 sq. ft. covering three roofs.

In conclusion it may be noted that any of the methods of constructing

impermeable diaphragms can be used for constructing impermeable

coatings.

~Szerelmey Stone Liquid Wash.~--This wash has been used in England for

waterproofing and preserving masonry for some 20 years. It is a thin

liquid compound which is applied to the surface with a brush. The stone

or concrete surface is required to be dry and thoroughly clean, with all

scale and loose particles removed. The standard treatment is three

coats; 1 gallon of liquid is in most cases sufficient for treating

(three coats) 25 sq. yds., but in exceptionally bad cases 1 gallon for

15 sq. yds. has been found necessary. The precautions necessary for the

successful use of the liquid are: It must be well stirred; it must be

applied to a perfectly dry, clean surface, and it must be well rubbed

into the masonry. The American agency for the liquid is Szerelmey & Co.,

Washington, D. C.

~Sylvester Wash.~--Waterproofing with Sylvester wash consists in applying

alternately to the concrete surface a soap solution wash and an alum

solution wash. The soap solution is applied first, and it must be

applied hot and to a dry surface; the alum solution is applied second

and 24 hours after the soap solution and is applied cold. This

constitutes one treatment. After 24 hours a second treatment may be

given, and as many treatments may be given as necessary. In some cases

as many as six treatments have been employed. The proportions of the

solutions used in practice vary. In waterproofing the standpipe

described in Chapter XXII the soap solution consisted of 12 oz. pure

Castile olive oil soap per gallon of water, and the alum solution

consisted of 2 oz. of alum per gallon of water. In repairing the bottom

of a reservoir lined with 4 to 6 ins. of concrete the following

solutions were used: ¾ lb. Olean soap to 1 gallon of water and ½ lb.

alum to 4 gallons of water. Both alum and soap were well dissolved and

the soap solution was boiled. The boiling hot soap solution was applied

on the clean, dry concrete; 24 hours later the alum wash was applied

cold. This treatment was repeated after 24 hours. Two men applied the

solutions, using whitewash brushes, while a third man carried pails of

the solution. In making the soap solution two men attended four kettles,

one man kept up fires, two men carried solution to men applying it. The

alum solution required fewer men, being made cold in barrels. After

applying the second soap wash to the concrete slopes, the men had to be

held by ropes to keep from slipping. The rope was placed around two men,

who started work at the top of the slope, a third man paying out the

rope. The work was done in 8½ days and cost as follows:

Labor:

1,140 hours labor at 15 cts. $171.00

83 hours foreman at 30 cts. 24.90

83 hours waterboy at 6 cts. 4.98

Add for superintendence 15% 30.13

-------

Total labor $231.01

Materials:

900 lbs. Olean soap at 4-1/3 cts. $ 39.00

210 lbs. alum at 3 cts. 6.30

6 10-in. whitewash brushes at $2.25 13.50

6 stable brushes at $1.25 7.50

-------

Total materials $ 66.30

Total labor and materials $297.31

This covered 131,634 sq. ft., hence the cost of the two coats of soap

and alum was $2.26 per 1,000 sq. ft., or 0.23 ct. per sq. ft.

The ordinary Sylvester wash, as described above, has been modified with

success on Government fortification work as follows: To 2 gals. of water

add 1 lb. concentrated lye and 5 lbs. alum and mix until completely

dissolved. This is a concentrated stock solution. In use 1 pt. of

solution and 10 lbs. of cement are mixed with enough water to make a

mixture that will lather freely under the brush. Two coats of this wash

are applied, the second at any time after the first is dry, and the

first as soon as the forms are removed from the concrete. The wash

should be applied to a wet surface, if the concrete is dry it should be

wet down with a brush ahead of the wash.

~Sylvester Mortars.~--In this class of coatings the alum and soap are

added to the mortar which is used for facing. A successful recipe for

such a mortar is given as follows: To 1 part cement and 2 parts sand add

¾ lb. of pulverized alum for each cubic foot of sand and mix these

ingredients dry; then add the proper quantity of water, in which has

been dissolved ¾ lb. of soap to the gallon, and mix the mortar

thoroughly. Such a mortar is but slightly inferior in strength to

ordinary mortar of the same proportions. In plastering a clear water

well to prevent leaking a 1-2 mortar was made as follows: 1¼ lbs. of

soap were dissolved in 15 gallons of water and 3 lbs. of powdered alum

were mixed with 1 bag of cement. Two coats of plaster of an aggregate

thickness of ½ in. were applied and completely stopped the leaking. The

cost of this treatment was as follows:

2 lbs. soap (with 24 gals. water) at 7½ cts. $0.15

12 lbs. alum at 3½ cts. 0.42

------

Total per barrel of cement $0.57

In lining a new reservoir near Wilmerding, Pa., a mortar was made as

follows: A stock solution of 2 lbs. caustic potash and 5 lbs. alum to 10

quarts of water was made in barrel lots, from which 3 quarts were taken

for each batch of 2 bags of cement and 4 bags of sand. A batch of mortar

covered an area 6×8 ft. with a 1-in. coat. The extra cost of the

waterproofing was:

100 lbs. caustic potash at 10 cts. $10.00

70 lbs. caustic potash at 9 cts. 6.30

960 lbs. alum at 3½, 3¾ and 4 cts. 34.38

60 hours mixing at 15 cts. 9.00

Freight, express and haulage 11.50

------

Total for 74,800 sq. ft. $71.18

This gives a cost of 95 cts. per 1,000 sq. ft., or less than 0.1 ct. per

sq. ft. It was found that if less than 2 parts of sand to 1 part of

cement was used the mortar cracked badly in setting. Clean sand was

imperative, as any organic impurities soon decomposed, leaving soft

spots. Do not use an excess of potash; a slight excess of alum, however,

does not decrease the strength of the mortar.

~Hydrolithic Coating.~--This waterproofing is a dry mortar composed by

mixing a cementing compound with sand, and sold dry in sacks containing

96 lbs. each. The dry mortar is mixed with water to proper consistency

for plastering, and is applied as a plaster to the surfaces to be

waterproofed. The dry mortar is mixed with water to a grout of the

consistency of thick cream and then this grout is stiffened to the

proper consistency by adding more dry mortar. Thoroughness of mixing is

absolutely essential. The concrete surface is prepared by picking and

scoring sufficiently to get a fresh surface and washing away all chips,

dust and loose material, or instead of picking in new work the outer

skin may be removed by a 1 to 9 muriatic acid solution and then washed

free of all acid and scrubbed with wire brushes. After preparing the

fresh surface it is well wetted; in fact water soaked, so that, while

not oozing moisture it will absorb no more water. The mixed mortar is

then applied with a trowel in a workmanlike manner. In mixing, no more

than 8 gallons of water per barrel of mortar should be used. The

coatings used are 3/8 to 5/8 in. for walls and ½ to ¾ in. for floors.

The following estimate of cost is made by the manufacturers, the E. J.

Winslow Co., Chicago, Ill. The figures are presented with the

understanding that they are to be considered merely as average costs for

waterproofing, without special construction, and subject to change in

accordance with local conditions, and to the time of year when the work

will need to be performed:

Per sq. ft.

To prepare surfaces to receive "coating" may

cost the contractor 5½ cts.

The coating material, f. o. b. Chicago, may

cost the contractor 4½ cts.

The labor of application may cost the contractor 7½ cts.

Administration and incidental expenses may

cost the contractor 7½ cts.

--------

25 cts.

The lowest price yet asked for work was 20 cts., and the highest, 55

cts., these two prices representing the opposite extremes of conditions

that different jobs will present.

~Cement Mortar Coatings.~--Rich cement mortar mixtures offer considerable

resistance to penetration by water and when well made may be used with a

fair degree of success to waterproof ordinary concrete. European

engineers make wide use of mortar coatings for waterproofing tanks and

reservoirs and appear to have good success with them. The experience in

this country is that no great reliance can be placed on them, where the

pressures are at all large. Records of work done show both successes and

failures, with no apparent reason for either so far as composition of

mortar or quality of workmanship goes. A rich mortar plaster will reduce

leakage, and may prevent it entirely, but it is uncertain how far it

will prove water tight.

~Oil and Paraffin Washes.~--The theory of the use of oil and paraffin

washes is that the material soaks into the concrete and closes the

surface pores against the penetration of water. Paraffin has been quite

widely used for preserving stone masonry walls for buildings. It is

applied hot, and in the best practice is applied to a dry heated

surface. Concerns doing such work on buildings have portable devices for

heating the masonry. Oil is sometimes applied hot but is more often

flushed onto the surface and allowed to soak in as it will.

~IMPERMEABLE DIAPHRAGMS.~--The most generally employed method of

waterproofing concrete structures, with the possible exception of

painting and coating methods, is to embed in the wall, roof and floor

slabs a diaphragm that is impervious to water. Such diaphragms are

usually composed of layers of waterproof felt or paper cemented together

and to the concrete by asphalt, coal tar pitch or patented cementing

compound. Another construction consists of a layer of asphaltic compound

between two layers of cement mortar. In some cases also the combination

felt and cementing compound diaphragm is further strengthened by placing

it between layers of mortar. In wall work the diaphragm is frequently

applied to the face of a single layer brick wall and the concrete filled

against it. The brick wall may be further waterproofed by laying the

brick in hot asphalt instead of in mortar.

Within the last few years a number of firms have devoted their efforts

to producing special fabrics (felts or papers) and special cementing

compounds designed to be used with the fabrics for waterproofing

concrete. These fabrics and cements are in most cases superior in

toughness, flexibility, ease of application, etc., to the ordinary

roofing and waterproofing fabrics designed originally for general

building purposes.

~Long Island R. R. Subway.~--In constructing the Long Island R. R. subway

the roof was waterproofed according to specifications as follows: After

the roof concrete was crowned, brought to a smooth surface and

thoroughly dried, it was swabbed over with hot melted "medium hard" coal

tar pitch to an even thickness of not less than 1-16 in. Immediately

upon the first coat of pitch and while it was still melted was laid a

covering of single-ply roofing felt, with the sheets lapping 4 ins. on

all cross joints and 12 ins. on longitudinal joints. This felt was in

turn mopped with pitch, and upon that again was laid another layer of

roofing felt, which was given a final coating of pitch. The pitch used

was of a grade somewhat softer than that used for roofing purposes, or

such as would soften at a temperature of 60° F. and melt at a

temperature of 100° F. The felt used consisted of pure wood paper pulp

or asbestos pulp, which had been thoroughly treated and soaked in

refined coal tar and which weighed for single ply at least 15 lbs. per

100 sq. ft.

After the waterproofing with pitch and felt had thoroughly hardened it

was plastered over with a trowel with a 1-in. layer of Portland cement

mortar, laid in uniform squares, in every respect similar to the plaster

on top of granolithic pavement. The dimensions of the squares were 5×5

ft. Their purpose was to take up expansion and contraction in the

coating.

During the year 1903, there were laid 9,056 sq. yds. of the

waterproofing described. The labor cost of placing the two layers of

felt and the three coats of pitch was as follows: 206 days labor at a

cost of $498 (or an average of $2.41 per day) for the 9.056 sq. yds.,

which is equivalent to 5½ cts. per sq. yd. for labor. Since this is for

two layers of felt the labor cost was 2¾ cts. per sq. yd. of single

layer. The labor cost of mixing and placing the 1-in. mortar covering

was as follows: It required 589 days at a cost of $1,306 (or an average

of $2.22 per day) to place 9,056 sq. yds., which is equivalent to 14½

cts. per sq. yd. The total cost of labor for two layers of tar felt and

the layer of cement mortar was, therefore, 20 cts. per sq. yd.

~New York Rapid Transit Subway.~--The waterproofing consisted of alternate

layers of asbestos felt and asphalt laid on the concrete and covered

with concrete. A coat of hot asphalt was laid on the concrete and on

this a layer of felt, then another coat of asphalt and another layer of

felt, and so on until the required number of layers of felt, from 2 to

6, were laid with asphalt between and on top and bottom. Natural asphalt

containing not less than 95 per cent bitumen was specified. The felt was

required to weigh 10 lbs. per 100 sq. ft. In constructing sidewalls the

alternative was allowed of placing the waterproofing layer between a

4-in. outside wall of brick laid in asphalt and the concrete lining. On

two sections of the work the actual cost of waterproofing was as

follows:

98,074 sq. yds. Single-Ply Felt. Per sq. yd.

Labor laying $0.05

Materials and plant 0.10

------

Total $0.15

1,337 cu. yds. Brick in Asphalt: Per cu. yd.

Labor laying $6.32

Materials and plant 11.48

------

Total $17.80

INDEX.

A

Page

Abutment Construction

Cost of

Bridges Over City Streets 254

Ernst St. Bridge, Cincinnati, O. 257

Kansas City Outer Belt & Electric Ry. 253

Lonesome Valley Viaduct 256

Railway Bridge 106

Methods of

Bridges over City Streets 253

Illinois & Mississippi Canal 196, 197

Lonesome Valley Viaduct 254, 255

Railway Bridge 105, 250

Summary of 230

Aggregates

Balanced, Value of 14

Broken Stone 13

Cinders 14

Cost of 15

Gravel 14

Heating (See Heating Aggregates)

Kinds Used 13

Measuring, Methods of 42

Open Box 42, 50

Trump Automatic Measurer 44

Quantities in Concrete, Test Determinations 192

Screened or Crusher Run, Stone for 15

Sizes Used 15

Slag 14

Voids in 25

Weighing, Apparatus for 102

Aqueduct Construction

Cost of

Cedar Grove Reservoir 549, 550

Salt River Irrigation Work 540

Methods of

Cast Pipe Swansea, England 584

Cedar Grove Reservoir 545

Jersey City Water Supply 544

Salt River Irrigation Works 538

Torresdale Filters 540

Asphalt Concrete

Definition of 108

Furnace for Heating 109, 110

Machine Mixing of 111

Asphalt Concrete Construction

Cost of

Base for Mill Floor 110, 111

Slope Paving for Dam 109

Methods of

Base for Mill Floor

Slope Paving for Dam 108, 109

B

Bags (See Cement Bags)

Depositing Concrete Under Water 89, 90

Barrels (See Cement Barrels)

Belt Conveyors

Capacity of 65

Gas Works Foundations, Astoria, N. Y. 64

Horse Power Required 65

Bench Monuments

Construction of 656

Cost of 657

Blasting Concrete 655

Bonding New Concrete to Old 659

Breakwater Construction

Cost of

Buffalo, N. Y. 214

Marquette, Mich. 209, 212

Methods of

Buffalo, N. Y. 212, 214

Marquette, Mich. 208, 212

Bridge Centers (See Centers)

Bridge Construction

Cost of

Arch Viaduct 373

Connecticut Ave. Bridge 392, 397

Elkhart, Ind., Arch 398

Five Span Arch 407

Girder Highway 377, 379

Grand Rapids Bridge 410, 413

Molded Slab Girders 387

Plainwell, Mich., Arch 399

Railway Bridge 375

Methods of

Connecticut Ave. Bridge 387

Elkhart, Ind., Arch 397

Five Span Arch 400

Girder Highway 367, 377

Grand Rapids, Mich., Arch 407

Molded Slab Girders 384

Plainwell, Mich., Arch 398

Bridge Pier Construction

Cost of

Calf Killer River Bridge 243, 245

City Island Bridge 236

Miami River Bridge 257

Steel Cylinder 241

Viaducts, Cincinnati, O. 258

Williamsburg Bridge 230, 231

Methods of

Calf Killer River Bridge 241, 245

City Island Bridge 235

K. C., M. & O. Ry. 245, 250

Lonesome Valley Viaduct 254, 255

Miami River Bridge 256

Nova Scotia Railways 108

Railway Bridge 231, 235

Scottish Railways 107, 108

Summary of 230

Tharsis & Calamas Ry. 106, 107

Williamsburg Bridge 237, 241

Broken Stone

Crushing (See Stone Crushing)

Quarrying (See Quarrying)

Rocks for, Best 13

Shoveling (See Shoveling)

Screened or Crusher Run 15

Voids in

Amount of 29, 30

Effect of Granulometric Composition 30

Effect of Hauling 33, 34

Effect of Loading 29

Variation, Causes of 28

Weight no Index 32

Weight of 32, 33

Building Construction

Cost of

Four-Story Garage 510

Wall Columns for Power Station 490

Walls for Factory Building 507

Divisions of Work 433

Methods of

Four-Story Garage 509

One-Story Car Barn 495

Six-Story Building 491

Wall Columns 488

Walls for Factory Building 505

C

Cableways

Capacity of 64

Construction of Bridge Work 369

Cost of 64

Fortification Work 186

Retaining Wall Work 269

Cars

Mixer Charging 72

Carts (See Concrete Carts, Horse Carts)

Cement

Classification of 1

Natural Definition of 2

Portland, Definition of 1

Quantity in Concrete

Formula for Computing 37

Rule for Figuring 40

Tables Showing 39, 40, 41

Quantity in Mortar

Formula for Computing 36

Tables Showing 38

Test Determinations 40, 41

Theory of 35

Shrinkage by Wetting 35

Slag, Definition of 2

Weight 2, 4

Cement Bags

Capacity of 2

Packing for Shipment 3

Rebate on 3

Storage House for 3

Cement Barrels

Capacity of 2, 3, 4

Dimensions of 4

Cement Specifications 4

Cement Testing, Cost of 4

Centers

Computation of

Luten Arch 566

Construction of

Conditions Governing 363

Cocket, 50 ft. Span 364

Connecticut Ave. Bridge 392

Five Span Arch 400

Grand Rapids Bridge 408

Luten Arch 365

Mechanicsville Bridge 365

Parabolic Arch 366

Supported, 50 ft. Span 364

Walnut Lane Bridge 368

Cost of

Connecticut Ave. Bridge 392, 393

Deflection of

Test Determinations 367

Types of 363

Charging Barrows

Ransome, Description 71

Sterling, Description 71

Charging Buckets

Wheeled 74

Charging Mixer

Cost of 270, 272

Gravity from Bins 69

Methods of

Car Plants 72

Charging Barrows 70, 71

Derricks and Buckets 73

Elevating Charging Hoppers 70

Enumeration 68

Gravity from Bins 68, 69

Shoveling 72, 73

Wheelbarrows 70

Wheeled Bucket for 74

Chutes

Cement Bag, Construction of 65

Concrete. Examples of 66, 67, 68

Working Gradients 65, 66

Cinders 15

Cofferdam Construction

Cost of Bridge Pier 232

Coloring Concrete, Recipes for 666

Colors for Mortar, Recipes for 666

Concrete

Asphalt (See Asphalt Concrete)

Definition of 1

Depositing (See Depositing Concrete)

Mixers (See Mixers)

Mixing (See Mixing Concrete)

Proportioning, Methods of 25

Concrete Bucket

Side Dumping 486

Subaqueous

Cyclopean 87

O'Rourke 86

Stuebner 88

Concrete Block

Molding (See Molding Concrete Blocks)

Sling for Handling 216

Concrete Cars

Lock Work, Coosa River 195

Concrete Carts

Hand, Capacity of 53, 54

Horse, Briggs 298

Ransome Two-Wheeled 53

Culvert Construction

Characteristics of 414

Cost of

Arch 26 ft. Span 425

Arch, N., C. & St. L. Ry. 418, 419, 422

Kalamazoo, Mich. 430

Kansas City Outer Belt & Electric Ry. 252

Pennsylvania R. R. 424

Methods of

Arch, N., C. & St. L. Ry. 417

Arch, Wabash Ry. 422

Box, C., B. & Q. R. R. 414

Kalamazoo, Mich. 427

Pennsylvania R. R. 423

Curb and Gutter Construction

Cost of

Champaign, Ill. 326

Estimating 321

Ottawa. Ont. 324

Methods of

Champaign, Ill. 325

General Discussion 321

Kinds of 318

Ottawa, Ont. 321

Curbing, Wood for Shafts 160, 161

D

Dam Construction

Cost of

Hemet 104

Richmond, Ind. 224

Rock Island, Ill. 225

Spier Falls 103

Methods of

Barossa Dam 101

Boonton, N. J., Dam 103

Boyds Corner Dam 105

Chaudiere Falls, Quebec 228

Chattahoochee River Dam 100

Hemet Dam 103, 104

McCall Ferry, Pa. 225, 228

Richmond, Ind. 223

Rock Island, Ill. 224, 225

Spier Falls Dam 103

Water Works Reservoir 104

Depositing Concrete

Subaqueous

Bags

Bridge Foundations 91

Marquette Breakwater 209, 210

Peterhead Pier 89, 90

Buckets

Marquette Breakwater. 208, 209

Pier Construction 222

Characteristics of 86

Closed Buckets 86, 87, 88

Tremie

Charlestown Bridge Foundations 92, 93

Masonry Bridge Foundations, France 93, 94

Harvard Bridge Foundations 91

Nussdorf Lock Foundations 94, 95

Drilling Concrete, Drill Mounting for 653

Dumping Concrete

Cost of

Wheelbarrows 55

Methods of

Chutes 55

Wheelbarrows 55

Dump Wagons for Transporting Concrete 54

E

Efflorescence

Causes of 126

Preventing, Methods of 126, 127

Removing, Cost of 127

Ejecters for Washing Sand 7

Erecting Derrick

Cost of Bridge Pier 232

Erecting Forms

Derrick for 501

Directions for Building Work 460

Erecting Molded Columns

Cost of 520

Methods of 520

Erecting Molded Roof Slabs

Cost of 522

Excavating Cofferdams

Cost of 232, 244, 250

F

Fabricating Reinforcement

Bending Machine for 468

Bending Tables for 466

Methods of

Building Work 464

Five Span Arch Bridge 402

Falseworks in Form Construction 144

Finishing Concrete Surfaces

Methods of

Acid Etching and Washing 133

Careful Mixing and Placing

Concrete 125, 126

Coloring 135

Form Construction 124, 125

Grout Washing 130

Mortar Facing 128, 129

Plastering 128

Scrubbing and Washing 131, 132, 133, 134

Spading and Troweling 127, 128

Special Facing Mixtures 130

Stuccoing 128

Tooling 133, 134

Washed Gravel or Pebble 134

Form Construction

Cost of

Aqueduct, Cedar Grove Reservoir 550

Arch Culverts 418, 419, 422, 425, 430

Battery Emplacement 188

Bridge Abutment 257

Bridge 233, 235, 250

Bridge Pier Work 243

Building Work 493, 496, 501, 503, 507, 511

Connecticut Ave. Bridge 392, 393

Dam Rock Island, Ill. 225

Effect of Design on 137

Estimating, Method of 146, 147, 148, 149

Girder for Separate Casting 517

Girder Highway Bridge 377, 380, 382

Grand Rapids Bridge 412

Guard Lock, Ill., & Miss. Canal 201

Gun Emplacements 185

Lock, Coosa River 196

Lock, Ill. & Miss. Canal 202, 206, 207

Mortar Battery Platform 187

Permanent Way Structures 252

Piers for Taintor Gates 198

Pier Superior Entry, Wis. 222

Reservoir for Fire Protection 591, 592, 593

Retaining Walls 273, 275

Retaining Wall Work 270, 272

Slab and I-Beam Floors 450

Subway Lining 362

Economics of 136

Falseworks and Bracing 144, 145

Methods of

Aqueduct, Cedar Grove Reservoir 546

Aqueduct Torresdale Filters 541

Arch Culvert 427

Arch Culverts 421

Blocks for Lake Pier 216

Blocks Molded Under Water 217-219

Box Culverts 417

Bridge Piers 255

Building Work 492, 495

Cement Pipe Molded in Place 577

Circular Columns 445

Columns 434

Connecticut Ave. Bridge 392

Coping for Walls 264

Culvert Pipe 431

Curb and Gutter 319, 321, 323

Dam Abutments 196

Dam, Rock Island, Ill. 228

Five Span Arch Bridge 400

Gasholder Tank 612

Girder for Separate Casting 516

Guard Lock, Ill. & Miss. Canal 200

Lock, Coosa River 195

Lock, Ill. & Miss. Canal 201, 203

Manhole Hartford, Conn. 536

Marquette Breakwater 211, 212

Ornamental Columns 446, 447

Piers for Taintor Gates 198

Polygonal Columns 443, 444

Rectangular Columns 435, 443, 490, 492, 511

Reservoir Bloomington, Ill. 605

Reservoir, Ft. Meade, S. Dak. 600

Retaining Wall, C., B. & Q. R. R. 262

Retaining Wall, Chicago Drainage Canal 275

Retaining Wall, Grand Central Terminal 281

Retaining Walls, N. Y. C. & H. R. R. R. 261, 262

Salt River Aqueduct 539

Sewer, Cleveland, O. 564

Sewer Invert, Haverhill, Mass. 554

Sewer, Invert, Medford, Mass. 535

Sewer, Invert, Middlesborough, Ky. 561

Sewer, South Bend, Ind. 551

Sewer, Wilmington, Del. 572

Sidewalks 309

Six-Story Building 492

Slab and Girder Floors 450, 456, 492

Slab and I-Beam Floors 448, 450

Slab Girders 385

Steel for Conduits 533

Steel, McCall Ferry Dam 227, 228

Steel Sheathed Collapsible for Conduits 533

Tunnel Centers 335, 341, 352, 358

Tunnel Sidewalls 330, 335, 340, 351, 358

Wall 456, 460, 505

Wall Columns for Factory 498

Computation, Methods of 140, 141

Design

Considerations in 141

Details Entering 142, 143

Lubrication, Methods of 144

Lumber

Dressing, Purpose of 138

Finish and Dimensions 138, 139

Kinds Suitable 138

Mortar Facing 129

Pile

Round 179

Rectangular Pier

Cost of, Rule for Calculating 14

Removing, Time of, Directions for 145, 146

Unit Construction, Purposes of 143

Steel, Opportunity for Development 136

Fortification Construction

Cost of

Battery Emplacement 188, 189, 190

Gun Emplacements 185

Mortar Battery Platform 187

Methods of

Battery Emplacement 187, 189

Gun Emplacements 185

Mortar Battery Platform 186

Foundation Construction

Street Railway

Cost of Continuous Mixer 301

Methods of Continuous Mixer 300, 301

Freezing Weather, Laying Concrete in 112

G

Grain Elevator Bins

Construction, Methods of 635

Gravel

Characteristics of 14

Commercial Sizes of 22

Screening and Washing Plants 23

Screening (See Screening Gravel)

Voids in

Amount of 30, 31

Effect of Granulometric Composition 29, 30

Weight no Index 32

Amount of 31, 32

Grouting Under Water

Hermitage Breakwater 96

Tests of Efficiency of 95

H

Heating Aggregates

Efficiency of 114

Methods of

Bridge Work, Plano, Ill. 118

Chicago, Burlington & Quincy R. R. 118

Hot Water Tanks 120

Huronian Power Co.'s Dam Work 118

Portable Combination Heater 115

Stationary Bin Outfits 115, 116

Steam Box 119

Steam Jets 119

Wachusett Dam Work 117

Water Power Plant, Billings, Mont. 116, 117

Hoists

Gallows, Frame and Horse 54

Ransome 476

Wallace-Lindesmith 474

Housing Concrete Work

Methods of

Chicago, Burlington & Quincy R. R. 119

Dam, Chaudiere Falls, Quebec 120, 121

Portable Unit System for Buildings 122, 123

I

Inclines

Grades of 62

L

Laying Concrete Blocks

Cost of 526, 529

Loading Concrete

Characteristic Features 53

Rate of 53

Loading Materials

Cost of

Shoveling into Wheelbarrows 47

Rate of 6

Lock Construction

Cost of

Coosa River 196

Ill. & Miss. Canal 200, 202, 205, 207

Cascades Canal 190, 191, 192, 193

Coosa River 194, 195

Ill. & Miss. Canal 200, 207

Lock Foundation 207

M

Manhole Construction

Cost of

Rye, N. Y. 577

Methods of

Rye, N. Y. 576

Mixers

Batch

Chicago 662

Chicago Improved Cube 75, 661

Cropp 661

Forms of 75

Koehring 662

Polygon 663

Ransome 75, 661

Rate of Output 83, 84

Smith 77, 662

Snell 660

Charging (See Charging Mixers)

Continuous

Advanced 660

Eureka Automatic Feed 78, 660

Forms of 78

Foote 297

Scheiffler 660

Efficiency of

Rating, Methods of 84, 85

Gravity

Forms of 79

Gilbreth Trough 80

Hains, Fixed Hopper 80, 81

Hains, Telescoping Hopper 81

Output

Conditions Affecting 83, 84

Hains Gravity 83

Types of 74

Mixing Concrete

Hand

Cost of

Abutment Construction 197

Culvert Work 428, 430

Fortification Work 189

Girder Highway Bridge 380, 382

Lock, Cascades Canal 192

Marquette Breakwater, 209, 210, 212

Retaining Wall, Allegheny 284

Superintendence, 57, 58

Cost of, 52, 59

Methods of Abutment Construction, 196, 197

Examples from Practice, 49

Fortification Work, 189

Lock Foundation, 207

Marquette Breakwater, 209

Retaining Wall, Allegheny, 283, 284

Rates of, 50, 51, 52

Specific Directions, Necessity, 51, 52

Machine

Cost of, 361, 362, 518

Buffalo Breakwater, 214

Building Work, 504, 507, 511

Dam Work, Rock Island, Ill., 225

Fortification Work, 190

Hains Gravity Mixer, 83

Lock, Cascades Canal, 193

Lock, Ill. & Miss. Canal, 206, 207

Pier, Superior Entry, Wis., 222

Retaining Wall, Allegheny, 284

Retaining Wall Work, 270, 273, 275

Methods of

Bridge Abutment Work, 253, 254

Building Work, 471

Fortification Work, 189

Hains Gravity Mixer, 82, 83

Operations Enumerated, 61

Piers in Caissons, 165, 166

Mixing Plants

Construction

Battery Emplacement, 187, 188

Bridge Construction, 369, 371, 372, 374, 386, 389, 403.

Culvert Work, 415, 416, 418, 420, 422, 423

Dam, McCall Ferry, Pa., 226

Lock, Cascades Canal, 190, 191

Lock Work, Coosa River, 194

Lock Work, Ill. & Miss. Canal, 198, 199, 204

Pier Work, Superior, Wis., 221

Retaining Wall, Grand Central Terminal, 277

Scow, Port Colborne Harbor, 216, 217

Traveling, Chaudiere Falls Dam, 228

Traveling, Chicago Track Elevation, 267

Traveling, Galveston Sea Wall, 268

Cost of

Lock Work, Ill. & Miss. Canal, 199

Retaining Walls, Chicago Drainage Canal, 274

Mixing Water

Reducing Freezing Point

Methods of, 112

Salt (Sodium Chloride), 113

Solutions for, Composition of, 113

Molding Blocks

Cost of, 524, 528, 530, 531

Marquette Breakwater, 211

Connecticut Ave. Bridge, 395

Separate Casting, 519

Methods of, 523, 526

Connecticut Ave. Bridge, 393

Marquette Breakwater, 211

Pier, Port Colbourne Harbor, 215

Separate Casting, 513, 515

Molding Cement Pipe

Cost of

Irrigon, Ore., 584

Ransome Mold, 577, 579

Methods of

Irrigon, Ore., 581

Ransome Mold, 577

Molding Culvert Pipe

Cost of

Chic. & En. Ill. R. R., 432

Methods of

Chic. & En. Ill. R. R., 430

Molding Girders

Cost of

Separate Casting, 519

Methods of

Separate Casting, 513, 514, 515

Molding Piles

Forms for (See Forms)

Methods of

Corrugated Polygonal, 176

Round, 179

Plant Arrangements for, 169

Cost of, 522

Molding Roof Slabs

Methods of, 521

Mortar Facing

Cost of

Lock, Ill. Miss. Canal, 206

Forms for, 129

N

Natural Cement (See Cement)

O

Ornament Construction

Methods of

Iron Molds, 644

Molding in Place, 647

Plaster Molds, 646

Sand Molding, 644

Wooden Molds, 637

P

Pavement Base Construction

Cost of

Batch Mixer, 306

Batch Mixer and Wagon Haulage, 302

Brick, Champaign, Ill., 296

Continuous Mixers, 298, 300, 305

Miscellaneous Examples 294, 295, 296

New Orleans 293

Stone Block, New York 292

Toronto, Ont. 293

Traction Mixer 304

Methods of

Batch Mixer 305

Batch Mixer and Wagon Haulage 302

Continuous Mixers 297-300, 304

Hand Mixing 290

Machine Mixing 290, 291

Traction Mixer 303

Mixtures Employed 288

Organization for 288

Stock Pile Distribution 289

Pavement Construction

Cost of

Fortification Work 186

Richmond, Ind. 318

Windsor, Ont. 317

Methods of

Richmond, Ind. 318

Windsor, Ont. 316

Pier Construction

Cost of

Lonesome Valley Viaduct 255

Superior Entry, Wis. 222, 223

Taintor Gates 198

Methods of

Port Colborne Harbor 215-217

Superior Entry, Wis. 217-223

Piers in Caissons

Construction of

Methods of 159-168

Cost of 168, 169

Pile Construction. (See Molding Piles, Pile Driving.)

Cost of

Ocean Pier 173, 174

Raymond Process 152, 154, 155

Methods of

Building Foundation Work 174, 175, 178, 179

Compressed Process 158, 159

Enumeration of 151

Molding in Forms 161-170, 172, 179, 180

Molding in Place 151

Ocean Pier 172, 173

Raymond Process 152

Rolling Process 181

Simplex Process 155, 156, 157

Spread Footing Process 157, 158

Track Scales 181

Pile Driving

Conditions Requisite for

Cost of

Ocean Pier 173, 174

Methods of

Corrugated Polygonal 177, 178

Hammer 179, 180, 181

Water Jetting 172, 177

Pile Driving Caps 177, 178, 180

Pile Rolling Machine 182

Piles (See Molding Piles)

Construction

Compressol Process 158, 159

Octagonal 180

Rolling Process 181

Round Piles 178, 179

Spread Footing Process 157, 158

Square 179, 180

Cost of

Rolling Process 183

Driving (See Pile Driving)

Handling, Sling for 175

Raymond

Construction, Method of 151, 152

Cost of 152, 154, 155

Simplex

Construction, Methods of 155, 156, 157

Placing Concrete

Cost of

Bags, Under Water 210

Belt Conveyors 275

Buckets Under Water 209

Buffalo Breakwater 214

Car and Trestle Plant 196, 201, 202, 206, 207, 244

280, 422

Cars and Chute 193

Cars and Derrick 285

Derricks 192, 233, 235

Port Colborne Harbor 217

Pneumatic Caissons 230

Retaining Wall Work 270, 272

Steel Cylinder Pier 241

Subaqueous Buckets 223

Wheelbarrows 189, 197, 198, 257, 285, 418, 419, 423

Methods of

Building Work 486

Locks Coosa River 194

Pneumatic Caissons 237, 238

Retaining Wall Work 266

Sewer Work 537

Placing Reinforcement

Cost of

Building Work 494

Directions for 470

Permanent Way Structures 252

Pole Base, Cost of 658

Portland Cement (See Cement)

Proportioning Concrete (See Concrete)

Q

Quarrying

Cost of

Limestone 18, 276

Trap Rock 17

Methods of

Limestone 18

Trap Rock 17

R

Ramming Concrete (See also Placing Concrete)

Cost of 423

Conditions Governing 56

Examples from Practice 56, 57

Pavement Base 292, 294

Methods of

Piers, Lonesome Valley Viaduct 255

Specific Directions, Necessity of 57

Raymond Piles (See Piles)

Reinforcement

Weight in Concrete

Tables for Estimating, 663-665

Removing Forms

Derrick for, 502

Methods of

Building Work, 461

Time for

Building Work, 462

Reservoir Construction

Cost of

Covered for Fire Protection, 594, 595

Ft. Meade, S. Dak., 601

Methods of

Bloomington, Ill., 603

Covered for Fire Protection, 588

Fort Meade, S. Dak., 597

Reservoir Lining

Cost of

Canton, Ill., 629

Chelsea, Mass., 623

Jerome Park, 628

Pittsburg, Pa., 630

Quincy, Mass., 619

Methods of

Chelsea, Mass., 620

Jerome Park, 628

Quincy, Mass., 617

Reservoir Roof, Cost of 632

Retaining Wall Construction

Cost of, 286

Chicago Drainage Canal, 273-277

Footing for Masonry, 283

Grand Central Terminal, 280

Railway Yard, 282

Methods of

Allegheny Track Elevation, 283

Chicago Drainage Canal, 272-277

Grand Central Terminal, 277-281

Subway in Trench, 269, 270

Retaining Walls

Comparison of Plain and Reinforced, 260, 261

Types of, 259

Rubble Concrete Construction

Cement, Saving in, 98

Cost of

Abutment, Railway Bridge, 106

Hemet Dam, 104

Spier Falls Dam, 103

Economy, Limitations to, 98, 99

Methods of

Abutment, Railway Bridge, 105

Barossa Dam, 101

Boonton Dam, 103

Bridge Piers, Nova Scotia, 108

Bridge Piers, Scotland, 107, 108

Bridge Piers, Spain, 106, 107

Chattahoochee River Dam, 100

Dams for Waterworks, 104, 105

Hemet Dam, 103, 104

Spier Falls Dam, 103

Percentages Rubble Stone, 100, 101, 103, 105, 108

Shape of Stones for, 99

Runway Construction, Methods of, 48

S

Salt

Percentages in Mixing Water, 114

Sand

Balanced, Value of, 6

Cleanness, Value of, 5

Cost of

Excavating and Loading, 6

Granulometric Composition, 28

Prices Charged for, 6

Sharpness, Value of, 5

Substitutes for, 5

Voids in

Amount of, 26, 28

Conditions Affecting, 25

Effect of Moisture, 25

Effect of Size of Grains, 27

Volume in Concrete, 5

Weight of, 6, 26

Sand Washing

Cost of

Ejector Method, 10

Hose Method, 7

Tank Method, 13

Methods of

Ejectors, 7

Hose, 7

Tank, 10

Rate of

Ejector Method, 9

Hose Method, 7

Tank Method, 10, 12, 13

Water Required

Ejector Method, 9

Sand Washing Plants, 7-13

Screening Gravel

Cost of

L. S. & M. S. Ry., 22

Stewart-Peck Sand Co., 24

Methods of

Handwork, 19

Lock, Cascades Canal, 191

Scraper into Wagons, 21

Stewart-Peck Sand Co, 23

Sewer Construction

Cost of

Cleveland, O., 566

Coldwater, Mich., 574

Haverhill, Mass., 557

Medford, Mass., 535

Middlesborough, Ky., 562

St. Louis, Mo., 560, 561

South Bend, Ind., 554

Wilmington, Del., 571, 573

Methods of

Cleveland, O., 563

Coldwater, Mich., 573

Haverhill, Mass., 554

Medford, Mass., 535

Middlesborough, Ky., 561

Pipe, St. Joseph, Mo., 579

St. Louis, Mo., 558

South Bend, Ind., 551

Wilmington, Del., 569

Shoveling

Cost of

Concrete into Barrows, 197

Rate of

Broken Stone from Piles, 46

Broken Stone from Shoveling Boards, 46

Broken Stone from Cars, 45

Gravel Against Screens, 21

Sand into Wheelbarrows, 46

Shoveling Boards Wooden, for Broken Stone, 46

Sidewalk Construction

Cost of

Estimation of, 311, 312

Quincy, Mass., 314

San Francisco, Cal., 315

Toronto, Ont., 313

Methods of

Bonding Wearing Surface to Base, 310

Edger for, 310

General Discussion, 307

Points for, 310

Prevention of Cracks, 311

Protection from Weather, 311

Quincy, Mass., 314

Toronto, Ont., 313

San Francisco, Cal., 314

Silo Construction

Cost of, 632

Methods of, 631

Slag, 14

Slag Cement (See Cement)

Specific Gravity, Stone, Various, 32, 33

Spreading Concrete

Cost of, 197

Effect of Method of Dumping on, 55

Standpipe Construction

Cost of

Attleborough, Mass., 611

Methods of

Attleborough, Mass., 609

Stock Piles

Capacity of, 46

Distribution, Pavement Work, 289

Purposes of, 45

Stone

Specific Gravity, 32, 33

Stone Crushing

Cost of

Cobblestone, 20

Limestone, 18, 225, 273, 276

Trap Rock, 17

Methods of

Cobblestone, 19

Limestone, 18

Trap Rock, 17

Stone Crushing Plant

Construction

Lock Work. Ill. & Miss. Canal, 200

Stone Dust, Value for Mortar, 5

Storing Materials, Cost of, 185, 225

Subway Lining

Cost of

Long Island R. R., 361

New York Rapid Transit Ry, 357, 358

Methods of

Long Island R. R., 361

New York Rapid Transit Ry., 356

Superintendence

Cost of, 57, 58, 185, 193, 197, 210, 211, 212, 273, 275, 397

T

Tamping Concrete

Cost of, 197

Lock, Ill. & Miss. Canal, 206, 207

Method of

Lock, Ill. & Miss. Canal, 204

Tank Construction

Methods of

Gas Holder, Des Moines, Ia., 609

Gas Holder, New York, 614

Tooling Concrete

Cost of, 394, 396

Transporting Concrete

Cost of

Cableways, 270

Cars, 280

Chutes, 67

Cars and Derricks, 285

Car and Trestle Plant, 63, 210, 212, 222

Wheelbarrows, 53, 189, 197, 272, 285, 293, 294, 296

Methods of

Belt Conveyors (See also Belt Conveyors), 64-65

Bucket Hoists, 474

Building Work, 472

Cableways, 64, 186, 289, 369, 370

Cars, 404, 421

Cars and Chute, 191, 192

Car and Trestle, 63, 243, 246, 377

Chutes (see also Chutes), 66, 67, 68

Derricks, 479

Dump Wagons, 54

Effect on Placing, 54

Enumeration of, 52

Hand Costs, 53

Hoist and Cars, 372

Platform Hoists, 479

Pulley and Horse, 489

Traveling Derrick Plant, 374

Trestle Runways, 54

Wheelbarrows, 53

Transporting Materials

Cars for, 45

Cost of

Bridge Pier Work, 243

Cars, 275

Car and Trestle Plant, 222

Dam, Rock Island, Ill., 225

Horse Carts, 49, 270, 273

Lock, Ill. & Miss. Canal, 206, 207

Wheelbarrows, 47, 48, 189, 197, 214, 280, 292, 293, 294, 296, 419

Methods of

Belt Conveyors (see also Belt Conveyors), 64-65

Cableways, 64, 269

Carrying in Shovels, 47

Chutes (see also Chutes), 46, 65, 66

Hand Carts, 48

Horse Carts 48

Indians 62

Shoveling to Derrick Buckets 46

Trestle and Car Plants 63

Wheelbarrows 47

Trestle Runways, Cost of 54, 55

Trestles

Car, Cost of 63

Structural Details 63

Tunnel Construction (See Tunnel Lining)

Tunnel Lining

Backfilling Machine for 330

Cost of

Cascade Tunnel 338

Gunnison Tunnel 355

Hodges Pass Tunnel 345

Mullan Tunnel 333

Peekskill Tunnel 336

Short Railway 344

Methods of

Burton Tunnel 347

Capitol Hill, Washington, D. C. 329

Cascade Tunnel 336

General Discussion 328

Gunnison Tunnel 353

Hodges Pass Tunnel 338

Mullan Tunnel 332

Peekskill, N. Y. 333

Mortar Car for 333

Removing Old, Methods of 332

Traveling Derrick for 330

Traveling Platform for 337, 350

U

Unloading Materials

Cost of

Grab Buckets 62

Methods of

Grab Buckets 62

V

Voids (See also Gravel, Sand, Stone)

Conditions Governing 25

W

Wall Ties

Construction of 265

Washing Gravel

Cost of

L. S. & M. S. Ry. 22

Stewart-Peck Sand Co. 24

Washing Gravel

Methods of

Lock, Cascades Canal 191

Stewart-Peck Sand Co. 23

Water

Quantity in Concrete

Rule for Figuring 42

Waterproofing

Cost of

Hydrolithic Coating 677

Long Island R. R. Subway 679

New York Subway 680

Sylvester Mortar 675

Sylvester Wash 674

Methods of

Bituminous Coatings 670

Covered Reservoir for Fire Service 596

Hydrolithic Coating 676

Impervious Mixtures 668

Long Island R. R. Subway 678

Medusa Compound 669

Moisture Coatings 677

New York Subway 679

Novoid Compound 670

Oil and Paraffin Washes 677

Star Stellen Cement 669

Sylvester Mortar 675

Sylvester Wash 673

Szerelmey Wash 673

Wheelbarrows

Loads for 47

Concrete Construction: Methods and Costs · 第 34 / 34 章