CHAPTER III.

Eau Brink Cut--Ramsgate Harbour--Sheerness Dockyard--Plymouth

Breakwater--Anecdote of the late Mr. J. Fox--London Bridge and

Approaches--Sir F. Trench’s Plan for Quaying the Thames--Nene

Outfall--Cross Keys Bridge--Norfolk Estuary--Improvement of the

Witham--Ancholme Drainage.

It was some time before I could recover from the shock. I had been

absent abroad nearly two years and four months, and had passed through

so many different scenes, that when I returned to England everything

seemed perfectly new to me; being deprived of my father so unexpectedly

threw me almost into a state of despair, so that I scarcely felt myself

equal to undertake the responsibility of following his noble career,

which I could never expect to equal. After giving way to my melancholy

reflections for about a month, I determined to rouse myself to the

utmost and to do my best, and with his brilliant example before me, and

cheered on by his numerous attached friends, I felt that if I had no

chance of attaining the same degree of celebrity as my dear father, I

might still do something, and although _lungo intervállo_, I might still

keep up the name. I determined therefore to set to work in right earnest

and endeavour to obtain some of my father’s numerous appointments. My

first ambition was to succeed him in his numerous great works then being

carried on by the Admiralty, such as the Plymouth Breakwater, and the new

Chatham and Woolwich dockyards.

That most excellent and able man, the late Lord Melville, was at the head

of the Admiralty; the distinguished and gallant Sir George Cockburn, one

of Nelson’s officers at the Nile and elsewhere, was the First Naval Lord;

John Wilson Croker and Sir John Barrow were the Secretaries; and there

never has been such a galaxy of talent at the Admiralty since. All these

great and good men have since passed away from us, not without, however,

leaving behind them indisputable monuments of their skill and the great

benefits they conferred upon their country. As for myself, I owe them

my deepest gratitude, and shall never forget their kindness. I was

appointed by the Admiralty to succeed my father as their engineer. This

high honour at my early age (for I was only seven-and-twenty) filled me

with the greatest thankfulness, although I felt it was due to no merit of

my own, but rather to the regard and respect which they entertained for

my father; I therefore resolved to do everything in my power to render

myself worthy of it, and set to work with right good will.

The next appointment I obtained was as drainage engineer to the Eau Brink

Commissioners. This was at that time the greatest work of the kind, at

the head of which were the late General Lord William Bentinck, afterwards

Governor-General of India; the late Sir Andrew Hammond, Bart.; the late

Sir Charles Browne, physician to the King of Prussia; and the late

Thomas Hoseason, Esq., of Banklands, in the district of Marshland, near

Lynn. These able and distinguished men formed the Committee for carrying

into effect the Eau Brink Cut, for the improvement of the drainage of

the great level of the fens, called the Bedford Level, amounting to

about 300,000 acres of valuable land. This work consisted of a cut for

altering the channel of the Ouse, by means of which nearly two miles of

the navigation of that river would be saved, and an additional fall for

the drainage of five feet perpendicular would be gained. This great work

had been planned nearly a century before, but had always been opposed

by the inhabitants of the fens, as being in their opinion inadequate to

effect the desired object. At length, after great opposition on the part

of the townspeople, who alleged that it would ruin their harbour and

trade, the plan was decided on, and an Act of Parliament was obtained,

in the year 1781, to carry it into effect, and to lay a tax of 4_d._ per

acre per annum upon all fen lands which it was supposed would derive

benefit from it; certain guarantees were given to Lynn Harbour and the

interior navigation interests, as well as to the owners of the banks of

the Ouse, that they should be indemnified for any damages they might

sustain in consequence of the Eau Brink Cut being executed. Under this

Act it was decreed that there should be two engineers, one appointed by

the drainage interests, namely, the late Robert Mylne (the architect of

Blackfriars Bridge), and Sir Thomas Hyde Page, R.E., as the engineer

for navigation. These two gentlemen were to decide the direction and

dimensions of the proposed Eau Brink Cut, which was to commence below

German’s Bridge and to terminate a short distance above the boat wharf

at Lynn. They, however, differed so materially that it was necessary to

call in an umpire to decide between them, and the late scientific Captain

Joseph Huddart, of the Trinity Board, and the inventor of the celebrated

patent cable machinery, was appointed arbitrator. Captain Huddart made

his award; but when it was determined to carry on the works, it was found

that the whole of the funds appropriated for that purpose, which amounted

to about 80,000_l._, had been expended in litigation and the cost of

obtaining the Act of Parliament, so that the whole matter fell to the

ground.

Meanwhile the defective state of drainage of the great level of the fens

still continued, and everybody was convinced that the only remedy was to

carry into effect the Eau Brink Cut as awarded by Captain Huddart. It was

therefore resolved that a new Act of Parliament should be obtained for

this purpose, increasing the tax upon the lands proposed to be benefited

sufficiently to cover the costs according to the estimate of my father,

who was appointed engineer-in-chief of the drainage interests; and the

above-mentioned gentlemen, Lord W. Bentinck, Sir A. Hammond, Sir Charles

Browne, and Thomas Hoseason, Esq., were appointed as the executive

committee.

The Act having passed, Messrs. Jolliffe and Banks tendered for, and

received and executed the contract.

The effect of this work greatly exceeded the most sanguine expectations

of its supporters. Immediately after it was opened the low-water mark at

the upper end of the cut fell five feet, and the drainage waters were

carried off with a degree of rapidity which astonished the whole country.

The autumn and winter of 1821-2 was characterized by an unusual quantity

of rainfall, and if it had not been for the opening of the Eau Brink

Cut the whole, or the greater part, of the level of the fens would have

been under water, and therefore the fenmen were very well pleased with

the result. At this time I was appointed to succeed my father as chief

drainage engineer, and the late Mr. Telford had been previously appointed

the chief engineer for navigation. Immediately after my appointment,

which was in the month of December, 1821, I went to Lynn to examine the

works, and was much astonished to find the great effects which had been

produced by the Eau Brink Cut. Instead of the circuitous old shallow

course, full of shoals and obstructions of every kind, there was a fine

straight, deep channel, two miles shorter than the old one, of the proper

width, bordered by strong banks of the full height; the floods passed off

without difficulty, and the navigation was so much improved that the

lighters and barges going up the river from Lynn saved several tides.

It is true that upon examining the country between Denver Sluice and

Cambridge, there was a great deal of water out in several places, but

this was attributed to the interior drains and rivers not being properly

defended and embanked, so that they could carry off the water to the main

outfall below. I also examined the new steam pumping apparatus, which had

lately been erected for draining Soham and other fens. This, although

proposed by my father in 1786, was the first of the kind that had been

erected. It consisted of a scoop wheel, with a perpendicular lift, worked

by a condensing engine. It answered its object completely, and has since

been imitated by numerous others with equal success in different parts

of the fen and lowland districts. Yet in many places it has been found

very difficult to induce the fen proprietors to combine together in order

to effect a natural drainage, which would be better and less expensive;

they prefer to act independently of each other, and adopt the steam

wheel. Still, even with this, the main outfalls must be improved to their

fullest extent, otherwise the water cannot run off; and when the floods

in the adjacent rivers rise so high that the banks are endangered, the

pumping must be discontinued, otherwise the banks will break, and then a

greater injury will ensue. Nevertheless, the steam pumping apparatus is

an immense improvement on the old windmill, which could only work when

there was wind.

My next appointment was to succeed my father as engineer-in-chief to

Ramsgate Harbour.

This harbour was established by special Act of Parliament for the purpose

of affording shelter to vessels of 300 tons lying in the Downs during

south-west gales. When these winds prevail that anchorage is crowded with

all classes of vessels, and the smaller ones, not being so well found

with ground tackle as the larger, are liable to be driven from their

moorings and fall foul of the larger vessels, causing them to go adrift

also, and thus creating considerable confusion and damage; but by having

Ramsgate under their lee, the small vessels can always get under way,

run for it at the commencement of the flood, and reach it in safety long

before high water, at which time the Goodwin Sands are covered, and a

heavy sea rolls into the Downs. In fact, Ramsgate Harbour was made for

clearing the Downs of small vessels, so that the large ones may ride in

safety, and so far has effectually answered its object.

There were a certain number of trustees appointed under the Act, who

were selected from the principal merchants and shipowners of London,

and the Deputy Master and three or four Elder Brethren of the Trinity

were members of the Board of Trustees _ex officio_. At the time I was

appointed engineer, the celebrated Sir William Curtis, Bart., member for

the City of London, was chairman, and the worthy Deputy Master of the

Trinity House, Sir John Woolmore, represented that Corporation with three

others of the Elder Brethren. As this was one of the oldest and most

important harbour trusts in the kingdom, I felt great honour in being

appointed their chief engineer, the more so as the celebrated Smeaton and

my father had previously occupied that position. It was here that Smeaton

followed out the idea that had been originally proposed at Dundee, of

establishing an inner basin with sluices for the purpose of scouring

away the mud which continually accumulated in the outer harbour, owing

to the great quantity of alluvial matter brought in from the adjacent

coast and waters, which otherwise in a very short time would have filled

it up and rendered it useless. Ramsgate Harbour was also celebrated for

being the first place of the kind where the diving bell was introduced by

Smeaton for the purpose of laying down moorings and removing obstacles

under water. The diving bell was afterwards, in 1813, much improved,

and rendered, for the first time, applicable to building masonry under

water with as much security and accuracy as building upon dry land. In

such an exposed situation it was more economical and expeditious than

the old cofferdams; it was in this manner Mr. Rennie rebuilt the east

pier-head in 17 feet at low-water spring tides, which was originally made

by Smeaton, and which failed. I also succeeded my father at Sunderland,

Donaghadee, Port Patrick, and Kingstown harbours, the West India Docks,

besides other places soon afterwards, so that I had a large business, and

was daily getting more.

The most difficult and anxious work, however, at that time was the

new dockyard at Sheerness, designed and partly carried into effect by

my father. He originally, in the year 1807, recommended that the old

dockyard, which was composed only of some old wooden slips imbedded in

the mud, a few storehouses, a wretched basin, lined with wooden walls,

and some timber jetties, should be abolished. He said that it was on the

lee or wrong side of the harbour, that the foundation for new works was

of mud and quicksand, that the space, on account of the buildings in the

old town, was very confined, and, therefore, that to make a good dockyard

there would be very expensive, and he thought it would be far better to

make a new complete establishment at Northfleet, just above Gravesend,

and to get rid of Woolwich, Deptford, and Sheerness altogether. Mr. Pitt,

then Prime Minister, decided that it should be done; but when he died the

matter fell to the ground, as I have before said, although the land was

bought for the purpose.

However, after the great war had terminated, in 1815, the nation was

naturally anxious to reduce the expenditure as much as possible, so that

the House of Commons would not listen to the idea of expending any large

sums upon great new works either for the navy or the army; and it was

only after considerable difficulty that the House of Commons would grant

money for the repairs of Sheerness Dockyard, and, like most extensive

repairs, it was found, when too late, that it would have been far better

to have abandoned Sheerness altogether.

Nevertheless it was absolutely necessary to do something to the Thames

and Medway dockyards, to keep in repair the large fleet of vessels which

was there laid up in ordinary. The total number of pennants flying at the

close of the war was about 1000, and the last vote for seamen in 1815

included 127,000 sailors and marines. As there was greater depth of water

at Sheerness than at any of the dockyards, and as the harbour immediately

contiguous was capable of accommodating with ease any number of large

vessels, Sheerness was decided upon as the place where the greatest

repairs and improvements should be made, and it ended in an entirely new

dockyard being built. The works accordingly commenced in 1815, and the

late Lord Melville laid the first stone at the north end that year. It

ended in expending nearly 3,000,000_l._, 1,700,000_l._ of which went to

the engineering department, and the remainder in the purchase of ground,

buildings in the town of Sheerness, in storehouses, mast and timber

ponds, smithery, admiral’s and officers’ houses. The engineering works

were of the most difficult kind; the foundations were composed of nothing

but soft mud and loose quicksands to an almost interminable depth, so

that my father was obliged to invent an entirely new system of hollow

walls faced with granite in front and brick behind. This system of walls,

which was entirely new, by giving a greater superficial area of bearing

surface with the same weight of materials, rendered them thoroughly

secure. He had adopted this kind of construction with perfect success at

the docks at Great Grimsby, in Lincolnshire, and they succeeded equally

well at Sheerness, although exposed to much greater difficulties. The

dockyard as completed consists of one basin of nearly 3 acres, at the

east end of which are three docks for first-rate vessels of war, with a

depth of 9 feet at low water of spring tides, the basin being of the same

depth, so that with a rise of tide of 18 feet at spring tides the largest

vessels can always be docked at those times. There is also another tidal

basin of about the same size, together with large storehouses, smithery,

mast ponds, boathouses, admiral’s and officers’ houses, chapel, &c., and

ample space for timber and other materials. This dockyard, therefore, as

was the intention, is well adapted for keeping in repair the numerous

vessels lying up in ordinary in the adjacent harbour, or for executing

any repairs which vessels on the northern stations may require; it never

was intended to be a building yard, and it answers its original purpose

well. It should be mentioned, that here Mr. Rennie first introduced

cast-iron gates for the dry docks; these fitted to the granite quoins so

nicely by polishing the two surfaces, iron and stone, with emery, that

they worked together perfectly, and were completely water-tight; and

although they have now been in use forty-five years, they are as good as

on the day when they were made.

At the time that these works were proceeding, it was decided to make a

new large granite dry dock at Chatham, similar to those at Sheerness; and

some improvements in the line of river wall, which partly interfered with

the free circulation of the tide there, were being constructed when I was

appointed, and I finished them.

The breakwater in Plymouth Sound, which was designed by my father and

commenced in 1815, had made considerable progress; in fact, the great

mass of rubble stone had been deposited throughout its entire length,

so that vessels of war as well as merchantmen could safely lie under

its protection during the heaviest gales from the westward. When I was

appointed engineer to the Admiralty, the late excellent Mr. Joseph

Whidbey, who was distinguished for his scientific acquirements, and who

had sailed round the world with Vancouver, was the superintendent of the

breakwater, so that I had but little to do with it until the latter end

of 1824, when, on the 22nd and 23rd of November of that year, a violent

storm occurred from the south-south-west, the most dangerous wind, and

its effect upon the breakwater above low water of spring tides was to

disarrange nearly the whole of the superstructure, and to transfer a

very large portion of the stone from the south to the north slope. The

effects of this severe storm were considered to be so serious as to

create considerable doubts as to the security of the breakwater, and

even Mr. Whidbey was alarmed. I was accordingly sent by the Admiralty to

make a detailed report as to what had occurred. I carefully examined the

whole work, and had numerous transverse and longitudinal sections taken

to show its exact state, and reported that the main body of the work

remained as substantial as ever, but that the rubble from above low water

to the top, on the south or sea slope, had only been laid at an angle of

3 to 1, and the waves during the storm above mentioned had in a great

measure disturbed it, and had transferred a very large portion from the

south to the north slope, increasing the south slope to 5 to 1. Now it

is singular that my father, when it was decided to raise the breakwater

from the level of half tide (which was the original intention) to above

high water of spring tides, always said that the outer slope should be

laid at 5 to 1. After his death, however, Mr. Whidbey, with an idea of

economy, reduced the south slope to 3 to 1, so that the effects of the

storm had been to confirm my father’s views; and not only had no real

damage been done, but it had consolidated and strengthened the breakwater

materially, and had given a practical example as to the best mode of

completing it, and I recommended that the outer slope should be finished

at 5 to 1, and the inner at 2 to 1. The Admiralty, however, feeling their

responsibility, thought it advisable, in addition to myself, to consult

three other experienced engineers, and the late Mr. Telford, Mr. Josias

Jessop, and my eldest brother, George, were appointed for that purpose.

We proceeded to Plymouth in the month of March, 1825, and spent several

days in examining the breakwater. We finally recommended that the outer

slope should be finished at 5 to 1 and the inner at 2 to 1 (as I had

previously suggested to the Admiralty), that the outer slope and top

should be paved with rough square blocks set closely together, and

that the inside slope should be paved with rubble. Mr. Whidbey was,

unfortunately, of a different opinion, and recommended a nearly vertical

wall of solid masonry on the top, of which the Admiralty did not approve,

and adopted our plan, which was ordered to be carried into effect. Mr.

Whidbey was so much annoyed that he resigned his situation and retired

into private life near Taunton. This was much regretted, as he was a most

able and honest public servant, and beloved and respected by everybody

who knew him. I was then appointed chief engineer, and upon considering

the subject again, I thought that, as the base or toe of the outer slope

was the most exposed part of the work, it would be better to strengthen

it by benching, which would effectually break the force of the waves

before they could reach the main body of the work. This was approved

by the Admiralty, and has since been carried into effect with complete

success.

I may here relate a curious anecdote in connection with the death of Mr.

Perceval. Messrs. Fox, Williams, and Co., the great mining contractors in

Cornwall, took the first contract for blasting the rock and depositing

the stones on the breakwater. In 1815 Mr. John Fox, a Quaker, having

come to town on business, breakfasted with my father and several others,

including myself. The conversation happened to turn on the death of Mr.

Perceval. Mr. Fox said in a simple, unaffected manner, “I remember it

very well; it is a curious story, and now I will tell it you. I was then

visiting my friend Williams at Redruth. I went to bed as usual, and awoke

in a most restless state, having had an extraordinary dream. I dreamed

that I went to the House of Commons, where I had never been before, and

having no admission into the interior of the House, I sat down quietly

on one of the benches in the lobby, expecting a Cornish member who

had promised when I came to London to give me a ticket of admission

to hear the debates. Beside me on the bench sat a tall, muscular man

(describing Bellingham most exactly), who appeared to be very restless,

and continually asking whether Mr. Perceval had come to the House, and

every now and then putting his right hand into his left breast pocket.

At length, after waiting some minutes, there was a bustle, and several

persons near me said that Mr. Perceval was coming; and shortly after

Mr. Perceval made his appearance (Mr. Fox describing the exact dress

he wore, namely, a blue coat with gilt metal buttons, white cravat and

waistcoat, with nankeen shorts, white stockings, and shoes, according to

his usual attire in the summer). Immediately after Mr. Perceval made his

appearance, the man who sat next to me got up, and, advancing close to

Mr. Perceval, drew a pistol from his left breast pocket, fired, and Mr.

Perceval fell at his feet. This occasioned great commotion. The man who

fired the pistol was at once seized, and I rushed out and asked what

had happened, and the bystanders told me that Mr. Perceval had been shot

by a man named Bellingham, who was the identical individual who had been

a few minutes before sitting by my side. When my dream had come to this

point I awoke in the greatest agitation. I could not account for it. I

had never seen Mr. Perceval, nor his murderer, Bellingham; I had never

been in the lobby of the House, and I had been in no way connected with

Mr. Perceval, either by correspondence or otherwise, still I was so much

affected by the dream that I felt convinced that Mr. Perceval had been

murdered. I passed the remainder of the night in great restlessness. I

could not sleep, but was always thinking of the dream, being thoroughly

convinced that it was true. I came down to breakfast at the usual hour,

in the most anxious and nervous state, which I in vain endeavoured to

conceal as much as possible; but my friend and partner Williams and his

whole family observed it, and said that I looked very ill, and kindly

asked me to explain the cause. After much pressing, I told my story.

Friend Williams and the whole of his amiable family said that it was

nonsense; that I had been unwell, and still was so, and said that they

would send for their family doctor. I said no; I felt perfectly convinced

that my dream would, unfortunately, prove but too true, and that the

mail, which would arrive in the evening, would bring a confirmation of

it. They tried to laugh me out of it, but nothing would do; I therefore

went about with my friend Williams, transacting our mining business,

being convinced that the arrival of the mail in the evening would confirm

the truth of my dream in all particulars. We returned to dinner at five

o’clock; at nine the mail arrived, and confirmed every particular of my

dream. I was afterwards taken to the House of Commons, where I had never

been before, and I correctly pointed out the whole particulars of the

melancholy transaction exactly as they occurred, to the astonishment of

my friends and the bystanders. The whole story seems so strange that I

cannot account for it. I relate it to you just as it occurred to me.”[2]

This is certainly one of those marvellous instances of foresight

which baffles all comprehension. John Fox was generally considered

by his numerous friends and acquaintance to be a most honest, plain,

straightforward, business man, and incapable of stating anything but what

he believed to be true. I heard him relate the dream, and my father and

all present believed it. The curious part of the story is how he should

have dreamed such a thing, being in no way connected with it.

About this time (1825) the several victualling departments of the navy

at Plymouth were very inefficient, and divided into three or four

establishments--one at Southdown, opposite to Devonport, another at

Cremill Point, near Stonehouse, a third at Plymouth, and the fourth in

Plymouth town--being several miles from each other, so that the extra

expense and delay in provisioning vessels of war was considerable. Upon

this being represented to the Admiralty by the Victualling Board, of

which the late General Stapleton was the chairman, they determined to

make an entirely new victualling establishment, concentrating the whole

of the several departments into one, upon a well-organized plan, so that

every operation should be carried out with the greatest dispatch and

economy.

After much discussion Cremill Point, being nearest to the dockyard at

Devonport, and being in other respects, as to depth of water, &c.,

possessed of peculiar advantages, was finally selected as the best place

for the new establishment, and I was ordered by the Victualling Board to

prepare the necessary plans, specifications, and estimates, and to see

them carried into effect.

Whilst these works were proceeding, a proposal was made to the Admiralty

to apply the Cornish system of engines to the Admiralty steam-vessels. Up

to this time steam, according to the principle of Watt, not exceeding 5

lb. pressure upon the square inch, was only used, whereas in the Cornish

condensing engines steam of the pressure of 37 lb. per square inch was

then usual, with much greater effect and economy. I was accordingly sent

by the Admiralty to Cornwall to investigate their scheme. I took with

me my principal assistant, the late Mr. William Lewin, a very zealous,

able, practical engineer. We examined the whole system very carefully

at different mines, measured the actual work done and the quantity of

fuel consumed, and came to the conclusion that the Cornish system of

high-pressure condensing might be applied to the navy with the greatest

advantage, and reported the same to the Admiralty. It was not adopted

at the time, although high-pressure condensing engines have since been

introduced into the navy; at the present time the pressure has advanced

to 27 and 28 lb. per square inch, and in the non-condensing engines to

100 and 120 lb. Watt, although he had tried steam at every temperature,

yet generally preferred low pressure; his reason for this must have been

the imperfect means then at command for controlling it, and perhaps

he was right at the time, for the manufacture of wrought iron had not

then made sufficient progress to render it capable of resisting with

safety the great power of high-pressure steam. He pointed out the

way, and others, through the improvements in the manufacture of iron,

have profited by his discoveries. I must not omit, in justice to the

very talented Mr. Perkins, his views as to the value of high-pressure

steam, upon which he made numerous experiments; amongst other things,

he proposed to use it as a destructive power in war, by means of his

celebrated steam gun, which created much sensation at the time; and it

is rather singular that this has not been taken up in modern times, when

every invention which can add to the methods of destruction is most

greedily adopted. There can be no doubt that the “_steam gun_” may be

used with the most terrible effect in fixed batteries either for musketry

or artillery, and probably the day will come when we shall see batteries

worked by steam, with a great diminution of manual agency; and the men

employed to work them will be so protected as to render the destruction

of human life comparatively trifling.

Amongst the other legacies which my dear father had left to me, was

that of building London Bridge. He had shown, to the satisfaction of

the Committee of the House of Commons, the impracticability of keeping

up the old bridge by any amount of repair or alteration; that it could

not be rendered fit for the improvement of the river Thames, nor for the

continually increasing traffic which must pass over it, at any reasonable

expense, and that therefore an entirely new bridge would be by far the

most satisfactory. The House of Commons was so fully convinced by his

arguments that it unanimously condemned the old bridge, and refused to

comply with the recommendation of the City of London that it should be

altered, but resolved that a new bridge should be built according to the

design made by my father. An Act of Parliament was accordingly passed

to this effect, the late talented and energetic Mr. Holme Sumner being

the leading member of the Committee. The Corporation demurred to this,

saying that there were other engineers equal to Mr. Rennie, and demanding

a public competition. The advertisement for designs was accordingly

issued, and a great number were sent in and referred to the Committee of

the House of Commons and the Government, according to the previous Act.

After considering the various rival plans, it was finally decided that

that of my father was the only one which complied with all the required

conditions, and it was therefore adopted. At this resolution great

discontent was manifested by the different competitors. The Corporation

of London also objected to this decision, as they considered that they

ought to have been the sole judges. But finding that the Government

adhered to its decision, they submitted, at the same time urging that

they, who were to pay the expense of the new bridge, ought to select the

engineer that was to execute the work. The Government agreed to this,

subject to their approval; and finally the Committee appointed by the

Corporation to carry into effect my father’s design, fixed upon me as the

engineer-in-chief; Mr. Richard Lambert Jones was appointed the chairman

of the executive committee of the Corporation. A very able and efficient

chairman he was, and conducted the whole to a conclusion, to the great

satisfaction of the Corporation and of the Government.

The design, as I have already observed, was made by my father, but no

detailed working drawings, specification, or estimate, had been prepared

by him; it fell to my lot, therefore, to do this. As I had acted under my

father during the construction of the Waterloo and Southwark bridges, I

had become so thoroughly acquainted with his system, that I had no very

great difficulty about it.

The design consisted of five semi-elliptical arches, the centre being 150

feet span, the two next arches 140 feet span each, the two side or land

arches 130 feet span each; the two centre piers were 24 feet thick at

the springing, and the two side piers 22 feet each; the whole was to be

built of the best grey granite. The width of the roadway was originally

designed to be 48 feet, but was afterwards increased to 54 feet wide, at

an extra cost of 46,000_l._

It was intended by my father that the new bridge should be built on the

site of the old one, which was to be pulled down in the first instance,

and a temporary wooden one was to be built above it to accommodate the

traffic whilst the new bridge was building. It was considered that

as soon as the fall of 5 feet occasioned by the old bridge should be

removed, the river would be restored to its natural state, and there

would then be less difficulty and expense in making the cofferdams and

founding the piers and abutments; the old approaches to the bridge would

then be preserved, and thus a less quantity of valuable property would

be required. The wish, however, of the Corporation to preserve the old

bridge during the construction of the new one was so strong, that there

was no possibility of resisting it. I therefore yielded to their desire,

and agreed to build the new bridge immediately above the old one, and as

near as practicable to it; notwithstanding, I felt at the time that there

would be considerable difficulty, risk, and extra expense in so doing, on

account of the great depth of water in which the piers must be founded,

namely, 28 feet at low water of spring tides, and the strong current and

fall through the old bridge both during the flood and ebb, particularly

during the latter. It should be observed that the old bridge stood as it

were upon a hill, the foundations of the piers being from 28 to 30 feet

above the bottom of the river immediately above and below it, occasioned

by the great fall and scour produced by the contracted waterway; thus

it was necessary to secure the piers by large projecting starlings, and

to throw considerable quantities of stone continually round them, in

order to prevent the old bridge from being carried away. However, there

was no alternative but to build the new bridge above the old one, and

I accordingly set about taking every possible precaution in order to

prevent accident.

As the loose stone thrown round the piers of the old bridge was

continually washed into the holes immediately above and below, it was in

vain to attempt driving the piles for the cofferdams of the piers until

this stone was removed, which was done by dredging. The cofferdams for

the piers were elliptical in form, this shape being the best adapted for

resisting the strong current in which they were placed; they consisted of

two main rows of piles each 14 inches square, each pile being properly

hooped and shod with wrought iron, and driven 25 feet into the bed of the

river. These piles were connected together in the horizontal direction

by three rows of braces 15 inches square, namely, one at the level of

the lowest tides, another at the level of half tide, and the third at

the level of high water. At every 10 feet the two rows of piles were

fastened together with wrought-iron bolts 2½ inches diameter, which

passed through the horizontal braces or walings, as they are technically

termed, and were secured outside and inside with additional wooden cleats

15 inches square and 8 feet long, so as to cover the joints where the

main horizontal braces met; outside of these were large iron plates, and

as the bolts were screwed at each end, they could be tightened up to the

full bearing without crushing the timber. On the outside of these two

main rows of piles was a third row of the same dimensions, and driven the

same depth into the bed of the river at a distance of 6 feet in the clear

from the two main rows, and connected together with a tier of horizontal

braces, and to the two main rows of piles with bolts, cleats, and plates

of the same dimensions as those already described. When the piles had

been driven to their proper depth, and had been properly secured to each

other as above described, the joints between every pile, which had been

previously fitted to each other, were well caulked with oakum, and the

outside joints were covered with melted pitch, so as to render them

water-tight; the spaces between the three rows of piles were then filled

with strong well-puddled clay.

In addition to the above three rows of piles, there was a fourth row on

the inside, driven down in the form of a parallelogram, corresponding

with the exact size of the foundation of the piers, and to the same depth

as the outer piles. Every tenth pile, and those at the corners or angles,

extended up to the level of low water. Upon the heads of these piles

longitudinal and transverse braces were fixed across the inside of the

dam, at the level of low water, half tide, and high water; so that the

dam was braced internally and externally in every direction to resist the

pressure of the water, like a well-made cask. There was a powerful steam

engine, with the requisite pumps, attached to each dam, to remove any

water which might either rise from the foundation or from the outside.

Each dam was provided with a trunk secured by a valve 3 feet diameter,

laid at the level of low water, so that in the event of any unusual

pressure of water coming against the dam, these valves were opened, and

the dam was then filled with water, and all mischief was prevented. The

first pier cofferdam on the Southwark side was completed, the water

pumped out, and the earth was excavated to the depth of 30 feet, going

below low-water mark of spring tides; the bottom consisted of the stiff

London clay. Piles, consisting of Baltic fir, elm, and beech, 22 feet

long, and 12 inches diameter in the middle, properly hooped and shod with

wrought iron, were then driven 20 feet into the solid ground, or until,

with a weight of 12 cwt. falling 18 to 20 feet, they would not move above

an inch at a blow. These piles were driven 3 feet 6 inches from centre

to centre, both in the longitudinal and transverse direction. After

having driven them, their heads were cut off and accurately levelled.

The loose earth between their heads was then removed, to the depth of 12

inches, and the spaces filled in with stone bedded in concrete; all the

rows of piles were then connected together in the transverse direction

by Baltic fir sills or beams 14 inches square, well fitted to each pile

head by jagged wrought-iron spikes 20 inches long and three quarters of

an inch square, driven through the sills into the pile heads below; the

spaces between the sills were well filled in with stone and brickwork;

another row of sills was then laid in the transverse direction above

the pile heads and spiked down to the lower sills in the same manner;

the spaces between the upper sills were then filled in with stone and

brickwork. The whole surface of the foundation was covered with elm plank

6 inches thick, closely jointed together and bedded in mortar, and well

spiked down to the sills below with jagged spikes 10 inches long and half

an inch square. Upon this platform the masonry was built, each course

diminishing in length and width by a series of offsets 12 inches wide,

until they reached the shaft of the pier, when it was carried up solid to

the springing of the arches. The whole of the exterior masonry was of the

best whitish-grey granite, and the interior stone was of the best hard

Yorkshire grit stone from the quarries of Bramley Fall. The abutments

were constructed upon piles and masonry of the same character as the

piers.

The first stone was laid with considerable ceremony on the first pier

cofferdam from the Surrey shore by His Royal Highness the late Duke

of York. The dam was fitted up with great taste like an amphitheatre,

with seats all round, the whole being covered at top with a handsome

coloured canvas awning adorned with numerous flags of all nations. The

Lord Mayor, assisted by the Aldermen, Common Councilmen, and Committee,

with Mr. Jones, the Chairman, attended in great state, and everything

went off well. After this pier had advanced nearly to the level of high

water, one day whilst examining it, standing upon one of the cross

beams, my foot slipped, and I fell headlong into the dam upon the top

of the masonry; fortunately, my left foot caught in a nail in the beam,

and I hung by it for a few seconds. This somewhat broke and changed the

direction of my fall, and I pitched upon an inclined plank, upon which I

slid until I struck my head against a stone; my hat deadened the blow;

as it was, however, I was cut about the forehead and half stunned. The

after effects of this fall were very serious; my whole system got such

a severe shaking, that I did not recover thoroughly until nearly ten

years afterwards, and I carried on my large professional business with

the greatest difficulty. The works made satisfactory progress, and the

centres for the first and second arches from the Surrey shore were soon

fixed.

Each centre was composed of eight ribs, framed upon the truss principle,

resting upon a continued series of wedges in one piece, laid horizontally

and resting upon tressels or legs formed by the piles of the cofferdams,

which had been cut off and levelled for that purpose. The mode of setting

and fixing the ribs was the same as that adopted at the Waterloo and

Southwark bridges. A large lighter was constructed especially for this

purpose. In the centre was placed a strong framing, which rested upon

eight screws, four in each row, working in a strong cast-iron box, to

which levers were attached, by means of which the screws and framing

above them could be gradually raised and lowered at pleasure; at one

end of the framing there was an upright scaffold. The centres, I have

already said, consisted of eight main ribs framed together separately.

As there was no room to frame these centres near the bridge, a special

workshop and wharf were provided by the contractors at Millwall, in

the Isle of Dogs; when ready they were launched in one piece, from a

properly-prepared platform, into the river, and towed to the Southwark

end of the bridge, where the lighter, with its apparatus of powerful

sheers, crabs, and tackle, was in readiness to receive them; by these

means they were gradually hauled up an inclined plane, and then raised

upright upon the platform, supported by the frame and screws beneath,

and firmly braced to the scaffolding in the lighter; two centre frames

were thus placed upon it at one time, and adjusted by the screws to an

extra height of 2 feet, so as to allow for any deficiency in the rise of

the tide. Two ribs having been placed upon the framing, the lighter was

hauled off from the shore and placed in front of the opening in which the

centre was to be, the lighter being moored 100 yards from it, about half

an hour before high water; upon the turning of the tide it was gradually

allowed to float down with the ebb current to its place. By the time that

the lighter with the centre ribs arrived in its exact position there was

always 2 feet to spare, in order to allow for any deficiency of the tide;

as the tide fell the two ribs were securely deposited in their places

upon the framing and wedges below them. It should be observed, that upon

the wedges there was an additional framing so as to reduce the weight

of the main ribs of the centring. When the main ribs had been deposited

upon the framing wedges, they were securely braced together until the

whole number of ribs required for each centre was fixed, when they were

all braced firmly together longitudinally, transversely, and diagonally.

This mode of fixing centres for arches of any span was most successful

and economical, and I believe that my father was the inventor of it, if

it may be termed an invention. My excellent and talented friend, the

late Robert Stephenson, adopted the same method for fixing the tubes of

the Conway and Menai Straits bridges. He told me that he was not aware

that my father had proposed it before him; but in the ‘History of the

Britannia and Conway Bridges,’ edited, I believe, by the present Mr.

Edwin Clarke, who was employed under Mr. Stephenson at the Conway Bridge,

it is expressly mentioned that my father had previously employed the same

plan.[3]

But to return to London Bridge. The works proceeded successfully; the

fifth or last arch on the City side was completed in 1829. The centres of

the first, second, and centre arches having been removed, it was found

that they had subsided only 3 inches each, which was the exact distance

that had been allowed for, with an extra half inch for the centre arch.

Upon examining the arches and piers after it was supposed that they had

subsided, it was found that there had been an unequal sinking, that the

two centre piers had subsided on the east side slightly more than on

the west side. I was much puzzled at this, and could not for some time

account for the difference. Three or four of the quoin arch-stones of

the second arch from the City shore had been fractured for about 8 or 9

inches; this, however, was of no consequence, for it is always difficult

in such large arches to get the workmen to bed the quoins accurately.

The same thing had occurred in the Waterloo and other bridges; I was

therefore led to investigate the subject more thoroughly during the

construction of the new bridge. It was found that the cofferdams for the

piers in several instances were made in front of the openings or arches

of the old bridge, which could not be avoided. These dams necessarily

still further obstructed the waterway through the old bridge; I therefore

felt that it was absolutely essential to find relief for the ebbing and

flowing tides, detained both by the old bridge and the cofferdams of the

new bridge, and accordingly recommended that, on the south side of the

main arch of the old bridge, which was only 80 feet wide, two arches

should be thrown into one, and that the intermediate pier should be

removed, by which means a single wide opening would be made facing the

space between the cofferdams of the arch and the centre on the Surrey

side of the new bridge, but the difficulty of doing this arose from the

fact that the traffic over the old bridge could not be interrupted for a

moment. I soon, however, found an expedient; I ordered that the requisite

number of logs of the best Baltic fir timber 15 inches square should be

prepared sufficiently long to extend over the two arches and piers of

the old bridge which I proposed to remove. Having got these ready, I

stopped up one half of the roadway, leaving the other half open for the

traffic, and working night and day, I laid these whole timbers spanning

the two arches to the adjoining piers close together, bolted them to each

other, and secured them to a longitudinal bearer of the same dimensions

imbedded in the masonry of the adjoining piers, so that the timbers which

were to form the increased opening rested firmly upon them. Having done

this, I removed the masonry of the intermediate arch by degrees from

beneath the timber girders, placing a strong diagonal strut or support

under each girder as I proceeded, at the same time connecting together

all these diagonal struts. Having completed one half of the temporary

arch or opening, the traffic was diverted over it, and the other half

was completed in the same manner; the whole operation was accomplished

within ten days, and the traffic was not stopped for one hour. The

intermediate pier of the old arch was then removed entirely. As the work

advanced to the fourth pier on the City side another similar opening

was made. These alterations relieved the river materially, and enabled

the works to be carried on much more securely, and greatly diminished

the fall through the old bridge at low water. Nevertheless, there was

increased scour against the dams where the openings were made, which

occasioned the slight unequal subsidence before mentioned. The last or

fifth arch was completed on the City side, January, 1829.

It has been mentioned that Lord Liverpool’s Government had always taken

the greatest interest in the construction of new London Bridge, and gave

the Corporation of London every support in their power, not only for the

accommodation of the great traffic across it, but for the improvement

of the Thames, which the removal of the old bridge would effect; and

amongst the men most zealous in Lord Liverpool’s Government were the

late Marquis of Salisbury, then Lord Cranbourne, and the late Earl

of Lonsdale, then Lord Lowther; both these noblemen had considerable

talent, and, fully alive to the advancing ideas of the day, were mainly

instrumental in forwarding this great work. That amiable, able, and

conscientious nobleman, the Earl of Liverpool, had succumbed to the

effects of a paralytic stroke, and the Duke of Wellington was now

Premier; he took the greatest interest in the promotion of London Bridge

and everything connected with it; so that the Corporation of London,

who had hitherto been radically inclined, or had rather been opposed to

the Tory Government, turned rather Conservative than otherwise, and the

Duke became most popular with them; he invariably, whenever he could,

accepted their invitations to Guildhall and the Mansion House, and was

always received by them with the greatest respect and attention. Richard

Lambert Jones, the Chairman of the London Bridge Committee, was his

particular favourite, and he always shook Jones by the hand, a favour

which he did not accord to everyone.

At this time the bridge had made considerable progress towards

completion, and the important question arose, what was the best plan for

the approaches? It was originally intended, in order to save expense,

that the old line of Fish Street Hill, on the City side, should be

adopted, pulling down such of the houses on this line as might be

necessary to make the incline not steeper than 1 in 30; but inasmuch as

the great traffic of Upper and Lower Thames Street interposed materially

with the main body of the traffic coming north and south, it became

most important to consider how this might be avoided, and the old idea

of making an arch over Thames Street was revived, and was favourably

received by the London Bridge Committee; the question was accordingly

referred by them to me. I had always felt that the old approach by Fish

Street Hill was a very great difficulty; but, restricted as I was to

the old line of approach, I felt that I could not get out of it without

some pressing necessity; I was therefore glad to have the opportunity of

reconsidering the subject, particularly when proposed by the Committee.

It was quite clear, that in any case an arch over Thames Street to

separate the great cart traffic of that quarter from the main coach and

passenger traffic coming from the City, Southwark, and the northern and

southern parts of the town, was absolutely necessary, and I should have

proposed it myself in the first instance, if there had at that time been

any chance of its adoption, and I am quite sure that my father would have

done the same. But if it had been proposed to divert the traffic from

the old line of Fish Street Hill at the first, it is most probable that

it would never have been carried; I was obliged, therefore, to confine

myself to the old approaches, leaving the future to develop itself. The

Committee, however, having taken up the idea of an arch over Thames

Street, I was only too happy to fall in with it; but as nothing could

be done without the sanction of the Government, it was determined by

the Committee to bring the subject before them at once; the more so, as

it would require a much larger sum than originally calculated to make

the approaches, for which the Committee had no funds, and a new Act

of Parliament would be required. Plans and estimates were accordingly

prepared for the new approaches, and submitted to His Majesty’s

Government. The Duke of Wellington took the greatest interest in the

subject, and investigated it to the fullest extent; he visited the place

himself, he interrogated the Chairman of the Committee and myself most

closely, and at length, being fully convinced that it was necessary, gave

the consent of the Government, provided that the funds could be found.

In order to meet this difficulty, the Committee proposed to increase

the coal tax, which, with the necessary sinking fund, would pay off the

whole sum necessary to make the new approaches, which were estimated at

1,400,000_l._, in a given number of years. The Government consented to

this, and the requisite notices, plans, &c., were given and deposited in

the month of November, 1828.

Early in 1829 the Bill was brought into Parliament, and was most

strongly opposed by the great northern coal-owners, Lord Durham, Lord

Londonderry, Lord Lauderdale, and others, as well as by a considerable

body of Londoners, and after a hard fight the Bill passed the House

of Commons and got into the Lords; but here the opposition was more

violent and powerful than ever. The Duke of Wellington, however, having

been thoroughly convinced of the necessity and justice of the measure,

determined that it should be carried if possible, whilst the Opposition

were equally determined to throw it out. The Committee accordingly met

in the Painted Chamber of the House of Lords, and the extraordinary

number of forty peers, including seven cabinet ministers, assembled, the

Duke of Wellington being in the chair. The Opposition comprised, amongst

others, Earl Grey, his son-in-law the Earl of Durham, the Marquis of

Londonderry, the Earl of Lauderdale, &c. Such a committee upon a private

Bill has never since been seen in the Lords, and perhaps never will be

again. The brunt of the battle fell upon me; I was the leading witness,

and had to establish the whole case. I never felt more nervous in my

life; I was to be prepared upon all points to defend everybody else’s

errors as well as my own. I knew there were several weak points, and

though I had an excellent case upon the whole, I still felt the greatest

difficulty about it; I knew also perfectly well, that if I broke down, my

career as an engineer was ruined for ever, for the Government had pinned

their faith upon me; I therefore had made myself thoroughly master of

the subject, and determined to sink or swim with it. Mr. W. Montague,

then surveyor to the City, was a very sensible, practical man, and of

great experience in the valuation of property, and possessed considerable

influence with the Corporation; but whether it was jealousy at my being

so much younger than himself, or whether he thought the post of honour

should have been given to him, I cannot say, but he did not act cordially

with me. That very remarkable man, Richard Lambert Jones, the Chairman

of the Bridge, with his usual tact and sagacity, at once saw this, and

thought that if he was examined there might be some discrepancy which

our enemies would take advantage of; he therefore, with the concurrence

of his Committee, determined that I alone should fight the battle of the

estimates, upon which the whole fate of the Bill depended. It was well,

both for Montague and myself, that this course was taken; for Montague,

when the first Bill of 1821 was carried, had made the surveys of the

property to be taken for the approaches on both sides of the bridge,

which was confined to 180 feet above the old bridge. This limit ought

to have been taken in a direct line, at right angles to the old bridge;

but unfortunately it was taken according to the line of the shore, which

near the old bridge receded considerably, whilst the old Fishmongers’

Hall projected beyond it, making the direct line, if taken, as it ought

to have been, at right angles to the old bridge, 20 feet longer than if

measured according to the line of the shore. This difference of 20 feet

rendered it necessary that old Fishmongers’ Hall should be removed, and

negotiations immediately commenced between the London Bridge Committee

and the Fishmongers’ Company with respect to the purchase of this piece

of land. The Fishmongers’ Company behaved very fairly; they said that

they did not wish to build a new hall, as the existing structure answered

their purpose very well; but if they were compelled to part with this

20 feet of ground, they must build a new hall, which they did not want

to do. However, as they had no wish to impede the construction of the

bridge and approaches, they were willing to sell the strip of land on

which part of their hall stood, namely, 20 feet in width, for 20,000_l._

1000_l._ per foot at first sight appeared a very large sum, although at

present it would be considered remarkably cheap. The Committee of the

bridge, looking at the matter fairly, resolved to pay the Fishmongers’

Company the required sum in full compensation for everything, and the

Fishmongers’ Company might, if they thought fit, build a new hall at

their own expense. This agreement was then settled, provided that the

Bill for making the new approaches by an arch across Thames Street should

pass the legislature. Knowing this fact, I was very anxious that this

error of Mr. Montague’s should not come out before the Committee of

the House of Lords, as it was no doubt a great mistake, and if it had

transpired, it might materially have injured our case. I determined,

therefore, during my examination, to keep it out of view as far as

possible; at the same time, if it was fairly put to me, of course I felt

myself bound to give every honest explanation. Perhaps Mr. Montague was

not anxious to be examined; anyhow, he was not, and the whole burthen

fell upon me.

The opposition in the Lords’ Committee was headed by the Earl of Durham,

a very able and intelligent man; he would have made an excellent lawyer

if Providence had so designed it, and in this instance he conducted his

case admirably. I got through the examination in chief very well, and

the opposing counsel commenced his cross-examination, and made nothing

of it. Then Lord Durham got up and for three days I underwent as severe

a cross-examination as I ever experienced, either before or since. He

seemed to be aware of all the facts, and omitted nothing to render his

case triumphant. I always feared that he was coming to the mistake about

Fishmongers’ Hall, but he never did, and I had to lead him away from it

as far as possible; at last he got to the frontages in the different

streets of the respective parishes which were proposed to be taken, and

the new frontages of the new streets which were to be erected. Here I

showed very clearly that the lineal frontage according to the proposed

new streets would be greater than the frontages taken away. This,

however, did not satisfy his Lordship, for he contended that some of the

parishes would lose a great deal more frontage than they would obtain. I

had some idea that this would be the case, and therefore did not think

it necessary to take the individual frontage gained and lost by each

parish. I thought it was quite sufficient to know that upon the whole a

greater line of frontage would be given by the new approaches, than taken

away from the old. The parishes which had petitioned against the Bill

on this account, argued that in some of them the rates would be greatly

diminished, and that in others they would be greatly increased, which

would cause an unequal and unjust distribution. I still kept to my point,

and said upon the whole, without going into detail, the parishes would be

the gainers, and it was for them to adjust the rates amongst themselves.

Lord Durham was very indignant at my obstinacy in maintaining this point,

and tried in every way to make me confess that I had made a mistake; I

nevertheless stuck to it, and said that if I had tried to equalize all

the frontages, my survey might have extended to the Tower, and there

would have been no end of the expense. By this time he was losing his

temper, and said that if I was not very careful I might go to the Tower

still. At this the Committee smiled, and his Lordship, being fairly

baffled, sat down, and I, having been told that they had no further

questions, left the witness-box with the greatest alacrity.

It was considered that I had made out the case for the Bill so

completely, both as regards the estimates and the absolute necessity, in

a public point of view, of carrying the new approaches into effect, that

no other professional witness was put into the box, except the present

able chamberlain, Mr. Scott, then chamberlain’s chief assistant, who

gave such clear and straightforward evidence with regard to the funds

which were disposable by the Corporation, and the way in which they

were administered, that the Committee of the Lords passed the Bill for

the London Bridge Approaches with but few dissentient voices. The Duke

of Wellington, and five or six Cabinet Ministers with him, attended

every day, and in fact kept Parliament sitting to pass the Bill. It was

curious to observe that he never for a moment interrupted the opponents

of the measure; he gave them full scope, and never said a word until

they had had their say, then he put the question, and carried it without

difficulty.

After the fifth arch, the first on the Surrey side, was keyed, the

sinking was observed to be 4 inches, or about 1 inch more than the

others. I could not very well account for this. I also observed that two

of the quoins on the south-east end of the fourth arch from the Surrey

shore had splintered off at the soffit, but no crack could be observed in

the spandril walls; but upon levelling the piers, it was found that the

east end had subsided from 10 to 14 inches more than the upper or west

end. This I could account for in no other way but that there had been

a greater scour here than at the upper end, and that the piles had to

some extent been laid bare. I levelled the arches and piers constantly

after this for several months from a fixed standard gauge, but could find

no alteration; I therefore felt satisfied that the whole of the pier

abutments had come to their final bearing, and the works were continued

as fast as possible towards completion.

In 1830 the Duke’s Government retired, and he himself became as unpopular

as he before had been popular; yet he never deserted London Bridge, and

was more frequent in his visits than ever. I often used to attend him at

five and six in the summer mornings; he generally came on horseback, and

remained from half an hour to an hour, and sometimes more if necessary.

At length the whole bridge and the approaches were completed, and His

Majesty, King William, at the special request of the Corporation of

London, condescended to fix a day on which he would open the bridge in

person. Earl Grey, who had strongly opposed the Bill for the improved

approaches two years before, now, as Premier, accompanied His Majesty

to inaugurate the opening of the same. Perhaps, as a spectacle of the

kind, it was the most brilliant of any that had taken place for fully

a century; and the whole Corporation, including the Bridge Committee,

did everything in their power, for the honour of the City of London,

to render the pageant as splendid as possible. The whole of the space

at the north or City end of the bridge was covered with a magnificent

tent, several hundred feet long, decorated in the greatest taste with

the flags of all nations, and with ancient and modern arms grouped

round the standards forming the supports of the tent, under which were

arranged tables for 1400 guests, for whom a splendid collation was

provided. His Majesty, King William, came in the royal barge in state,

accompanied by all his ministers, and upon his arrival was greeted with

a salute of twenty-one guns from the Tower. All the piers and arches

were decorated with lofty standards displaying the national emblems; the

whole of these, as well as the great tent and decorations, were under

the direction of Mr. Stacey, of the Ordnance department of the Tower,

and the greatest credit is due to him for the admirable taste which

he displayed. The ceremony consisted in King William walking over the

bridge, accompanied by his ministers, the Lord Mayor and Corporation, and

the Bridge Committee. When His Majesty arrived at the Southwark end a

balloon ascended, carrying Mr. Richard Crawshay; the Tower guns then sent

forth another salute, and King William and his _cortège_ returned to the

tent at the City end of the bridge, where they partook of lunch with the

usual ceremonies, and returned by water as they came, with another royal

salute from the Tower. The day was remarkably fine, the river was covered

with boats filled with gaily-dressed people; the wharves, warehouses,

and bridges were thronged with spectators; in fact, it was a great

metropolitan holiday; everything went off well, and all appeared to be

satisfied; I was particularly so. I had been very hard worked, I may say

almost night and day, for some time past, to get things ready, and was of

course rather tried; nevertheless, the success which attended the whole

rendered me completely unmindful of myself, and I forgot all my fatigues,

for I was amply rewarded for all my troubles and anxieties.

A few days after the opening of London Bridge, Jeffreys, the cheesemonger

of Ludgate Hill, presented a petition to Parliament through the

well-known Henry Hunt, stating that the new bridge was coming down.

Jeffreys was very much annoyed because he had received no recompense for

his repeated proposals with regard to the new approaches, though he was

never regularly employed; but he was one of those active, intelligent

persons, who are always interfering in matters which do not concern

them. If he had devoted himself to his own business he might have done

well; but, unfortunately, he neglected this, and fancied himself a great

engineer, a post for which he was absurdly incompetent. He mistook his

vocation, and in attempting to do that for which he was wholly unfit,

he neglected the business of a tradesman, for which he was thoroughly

suited. The petition ended in its being referred to a Commission,

consisting of J. Walker, Telford, and Tierney Clark, who examined the

bridge carefully and made their report, which was colourless and came to

nothing, as the subsidence spoken of had taken place two years and a half

before, and had not increased, nor has it done so up to the present day.

In all works of great magnitude, and particularly in such a difficult

situation as that in which London Bridge is built, it is impossible to

be certain of attaining absolute perfection, but the Committee, being

perfectly satisfied of the stability of the new bridge, determined to

remove the old one forthwith, and I received orders accordingly. The

removal was contracted for by Messrs. Jolliffe and Banks, for the sum of

10,000_l._, they having the benefit of the old materials, except in so

far that they were to fill up the holes in the river below both bridges,

to the extent of 14 feet below low water of spring tides, which was

rather more than the average depth of the river in the vicinity; they

were also bound to remove the whole of the foundations of the piers,

starlings, &c., of the old bridge, to the same depth. The whole of these

operations were completed in the year 1834, when the river, after a lapse

of 658 years, was restored to its natural state.