TUNNELS FROM EAST AVENUE TO THE RIVER SHAFTS.

The sinking of the temporary shaft at East Avenue was a fairly simple

matter. Rough 6 by 12-in. sheet-piling, forming a rectangle, 127 by 34

ft., braced across by heavy timbering, was driven about 28 ft. to rock

as the excavation progressed. Below this, the shaft was sunk into rock,

about 27 ft., without timbering. As soon as the shaft was down, on

September 30th, 1904, bottom headings were started westward in Tunnels

_A_, _B_, and _D_. When these had been driven about half the distance to

the river shafts, soft ground was encountered. (See Station 59, Plate

XIII.) As the ground carried considerable water, it was decided to use

compressed air. Bulkheads were built in the heading, and, with an air

pressure of about 15 lb. per sq. in., the heading was driven through the

soft ground and into rock by ordinary mining methods. The use of

compressed air was then discontinued. West of this soft ground, a top

heading, followed by a bench, was driven to the soft ground at about

Station 66. Tunnel _C_, being higher, was more in soft ground, and at

first it was the intention to delay its excavation until it had been

well drained by the bottom headings in the tunnels on each side. A

little later it was decided to use a shield without compressed air. This

shield had been used in excavating the stations of the Great Northern

and City Tunnel in London. It was rebuilt, its diameter being changed

from 24 ft. 8-1/2 in. to 23 ft. 5-1/4 in. It proved too weak, and after

it had flattened about 4 in. and had been jacked up three times, the

scheme was abandoned, the shield was removed, and work was continued by

the methods which were being used in the other tunnels. The shield was

rather light, but probably it would have been strong enough had it been

used with compressed air, or had the material passed through been all

earth. Here, there was a narrow concrete cradle in the bottom, with rock

up to about the middle of the tunnel, which was excavated to clear the

shield, and gave no support on its sides. The shield was a cylinder

crushed between forces applied along the top and bottom.

With the exception of this trial of a shield in Tunnel _C_, and a novel

method in Tunnel _B_, where compressed air, but no shield, was used, the

description of the work in one tunnel will do for all.

From the bottom headings break-ups were started at several places in

each tunnel where there was ample cover of rock above. Where the roof

was in soft ground, top headings were driven from the points of break-up

and timbered. As soon as the full-sized excavation was completed, the

iron lining was built, usually in short lengths.

It will be noticed on Plate XIII that there is a depression in the rock

between Station 65 and the river shafts, leaving all the tunnels in soft

ground. As this was directly under the Long Island Railroad passenger

station, it was thought best to use a shield and compressed air. This

was done in Tunnels _A_, _C_, and _D_, one shield being used

successively for all three. It was first erected in Tunnel _D_ at

Station 64 + 47. From there it was driven westward to the river shaft.

It was then taken apart and re-erected in Tunnel _C_ at Station 63 + 63

and driven westward to the shaft. It was then found that there would not

be time for one shield to do all four lines. The experience in Tunnels

_C_ and _D_ had proven the ground to be much better than had been

expected. There was considerable clay in the sand, and, with the water

blown out by compressed air, it was very stable. A special timbering

method was devised, and Tunnel _B_ was driven from Station 66 + 10 to

the shaft with compressed air, but without a shield. In the meantime the

shield was re-erected in Tunnel _A_ and was shoved through the soft

ground from Station 65 + 48 nearly to the river shaft, where it was

dismantled.

There was nothing unusual about the shield work; it was about the same

as that under the river, which is fully described elsewhere. In spite of

great care in excavating in front of the shield, and prompt grouting

behind it, there was a small settlement of the building above, amounting

to about 1-1/2 in. in the walls and about 5 in. in the ground floors

which were of concrete laid like a sidewalk directly upon the ground.

Whether this settlement was due to ground lost in the shield work or to

a compacting of the ground on account of its being dried out by

compressed air, it is impossible to say.

The interesting features of this work from East Avenue to the river

shafts are the mining methods and the building of the iron tube without

a shield.

Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 The New York Tunnel Extension of the Pennsylvania Railroad. The East River Tunnels. Paper No. 1159 · 第 7 / 35 题