THE EAST RIVER TUNNELS.[A]

BY JAMES H. BRACE, FRANCIS MASON, AND S. H. WOODARD, MEMBERS, AM. SOC.

C. E.

This paper will be limited to a consideration of the construction of the

tunnels, the broader questions of design, etc., having already been

considered in papers by Brig.-Gen. Charles W. Raymond, M. Am. Soc. C.

E., and Alfred Noble, Past-President, Am. Soc. C. E.

The location of the section of the work to be considered here is shown

on Plate XIII of Mr. Noble's paper. There are two permanent shafts on

each side of the East River and four single cast-iron tube tunnels, each

about 6,000 ft. long, and consisting of 3,900 ft. between shafts under

the river, and 2,000 ft. in Long Island City, mostly under the depot and

passenger yard of the Long Island Railroad. This tube-tunnel work was

naturally a single job. The contract for its construction was let to S.

Pearson and Son, Incorporated, ground being broken on May 17th, 1904.

Five years later, to a day, the work was finished and received its final

inspection for acceptance by the Railroad Company.

The contract was of the profit-sharing type, and required an audit, by

the Railroad Company, of the contractor's books, and a careful system of

cost-keeping by the Company's engineers, so that it is possible to

include in the following some of the unit costs of the work. These are

given in two parts: The first is called the unit labor cost, and is the

cost of the labor in the tunnel directly chargeable to the thing

considered. It does not include the labor of operating the plant, nor

watchmen, yardmen, pipemen, and electricians. The second is called "top

charges," a common term, but meaning different things to different

contractors and engineers. Here, it is made to include the cost of the

contractor's staff and roving laborers, such as pipemen, electricians,

and yardmen, the cost of the plant and its operation, and all

miscellaneous expenses, but does not include any contractor's profit,

nor cost of materials entering permanent work.

The contractor's plant is to be described in a paper by Henry Japp,[B]

M. Am. Soc. C. E., and will not be dealt with here.

The contractors carried on their work from three different sites. From

permanent shafts, located near the river in Manhattan, four shields were

driven eastward to about the middle of the river; and, from two similar

shafts at the river front in Long Island City, four shields were driven

westward to meet those from Manhattan. From a temporary shaft, near East

Avenue, Long Island City, the land section of about 2,000 ft. was driven

to the river shafts.

[Footnote A: Presented at the meeting of December 15th, 1909.]

[Footnote B: _Transactions_, Am. Soc. C. E., Vol. LXIX. p. 1.]

Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 The New York Tunnel Extension of the Pennsylvania Railroad. The East River Tunnels. Paper No. 1159 · 第 6 / 35 题