CHAPTER XIV.

THE FULL SECTION METHOD OF TUNNELING: ENGLISH METHOD; AMERICAN METHOD;

AUSTRIAN METHOD.

ENGLISH METHOD.

The English method of tunneling through soft ground, as its name

implies, originated in England, where, owing to the general prevalence

of comparatively firm chalks, clays, shales, and sandstones, it has

gained unusual popularity. The distinctive characteristics of the method

are the excavation of the full section of the tunnel at once, the use of

longitudinal strutting, and the alternate execution of the masonry work

and excavation. In America the method is generally designated as the

longitudinal bar method, owing to the mode of strutting, which has

gained particular favor in America, and is commonly employed here even

when the mode of excavation is distinctively German or Belgian in other

respects.

[Illustration: FIG. 84.--Diagram Showing Sequence of Excavation in

English Method of Tunneling.]

=Excavation.=--Although, as stated above, the distinctive characteristic

of the English method is the excavation of the full section at once, the

digging is usually started by driving a small heading or drift to locate

and establish the axis of the tunnel, and to facilitate drainage in wet

ground. These advance galleries may be driven either in the upper or in

the lower part of the section, as the local conditions and choice of the

engineer dictate. Whether the advance gallery is located at the top or

at the bottom of the section makes no difference in the mode of

enlarging the profile. This work always begins at the upper part of the

section. A center top heading is driven and strutted by erecting posts

carrying longitudinal bars supporting transverse poling-boards. This

heading is immediately widened by digging away the earth at each side,

and by strutting the opening by temporary posts resting on blocking, and

carrying longitudinal bars supporting poling-boards. This process of

widening is continued in this manner until the full roof section, No. 1,

Fig. 84, is opened, when a heavy transverse sill is laid, and permanent

struts are erected from it to the longitudinal bars, the temporary posts

and blocking being removed. The excavation of part No. 2 then begins by

opening a center trench and widening it on each side, temporary posts

being erected to support the sill above. As soon as part No. 2 is fully

excavated, a second transverse sill is placed below the first, and

struts are placed between them. The excavation of part No. 3 is carried

out in exactly the same manner as was part No. 2. The lengths of the

various sections, Nos. 1, 2, and 3, generally run from 12 ft. to 20 ft.,

depending upon the character of the soil.

=Strutting.=--The strutting in the English method of tunneling consists

of a transverse framework set close to the face of the excavation, which

supports one end of the longitudinal crown bars, the other ends of which

rest on the completed lining. The transverse framework is composed of

three horizontal sills arranged and supported as shown by Fig. 85. The

bottom sill _A_ is carried by vertical posts resting on blocking on the

floor of the excavation. From the bottom sill vertical struts rise to

support the middle sill _B_. The top sill, or miners’ sill _C_, is

carried by vertical posts or struts rising from the middle sill _B_. The

vertical struts are usually round timbers from 6 ins. to 8 ins. in

diameter; and the sills are square timbers of sufficient section to

carry the vertical loads, and generally made up of two posts

scarf-jointed and butted to permit them to be more easily handled. In

firm soils the struts between the sills are all set vertically, but

those at the extreme sides of the roof section are inclined. In loose

soils, however, where the sides of the excavation must be shored, the

V-bracing shown by Fig. 85 is employed between one or more pairs of

sills as the conditions necessitate. The manner of holding the

transverse framework upright is explained quite clearly by Fig. 85;

inclined props extending from the completed masonry to the sills of the

framework being employed. Two props are used to each sill. Sometimes, in

addition to the props shown, another nearly horizontal prop extends from

the crown of the arch masonry to the middle piece of the strutting.

[Illustration: FIG. 85.--Sketches Showing Construction of Strutting,

English Method.]

Referring to Fig. 85, it will be observed that the longitudinal crown

bars are above the extrados of the roof arch. When, therefore, the

lining masonry has been completed close up to the transverse framework,

the latter is removed, leaving the crown bars resting on the arch

masonry; and excavation, which has been stopped while the masonry was

being laid, is continued for another 12 ft. to 20 ft., and the

transverse framework is erected at the face, and braced or propped

against the completed lining as shown by Fig. 85. The next step is to

place the crown bars, and this is done by pulling them ahead from their

original position over the masonry of the completed section of the roof

arch. It will be understood that the crown bars are not pulled ahead

their full length at one operation, but are advanced by successive short

movements as the excavation progresses, their outer ends being supported

by temporary posts until the transverse framework is built at the face

of the excavation.

=Centers.=--Two standard forms of centers are employed in the English

method of tunneling, as shown by Figs. 86 and 87. Both consist of an

outer portion, constructed much like a typical plank center, which is

strengthened against distortion by an interior truss framework. The

elemental members of this truss framework take the form of a queen-post

truss, as is shown more particularly by Fig. 86. In Fig. 87 the

queen-post truss construction is less easily distinguished, owing to the

cutting of the bottom tie-beam and other modifications, but it can still

be observed. The possibility of cutting the tie-beam as shown in Fig.

87, without danger, is due to the fact that the lateral pressures on the

haunches of the center counteract the tendency of the center to flatten

under load, which is usually counteracted by the tie-beam alone. The

object of cutting the tie-beam is to afford room for the props running

from the completed masonry to the transverse framework of the strutting

as shown by Fig. 85.

[Illustration: FIGS. 86 and 87.--Sketches of Typical Timber Roof-Arch

Centers, English Method.]

Generally four or five centers are used for each length of arch built.

They are set up so that the tie-beams rest on double opposite wedges

carried by a transverse beam below. This transverse beam in turn rests

on another transverse beam which is supported by posts carried on

blocking on the invert masonry. It is usually made with a butted joint

at the middle to permit its removal, since it is so long that the

masonry has to be built around its extreme ends. The lagging is of the

usual form, and rests on the exterior edges of the curved upper member

of the centers.

=Masonry.=--In the English method of tunneling, the masonry begins with

the construction of the invert, and proceeds to the crown of the arch.

The lining is built in lengths, or successive rings, corresponding to

the length of excavation, which, as previously stated, is from 12 ft. to

20 ft. Each ring or length of lining terminates close to the transverse

strutting frame erected at the face of the excavation. Work is first

begun on the invert at the point where the preceding ring of masonry

ends, and is continued to the transverse strutting frame at the front of

the excavation. As fast as the invert is completed, work is begun on the

side walls. In very loose soils the longitudinal bars supporting the

sides of the excavation are removed after the side walls are built; but

in firmer soils they may be taken out one by one just ahead of the

masonry, or in very firm soils it may be possible to remove them

entirely before beginning the side walls. In all cases it is necessary

to fill the space between the masonry and the walls of the excavation

with riprap or earth. To build the roof arch the centers are first

erected as described above, and the crown bars are removed as previously

described by pulling them ahead after the arch ring is completed. As

with the side walls, the vacant space between the arch ring and the roof

of the excavation must be filled in. Usually earth or small stones are

used for filling; but in very loose soils it is sometimes the practice

not to remove the poling-boards, but to support them by short brick

pillars resting on the arch ring and then to fill around these pillars.

=Hauling.=--To haul away the material and take in supplies, tracks are

laid on the invert masonry. Generally the permanent tracks are laid as

fast as the lining is completed. A short section of temporary track is

used to extend this permanent track close to the work of the advanced

drift.

=Advantages and Disadvantages.=--The great advantage of the English

method of tunneling is that the masonry lining is built in one piece

from the foundations to the crown, making possible a strong, homogeneous

construction. It also possesses a decided advantage because of the

simple methods of hauling which are possible: there being no differences

of level to surmount, no hoisting of cars nor trans-shipments of loads

are necessary. The chief disadvantage of the method is that the

excavators and masons work alternately, thus making the progress of the

work slower perhaps than in any other method of tunneling commonly

employed under similar conditions. This disadvantage is overcome to a

considerable extent when the tunnel is excavated by shafts, and the work

at the different headings is so arranged that the masons or excavators

when freed from duty at one heading may be transferred to another where

excavation or lining is to be done as the case may be. Another

disadvantage of the English method arises from the excavation of the

full section at once, which in unstable soils necessitates strong and

careful strutting, and increases the danger of caving. The fact also

that the arch ring has to carry the weight of the crown bars, and their

loading at one end while the masonry is green, increases the chances of

the arch being distorted.

=Conclusion.=--The English method of tunneling in its entirety is

confined in actual practice pretty closely to the country from which it

receives its name. A possible extension of its use more generally is

considered by many as likely to follow the development of a successful

excavating machine for soft material. The space afforded by the opening

of the full section at once, especially adapts the method to the use of

excavators like, for example, the endless chain bucket excavator used

on the Central London Ry., and illustrated in Fig. 11. The method also

furnishes an excellent opportunity for electric hauling and lighting

during construction.

The English method of tunneling has been used in building the Hoosac,

Musconetcong, Allegheny, Baltimore and Potomac, and other tunnels in

America. The names of the European tunnels built by this method are too

numerous to mention here.

AMERICAN METHOD.

In this country tunnels through loose soils are excavated according to

the “Crown Bar” or American Method. This consists in opening the whole

section of the tunnel before the construction of the lining as in the

English Method. It differs from the English method, however, in that

many timber structures are erected for the support of the roof, and that

the excavation and construction of the lining are far apart, so allowing

the miners and the masons to work continuously and without interfering

with each other.

[Illustration: FIG. 88.--Sequence of Excavation in the American Method.]

[Illustration: ~Section A-B.~

FIG. 89.--Strutting the Heading in the American Method.]

[Illustration: ~Section C-D.~

FIG. 90.--Temporary Timbering of the Roof in the American Method.]

[Illustration: ~Section E-F.~

FIG. 91.--Showing Crown Bars Supported by Segmental Arches.]

=Excavation.=--The diagram in Fig. 88 shows the sequence of excavation.

The work begins by driving a central heading usually 7 × 8 ft., strutted

by means of vertical or batter posts and cap-piece. Fig. 89,[11] the

props resting on foot blocks. Between the cap-pieces of the consecutive

frames are placed planks driven upward at a slightly inclined angle.

After the heading has been excavated and strutted, the floor is lowered

by removing the part marked 2 in the figure. The two batter posts

supporting the cap-piece are now substituted by two longer ones resting

on the floor of part 2 and abutting against longitudinal beams which

are inserted underneath the cap-pieces. These longitudinal beams are

called crown bars. The new batter posts are resting either on foot

blocks or sills according to the quality of soil and they are strongly

wedged to the crown bars. On each side of these crown bars are inserted

poling-boards or planks close to each other, which are driven downward.

The part marked 3 in the figure is removed by enlarging the cut 1 × 2 on

both sides. The plank, inserted above the crown bar, is driven in either

preceding or following the excavation and another crown bar is inserted

at the end of this plank. This second crown bar is supported by a prop

whose other end abuts against the foot of the rafter strutting the

heading. Between this crown bar and the roof of the excavation, other

planks are placed transversally to the axis of the tunnel and are driven

in until they are supported by a new crown bar, etc. The various props

supporting the crown bars are placed radially or in a fan-like manner,

similar to the characteristic arrangement of the timbering in the

Belgian method. Bracers to strengthen the timbering and the roof of the

excavation are inserted longitudinally between the various posts and

transversally between the crown bars, Fig. 90. As a rule, only three or

four of these radial structures are temporarily erected. A trench is

excavated at the side of the part marked 3 in the figure to receive the

wall plate which is a heavy timber laid on the floor parallel to the

longitudinal axis of the tunnel. On the wall plates are erected the

arched timber sets composed of five or seven segments of hewn timbers so

as to form a polygonal frame which is wedged to the crown bars and

which will support the arch of the roof. After one of these segmental

timber sets is erected the temporary radial structure is removed and the

upper section of the tunnel is cleared of any obstruction as the

pressures are transferred to the wall plates, Fig. 91. The bench marked

4 in the figure is taken away and the vertical props inserted under the

wall plates, Fig. 92.

[11] Figs. 89 to 91 are taken from a paper by S. W. Hopkins in

_Harvard Engineering Journal_, April, ’03, on the Fort George tunnel.

[Illustration: ~Section G-H.~

~Longitudinal Section.~

FIG. 92.--Transversal and Longitudinal Section of a Tunnel Excavated and

Strutted According to the American Method.]

=Strutting.=--The longitudinal strutting is used in connection with the

American method of tunneling. In fact, the strutting consists of a

series of longitudinal bars supporting planks laid transversally to the

axis of the tunnel and abutting against the roof of the excavation.

These crown bars during the excavations and immediately after are

temporarily supported by radial timbers forming almost a fan-like

structure, but this is soon substituted by a permanent one composed of a

polygonal timber frame of five or seven segments which are cut to

dimensions. The batter posts of the heading, the radial posts of the

temporary timber structure and the crown bars are all round timbers from

10 to 12 ins. in diameter. All the other timbers are square edged, the

usual dimensions being 10 × 10 ins. or 12 × 12 ins. with the exception

of the wall plates which are 14 × 14 ins. The dimensions of the various

members of the strutting and the distance apart of the different frames

vary with the quality of the soil. For instance, in ordinary loose

soils the frames are placed between 4 to 6 ft., but in very soft soils

they are erected only 3 or 3¹⁄₂ ft. apart.

Chiefly in the southwest, in tunnels excavated according to the American

method, the timbering has been left as regular lining and it was only

after many years when this temporary structure had decayed or was burned

down, that the tunnels were lined with masonry. But in many instances

the whole timber structure was left in place even when the tunnel was

lined with masonry immediately after the excavation had been made. This

was usually done when the tunnel was lined with concrete masonry. In

such a case the timbering was left to support the pressures of the roof

while the concrete was plastic and before it hardened.

=Centers.=--In the American method the whole section of the tunnel is

open before the construction of the lining, thus the masonry can be

built from the foundations up. The centers are designed so as to support

only the weight of the masonry during its construction and not the

pressures of the tunnel as in the other methods and consequently they

are of light construction. The centers described in the Murray Hill

tunnel, page 123, may be advantageously used in building the concrete

lining in tunnels through loose soils excavated by the American method.

=Hauling.=--The excavation of the heading and the upper section of the

tunnel is usually far ahead of the bench, consequently the hauling of

both the débris and the building materials is made at two different

levels, viz., on the bench and on the floor of the tunnel. When the face

of the heading and the excavation of the bench are not more than 50 ft.

apart, the hauling can be conveniently done on the tunnel floor, while

the materials and débris on the upper section of the tunnel are hauled

by wheelbarrows or light cars propelled by handpower. For a greater

distance, however, it is more convenient to use light cars running on

narrow-gauge tracks all through the tunnel. In this case the tracks on

the tunnel floor and on top of the bench are connected by means of an

inclined platform where the cars may ascend and descend without

interfering with the excavation of the bench. Here, as a rule, tunnels

have been excavated in soils considered good, generally through rock,

while loose soils have been encountered only in small sections. The same

method of excavation for whatever material is encountered is certainly

very convenient, as it affords a great regularity in the work; hence its

extensive use. A great disadvantage of this method is the double

strutting, viz., the polygonal and the longitudinal strutting succeeding

each other, whereas one of them could be easily spared. Another defect

is that it requires a larger amount of excavation, in case the strutting

is left in place.

AUSTRIAN METHOD.

The Austrian full-section method of tunneling through soft ground was

first used in constructing the Oberau tunnel on the Leipsic and Dresden

R.R., in Austria in 1837. It consists in excavating the full section and

building up the lining masonry from the foundations as in the English,

but with the important exception that the invert is built last instead

of first in all cases except where the presence of very loose soil

requires its construction first. A still more important difference in

the two methods is that the excavation is carried out in smaller

sections and is continuous in the Austrian method instead of alternating

with the mason work as it does in the English method.

=Excavation.=--The excavation in the Austrian method begins by driving

the bottom center drift No. 1, Fig. 93, rising from the floor of the

tunnel section nearly to the height of the springing lines of the roof

arch. When this drift has been driven ahead a distance varying from 12

ft. to 20 ft. or sometimes more, the excavation of the center top

heading No. 2 is driven for the same distance. The next operation is to

remove part No. 3, thus forming a central passage the full depth of the

tunnel section at the center. This trench is enlarged by removing parts

Nos. 4, 5, 6, 7, and 8 in the order named until the full section is

opened. A modification of this plan of excavation is shown by Fig. 94

which is used in firm soils.

[Illustration: FIGS. 93 and 94.--Diagrams Showing Sequence of Excavation

in Austrian Method of Tunneling.]

=Strutting.=--Each part of the section is strutted as fast as it is

excavated. The center bottom drift first excavated is strutted by laying

a transverse sill across the floor, raising two side posts from it, and

capping them with a transverse timber having its ends projecting beyond

the side posts and halved as shown by Fig. 95. The top center heading

No. 2, which is next excavated, is strutted by means of two side posts

resting on blocking and carrying a transverse cap as also shown by Fig.

95. Sometimes the side posts in the heading strutting-frames are also

carried on a transverse sill as are those of the bottom drift. This

construction is usually adopted in loose soils. When the sill is

employed, the middle part, No. 3, is strutted by inserting side posts

between the bottom of the top sill and the cap of the frame in the drift

below. When, however, the posts of the top heading frame are carried on

blocking, it is the practice to replace them with long posts rising from

the cap of the bottom drift frame to the cap of the top heading frame.

Further, when the intermediate sill is employed at the bottom level of

the top heading it projects beyond the side posts and has its ends

halved.

[Illustration: FIGS. 95 to 97.--Sketches Showing Construction of

Strutting, Austrian Method.]

After the completion of the center trench strutting the next task is to

strut parts Nos. 4 and 5. This is done by continuing the upper sill by

means of a timber having one end halved to join with the projecting end

of the sill in position. This extension timber is shown at _a_, Fig. 96.

The next operation is to place the timber _b_, having one end resting on

the cap-piece of the top heading frame and the other beveled and resting

on the top of the sill _a_ near the end. The timber _b_ is laid tangent

to the curve of the roof arch, and to support it against flexure the

strut _c_ is inserted as shown. To support the thrust of this strut the

additional post _d_ is inserted and the original bottom heading frame is

reinforced as shown. The next step is to insert the strut _e_, and when

this and the previous construction are duplicated on the opposite side

of the tunnel section we have the strutting of the parts Nos. 1 to 5;

inclusive, complete. Part No. 6 is then removed and strutted by

extending the bottom drift cap-piece by a timber similar to timber _a_

above, and then by inserting a side strut between the outer ends of

these two timbers, as indicated by Fig. 97. As the final parts. Nos. 7

and 8, are removed, the inclined prop _a_, Fig. 97, is inserted as

shown. When the soil is loose some of the members of the framework are

doubled and additional bracing is introduced as shown by Fig. 97.

The frames just described are placed at intervals of about 4 ft. along

the excavation, and are braced apart by horizontal struts. Some of the

longitudinal bearing beams, as at _b_, Fig. 97, also extend through two

or three frames, and help to tie them together. Finally, the

longitudinal poling-boards extending from one frame to the next along

the walls of the excavation serve to connect them together. The short

transverse beam _c_, Fig. 90, located just above the floor of the

invert, serves to carry the planking upon which the train car tracks are

laid. Besides the timber strutting peculiar to the Austrian method, the

Rziha iron strutting described in a previous chapter is frequently used

in tunneling by the Austrian process.

[Illustration: FIG. 98.--Sketch Showing Manner of Constructing the

Lining Masonry, Austrian Method.]

=Centers.=--The two forms of centers used in the English method of

tunneling are also used in the Austrian method. One of the methods of

supporting these centers is shown by Fig. 98. The tie-beam of the center

rests on longitudinal timbers carried by the strutting frames and

intermediate props. In single-track tunnels it is the frequent practice

also to carry the ends of the tie-beams in recesses left in the side

wall masonry, with intermediate props inserted to prevent flexure at

the center. When the Rziha iron strutting is employed, it also serves

for the centering upon which the arch masonry is built.

=Masonry.=--In the Austrian system of tunneling, the lining is built

from the foundations of the side walls upward to the crown of the roof

arch in lengths in consecutive rings equal to the lengths of the

consecutive openings of the full section, or from 12 ft. to 20 ft. long.

Except in infrequent cases in very loose materials the invert is the

last part of the masonry to be built, since to build it first requires

the removal of the strutting which cannot easily or safely be

accomplished until the side walls and roof arch are completed. As the

side wall foundations are built, however, their interior faces are left

inclined, as shown by Figs. 97 and 98, ready for the insertion of the

invert, and are meanwhile kept from sliding inward by the insertion of

blocking between them and the bottom of the strutting. Fig. 98 shows the

nature of this blocking, and also the manner in which the side wall and

roof arch masonry is carried upward. Finally when the roof arch is keyed

and the centers are struck, the strutting is taken down and the invert

is built.

=Advantages and Disadvantages.=--The principal advantages claimed for

the Austrian method of tunneling are: (1) The excavation being conducted

by driving a large number of consecutive small galleries, which are

immediately strutted, there is little disturbance of the surrounding

material; (2) the polygonal type of strutting adopted is easily erected

and of great strength against symmetrical pressures; (3) the masonry,

being built from the foundations up, is a single homogeneous structure,

and is thus better able to withstand dangerous pressures; (4) the

excavation is so conducted that the masons and excavators do not

interfere, and both can work at the same time. The disadvantages which

the method possesses are: (1) The strutting while very strong under

symmetrical pressures, either vertical or lateral, is distorted easily

by unsymmetrical vertical or lateral pressures, and by pressure in the

direction of the axis of the tunnel; (2) the construction of the invert

last exposes the side walls to the danger of being squeezed together,

causing a rotation of the arch of the nature discussed in describing the

Belgian method of tunneling.