PART II.

=85.=--LAUNCHING A SHIP.

After the carpenters have completed the hull of the vessel, the

necessary preparations for launching are commenced as follows:--

Get an anchor on each bow; get the cables on board and bend them to

the anchors; range and bitt the cables; bend the buoy ropes, and see

everything clear for letting go the anchors.

It will then be necessary to get four stout hawsers on the spar deck,

two on each side; bend one to the other, and have them coiled down

clear for running. This being done, pass the ends of two hawsers

out forward, through the warping chocks on each bow; pass the ends

aft, one on each side, and make them fast to some secure place, on

their respective sides of the launching slip, as clear of the ways

as possible. Stop the bights of the hawsers with a single rope-yarn

up along the ship’s sides, so as not to interfere with the ways, or

interrupt the progress of the carpenters while knocking away the shores

previous to launching.

Have men stationed to attend to veering the hawsers and cables when the

ship is off the ways, and also to letting go the anchors, if necessary.

Have a few buckets of water ready to throw on the bitts, to prevent any

danger that might occur from fire while veering the hawsers and cables.

The ways being well greased, and the necessary preparations for

launching completed, all the blocks and wedges by which the ship was

formerly supported, are driven out from under her keel, until the whole

weight gradually subsides upon the sliding ways, or cradle; a few

shores, or stanchions, remain, by which she is retained on the stocks

until the period for launching arrives, which is generally at high

water; they are then cut away, and all obstructions removed, with the

exception of the _dogshore_ (a representation of which is given in the

Plate). The word is given “to _launch_”--the dogshore is then knocked

away, which causes her to advance down the inclined plane into the

water.

If the ship should _hang_ after the dogshore is removed, it will be

necessary to apply screws under the fore-foot, which will cause her to

move immediately along the ways. The ways generally extend a sufficient

depth under the surface of the water to float the vessel when she

arrives at the extreme ends.

When the ship is off the stocks “veer away roundly,” and do not attempt

to check her until she begins to _deaden her way_, then check her

“handsomely” with the hawsers so as not to part them; if, however, they

should part, let go an anchor immediately; if that should not bring her

up, let go the other anchor, and veer gradually on both _cables_ until

she is brought up.

_Note._--When a ship is to be launched it is always customary to

hoist the ensign, jack, and pennant; the jack forward, ensign aft,

and the pennant amidships. Flagstaffs are erected for that purpose

previous to launching, as represented in the Plate, where you see a

ship of war ready to be launched from the stocks.

=86.=--CUTTING OUT STANDING RIGGING.

_Lower Rigging._--Measure the distance from the larboard side of the

mast-head to the foremost dead-eye in the starboard channels, which

distance set off on the floor of the rigging loft and stick in a

marlinespike at each extremity. The shroud stuff being stretched,

stop one end to one of the marlinespikes; take the bight round the

other and back again: this is the first pair of shrouds; pass it round

again, _outside at each end_, for the second pair, and continue in

this manner until one gang of rigging is completed. Mark the length of

the eyes straight across at the _opposite end_, to the one stopped to

the marlinespike; cut at the latter in an angular direction (so that

the after-legs will be a little longer than the forward ones), and

the inside pair will be the first pair of shrouds. Hitch a piece of

spun-yarn round each shroud, in the centre of the eye, making knots

on it according to the number of the shroud, commencing the inside

pair with one knot. The mark for the length of the eye gives the place

for the eye-seizing; the round of the rope giving their place on the

mast-head. (_Old fashion._)

The proportion for the eye is the round of the mast-head above the

bolsters; I have also seen the breadth of the seizing added (some allow

five squares of the mast-head, which is the best rule), supposing it

would lay fairer on the side of the bolsters than too close to the

mast-head. This precaution is hardly necessary, as the rigging will

stretch sufficiently in pulling up to bring the seizing down, no matter

how much it may have been stretched before being warped round for

cutting.

[Illustration: Sketch of a draft for cutting rigging.]

Rigging cut on the above old plan, causes great waste in squaring off

the ends, after fitting the eyes, previous to turning-in the dead-eyes.

I would therefore recommend (if not in a great hurry) a more economical

plan. Get the shroud-warp on a stretch, or rather one end of it, long

enough for one pair of shrouds; mark off the distance for the required

service, and when completed--being wormed, parceled, and served, while

on a taut stretch--measure the length with a tape-line, from _draft_

of first pair of shrouds, No. 1 starboard; when measured and chalked

the required length, “come up the stretch,” and cut at the chalk-mark;

middle the shroud at the centre of the service, and lay it on the loft

floor. Continue fitting, and cutting, in this way until you get the

number of shrouds required for the gang, allowing each pair of shrouds

to lap over the diameter of the rope at the eye, as they are laid on

the loft floor; alternately making due allowance at the ends, before

cutting, for the carry aft, or the jump of a port, if required. (_See

Plate._)

_Note._--In measuring the length of the shrouds, some prefer the

distance from the opposite side of the mast-head to the partners,

added to half the breadth of the deck, from the mast to the side.

In parceling, begin at each end where the service is to leave off,

and parcel upwards to the middle of the eye, where commence serving

downwards on each leg. The eye seizings are round ones, and when put

on, the whole eye is neatly covered with parceling. A half-sister

block is sometimes put between the two forward shrouds, for the lower

boom topping lift to lead through.

=87.=--TOPMAST AND TOP-GALLANT RIGGING

Is cut in the same manner. In fitting the topmast rigging, always

seize-in a sister-block between the two forward shrouds, for the

topsail lift and reef tackles. The swifters are generally served the

whole length.

The eyes of the top-gallant rigging are made to fit exactly around the

cylinder; if there is an odd topmast, or top-gallant shroud, on each

side, they are either fitted with a horse-shoe eye, or go together with

a cut splice.

=88.=--BREAST AND STANDING BACKSTAYS.

These may be cut by the same rule; the eyes of the breast backstays are

fitted in different ways. They are sometimes spanned together, making

a square, the size of the mast-head; sometimes they have an eye like

the shrouds, made to fit close; and others have a small eye seized in

the bight, and lashed round the mast-head. The eyes of the standing

backstays are fitted like those of the shrouds.

=89.=--CAT HARPEN LEGS, AND FUTTOCK SHROUDS.

Take one-third the breadth of the top, and lay of that distance from

the eye-seizing, down upon the shrouds, each side; draw a line across

which will represent the cat harpens, and measured on the scale, will

give their length; splice in eyes at each end; worm, parcel, serve, and

leather them. The distance from the extremity of the top and this line

upon the shroud, will give the length of the futtock shrouds, which

must have a hook and thimble in their upper ends, and a thimble in

their lower ends.

=90.=--FORE-AND-AFT STAYS.

Measure from the after parts of the mast-head to where the stays set

up, and to this distance add the length of the mast-head, for collars.

Collars for stays are the length of their respective mast-heads. The

mousings are raised once-and-a-half the size of the stays, and at a

distance equal to twice the length of the mast-head from the mousing.

A Flemish eye is worked on the end, and the stay rove through it; or

they may be fitted with lashing eyes, in which case each leg is the

length of the mast-head; the service is continued the length of the

eye below the mousing, the collars leathered, and the hearts turned

in with the lay of the rope. Stays are wormed, parcelled, served, and

leathered in the wake of all nipps, such as the bees, bullock-blocks,

and sheave-holes.

=91.=--CUTTING LOWER MAST HEAD-PENDANTS.

The forward pair should be twice the length of the mast-head--the after

pair twice-and-a-half; thimbles are spliced in the ends, and they are

wormed or spanned together, so as to form a span to fit the mast-head.

=92.=--BOBSTAYS.

The bobstays are cut twice the length from the collars, on the

bowsprit, to their respective holes on the cutwater. They are wormed,

parceled, and served the whole length, and leathered in the nipp, after

which they are rove through the holes, spliced together, and the dead

eyes turned in, in the wake of a splice.

=93.=--BOWSPRIT SHROUDS.

The length from the bowsprit to the eye-bolts in the bows; a dead-eye

or heart is spliced into one end, and a hook and thimble in the other.

=94.=--JIB AND FLYING JIB GUYS.

Take the distance from the boom-end to the bows, making a small

allowance for reeving through the straps on the spritsail yard. They

are generally fitted with a cuckold’s neck over the boom end, and set

up with dead-eyes to the bows. The cuckold’s neck is served or covered

with canvass. The guys in the wake of the spritsail yard are leathered.

The martingales must be cut, and fitted to the manner in which they are

rove.

=95.=--CUTTING RUNNING RIGGING.

The greater part of the running rigging may be cut as it is rove,

making due allowance for the hands to clap on. The length and size may

also be got from the rigging table for all classes in the navy (see

rigging tables). The most proper way to ascertain the length of a rope

is from the _draft_, or rigging plan of the vessel you are employed

upon, making the proper allowance for leading out, &c., &c.

=96.=--RIGGING SHEERS, AND TAKING IN MASTS AND BOWSPRIT.

In cases where there is neither sheers nor wharf to have recourse to,

in order to get the lower masts on board, it becomes necessary to get

such spars as can be procured, and erect a pair of sheers on board for

that purpose.

In doing this proceed as follows:--Take in a sufficiency of ballast to

steady the ship, and shore the decks from the skin up, particularly

abreast of the partners. Sling skids up and down the sides; reeve the

parbuckles, and bring the sheer legs alongside, with their small ends

aft; parbuckle them on board, raise one leg over the capstan, and their

heads or after ends resting either on the taffrail, the break of the

poop, or a spar placed in the most convenient spot, the more elevated

the better. Square the heels exactly one with the other, so that when

they come to be raised the legs may be found of equal height.

As near the after ends of the spars as may be considered necessary,

when crossed, put on the head-lashing of new, well-stretched rope

(_figure-of-8 fashion_), similar to a racking seizing, and cross with

the ends. Open out the heels, carrying one over to each gangway, and

placing it on a solid piece of oak or shoe, previously prepared for

the purpose. Clap stout tackles on the heels, two on each, one leading

forward, the other aft; set taut the after ones, and belay them. Lash

a three or four-fold block, as the upper one of the main purchase,

over the main lashing (so that it will hang plumb under the cross),

with canvass underneath to prevent chafing; and in such a manner that

one-half the turns of the lashing may go over each horn of the sheers,

and divide the strain equally; also sufficiently long to secure the

free action of the block. Lash the small purchase block on the after

horn of the sheers, sufficiently high for the falls to play clear of

each other, and a girtline block above all.

Middle a couple of hawsers, and clove-hitch them over the sheer

heads--having two ends leading forward, and two abaft, led through viol

blocks, and stout luffs clapped on them. These should be sufficiently

strong to secure the sheers while lifting the masts.

The lower purchase block is lashed forward (perhaps round the

cut-water), and the fall being rove, the sheers are raised by heaving

upon it, and preventing the heels from slipping forward, by means of

the heel tackles previously mentioned.

Sometimes a small pair of sheers are erected for the purpose of raising

the heads of the large ones; in which case care must be taken to place

them so as to allow the heads or horns of the other pair to pass

through.

When the sheers are up, or nearly perpendicular, _cleat the shoes_, so

as to confine the heels to their places upon them. They can then be

transported along the deck by means of the heel-tackles and guys to the

situation required, taking care to make them rest upon a beam, and to

have the deck properly shored up below.

Finally, give the sheers the necessary rake by means of the guys, and

set taut all the guys and heel-tackles. Also, five or six feet above

the deck, on each leg, put two cleats, for the purpose of applying two

stout lashings from _them above_, to the dead-eyes in the channels

_below_, in order to give greater security; this being done, the sheers

may be considered ready. (_See Plate_).

[Illustration: Masting and Dismasting.

FIG. 1.

FIG. 2.

FIG. 3.

Method of forming Sheers, and removing a Mainmast, by means of 2

Topm’st]

_Note._--The skids which are slung up and down the sides, are for

the purpose of keeping the sheer-legs clear of the channels, and

from thence to the plank shear. Mats should also be placed over the

quarter galleys to prevent injury.

_Parbuckles_ are hawsers which are middled; the ends of which are

taken through two ports which are about five or six ports apart, from

outside, in; down over the rail, under the sheer legs; up again through

snatch blocks, in the opposite water-ways, and luffs clapped on them.

The counter parbuckles are used to ease the sheer legs down on deck,

and are rove through the gun-deck ports. Mats should be placed in the

wake of the chafe, where the parbuckle leads over the rail, or up

through the gun-deck ports.

The parbuckling on board of heavy spars for sheers may be much

facilitated at times, and injury to the ship avoided, by attending to

circumstances, and getting them in at slack water, or over the bows or

stern.

When a ship is confined to her own resources, the lower yards are the

best spars for sheers; the heels (or yard-arms resting on the deck)

being strengthened where they taper by a temporary fish, _woolded on_,

and the woolding set up by wedges.

In a brig, the main yard and main boom are the best spars for sheers

(if other spars are not available).

The shoes are made of either stout oak plank or beam timbers of pine,

and long enough to extend over at least three beams, with a saucer in

them for the heels to rest in; likewise, mortices or bolts in each end

for lashing. The spare caps will be found very handy for placing the

heels of the spars in, and the eye-bolts in them convenient for hooking

the heel-tackles, and transporting along the decks.

[Illustration]

[Illustration]

=97.=--TO TAKE IN THE MIZEN-MAST.

Tow the mizen-mast alongside, with the head aft, and the garland[1]

lashed on to the forward part of the mast, at the distance from the

tennon to just above the spar deck partners; lash a pair of girtline

blocks on the mast-head, and reeve the girtlines; bend the sheer-head

girtline to the mast below the bibbs to _cant_ it. Overhaul the main

purchase down abaft, thrust the strap through the eyes of the garland,

toggle it, and secure the toggle by a back-lashing. Take the fall to

the capstan and “heave round;” when the heel rises near the rail, hook

on a heel-tackle to ease it inboard. Get the mast fair for lowering

by means of the girtlines, have carpenters attending below, wipe the

tennon dry, and white lead both it and the step, “lower away,” and step

the mast.

Pass a couple of straps around the mast; to each of these hook the

double blocks of the pendant tackles--the single ones to the sides,

and hauled taut; wedge the mast temporarily, “come up” the purchases,

man the guy and heel tackles, wet the decks, and transport the sheers

forward for taking in the main-mast.

The object of taking in the mizen-mast first is, because the breadth of

beam is less aft than forward; and the heels of the sheers being spread

more as they go forward, the head lashing consequently becomes tauter;

moreover, if the mizen-mast was taken in _last_, the bowsprit must be

got in _first_, and thus the _advantage_ of securing the sheers to the

foremast-head, when getting in the bowsprit, would be lost.

[1] Garlands are made of new rope, well stretched (salvagee fashion),

marled together and parceled. They are laid on the forward part of

the mast, a stout lashing put on over all, and crossed between the

garland and the mast;--a good dogging also, if necessary, passed

downward.

=98.=--TO TAKE IN THE MAIN AND FOREMAST.

Proceed in the same manner as in getting in the mizen mast. The garland

for the small purchase should be lashed about the diameter of the mast,

_above_ the main purchase.

In taking in either of the masts, if the sheers should be found to

be a few inches short, the difficulty may be remedied by manning the

forward guy-falls, and bringing the sheers perpendicular to the deck.

Some distance may also be saved by using no garlands and having the

purchase blocks lashed to the mast. If in lowering there should still

be a difficulty, chocks might be placed on the kelson until the tennon

rested on them; then steady the mast by means of the small purchase and

sheer-head girtlines, while the main purchase is unlashed, and lashed

again on the mast sufficiently high to step it.

If the ship has a top-gallant forecastle, it would be well to step the

mast forward of the sheer legs, for the brake of the forecastle comes

abreast of the partners; and, in a case of this kind, it would be well

to take in the foremast first.

=99.=--TO TAKE IN THE BOWSPRIT.

Transport the sheers as far forward as possible, or as the bows will

permit; send a hand to the sheer-head, bend on the girtlines to the

small purchase block to light it up, unlash it, and lash it again

to the forward fork or horns of the sheers, pass a strap round the

foremast-head, to which hook a large tackle, carry it well aft, and

haul it taut, for the purpose of staying the mast. Lash a couple

of large single blocks to the foremast-head, middle a hawser, and

clove-hitch it over the sheer-head; reeve the ends through the blocks

at the mast-head, down on deck, carry them well aft, and take a turn.

Hook the after heel-tackles forward, and take the after-guys aft;

pass a bulwark lashing round each heel, rake the sheers over the bows

sufficiently for the main purchase to hang directly over the gammoning

scuttle, and make all fast.

The bowsprit being brought under the bows, with the head forward, and

the garlands lashed on, the main one a little more than one-third from

the heel, the smaller one between the cap and bees, having guys leading

from the bowsprit to the cat-heads, and a couple of straps round the

heel for hooking the bedding tackles. Overhaul down the purchases

and toggle them; “sway away,” attending it by the guys, until nearly

perpendicular; hook on the bedding tackles, which are taken from the

bitts on the main deck, and led up through the partners; wipe the

tennon dry, and white-lead both it and the mortice; “lower away,”

bouse upon the bedding tackles, and bring it into its place; come up

purchases, guys, unlash garlands, and proceed to dismantle the sheers.

If the ship has a topgallant forecastle, you will be unable to take in

the bowsprit with the sheers without the assistance of a _derrick_[2]

on account of the brake of the forecastle, it not being prudent to step

sheers on the top of it.

When the ship is masted, and alongside the yard, commence getting

on board and stowing ballast and tanks; fit the rudder, gammon the

bowsprit, fit and set up the bobstays and bowsprit shrouds; fit fore

stay collars; get on board tops, caps, cross-trees, topmasts and

topgallant masts, placing lower yards athwart ships, topsail and

topgallant yards amidships; also, have ready tackles and luffs for

setting up the rigging and staying the masts, top-blocks with lashings

for top-ropes, and all the rigging at hand and in order.

[2] See Derrick, in Miscellaneous Articles.

=100.=--GAMMONING THE BOWSPRIT.

In rigging a stage under the bowsprit for this purpose, make use of two

small spars, such as topgallant studding-sail booms, with their heels

lashed to the head-rail, their heads frapped together, and slung from

the bowsprit end, and boards laid across from one to the other.

The gammoning is of new, well-stretched rope, generally water-laid.

One end of the gammoning being whipt, is passed through the hole in

the cutwater, and over the bowsprit with a round turn, then clenched

round the bowsprit close against the stop or cleats; the other end

passes through the forepart of the hole in the cutwater, again round

the bowsprit (but before the clinch), and again through the hole in the

cutwater, abaft the first turn. All the succeeding turns go in the same

way, laying forward on the bowsprit and aft in the cutwater, and all

are passed inside of the first turns; by which means the outer turns on

the bowsprit which bear the most strain are more preserved from chafing

than the inner ones.

[Illustration: A Representation of the Masting Shears in the New-York

Navy Yard, for the Masting and Dismasting of large ships.]

The turns are then hove taut as follows:--A leading block is made

fast to the holes for the bobstays by a strap long enough to admit of

the pendant, which is then rove through it, leading straight through

the hawse-hole to the capstan. In one end of this pendant an eye is

spliced, through which a bight of the gammoning is passed, and retained

by means of a toggle, while to the other end is hooked a long tackle,

and the fall led to the capstan. As each turn is hove taut, it is, by

some, nailed to the bowsprit, and by others, racked in several places,

which is preferable to nailing.[3]

When all the turns are passed and hove taut, they are frapped together

by as many crossturns as are passed on the bowsprit. The end is then

whipped and seized to one of the turns.

In ships with two gammonings, the outer one is hove taut first, as it

would otherwise slack the inner one.

_Note._--Iron gammoning is now allowed for vessels of all classes in

the service. (_See Rigging Table._)

[3] See Gammoning the Bowsprit, in Miscellaneous Articles.

=101.=--FITTING RIGGING.

The shroud is hove well taut, with a tackle clapped on one end, and the

other secured to a sampson post. It is wormed, parceled, and served a

third down from the seizing; the swifter or foremost shroud all the

way, except where the dead-eye is turned in. A sword mat is sometimes

laced on the foremost shroud, which, I think, answers much better, as

it can be taken off and the rope dried; and, from the different ropes

I have seen rotted under the service, I feel convinced, the less on

rigging, unless where absolutely necessary, the better.

In parceling the eyes, commence from each end of the service and finish

in the centre, and pass several riding parts, as in breaking the shroud

to form the eye, the service gets opened, which allows the wet to get

in; and if the service is begun in the centre, doubled, and then passed

toward each end, it will prevent the wet getting to the rope.

In forming the eye, take a good strand, knot both ends together, and

lay it across both parts of the shroud; having brought them as close

together as possible, pass both bights of the strand under the shroud

clear of each other; then place a long bolt across, close to the strand

on the upper side; take a round turn round the bolt with each bight of

the strand on each side of the shroud, put a smaller bolt through each

eye in the strand, and _heave it round_ the long bolt, and as the turns

accumulate on the bolt, both parts of the shroud come together; when

quite close pass the eye seizing, the shroud being previously parceled

in the way of it.

When there is an odd on each side, it is fitted horse-shoe fashion to

fit the mast-head; parceled, and served over a third down the same as

the other shrouds. I have seen the odd shroud put on the mast-head

first (after the pendants), instead of last; and then the others put on

in rotation: No. 1 starboard, No. 2 larboard, No. 3 starboard, &c., &c.

=102.=--FITTING MAST-HEAD PENDANTS.

The long leg, when two, should be a third of the shroud. The eye is

formed the same as the shroud: wormed, parceled, &c. A thimble is

spliced in each end, the ends put in once and a-half, marled down, and

served over. The foremost leg is once and a-half the round of the rope

shorter than the after one. The thimbles are well parceled before being

spliced in.

Small ships have only one pendant on each side; when this is the case,

the rope is cut to the proper length, the starboard pendant is spliced

into the larboard, and the larboard into the starboard, with a cut

splice forming an eye, or span, to fit the square of the mast-head; a

thimble is spliced into each end, and they are wormed, parceled and

served;--they are the same length as a long leg, when a pair on each

side.

=103.=--LOWER AND TOPMAST STAYS.

Stays are four stranded, and are now both the same size, and lashed

abaft the mast-heads. The legs are made for the collar in laying up.

When sufficient length is laid up for the stay, from whence the collar

commences to the end for setting up, two strands, one for each, are

left sufficiently long to double back, and are then laid up as four

strands, forming the lashing eyes and legs. The ends of the strands

are then unlaid, the inside ones wormed into the lay of the rope; the

other strands are divided, laid up, and worked in alongside the first

strands; then some more yarns are twisted smaller and used as backing;

some inside yarns from each strand should be wormed into the stay their

whole length, below the crotch; the legs are then wormed, so as to

completely fill the rope, commencing from the centre of the eyes for

lashing, which should be well opened with a large setting fid, and

worming carried into the stay as far down as the worming of the legs.

The outside yarns of the legs are then marled down, over all, round the

stay, tapering the ends. The legs are well parceled and served, and

likewise the stay, sufficiently far down to take the lower yards, and

covered with tanned hide.

The stays should be hove well out with purchases, and allowed to hang,

pulling up occasionally. I have known a line-of-battle ship’s stays

(cable laid rope) to stretch out twelve feet, and after a two month’s

cruise were long enough to allow nearly two feet to be taken off the

fore-stays.

Stays fitted with lashing eyes are decidedly preferable, as they are

easier shifted; the collars not being so long the yards can be slung

higher up, and consequently braced further forward.

In the merchant service the stays are also fitted on the bight, or two

in one, as follows: the bight is put over the mast-head and both ends

taken forward and set up in their respective places. Others again put

the bight under the bowsprit and set them up abaft the mast head, with

lashing eyes, putting on a seizing at the proper place to form the

collar. This last plan would not answer for a ship of war.

=104.=--TO RIG THE FOREMAST.

White-lead the mast-head in the wake of the trestle-trees, over haul

down the girtlines, bend on the trestle-trees and sway them on board;

take out the after chock, wipe them dry, bend the girtlines to the

forward part and stop the girtlines to the after part; bend the main

girtline to the after part also; “sway away,” having a steadying-line

forward to keep the trestle-trees from catching under the bibbs, for if

they should be heavy, one man aloft will not be able to bear them off;

when above the bibbs, send a hand aloft to slip the stops, one at a

time, so as to let them come down gradually. “Lower away,” bouse on the

after girtlines, and get the trestle-trees in their places; send aloft

the after chock, ship and bolt it. Tar the mast-head in the way of the

rigging; overhaul down the girtlines for the bolsters, which are tarred

and parceled; sway them aloft and stop them; lash the girtline blocks

to the after part of trestle-trees.

The rigging is then sent up by the girtlines in the following manner:--

_Mast head pendants._--Foremost pair of shrouds, starboard side;

foremost pair of shrouds, larboard side; second pair of shrouds,

starboard side; second pair of shrouds, larboard side, and so on

until all the shrouds are over, after which send up the stay, and

last of all the preventer or spring-stay.

_Placing the rigging._--The girtlines being overhauled down send

aloft the lower pendants, which have got a long and short leg, fitted

together with a span, or square, the size of the mast-head; the long

leg is placed abaft, so that in case of the forestay being shot away,

the pendant tackles can be hooked in them without being in the way

of the fore-yard in bracing; while the leg being abaft, the mast

affords them good security. As soon as the mast-head pendants are

placed they ought to be lashed abaft, the tackles hooked, and the

mast stayed by them. Overhaul down the girtlines, bend the mast-head

one on the shroud, with a timber-hitch, or toggle, four or five feet

below the seizing, and stop it to the centre of the eye; take the

girtline from the after trestle-tree, and bend it half way down the

shroud; “sway away,” on the lower girtline, and lift the weight of

the shroud. When high enough, the stop in the eye is cut, and it will

fall over the mast-head; the men on the trestle-trees placing it fair

on the bolsters, beating it well down, with commanders, and observing

to have the eye-seizing come as near the centre of the mast-head as

possible. The larboard pair is got up in the same manner, and so on

until all are placed. Reeve the lanyards, if prepared with a knot on

the end; a double-wall and crowned is preferable, a mathew-walker

being liable to capsize; the lanyard should be rove through the hole

under the end of the shroud, because in setting it up, the strain

comes on the shroud first, and keeps the dead-eye in its place; if

put under the standing part, the strain coming on the end first, the

dead-eye would _slue round_.

_Setting up the lower rigging._--The rigging is often placed and then

set up, but I would prefer (if time would permit) having it pulled up

as placed. When the first pair on each side are over and placed, and

the lanyards rove through both dead-eyes, clap a selvagee strap on

each shroud well up; to this hook the single block of a luff tackle;

the double, to a blackwall hitch in the lanyard; then take the lower

blocks of the pendant tackles and hook them to both the falls of

the luffs on each side; reeve the tackle falls through the leading

blocks, and pull up, setting up both pair of shrouds at the same

time, the men on the trestle-trees beating the shroud down as pulled

up; when well up, place two pair more, and proceed in this manner

until the mast is rigged.[4]

The advantage of pulling up a pair at each side, instead of singly,

is evident from the fact that pulling up singly injures the seizing;

as it is first dragged _forward_ and then _aft_ by the after leg, it

is liable to slack the seizing, and perhaps snap the inside turns.

In rigging the lower masts, I have seen the after swifter go over

first; a plan that is now adopted in small vessels. In staying the

mast these swifters should be set taut, the mast being previously

wedged, and the stays set steadily up. I have heard some old sailors

dispute this plan, it being new, but for my own part I think well of

it.

_Note._--The trestle-trees might be got over without knocking out the

after-chocks, by running up a derrick abaft the mast, well lashed

abaft below the bibbs, having chocks placed between it and the mast,

sufficient to admit of the free passage of the after chock of the

trestle-trees. They are sometimes got on before getting in the mast,

but they then bring in an additional and unnecessary weight upon the

mast-head, and moreover, in lowering, catch over the shear-head.

N. B. The blocks for _topmast stays_ should be put on _after_ the

second pair of shrouds (on foremast).

[4] See note on lower rigging.

[Illustration]

=105.=--FUTTOCK SHROUDS

Are now fitted, and hooked to the futtock plates in the top, and set up

to an iron band round the mast. In small vessels these are iron, and

set up with turnbuckles, or screws. Cat-harpens are seldom used, being

considered unnecessary lumber aloft.

_Note._--The futtock shrouds are hooked to their respective plates,

_with the points of the hooks in_.

=106.=--TO RIG THE MAIN AND MIZEN-MAST.

Proceed in the same manner as directed for the foremast. The mainmast

of a frigate has one more pair of shrouds than the foremast, and the

mizen-mast three less. The mizen-mast has only one pendant on each

side, fitted with a cut-splice, and a thimble spliced in each end. The

rigging is placed the same as the fore or main; the mast is steadied

into its place with a couple of long burtons, one to each pendant, and

hooked to straps round the bitts, or to ring-bolts in the fore part of

the quarterdeck bulwarks. If the stays are not ready for going up, the

tackles can be hooked to a lashing round the mast, the pendants being

wanted to pull up the rigging (for placing); the rigging is the same as

the fore.

In setting up the main-stays, pass one _under_, the other _over_,

around the cross-piece in the four bitts, for the purpose; clap the

selvagee straps well up the stay, and two more near the ends; to these

hook two luffs; to the falls of the luffs hook the lower blocks of main

tackles; reeve their falls through leading blocks, in as direct a line

with the stay as possible, and grease the bitts in the way of the stay.

In placing the main stays, in the manner mentioned above, there is

sufficient space between the stays for a shot to pass through, which

often prevents their being both cut away at the same time.

When the rigging is to be set up for a full due, the stays in the way

of the bitts are well wormed, parceled, served, and covered with hide;

and the ends of the stays, and all the lower rigging whipped, and

covered with canvass caps (neatly fitted).

=107.=--TO RIG THE BOWSPRIT.

[Illustration]

_Bobstays._--The rope should be well stretched, wormed, parceled,

and served, and in the way of the cutwater covered with leather;

when none is to be had, pass two parts of parceling, the first

against, the second with the lay of the rope; and serve with good

stout spun-yarn, or four-yarn plait; then reeve them through the

cutwater, splice both ends together, put the strands in once each

way, marl down, and serve over. The hearts are then secured in their

place (keeping the splice on the upper side) with a round seizing,

with parceling under it. They are sometimes fitted to shackle to the

cutwater, with iron plates let in flush with the wood, a bolt going

through both plates, which is very snug and strong.

_Bowsprit Shrouds_ are single pieces of rope. When cut the required

length (a hook and thimble), the latter parceled, is spliced into one

end, put in once-and-a-half, marled down and served over; a heart is

spliced into the other. After being hooked to eye-bolts in the bows

for the purpose, they are set up to their collars on the bowsprit.

A celebrated master (now a commander) in the navy, and a first

rate seaman, never served the bowsprit rigging _all over_; it is,

certainly, in my opinion, better not to do so, as the water can never

lodge, which it may do, by getting in from broken service, which

cannot be repaired at sea. They are now fitted one-third chain, on

account of the chain cable chafing against them.

It is not unusual, in small vessels, to insert thimbles instead of

hearts in the bobstays, bowsprit shrouds, and collars; covering the

lanyards neatly afterwards, with canvass.

_Placing the rigging._--Tar well the bowsprit; then put on the first

forestay collar, first pair bowsprit shroud collars, first bobstay

collar; second bobstay collar; second pair of shroud collars;

spring-stay collar; and cap bobstay collar; then heave them close up,

pass and heave well _on_ with a rose-lashing.

The man-ropes are spliced, or hooked into bolts in the bowsprit cap,

and in the other end an eye is spliced; ends put in once-and-a-half,

and set up with a lanyard to an eye-bolt in knight-heads or

stanchions, for the purpose; splices served over, and leathered in

the nip.

The goblines[5] are either clove-hitched, or may be fitted with a

cuckold’s neck around the end of the dolphin-striker, and set up to

the bows, one on each side.

[5] Called back-ropes by some.

=108.=--GETTING THE TOPS OVER.

_Whole tops._--Overhaul the girtlines for the cross-trees, white-lead

the squares in the trestle-trees, and ship them. The girtlines being

on each side of the mast-head are then overhauled down for the tops;

one end is passed from underneath, and up through the hole for futtock

plate and hitched to the standing part; the girtline can be rove down

through one of the holes in the edge of lubber’s hole; the girtline

stopped to the foremost edge, to holes bored for the purpose. A

girtline is taken from the mizen-mast-head, and bent to the foremost

part of maintop; bend on a tripping line to the pigeon hole leading

from the foremast-head. Man the girtlines and “sway away;” when

sufficiently high to allow the foremost edge of lubber’s hole to clear

the mast-head, cut the stops and cant it over by the tripping line, and

the top will hang in the girtlines, when it can be lowered, placed, and

bolted.

I have seen girtlines bent from the foremost part of the fore-top to

the bowsprit end; and from foremast to the forward part of the maintop;

and from mainmast to foremost part of mizen-top, to assist in getting

the tops over; but if they are properly slung it is not necessary.

The dead-eyes for the topmast rigging can now be hauled up, and put

in their places in the top-rims: and also ship the top-rail, and

stanchions in their respective places.

=109.=--GETTING HALF-TOPS OVER.

Unlash the girtline blocks from each side of the mast-head, and lash

them on the foremost and after sides; send the end of the foremost

girtline down abaft all, the other between the cross-trees.

If the starboard half is to be got over, place it on the deck with

its upper side up, or on its edge with the upper side aft. Take the

foremost girtline, reeve it down through the foremost hole, by lubber’s

hole for the purpose, (or from aft forward, if on its edge,) take it

underneath the top, and if the hole for the futtock plate will take it,

reeve it up, (or from forward, aft, if on its edge,) and half-hitch it

to the mast-head, or standing part; then take the mast-head part under

the top, (if on its edge, to the foremost side,) and seize it well to

the foremost corner with a piece of small rope, through a hole bored

for the purpose. Take the after girtline, reeve it the same way through

the after hole bored for the purpose in the after part of lubber’s

hole; pass, and half-hitch it the same way as the fore one, and secure

it with a good seizing of small rope, through another hole bored in the

foremost corner. If the futtock holes will not take the girtlines, stop

them with spun-yarn. The top should be so balanced in the girtlines,

as to hang fair when the stops are cut. Reeve the other ends of the

girtlines through the leading blocks; man them, and sway up the top

with the after girtline; at the same time taking in the slack of the

fore one. Have men stationed at the trestle-trees to bear off, cut the

stops, and place. When the edge is clear of the cross-trees, cut the

after stop and sway on both girtlines; and when the foremost corner is

well up, cut the stops; the top will then hang in the girtlines, and

can be easily placed. Shift the girtlines for the larboard half, get

it up the same way, bolt and secure the top. Shift the girtlines on

each side of the mast head, as they were before. A girtline from the

mizenmast-head is sometimes bent to the foremost edge of the main-top,

to assist in bearing off; (it can be dispensed with;) a rope’s end bent

to the top and hauled well aft, will answer the same purpose. Half-tops

may be swayed up, before the cross trees are sent aloft, and hung to

the mast-head, one half on each side, swayed chock up; then send up the

cross-trees, and bolt them to the trestle-trees; lower the half tops

down on the cross-trees; place and secure them as before.

_Note._--In cold weather it would be best to get the tops over before

rigging the masts, in order to give the men a more secure place for

standing while placing the rigging; and in this case a derrick rigged

on the top would be the best way to get the rigging over in a heavy

ship. (If the topmast is pointed and swayed about six feet above the

lower mast-head, it will make a good derrick for getting the lower

rigging over.)

=110.=--GETTING UP TOP-BLOCKS, &c.

Top-blocks are large single blocks, having iron straps, which are

formed after being put round the block, into a large hook. Overhaul

down the girtlines through lubber’s hole; bend one part through the

sheave hole of the block, and stop it to the back part of the hook;

hoist it up, and lash it to the mast-head around the hook, with a

lashing long enough to allow the block to hang half-mast-head high.

Through this block reeve a hawser; send the foremost end down through

the square hole in the foremost part of the trestle-trees; the after

end through the lubber’s hole through a leading block on deck, and

round the capstan.

=111.=--GETTING UP THE TOPMAST.

Take two half-hitches through the fid-hole, with the foremost end of

the hawser, and stop the hawser well round the hounds of the topmast

with a good lashing. Man the capstan, and heave the mast up and down.

Unbend the hawser, reeve it through the sheave-hole in the topmast;

send a hauling line down through the trestle-trees for the end of the

hawser, which haul up and clinch round the lower mast-head over the

block. Overhaul the girtlines down before all, and get the cap into the

top.

_Note._--Pendant tackles may be used to a greater advantage than a

hawser in pointing a topmast, when light handed.

=112.=--GETTING THE CAP INTO THE TOP.

Bend the foremost end of the girtlines, which were sent down before

all, through the round hole in the cap, and stop them along to the

after part of the square hole, keeping the bolts in the cap _up_.[6]

Man the girtlines and “sway away,” bearing well off the fore part of

the top. When high enough, lower, and place the round hole over the

square hole in the trestle-trees. Sway the topmast well through and

lash it securely to the cap; put a capstan bar in the fid-hole with

a hauling line on the end, and heave the topmast up; when the cap is

clear of the lower mast-head, haul on the line from the bar in the heel

of the topmast, and it will slue the mast and bring the square hole

of the cap over the lower masthead; ship the cap-shore, then lower

the hawser, or tackle, and place the cap, beating it into its place.

Land the mast, unreeve the hawser, unlash the top blocks, and hook

them to their proper bolts on each side of the cap; reeve the hawser

through one block, through the trestle-trees, through the sheave in the

top-mast, up through trestle-trees again, and reeve the end through

the foremost bolt in the cap on the opposite side of the block; before

reeving it through, parcel it well; take two half-hitches on its own,

or standing part, and secure the end with a round seizing of spun-yarn.

Bring the hawser to the capstan, heave the topmast up and try the fit;

(then lower away, get the topmast on deck, and try the other set);

and then lower the mast for rigging. Secure the girtline blocks to

eye-bolts in the cap, or to the topmast cross-trees.

_Note._--The stop should be taken off the hounds of the topmast,

directly it is pointed through the trestle-trees; and when getting on

deck, after it is landed, single the hawser the same as when getting

up and down, and stop it to the hounds; then have slip ropes on the

heel to haul it forward or aft, whether fore or main, and place it

on the chocks, for stowing on the booms. A fore-topmast is generally

stowed with the head forward; a main with the head aft; both heads

are sometimes stowed forward, a practice that is frequently adopted

at the present day.

[6] The object of _keeping the bolts up_ in getting the cap into the

top, is, that they may not catch on the top rim and cause delay, and

perhaps injury. (_It is not intended to be shipped so._)

=113.=--TURNING IN DEAD-EYES.

If in the loft, get the length from the mast-head to the deck, from

the draft, if the masts are not stepped, and place the dead-eye to

that length, making due allowance for stretching in setting up. Turn

the dead-eye in as near the end as possible, so that all parts of the

shroud may be equally stretched, which will prevent its having _a gouty

end_.

The principal caution is to keep the lay in the rope, as it prevents

the wet getting in. If the shroud is to be wormed, and served in the

wake of the dead-eye, the worming should not be hove in too taut, as

breaking the shroud round the dead-eye would probably snap it.

The score being well tarred, the end of the shroud is taken underneath,

round the dead-eye, inside standing, or mast-head part; a bolt is put

in a hole of the dead-eye. Take a good strand, knot both ends together;

it is then middled and crossed round the end of the shroud; both bights

are taken round the bolt, one on each side of the dead-eye, and a

smaller bolt put in each bight, which are hove round the large bolt in

the dead-eye. As the turns accumulate, it heaves the shroud taut round.

The dead-eye should be secured through one of the holes with spun yarn

to the shroud before heaving, where the shroud is marked, for the lower

part. When the dead-eye is turned in, in a loft, the shroud is hove in

with a jigger, (or dead-eye machine).

When the shroud is hove well round, pass a good throat-seizing. When

secured, take out the bolts, get a small jigger, hook one end to a

strap round the end of the shroud, and the other to the mast-head part;

take a good strand, knot both ends together, take it round the end and

standing or masthead part; put a bolt in both bights, and heave it

round, pulling up the jigger at the same time; this will bring the end

taut up, as heaving on the strap brings both parts close together; then

pass a round, or quarter seizing, and a smaller one on the end.

If the rigging is turned in on shore, keep the lay in the rope, and

when sent out of the loft, to be placed on the mast-head, keep the ends

inside, the shrouds being marked with a knot or a piece of spun-yarn,

according to the number. The ends will lay aft on one side, and forward

on the other; this is of importance and should be remembered.

_Turning in dead-eyes_, termed _Cutter stay-fashion_.--The dead-eye

being placed to the mark, the end is passed round it as before, but

instead of being secured with a throat-seizing, the end is passed

round the standing-part and seized to the part round the dead-eye

with a round-seizing, and another on the end further round the

dead-eye. The same precaution as in the other way, keep the lay in

the rope and _end_ inside.

_Note._--Worming and serving _shrouds_ in the wake of the dead-eyes

is not a common practice in all ships, but I would recommend it as

a great preservative to the shrouds, if they were served at least

six feet above the dead-eyes. I have known of many gangs of rigging

condemned on account of the shrouds being _magged_ and _chafed_ in

the wake of the dead-eyes and throat-seizing, for want of service,

when all other parts of the shrouds were found to be good.

=114.=--GETTING TOPMAST CROSSTREES OVER.

Overhaul a girtline through the round hole in the cap; and if they

are to go up from the starboard side, overhaul and send it down, and

the after girtline outside the top; hitch that through the round hole

in the cap, well out on the starboard foremost horns underneath, and

secure the end with a good seizing of spun-yarn; the after one bend on

in the same way, to the after starboard horn; then stop both girtlines

well with spun-yarn, close to the trestle-trees, and also with two

stops, on the larboard horns; “sway away;” having a guy from the deck

to clear it of the top, as it goes aloft. When the upper, or larboard

horns are well clear of the cap, take two rope’s ends from the larboard

side of the top, and bend them to the larboard horns, and man them in

the top--these are called “steadying lines,” and are used to prevent

the crosstrees _falling back_, if a stop is cut too soon, and to assist

in getting the crosstrees on the cap, and over the mast-head. “Sway

higher,” cutting the stops, and hauling on the steadying lines. When

the trestle-trees are as high up as possible on the cap, haul on the

steadying lines, and cut the stops close to the trestle-trees on the

starboard side, and the crosstrees will fall across the cap; then

place the after hole between the trestle-trees, over the round hole in

the cap--cast off the girtlines and steadying lines--white-lead the

mast-head in the wake of the crosstrees, and sway the topmast through;

beat the crosstrees well down on the mast-head; and when placed, sway

the topmast a few feet higher for rigging. Pass a lashing through the

fid-hole, and round the lower mast, to steady it.

The topmasts are sometimes fidded before rigging, to avoid the greater

strain upon the top tackles. If a topmast has only one sheave (like a

mizen topmast), it is a good precaution to reeve a hawser through the

fid-hole, and haul it taut, as the mast goes aloft; unreeving it only

when the mast is high enough for fidding, or previous to the squares

entering the trestle-trees.

[Illustration]

=115.=--PLACING TOPMAST RIGGING.

Tar the masthead in the wake of the rigging; send the bolsters aloft,

and stop them. After the bolsters are on, put over first the mast-head

pendants--then the span for ginn blocks; then follows the straps, with

thimble in for standing part of the tyes--next, first pair of shrouds

on the starboard side, then the larboard; and so on, until all are

over; then lash the breast backstay (if single); if a pair, put them

over the same as a shroud; next the after backstays; lash the stays,

if fitted for it, if not, put them over the same as lower stays, with

_mousings_. The collars of the stays go between the cross-trees, and

lash over the after one. Some prefer chain spans. The most approved

method is an iron plate, with a hook on each end, which lays across the

trestle-trees.

=116.=--TO SEIZE-IN THE SISTER-BLOCKS.

There is a score on each side to take the shroud, and three scores

for seizing--one on each end, and one between both sheaves. They are

seized-in the length of the hanging block, from the eye-seizing, to

prevent any risk of the reef-tackle and lift being jammed between

the hanging blocks and the rigging--one seizing is passed round the

shrouds, above the block, another below the block; and a small seizing

put on each score, round the block and shrouds. The topsail-lift leads

through the lower sheave, and reef tackle through the upper one.

The larboard block should be seized-in once the diameter of the shroud

lower than the other, as, if both are seized alike (the starboard

shroud going over first) they would not be square when the rigging is

placed.

=117.=--BACKSTAYS, (BREAST,)

When in pairs, are fitted with eyes, the same as the shrouds, and

served sufficiently far down to be square with the service of the

topmast shrouds. They are also parceled and served in the way of the

lower yards, when braced up. When there is only one backstay it is

secured round the mast-head with a lashing passed round it, through an

eye spliced in;[7] they are set up to a treble block in the channels.

Through these blocks a fall is rove, the standing part being spliced

into the strap of the double block, and then led from the treble block

through a fair leader in the side, in on deck.

_Note._--I have seen ships without breast backstays on any mast,

and they carried sail equally well with those who had them; one

was the _Independence razee_: her breast backstays were converted

into standing ones, and set up a little further aft, or immediately

forward of the proper standing backstays.

Breast backstays are generally pulled up in stays when the ship is

head to wind, having a quarter-watch of topmen stationed by them. If

they should be set up too taut, which may be the case, especially

when the rigging is slack, they are likely to snap and endanger the

mast by the sudden jerk; if not set up enough, they can be of no use,

and are only an additional weight on the mast-heads, and a useless

expenditure of rope. Their being set up to bear an equal strain with

the rigging, will not occur with the greatest care once in a year,

and I consider them particularly injurious on top-gallant-masts. A

good stout _standing backstay_ is the main support.

[7] Some are fitted with a cut splice.

=118.=--STANDING AFTER-BACKSTAYS,

When in pairs, are fitted with an eye the same as topmost rigging. When

an odd one on each side, they are fitted with a horse shoe. They are

now fitted the same size as lower rigging.

The backstays are set up with a lanyard rove through dead-eyes, the

same as shrouds, having service in the wake of the lower yards and tops.

=119.=--MAIN TOPMAST STAY

Is fitted of the same size as the standing backstay. A large clump

block is strapped round the foremast head, over the eyes of the

rigging, and immediately over the square hole in the after part of the

trestle-trees. Through this block the main topmast stay is rove down,

through the trestle-trees--has a thimble turned in the end, lanyard

spliced and rove through it, and set up to a span shackle in the deck,

abaft the foremast, for the purpose; or a large bull’s-eye hooked to an

eye-bolt, and set up on the end.

The spring stay leads through a block strapped round the foremast above

the cat-harpens, and sets up in the fore-top.

[Illustration]

=120.=--MIZEN TOPMAST STAY

Is rove through a thimble strapped round the mainmast-head, over the

eyes of the rigging; and when set up, is secured to its own part with

round seizings. If preferred, it can be set up with a thimble turned

into the end, and a lanyard rove through it; but this is not necessary.

When the stays are well stretched, the thimbles can be spliced in, but

it is not a good plan; for, should it be necessary to unreeve, the

splice must be drawn, which will injure the rope. I have seen them

fitted in this way, and pointed over for neatness,--but prefer their

being turned in, and the end pointed or capped.

_Note._--There is no mizen topmast spring-stay.

=121.=--GETTING THE TOPMAST CAPS ON.

The girtline blocks should be lashed well up to the topmast head.

Overhaul down before all the foremost ends, and secure them to the

foremost bolts in the cap; stop them to the centre ones, and also to

the square hole in the after part; sway the cap up;--when well up, cut

the after stops, sway higher, and the cap can be easily placed by the

man aloft, and girtlines cast off.

If the cap should be very heavy, use a derrick; a capstan bar will

answer the purpose.

_Note._--Ship the capshore the same time you place the cap.

=122.=--MAST-HEAD MAN ROPES, &c., &c.

A piece of rope has an eye spliced in one end, and several overhanded

knots made on the bight, at equal distances from each other. They

should be long enough to reach a third down the topmast rigging, and

seized round the mast-head close to the cap; one on each side is

sufficient. They are absolutely necessary in large ships, and should be

on all.

I have seen them in some very neat ships; and, when it is recollected

the small space the men have for their feet when they get near the

crosstrees, and the long mast-head, to get on the cap, it is certainly

worth while to sacrifice something in the way of appearance to ensure

the safety of a man’s life.

Some large ships have ladders with two steps, set up to the eyes of

the topmast rigging, from the cap; also, spans and grab-ropes fitted,

to go from the swifters abreast of the cap, which will be found very

convenient for the topmen, when exercising sails. These may appear

trifling matters to some, but ships fitted with them are generally

ahead, when exercising in a squadron.

=123.=--TOP TACKLE PENDANTS, &c.

When cut to the required length, a thimble, _well parceled_, is spliced

into one end, and the other pointed, with a becket in it. There are two

to the fore, and two to the main topmasts. In the heel of each topmast

there is a dumb sheave;--take one pendant and reeve it through the top

block, hooked to the cap, through the trestle-trees, through the dumb

sheave, or _heel-block_, through an eye-bolt in the foremost part of

the cap, on the opposite side to the block; take two half-hitches, and

secure the end to its own part, with a spun-yarn seizing; hook the top

tackle block to the thimble in the pendant, and the lower one, to a

bolt in the deck for the purpose; reeve the fall through a leader, and

bring it to the capstan; heave well taut, and unreeve the hawser by

which the mast was formerly hove up for rigging.

The other pendant reeves through the other top-block, through the

sheave hole in the topmast, and clenched to the other eye-bolt in the

fore corner of the cap; hook the blocks, reeve and bring the fall

to the capstan, taking the other off, and manning it well. When no

capstan, both falls must be well-manned by hand.

_Top Tackle Falls and Blocks._--The upper block is double, strapped,

which is made into a hook; the lower is also double, and should be

iron-strapped, having a swivel; a single one is hooked near the

double as a leading block; the fall is rove; the standing part

hitched, or clenched, over the block; they are sometimes spliced in,

and some have beckets.

To hook the double block, clap a single tail-block well up on the

pendant, reeve a whip through it, hitch one end of the whip through

one of the sheaves of the double block, hoist it up, and hook it to

the pendant.

=124.=--PREPARING TO FID THE TOPMASTS.

Capshores should be stepped and secured, luff tackles clapped on all

the stays and backstays. Lower blocks should not be hooked on to the

lanyards, but to bolts in the deck, and eye-bolts or straps in the

chains; capstans and falls manned, topmast rigging quite clear, and

hove over the sides of the tops, and the topmasts hove up and fidded,

_mast stayed_, _rigging set up_, _&c._

=125.=--RATTLING THE LOWER AND TOPMAST RIGGING.

Cat-harpen legs and futtock shrouds are seized-on and set up; topmast

stayed, rigging and backstays set up, lanyards secured as lower

rigging,--then commence rattling down.

Girt the rigging with three fore and aft swifters--one by the shear

rail, and the others at equal distances, as follows:--Make one end of a

small rope fast round the foremost shroud, take a turn round the next,

then the third, and so on, until all are taken in; then back the same

way, and half-hitch it round the first. The swifter should be just

taut, and not so as to bring the shrouds together,--the object being

to make the ratlines a little tauter when let go. Sometimes swifters

are not used, but the ratlines are never so square, or look well. Care

should be taken that they are not too taut, for, when let go, all the

strain will come on the seizing in the eyes of the ratlines, and they

will be constantly snapping. Two swifters on each side are sufficient

for the topmast rigging.

_Spar the rigging down_, with spare spars, such as studding-sail

yards, boat’s oars, boat’s masts, handspikes, or anything _light_ that

will answer, and seize them to the shrouds on the outside, at equal

distances, leaving sufficient space for three or four ratlines between

each spar.

A coil of small well-stretched rope is placed on each side of the deck,

two or three on a side when required to be done quick. Splice an eye in

one end of the rattling stuff, seize it to the first shroud, and then

commence clove-hitching on the second, and so on to the after, but one;

then measure the distance from that to the last, cut it off, and splice

an eye in the end. Beat the _hitches_ well round each shroud, seize the

end to the foremost one, and also the other eye to the after one, and

rattle up, taking the shear of the rails. The hitches are formed on the

outside, and at equal distances; in three or four places take a ratline

to the after swifter;--these are called _shear ratlines_.

When it is necessary to rattle quick, take three ends up at a time.

Fifteen inches is a good distance between the ratlines, and their

places should be chalked off all the way up and down before commencing.

Each man employed should have a measure within his reach, and care

should be taken to make the ratlines on one side correspond in a

parallel direction with those of the other. This can only be seen from

the outside of the ship. Make the hitches neat, and the eyes small; few

things tend more to a snug appearance.

If the rigging is to be blacked, after rattling down, it is best to

leave the spars on until that is done, taking them off as you black

down.

=126.=--FUTTOCK-STAVES IN TOPMAST RIGGING

Are iron bolts parceled and served; are seized to the shrouds the

length of the _hounds_, down on the inside; seizings passed as in lower

rigging.

_Cat-harpen legs on topmast rigging._--Take the length from the

starboard foremost shroud round the mast, and to the after one on

the same side; get a piece of rope this length, splice an eye in

each end, worm, parcel, and serve it. There are two on each mast.

Seize the foremost end to the foremost shroud and futtock stave, take

it round the mast and seize it to the after one; secure one to the

larboard side in the same manner.

I have seen them go from the foremost starboard shroud, straight to

the after larboard one, crossing abaft the mast. They are also fitted

to set up with thimbles and a lanyard, abaft the mast. When this is

done, both eyes are seized to the futtock staves on the starboard

side, a thimble seized in the bight, and set up abaft the mast to

the larboard one, with a lanyard fitted in the same way. (Vessels

with chain topsail ties are fitted with iron _bands_, to go round the

mast, with eyes for the topgallant rigging to lead through.)

=127.=--TO RIG THE JIB-BOOM.

Hoist the jib-boom on board by the hawser or tackle, which was left at

the foremast head when getting on board the fore topmast, run the end

out on the bowsprit, pointing it through the stays and bowsprit cap.

Reeve the heel-rope, and sway the jib-boom out a foot or two beyond the

cap. Reeve the jib-stay through the hanks, _traveller if required_, and

then through the inner sheave-hole, in the boom end, martingale and

necklace, and turn a double block in the inner end; reeve the lanyard

or fall through this, and a single block bolted to the bows. To the

traveler seize the jib downhaul blocks and traveling guys; tar the boom

end, put a grommet over, to which seize the fore topgallant bowline

blocks, one on each side.

_Foot ropes._--There is one on each side of the jib-boom. They should

be long enough when in their place to allow a man to stand navel-high

along the boom, and are fitted as follows: take a piece of rope long

enough to make both; cut it in the centre and splice one end into the

other with a cut splice, forming an eye to fit the jib-boom end. Four

or five overhand knots are taken at equal distances on the rope, from

the eye, according to the length of the foot-rope; the knots are for

the purpose of preventing the men from slipping. In each end splice a

small eye, large enough to take a lashing, by which they are set up

to bolts in the bowsprit cap. An eye is sometimes made by taking a

round turn round the boom end, and two seizings passed. Also with a

span, horse-shoe fashion, and neatly covered with canvass.

_Note._--Turk’s-heads worked through the strands, may be substituted

for knots on the foot-ropes, if time will permit.

=128.=--JIB-BOOM MARTINGALE STAY

Is a short rope, with an eye in each end to fit the jib-boom, and end

of the dolphin-striker. The eyes are well served, and covered with

canvass or leather. The martingale is wormed, and a small twine seizing

(snaked) put on round the worming at equal distances between the eyes;

three, or four, according to the length, which must depend on the way

the dolphin-striker is intended to stand, or rake. It looks best when

perpendicular to cap or jackstaff.

Chain is sometimes used for the purpose, as also for back-ropes; and is

found to answer well, it not being liable to stretch.

=129.=--JIB-BOOM GUYS.

There is one pair on each side; an eye is made to fit the boom end

by passing a round seizing, when in their place; both ends are rove

through thimbles on each yard-arm of spritsail yard (when crossed).

Then brought in and both ends set up to bull’s eyes in the bow, or

fitted with tackles.

_Placing the rigging on the jib-boom._--First, the foot-ropes; next,

the martingale stay, and guys. In some ships, an iron grummet is

fitted with an eye on top and one underneath, neatly leathered, and

put over the boom-end first. The martingale stay is hooked to the

underneath eye, the jib-tack and downhaul to the upper one.

=130.=--MARTINGALE BACK-ROPES

Are pendants, middled and served in the centre, the round of the

dolphin striker, both parts crossed and secured with a throat seizing.

The service should be long enough to take in the seizing. In the ends

splice a single or double block; another single one is strapped into a

bolt in the bow for the purpose, or fitted in a strap with a hook and

thimble (hook moused). A gun tackle, or luff-purchase, is then rove,

the standing part of the fall spliced round the pendant, in after end

of the block, rove through the one in the bow, over the head rails,

back through the one in the pendant, and through a fair leading sheave,

in the forecastle bulwark. These falls, after being pulled up, are

racked together outside the bulwark. If belayed on the forecastle, they

should be seized to their next part, so as not to be let go by mistake.

=131.=--PLACING THE RIGGING ON A DOLPHIN-STRIKER.

Back-ropes first, and next the martingale; below this rigging, in the

end of the dolphin-striker, are two or three sheaves, and one close

above it, large enough to admit the jib-stay, which is rove through

it; flying jib-stay in the next sheave, and flying martingale stay

under all, which will show two ropes leading from each boom end, to the

dolphin-striker.

=132.=--GETTING THE JIB-BOOM OUT.

The flying jib-boom iron is driven on; the heel rope manned (if

rigged), and the boom hauled out. The heel strap is placed in a score

in the heel for the purpose, and both bights lashed together; then

another lashing passed round the strap, between the boom and the

bowsprit, and the strap well frapped together. The heel being well

secured, set up the back ropes and guys.

_Note._--Rigging to be placed same as jib-boom.

=133.=--SENDING UP TOPGALLANT MASTS.

The topgallant top blocks being hooked, we will suppose the long mast

rope is to be rove, from the starboard side of the topmast-cap; take

the end through the square hole in the fore part of the trestle-trees,

half-hitch it through the fid-hole, and stop it round the _hounds_,

and the royal mast-head; send the hauling part through lubber’s hole,

and through a leading block or sheave on deck. The topgallant rigging

is fitted on a sheet-iron cylinder or funnel, attached to the jack

cross-trees (by an order from the former Navy Commissioners), leathered

and painted on the outside, and tarred on the inside; put on the

grommet or strap for the main royal stay[8] to reeve through, then put

on the topgallant and flying jib-stays, starboard and larboard shrouds,

breast and standing backstays, and secure them over the funnel;

overhaul the girtlines down on deck, and bend them on to the rigging,

around all parts, about the length of the mast-head below the jack, and

a good stop through the funnel; hoist the funnel up and place it, with

the rigging on, over the hole in the cap, and take the stays forward

and reeve them.

Man the mast-ropes and “sway away,” having men stationed to bear off

and place the rigging or funnel. When pointed through the funnel, place

the royal rigging and truck, reeve the signal halyards, and _attach_

the conductor; “sway higher,” land the mast on the top or forepart of

lower mast-cap, and, if required, reeve the short mast rope; reeve the

pointed end through a block hooked to the cap on the larboard side, or

the sheave, then through the trestle-trees, through the sheave-hole

in the topgallant-mast, up through the trestle-trees, and secure the

end to the foremost bolt in the cap, with two half-hitches, and seize

the end; to the thimble in the other end, hook the double block of a

burton; hook the single one to a strap round the trestle-trees; send

the burton fall on deck through lubber’s hole, and lead it through a

single leading block, and haul it taut; unreeve the long mast rope,

and fid the mast; when the fid is in, the mast rope can be unrove, if

wished.

Reeve the ends of the shrouds through the horns of the cross-trees,

between the topmast rigging, over the futtock staves, and turn a

thimble in each end; strap another round a futtock plate, inside the

dead-eyes of top-mast rigging; if there is none placed in the top,

splice a lanyard into that in each shroud, and take two or three turns

through each, stay the mast, and set the rigging and backstays up.

In setting up the backstays the single block of the jigger, which is

hooked to the thimble, is hooked to a blackwall hitch, in the lanyard,

and when set up, expend the lanyard through the thimbles, and seize

the ends. On both shrouds on each side clap on small jiggers, hook the

double blocks to straps on the shrouds, the single to Blackwall hitches

in the lanyards, and set up and secure the same as the backstays.

The fore topgallant stay reeves through the outer sheave-hole in the

jib-boom, and through a bull’s-eye hooked to the bows, and when set up,

is seized to its own part.

The main topgallant stay is rove through the middle sheave in the after

chock of the fore topmast crosstrees, or through a block strapped

around the fore mast-head, and set up in the fore top.

The mizen topgallant stay is rove through a bull’s-eye in the after

part of the main cap, and set up in the main top.

[8] Suppose this to be the fore topgallant-mast.

=134.=--ROYAL RIGGING.

There is one breast, and after backstay on each side, seized as the

after backstays on topgallant masts. The breast backstay or _shroud_,

is pulled up with a gun tackle purchase;[9] the after leg has a thimble

turned in, and sets up in the after part of the chains, with a lanyard.

_Royal stays._--As there is no funnel (although it would be a

great advantage to have one), splice an eye in the stay to fit the

mast-head, cover it, and serve over the splice. It goes on next to

the grommet, then the shroud and backstays, spanned together.

The fore royal stay is rove through the outer sheave-hole in the

flying jib-boom end, and pulled up through a fair leader on the

forecastle.

The main royal stay is rove through a thimble stopped around the

foretop gallant mast-head, through another strapped round the eye of

a shroud, and when set up is seized to its own part.

Mizen royal stay reeves through a sheave in the after part of the

main topmast trestle-trees, through a thimble strapped round the eye

of a main shroud, and seized to its own part.

[9] Royal-backstays are set up with a jigger to their respective

places in the channels. The shrouds are set up in the top

breast-backstay-fashion.

=135.=--SHORT AND LONG TOPGALLANT MAST-ROPES.

_Short mast ropes_ have a thimble spliced in one end, and the other

end pointed. They are rove when the mast is rigged, and are used for

fidding. They should be sufficiently long (when the mast is landed on

the top or cap), after being rove through the block and sheave in the

heel of the mast, and clenched to the cap, to allow the thimble to hang

clear of the cat-harpen legs.

If the topsail-yard is crossed, the mast is landed on it, for rigging;

if the topgallant-mast should be too long to allow its being landed on

the yard, the mast rope must be lengthened accordingly.

_Long mast ropes._--Ropes are often fitted for the purpose; but the

topgallant yard rope is generally used. I have seen them fitted as

follows, and they answered very well:--

The rope is rove, and stopped to the topgallant-masthead, and royal

sheave-hole, leaving a long end over the upper stop, to hitch to the

bolt, before cutting the stops. To prevent the rope _slipping_, rack

both parts together above the sheave-hole in the heel of the mast.

=136.=--TO RIG THE FLYING JIB-BOOM.

Sway it on board and point it through the iron at the jib-boom end. A

tail block is put on the neck of the iron, or on the jib-stay, close

down to the boom. Through this block reeve the heel rope, one end taken

in on the forecastle, and the other bent to the heel of the boom.

A rope is bent to the heel of the boom to serve as a guy; sway the

boom out a foot or two for rigging. Put over the foot ropes, fitted

as the jib-boom, the inner ends seized to the jib-boom end, inside

the iron. The martingale, when single, is secured round the boom end,

clenched, spliced, or with a running eye, rove through a sheave in the

dolphin-striker, and in on the forecastle, on the opposite side to the

royal stay. When double, a single block is strapped round the boom end,

and the standing part spliced round the dolphin-striker; hauling part

as when single.

_Guys._--One on each side spliced into each other, forming a

cut-splice to fit the boom end. The other end rove through thimbles,

strapped round the spritsail yard, through fair leaders in the

bulwarks, and pulled up on the forecastle, or set up on the bows.

Man the heel rope and get the boom out; the heel is placed in a

step formed on the fore side of the bowsprit cap, for the purpose,

and secured with a lashing, rove through the end, and passed round

the jib-boom. Set up the martingale, stay the fore topgallant and

royal mast, (fore and aft,) by the stays and backstays; and if the

spritsail yard is crossed, reeve the guys, turn in thimbles, and set

them up.

=137.=--SPRITSAIL LIFTS

Are single; have an eye spliced in one end to fit the yard-arm; splices

served over are taken over the jib guys, rove through the bull’s-eye in

the cap, and set up on the forecastle. Blocks are sometimes strapped

into the bolts, but it is quite unnecessary. Bolts are often driven

into the fore side of the cap, and the lifts led through; when this

is done, they are generally set up there with lanyards and thimbles,

spliced into the end, which answers every purpose.

=138.=--SPRITSAIL BRACES.

A single block is strapped into a bolt in the cheek of the foremast on

each side. The brace has an eye in one end, to fit the yard arm; the

other is rove through the single block, on collar of fore-stay, and

another single block is spliced into the end; a luff tackle purchase is

rove with it, and a double block on the deck, one sheave answering for

a leading one.

They are sometimes rove double, but the practice is getting out of date.

=139.=--STRAPPING THIMBLES FOR GUYS ON SPRITSAIL YARDS.

The thimbles are double-strapped and secured, after being placed round

the yard, and in the score of the thimbles, with a round seizing passed

between the thimble and the yard; the splices laying in the upper side

of the score in the thimbles. Some fit grummet straps, or a short-long

splice, in the strap for neatness.

The use of double straps is to allow the thimbles to lay fair with the

yard for the jib guys to lead through; if single, they would stand fore

and aft.

=140.=--CROSSING A SPRITSAIL YARD.

The yard being rigged, prepare for crossing as follows:

Clap a good selvagee strap well up, on the fore topmast stay; to it

hook a snatch or leading block large enough to take a hawser; reeve

it and timber-hitch it round the starboard quarter of the spritsail

yard, (if got out on the starboard side,) stop it along to the larboard

quarter, and half way out on the larboard yard-arm. Overhaul down the

lifts and braces, and sway out, keeping the larboard yard-arm under

the bowsprit; when clear on the larboard side, put over the brace, or

block, and lift, and haul out; when nearly out, or before clear of

the head rails, put over the starboard brace or block and lift; haul

on the hawser, starboard lift, and brace, and cast off the stops.

When sufficiently out, pass the parrel, _take a turn or hold well on

the end_; hook the tye, and square the yard. Cast off the hawser and

unreeve it; reeve the jib-guys through their thimbles on the spritsail

yard, turn in dead-eyes or blocks, and set them up to others on the

bows; set all up taut and square the yard.

=141.=--TWO HALF SPRITSAIL YARDS.

Two half spritsail yards, made like dolphin-strikers, are secured to

the bowsprit with jaws, (or an iron band fitted round the bowsprit,

with a double goose-neck hinge,) to cant or turn in any required

direction. When the half spritsail yard is carried it is rigged as

follows:--

The fore guys are made of well stretched rope, and equal in strength to

the jib guys together, each fitted with an artificial eye to fit the

jib-boom end and half yard-arm. They should be wormed with small rope,

parceled and served, or covered in the eyes; four stranded rope is

preferable, it being not so liable to stretch as three.

The after guys are fitted with an artificial eye in one end, to fit the

yard arm, and a thimble spliced into the other. They are the same size

as the fore guys, and wormed in the same manner. If made on purpose,

and four-stranded, the thimble is kept in the bight with a round

seizing.

The jumper, or lower guy, is fitted the same as the after, only

shorter; the length of this depends on the drop intended to be given to

the yard arm, which should never be less than the spritsail yard, when

well braced up, or, in other words, _canted_.

The jumper is put on the yard arm first, then the after one, next, the

foremost, and over the jib-boom. The after one is set up to a bolt by

the cat-head, well down; the lower, to an eye-bolt in each side of the

cutwater, well out.

For a frigate, the guys are eight-and-a-half-inch, and wormed with

twenty-one thread stuff. Four-stranded rope, if made on purpose, can

have the eyes formed when laying up in the rope walk. Some fit forward

and after guys all in one.

=142.=--WHISKERS.

Whiskers are iron outriggers from the cathead, with sheaves in them for

the guys to reeve through, and set up to the fore chains, the same as

when rove through the spritsail yard. This plan is much in use in small

vessels, but the boom is supported almost entirely by the martingale,

as the guys being considerably above the boom, and its always _topping

up_, when the sail is set on a wind, the more wind the greater the

strain on the martingale; and should the guys be not carefully pulled

up, the boom must depend on the martingale entirely for support.

=143.=--TO GET ON BOARD AND RIG LOWER YARDS.

Overhaul the hawser from the lower mast-head, bend on to the slings

of the yard, and get them nearly up and down; clap selvagees on the

quarters, to which hook the pendant tackles. As it comes on board, cut

the stops, easing away on the pendant tackle, and bousing on the other,

until the yard is athwart-ships; place chocks in the hammock nettings

for the yard to rest on; slue them fair, and lash them; come up the

tackles, cast off the hawsers, and place a shore under the middle of

the yard to prevent its springing. Measure the yard, tar and leather

the slings, fit a saddle for the D thimble, which lash on with a piece

of well stretched rope, heaving each turn taut with a Spanish windlass,

and fitting the score of the D thimble. Cover all with leather, and fit

the straps for the preventer slings, &c., &c., &c.

_Note._--The iron sling-bands are now used instead of the _old

fashioned_ D thimble.

Chain is now generally used, and allowed to all ships in the service

for the slings (proper), rope ones being used as preventers. (See

Rigging Table.)

=144.=--TRUSS STRAPS.

A large thimble with the score well parceled, is seized into a double

strap, which is made by splicing both ends together, and served over;

the thimble secured in the strap with a round seizing, the splice

laying in the score. The strap should be long enough to go round the

yard in the quarter, both eyes lashing together on the fore side. There

are two on each yard. One thimble is seized inside the truss pendant,

the other outside; and one in the round of the pendant higher up than

the other.

=145.=--TRUSS PENDANTS[10]

Are wormed, parceled, and served; an eye is spliced in one end large

enough to take the pendant when rove through it; in the other an

artificial eye is made, large enough to take the single block for truss

fall. The pendant should be rove through the small eye before the

artificial one is made, boused well taut round the yard, the eye being

kept underneath, and one pendant higher than the other. Reeve the upper

pendant through the upper thimble, and lower pendant through lower

thimble. Being rove in this manner, they will lead perfectly clear of

each other.

_Hide rope_ is preferable for pendants, but the iron patent truss is

now allowed to all vessels, up to a second class frigate inclusive.

(_New regulation_).

[10] For length and size, see Rigging Table.

=146.=--QUARTER BLOCKS--LOWER YARDS.

The kedge-anchor · 第 2 / 16 章