AUTHOR’S COMMENT

It would not be desirable to prohibit production of heavy water and

deuterium in quantity since heavy water is the best moderator of

neutrons in the large-scale production of atomic power for industrial

uses. Furthermore, such a prohibition could never be enforced, since, as

stated, the manufacture of heavy water and the separation of deuterium

are relatively simple processes that “may be carried out in small plants

which can exist in a variety of locales.” What makes it even more

difficult, if not impossible, to detect any violation of such a

prohibition is the fact that the raw material for heavy water or

deuterium is just plain water.

7. SHOULD THE PROVISIONS OF THE PRESENT UN PLAN RELATING TO INSPECTION,

SURVEYS, AND EXPLORATIONS BE MODIFIED TO CONTROL HEAVY WATER AND

DEUTERIUM PRODUCTION?

The United Nations plan assumes that the production of fissionable

material cannot be regulated without strict supervision over the mining

of source materials such as uranium and thorium:

Without the control of raw materials, any other controls that might be

applied in the various processes of atomic energy production would be

inadequate because of the uncertainty as to whether or not the

international agency has knowledge of the disposition of _all_ raw

material. (_Second Report_, p. 30.)

Whereas uranium and thorium are needed to produce U-235, [U-233] and

plutonium, the production of deuterium is not subject to such limitation

of source materials. Only water, the existence of power, and

comparatively simple plants are needed for the manufacture of heavy

water and deuterium. In view of these facts, can the existing United

Nations plan cope with the problem of regulating deuterium production?

In commenting upon spot aerial surveys, for example, the _Second Report_

recommends that “the [international] agency shall conduct spot aerial

surveys in each period of 2 years over areas not exceeding 5 percent of

the territory under the control of each nation or areas not to exceed

2,000 square miles, whichever is the larger. (These area limitations

apply to spot aerial surveys only)” (p. 68). If aerial surveys were to

be used not only in controlling raw materials but also to help in

spotting deuterium and heavy water plants, must they be carried out more

frequently than is provided in the existing plan?

The _Second Report_ also indicates that a UN inspectorate should be

compelled to secure permission, through a warrant procedure, before

inspecting “private and restricted property not open to visitation by

the population in the locality, and in the case of certain ground

surveys and aerial surveys which are additional to others which the

agency may conduct without warrant or other special authorization” (p.

60). Do the technical facts surrounding heavy water and deuterium

production suggest that such a restriction on an international agency’s

authority would have to be modified?

The hell bomb · 第 30 / 46 题