PART II

THE LULL BETWEEN THE STORMS

With the departure of the 3d Marines, a relative calm prevailed at Khe

Sanh for the remainder of the year. Although occasional encounters and

sightings indicated that the Communists still had an interest in the

area, there was a marked decrease in large unit contacts and the tempo

of operations slackened to a preinvasion pace. Such was not the case in

other portions of Quang Tri Province.

During the summer and fall of 1967, the center of activity shifted

to the eastern DMZ area. After being battered and thrown for a loss

on their end sweep, the Communists concentrated on the middle of the

line again. With an estimated 37 battalions poised along the border,

the NVA constituted a genuine threat to the northernmost province. At

times as many as eight Marine battalions were shuttled into the area

for short-term operations and three or four were there full time, but

the enemy's intensified campaign created a demand for more troops.

As a result, General Westmoreland was forced to make major force

realignments throughout South Vietnam to satisfy the troop requirements

in I Corps.(14)

General Westmoreland drew the bulk of these reinforcements from areas

in Vietnam which, at the time, were under less pressure than the five

northern provinces. During April and May 1967, Task Force OREGON,

comprised of nine U. S. Army battalions from II and III Corps, moved

into the Chu Lai-Duc Pho region and was placed under the operational

control of General Walt. By the end of May, five battalions of the 5th

and 7th Marines at Chu Lai had been released for service further north.

Two of these units moved into the Nui Loc Son Basin northwest of Tam

Ky to conduct offensive operations and support the sagging Vietnamese

Revolutionary Development efforts. The other three settled in the Da

Nang tactical area of responsibility (TAOR) and in turn released two

Marine battalions, 1/1 and 2/1, which moved to Thua Thien and Quang Tri

provinces.

In addition to his in-country assets, General Westmoreland also

called on Admiral U. S. Grant Sharp, Commander in Chief, Pacific, for

reinforcements. Besides the two Special Landing Forces afloat with the

U. S. Seventh Fleet, the Pacific Command maintained a Marine Battalion

Landing Team (BLT 3/4) as an amphibious reserve on Okinawa.[7](15)

Actually, this unit was part of the BLT rotation system whereby

battalions were periodically shuttled out of Vietnam for retraining and

refurbishing in Okinawa before assignment to the SLF. ComUSMACV needed

the unit and got it. On 15 May, 3/4 began an airlift from Okinawa to

Dong Ha by Air Force and Marine C-130 aircraft and within 31 hours the

1,233-man force was in-country. After the realignment of units in I

Corps was complete, there was a net increase of four USMC battalions in

the DMZ area making a total of seven. Additionally, the SLFs, cruising

off the Vietnamese coast, provided two more battalions which could be

landed quickly and added to the III MAF inventory. SLF Alpha (BLT 1/3

and HMM-362) was placed on 24-hour alert to come ashore and SLF Bravo

(BLT 2/3 and HMM-164) was given a 96-hour reaction time.(16)

During the second half of 1967, the enemy offensive south of the DMZ

was a bloody repetition of the previous year's effort. With more

courage than good sense, the NVA streamed across the DMZ throughout the

summer only to be met and systematically chewed up in one engagement

after another. In July, the enemy, supported by his long-range

artillery along the Ben Hai, mounted a major thrust against the 9th

Marines near the strongpoint of Con Thien. Reinforced by SLFs Alpha and

Bravo, the 9th Marines countered with Operation BUFFALO and, between

the 2d and 14th of July, killed 1,290 NVA. Marine losses were 159 dead

and 345 wounded.(17)

[Illustration: Action near the DMZ was characterized by hard fighting

in rugged terrain. A Marine of 3/4 moves forward during Operation

PRAIRIE. (USMC Photo A187904)]

[Illustration: Marine Battalion Landing Teams aboard U. S. Seventh

Fleet shipping augmented III MAF forces. USS =Iwo Jima= stands off

South Vietnamese coast. (USMC Photo A650016)]

After this crushing defeat, the NVA shifted its emphasis from direct

infantry assaults to attacks by fire. Utilizing long-range rockets and

artillery pieces tucked away in caves and treelines along the DMZ, the

enemy regularly shelled Marine fire support and logistical bases from

Cam Lo to Cua Viet. One of the most destructive attacks was against

Dong Ha where, on 3 September, 41 enemy artillery rounds hit the base

and touched off a series of spectacular explosions which lasted for

over four hours. Several helicopters were damaged but, more important,

a fuel farm and a huge stockpile of ammunition went up in smoke.

Thousands of gallons of fuel and tons of ammunition were destroyed. The

enormous column of smoke from the exploding dumps rose above 12,000

feet and was visible as far south as Hue-Phu Bai.(18)

The preponderance of enemy fire, however, was directed against Con

Thien. That small strongpoint, never garrisoned by more than a

reinforced battalion, was situated atop Hill 158, 10 miles northwest

of Dong Ha and, from their small perch, the Marines had a commanding

view of any activity in the area. In addition, from one to three

battalions were always in the immediate vicinity and deployed so that

they could outflank any major enemy force which tried to attack the

strongpoint. Con Thien also anchored the western end of "the barrier,"

a 600-meter-wide trace which extended eastward some eight miles to Gio

Linh. This strip was part of an anti-infiltration system and had been

bulldozed flat to aid in visual detection.[8](19)

Because of its strategic importance, Con Thien became the scene of

heavy fighting. The base itself was subjected to several ground

attacks, plus an almost incessant artillery bombardment which, at its

peak, reached 1,233 rounds in one 24-hour period. Most of the NVA and

Marine casualties, however, were sustained by maneuver elements in

the surrounding area. Operation KINGFISHER, which succeeded BUFFALO,

continued around Con Thien and by 31 October, when it was superseded by

two new operations, had accounted for 1,117 enemy dead. Marine losses

were 340 killed.[9](20)

While heavy fighting raged elsewhere, action around Khe Sanh continued

to be light and sporadic. Immediately after its arrival on 13 May,

Colonel Padley's undermanned 26th Marines commenced Operation

CROCKETT.[10](21) The mission was to occupy key terrain, deny the enemy

access into vital areas, conduct reconnaissance-in-force operations to

destroy any elements within the TAOR, and provide security for the base

and adjacent outposts. Colonel Padley was to support the Vietnamese

irregular forces with his organic artillery as well as coordinate

the efforts of the American advisors to those units. He also had the

responsibility of maintaining small reconnaissance teams for long-range

surveillance.(22)

To accomplish his mission, the colonel had one infantry battalion,

1/26, a skeleton headquarters, and an artillery group under the control

of 1/13. The 1st Battalion, 26th Marines, commanded by Lieutenant

Colonel James B. Wilkinson, maintained one rifle company on Hill

881S and one on 861; a security detachment on Hill 950 to protect

a communication relay site; a rifle company and the Headquarters

and Service Company (H&S Co) for base security; and one company in

reserve. The units on the hill outposts patrolled continuously within

a 4,000-meter radius of their positions. Reconnaissance teams were

inserted further out, primarily to the north and northwest. Whenever

evidence revealed enemy activity in an area, company-sized search and

destroy sweeps were conducted. Although intelligence reports indicated

that the three regiments of the =325C NVA Division= (i.e. =95C=,

=101D=, and =29th=) were still in the Khe Sanh TAOR, there were few

contacts during the opening weeks of the operation.(23)

Toward the end of May and throughout June, however, activity picked

up. On 21 May, elements of Company A, 1/26, clashed sharply with

a reinforced enemy company; 25 NVA and 2 Marines were killed. The

same day, the Lang Vei CIDG camp was attacked by an enemy platoon.

On 6 June, the radio relay site on Hill 950 was hit by an NVA force

of unknown size and the combat base was mortared. The following

morning a patrol from Company B, 1/26, engaged another enemy company

approximately 2,000 meters northwest of Hill 881S. A platoon from

Company A was helilifted to the scene and the two Marine units killed

66 NVA while losing 18 men. Due to the increasing number of contacts,

the 3d Battalion, 26th Marines, commanded by Lieutenant Colonel Kurt

L. Hoch, was transferred to the operational control of its parent unit

and arrived at Khe Sanh on 13 June. Two weeks later, the newly arrived

unit got a crack at the NVA when Companies I and L engaged two enemy

companies 5,000 meters southwest of the base and, along with air and

artillery, killed 35.(24)

Operation CROCKETT continued as a two-battalion effort until 16 July

when it terminated. The cumulative casualty figures were 204 enemy KIA

(confirmed), 52 Marines KIA, and 255 Marines wounded. The following

day, operations continued under a new name--ARDMORE. The name was

changed; the mission, the units, and the TAOR remained basically

the same. But again the fighting tapered off. Except for occasional

contacts by reconnaissance teams and patrols, July and August were

quiet.(25)

On 12 August, Colonel David E. Lownds relieved Colonel Padley as the

commanding officer of the 26th Marines. At this time the 3d Marine

Division was deployed from the area north of Da Nang to the DMZ and

from the South China Sea to the Laotian border. In order to maintain

the initiative, Lieutenant General Robert E. Cushman, Jr., who had

relieved General Walt as CG, III MAF in June, drew down on certain

units to provide sufficient infantry strength for other operations.

Except for several small engagements Khe Sanh had remained relatively

quiet; therefore, on the day after Colonel Lownds assumed command, the

regiment was whittled down by two companies when K and L, 3/26, were

transferred to the 9th Marines for Operation KINGFISHER. Three weeks

later, the rest of 3/26 was also withdrawn and, as far as Marine units

were concerned, Colonel Lownds found himself "not so much a regimental

commander as the supervisor of a battalion commander." The colonel,

however, was still responsible for coordinating the efforts of all the

other Allied units (CACO, CIDG, RF, etc) in the Khe Sanh TAOR.(26)

[Illustration: Colonel John J. Padley turns over the colors and the

26th Marines to Colonel David E. Lownds on 12 August 1967. (Photo

courtesy Colonel David E. Lownds)]

As Operation ARDMORE dragged on, the Marines at Khe Sanh concentrated

on improving the combat base. The men were kept busy constructing

bunkers and trenches both inside the perimeter and on the hill

outposts. On the hills, this proved to be no small task as was pointed

out by the 1/26 battalion commander, Lieutenant Colonel Wilkinson:

The monsoon rains had little effect on 881, but when the first

torrential rains of the season hit 861 the results were disastrous.

The trenchline which encircled the hill washed away completely on

one side of the position and caved in on another side. Some bunkers

collapsed while others were so weakened they had to be completely

rebuilt. Because of the poor soil and the steepness of the terrain,

the new bunkers were built almost completely above ground. To

provide drainage, twenty-seven 55 gallon steel drums, with the tops

and bottoms removed, were installed in the sides of the trenches

around 861 so water would not stand in the trenches. (Culvert

material was not available.) All bunker materials, as well as other

supplies, were delivered to the hills by helicopter. Attempts were

made to obtain logs for fighting positions and bunkers in the

canopied jungle flanking the hills. This idea was not successful.

The trees close to 881 and 861 were so filled with shrapnel from

the battles the previous spring that the engineers did not want to

ruin their chain saws on the metal.... In spite of the shortages,

Marines of 1/26 worked extremely hard until every Marine on 881(S)

and 861 had overhead cover.(27)

Another bit of foresight which was to prove a God-send in the

succeeding months was the decision by higher headquarters to improve

the airstrip. The original runway had been a dirt strip on top of which

the U. S. Navy Seabees had laid aluminum matting. The 3,900-foot strip,

however, did not have a rock base and as a result of the heavy monsoon

rains, mud formed under the matting causing it to buckle in several

places. Upon direction, Colonel Lownds closed the field on 17 August.

His men located a hill 1,500 meters southwest of the perimeter which

served as a quarry. Three 15-ton rock crushers, along with other heavy

equipment, were hauled in and the Marine and Seabee working parties

started the repairs. During September and October, U. S. Air Force

C-130s of the 315th Air Division (under the operational control of

the 834th Air Division) delivered 2,350 tons of matting, asphalt, and

other construction material to the base by paradrops and a special

low-altitude extraction system. (See page 76) While the field was shut

down, resupply missions were handled by helicopters and C-7 "Caribou"

which could land on short segments of the strip. Work continued until

27 October when the field was reopened to C-123 aircraft and later, to

C-130s.(28)

On 31 October, Operation ARDMORE came to an uneventful conclusion. The

absence of any major engagements was mirrored in the casualty figures

which showed that in three and a half months, 113 NVA and 10 Marines

were killed. The next day, 1 November, the 26th Marines commenced

another operation, new in name only--SCOTLAND I. Again the mission and

units remained the same, and while the area of operations was altered

slightly, SCOTLAND I was basically just an extension of ARDMORE.(29)

One incident in November which was to have a tremendous effect on the

future of the combat base was the arrival of Major General Rathvon

McC. Tompkins at Phu Bai as the new Commanding General, 3d Marine

Division. General Tompkins took over from Brigadier General Louis

Metzger who had been serving as the Acting Division Commander following

the death of Major General Bruno Hochmuth in a helicopter crash on 14

November. In addition to being an extremely able commander, General

Tompkins possessed a peppery yet gentlemanly quality which, in the

gloom that later shrouded Khe Sanh, often lifted the spirits of his

subordinates. His numerous inspection trips, even to the most isolated

units, provided the division commander with a first-hand knowledge of

the tactical situation in northern I Corps which would never have been

gained by simply sitting behind a desk. When the heavy fighting broke

out at Khe Sanh, the general visited the combat base almost daily. Few

people were to influence the coming battle more than General Tompkins

or have as many close calls.(30)

During December, there was another surge of enemy activity.

Reconnaissance teams reported large groups of NVA moving into the area

and, this time, they were not passing through; they were staying.

There was an increased number of contacts between Marine patrols and

enemy units. The companies on Hills 881S and 861 began receiving more

and more sniper fire. Not only the hill outposts, but the combat base

itself, received numerous probes along the perimeter. In some cases,

the defensive wire was cut and replaced in such a manner that the break

was hard to detect. The situation warranted action, and again General

Cushman directed 3/26 to rejoin the regiment. On 13 December, the

3d Battalion, under its new commander, Lieutenant Colonel Harry L.

Alderman (who assumed command 21 August), was airlifted back to Khe

Sanh and the 26th Marines.(31)

On the 21st, the newly-arrived Marines saddled up and took to the

field. This was the first time that Colonel Lownds had been able to

commit a battalion-sized force since 3/26 had left Khe Sanh in August.

Lieutenant Colonel Alderman's unit was helilifted to 881S where it

conducted a sweep toward Hill 918, some 5,100 meters to the west,

and then returned to the combat base by the way of Hill 689. The 3d

Battalion made no contact with the enemy during the five-day operation

but the effort proved to be extremely valuable. First of all, the men

of 3/26 became familiar with the terrain to the west and south of

Hill 881S--a position which was later occupied by elements of the 3d

Battalion. The Marines located the best avenues of approach to the

hill, as well as probable sites for the enemy's supporting weapons.

Secondly, and most important, the unit turned up evidence (fresh

foxholes, well-used trails, caches, etc.) which indicated that the NVA

was moving into the area in force. These signs further strengthened the

battalion and regimental commanders' belief that "things were picking

up," and the confrontation which many predicted would come was not far

off. Captain Richard D. Camp, the company commander of L/3/26 put it a

little more bluntly: "I can smell ... _[_enemy_]_."(32)

[Illustration: General Leonard F. Chapman, Jr., Commandant of the

Marine Corps, talks with his son, First Lieutenant Walton F. Chapman,

during the General's visit to Khe Sanh in January 1968. Lieutenant

Chapman served with the 1st Battalion, 26th Marines and spent a good

portion of the siege on Hill 950. (USMC Photo A190283)]

FOOTNOTES:

[7] The two Special Landing Forces of the Seventh Fleet are each

comprised of a Marine Battalion Landing Team and a Marine helicopter

squadron, and provide ComUSMACV/CG, III MAF with a highly-flexible,

amphibious striking force for operations along the South Vietnam

littoral. During the amphibious operation, operational control of the

SLF remains with the Amphibious Task Force Commander designated by

Commander, Seventh Fleet. This relationship may persist throughout

the operation if coordination with forces ashore does not dictate

otherwise. When the Special Landing Force is firmly established ashore,

operational control may be passed to CG, III MAF who, in turn, may

shift this control to the division in whose area the SLF is operating.

Under such circumstances, operational control of the helicopter

squadron is passed by CG III MAF to the 1st Marine Aircraft Wing.

[8] The system was an anti-infiltration barrier just south of the DMZ.

Obstacles were used to channelize the enemy. Strongpoints, such as Con

Thien, served as patrol bases and fire support bases.

[9] In addition to the action near the DMZ, there was one other area

in I Corps that was a hub of activity. The Nui Loc Son Basin, a rice

rich coastal plain between Hoi An and Tam Ky, was the operating area of

the =2d NVA Division=. Between April and October 1967, Marine, U. S.

Army, and ARVN troops conducted 13 major operations (including 3 SLF

landings) in this region and killed 5,395 enemy soldiers. By the end of

the year, the =2d NVA Division= was temporarily rendered useless as a

fighting unit.

[10] The official designation of the unit at Khe Sanh was Regimental

Landing Team 26 (Forward) which consisted of one battalion and a

lightly staffed headquarters. The other two battalions were in-country

but under the operational control of other units. The rest of the

headquarters, RLT-26 (Rear), remained at Camp Schwab, Okinawa as a

pipeline for replacements. RLT-26 (Forward) was under the operational

control of the 3d MarDiv and the administrative control of the 9th

MAB. Any further mention of the 26th Marines will refer only to RLT-26

(Forward).

The Battle for Khe Sanh · 第 2 / 9 章