The Subsistence Department has charge of the commissaries and the

manufacturing plants which consist of an ice and cold-storage

establishment, a bread, pie, and cake bakery, a coffee roasting outfit,

and a laundry. These belong to the Panama Railroad Company, as, at

the time they were established, money received from sales could be

reapplied, whereas if operated by the Commission it would have reverted

to the Treasury, necessitating reappropriation before the proceeds

of the sale could be utilized. They are, however, under the management

of the subsistence officer of the Commission, who has charge of the

various hotels, kitchens and messes.

There are 16 hotels from Cristobal to Panama which serve meals to the

American, or “gold” employees at 30 cents per meal. There are 24 messes

where meals to European laborers are served, the cost per day being 40

cents; and there are 24 kitchens for meals supplied to the “silver”

laborers (men paid in Panamanian currency), the cost to the laborer

being 30 cents per day. There is no profit to the Commission. The

commissaries and manufacturing plants are operated at a profit so as

to repay the Panama Railroad Company for its outlay in six years from

January 1, 1909, at 4 per cent interest.

The Subsistence Department also has charge of a large hotel at Ancon

for the entertainment of the Commission’s employees at a comparatively

low rate, and of transient guests at rates usually charged at first

class hotels.

The Department of Civil Administration exercises supervision over the

courts, which consist of three circuit and five district: the judges

of the three former constitute the supreme court. The district courts

take cognizance of all cases where the fine does not exceed $100 or

imprisonment does not exceed 30 days. Jury trials are restricted to

crimes involving the death penalty or life imprisonment.

The Sanitation Department looks after the health interests of the

employees. It is subdivided into the health department, which has

charge of the hospitals, supervision of health matters in Panama

and Colon and of the Quarantine, and into the sanitary inspection

department, which looks after the destruction of the mosquito by

various methods, as grass and brush cutting, the draining of swamp

areas, and by oiling unavoidable pools and stagnant streams.

To this Department also belong 11 chaplains employed by the Commission

to attend the sick as well as look after the spiritual welfare of the

employees.

All moneys are handled by the Disbursement Department, which pays

accounts which have been previously passed upon by the Examiner of

Accounts.

The Examiner of Accounts makes the examination required by law

prior to the final audit of the accounts by the Auditor for the War

Department. The pay rolls are prepared from time books kept by foremen,

timekeepers, or field clerks, subsequently checked by the Examiner

of Accounts who maintains a force of inspectors. The time inspectors

visit each gang, generally daily, at unknown times to the foreman,

time-keeper, or field clerk, and check the time books with the gangs

of workmen; the inspectors report to the Examiner of Accounts the

results of their inspection not in connection with timekeeping but all

violations of the regulations of the Commission that may come under

their observation.

Payments of pay rolls are made in cash, beginning on the 12th of each

month and consuming four days for the entire force on the Isthmus.

The last published financial report of this Department was as follows:

_Statement of Receipts, Disbursements, and Balances Available to June

30, 1909._

_Receipts_

Appropriations by Congress $176,432,468.58

Rentals collected and returned to appropriations 264,393.76

Collections account sale government property, etc. 4,235,141.50

Balance due individuals and companies, account

collections from employees 1,856.73

--------------

Total receipts 180,933,860.57

_Disbursements_

Classified expenditures 106,795,058.38

Department of civil administration $2,932,951.06

Sanitary department 8,741,715.40

Hospitals and asylums $4,656,125.99

Sanitation 4,085,589.41

Department of construction

and engineering 54,832,540.14

Canal construction 48,311,622.16

Municipal improvement

on Zone 4,245,913.98

Municipal improvements in

Panama and Colon 2,275,004.00

Cost of plant 40,287,851.78

Rights of way and franchises 49,107,914.89

Rights acquired from the Republic of

Panama 10,000,000.00

Rights acquired from New Panama

Canal Company 39,107,914.89

Payment to New Panama Canal

Company 40,000,000.00

Less value of French

material sold or used

in construction 892,085.11

Panama Railroad Company stock purchased 157,118.24

Loans to Panama Railroad Company for reequipment

and redemption of bonds 4,009,596.03

Paid into United States Treasury for sale

of government property, etc. 3,572,141.50

Services rendered and material sold

individuals and companies 2,764,001.30

Unclassified expenditures 4,877,072.36

Material and supplies 4,813,158.37

Other unclassified items 63,913.99

Advances to laborers for their

transportation 48,783.26

Bills collectible outstanding 517,585.79

--------------

Total 171,849,271.75

Less amounts included in above but

unpaid on June 30 1,694,355.70

Salaries and wages unpaid on

rolls to June 1, 1909 181,291.08

Pay rolls for the month of June, 1909 1,513,064.62

--------------

Net disbursements 170,154,916.05

Balances available June 30, 1909 10,778,944.52

Congressional appropriations 10,114,087.79

Miscellaneous receipts of

United States funds 663,000.00

Collections from employees account

individual and companies 1,856.73

--------------

Total 180,933,860.57

Note.--By an act of March 4, 1909, additional appropriations were made

to continue the construction of the Isthmian Canal, during the fiscal

year 1910, available for expenditures July 1, 1909, as follows:

Expenses in the United States $225,000.00

Construction and engineering 27,388,000.00

Civil administration 630,000.00

Sanitation and hospitals 1,915,000.00

Reequipment Panama Railroad 700,000.00

Relocation of Panama Railroad 1,980,000.00

Sanitation in cities of Panama and Colon 800,000.00

-------------

Total 33,638,000.00

VII. CONSTRUCTION OF THE CANAL PRISM

Excavation throughout the whole length of the canal is being carried on

as much as possible in the dry as this has been found to be the cheaper

method.

Upon the Atlantic Division, during the fiscal year 1908–’09, a dredging

fleet consisting of one sea-going suction dredge, two 5-yard dipper

dredges and three French ladder dredges worked on the section between

Mindi and deep water, removing 6,039,934 cubic yards, of which 427,005

cubic yards were rock. The rock is removed by blasting. Holes averaging

15 feet apart are drilled to a depth of 50 feet below sea level, loaded

with dynamite and fired. At the close of the year nearly 3 miles of the

channel from deep water were completed.

The plans for breakwaters in Limon Bay were recently changed.

Originally breakwaters were planned to extend nearly parallel to the

axis of the channel to protect against filling by wave action. However,

it was found that the northers entering between these breakwaters would

lack room to dissipate and so vessels would be unprotected for a great

portion of the distance to the locks. Accordingly two breakwaters have

been planned which are to be so placed as not only to prevent filling

but also to give shelter to shipping.

On the Culebra section of the Central Division considerable trouble

has been caused by the great rainfall. To carry the rain off quickly

diversion channels have been constructed at a large expense of money

and labor.

Water falling in the prism is cared for by the cut itself. In the

process of deepening pilot cuts are started from either end towards

the summit which is now between Empire and Culebra. Drainage in either

direction is by gravity through these cuts.

The total amount excavated from the canal prism in this division during

the past year was 18,442,624 cubic yards, 12,291,472 cubic yards being

rock. At the close of the year 43,574,954 cubic yards remained to

be removed. The material is loaded on the cars by steam shovels, is

hauled to the various dumps, and unloaded by a huge plow-like apparatus

which is drawn from end to end of the train. Part of the spoil aided

in the rebuilding of the Panama Railroad; the rock from Empire and

Bas Obispo went to Gatun for the dam, and some material was hauled to

Balboa on the Pacific and was there used in reclaiming ground and in

building a breakwater in Panama Bay to cut off silt-bearing currents

which were filling up the excavated channel. It has been built out

about 2 miles by dumping from a trestle built for the purpose. One mile

more remains to be built.

The slides in Culebra Cut have continued. The largest, called the

Cucaracho slide, measures 2,700 feet along the cut, involving an area

of 27 acres. During the year 1908–’09, 670,017 cubic yards were removed

from this slide but it is estimated that 700,000 more are still in

motion. Drainage seems to be ineffectual in these cases.

The original summit at Culebra Cut was 333 feet above the sea; it was

lowered by the French to 157 feet and the lowest point at the summit is

now 143 feet above sea level.

The lake section of the Central Division extends from Gamboa to Gatun.

The Chagres River here crosses the line of the canal 23 times, forming

a series of peninsulas. A portion of the channel 2,700 feet long, 500

feet wide at the bottom and 50 feet deep, was completed May 25, 1909

and the waters of the Chagres turned in. A total of 1,784,459 cubic

yards were taken out, of which 1,350,308 were removed in 1908–’09. From

the remainder of this division 2,625,283 cubic yards were excavated in

1908–’09.

To secure the necessary width and depth between Pedro Miguel and

Miraflores on the Pacific Division 1,279,600 cubic yards of material,

of which 63,600 are rock, must be excavated. The material still to be

taken out between Miraflores and deep water is 13,000,900 cubic yards

of loam and 1,725,000 cubic yards of rock. It has been decided to

remove all rock between the locks and for 2 miles below the Miraflores

locks, in the dry. This will leave 3,600,000 cubic yards of loam and

123,000 of rock to be removed by dredging and blasting.

The dredging fleet in Panama Bay for 1908–’09 consisted of one

sea-going suction dredge, one 20 inch suction and pipe-line dredge,

one 5 yard dipper dredge, and four French ladder dredges. They removed

8,475,931 cubic yards of material during the year. The channel is

completed for about 5 miles from deep water in the Pacific.

The entire present steam-shovel equipment on the Isthmus consists

of forty-eight 95-ton, forty-two 70-ton, ten 45-ton, and one 38-ton

steam-shovels, or a total of one hundred and one steam-shovels.

Dry excavation for the first quarter of the fiscal year 1908–’09, (July

1 to October 1), cost 63 cents per cubic yard for direct charges and 12

cents per cubic yard for general administration, making a total of 75

cents. Dredging cost 9 cents per cubic yard for direct charges and 2

cents per cubic yard for general administration. The average cost per

cubic yard for excavation was 40 cents for direct charges and 8 cents

for general administration, making a total of 48 cents.

VIII. CONSTRUCTION OF THE LOCKS

_Locks_

As before stated there are to be 6 locks on the Panama Canal, 3 at

Gatun, 1 at Pedro Miguel and 2 at Miraflores. All of these locks are

arranged in duplicate, i.e., at any group of locks a vessel may ascend

at one side of the middle wall, while another is descending at the

other side. It is the intention that Pacific bound vessels use one side

and Atlantic bound the other.

The middle wall is to extend 1,600 feet above the upper gates and below

the lower gates as an approach wall against which vessels to be locked

may lie while waiting for the gates to open. The side walls will not

be as long, and will flare out at their ends. The lock chambers are to

be 110 feet wide and 1,000 feet long and will pass vessels of 40 feet

maximum draught in sea water. The upper lock in each flight is to be

subdivided by additional gates into a 600 foot and a 400 foot lock so

that water may not be needlessly wasted in passing small boats. These

smaller subdivisions may be used until vessels of over 550 feet length

require passage.

The lifts will average 28 feet, but will vary with changes in tide,

lake level, and conditions of lockage. The diagram below shows the

entire lock system at Gatun.

[Illustration: Fig. 2.--General Arrangement of the Locks, Valves and

Gates at Gatun.

S. V., Stoney valve.

G. V., Guard valve.

E. D. P., Emergency dam pier.

U. G. G., Upper guard gate.

U. G., Upper gate.

M. G., Middle gate.

S. G., Safety gate.

L. G.--U. L., Lower gate, upper lock. L.

L. G.--I. L., Lower gate, intermediate lock.

L. G.--L. L., Lower gate, lower lock.

L. G. G., Lower guard gate.

Ch., Fender chain.

Ga., Gauge.

L., Ladder.

St., Stairs.

Inc., Incline.

I., Intake.

O., Outlet.

In each side of the wall

Between, there will be

A and B-- 3 cylindrical valves.

C and D-- 7 cylindrical valves.

E and F-- 10 cylindrical valves.

G and H-- 10 cylindrical valves.

]

Near the bottom of each wall will be a large culvert for passing water

from the lakes into the upper chamber, and from chamber to chamber, and

then out to the canal below the locks. The intakes (See Fig. 2) will

be located at “I” and outlets at “O”. The water enters and leaves the

culverts through several small openings, the intakes being screened.

The flow of water in the culverts is to be controlled by what is called

the Stoney type of valves. These valves occur in pairs which are

duplicated at each of the lifts so that if one pair is disabled the

other set may be used while repairs are being made. On each side wall,

at the middle gates in the upper lock there will be only one set of

valves, but none in the middle wall. The flow between the culvert in

the middle wall and the lock chamber is to be controlled by cylindrical

valves capable of withstanding pressure on both sides. By using these

valves water may be saved under certain conditions of lockage by

cross-connecting the twin chambers through the middle wall.

In each chamber 11 laterals of 41 square feet cross-section will be

led from the side wall culverts while at the middle culvert there will

be 10 laterals having a minimum cross-section of 33 square feet. Each

lateral will have five holes, each of 12 square feet area, opening

up through the lock floor. The laterals leading from the middle wall

culvert are to be controlled individually to provide for independent

operation of the twin chambers.

The lake levels and the desired lock levels are to be maintained by

large steel miter gates. At the upper and lower end of the upper

chambers of all locks there will be two sets of these gates operated

simultaneously so that a vessel entering the upper chamber will always

have two pairs of gates between it and the lake. At the lower end

of each flight, besides the regular gates there will be guard gates

mitering in the opposite direction. They are intended primarily for

holding back the water in the canal below, when the lock above is

unwatered for repairs but may be operated during lockages purely as a

safeguard.

As a protection to the gates heavy fender chains are to be stretched

across the locks at critical places. They are designed by suitable

retarding devices to bring a slowly moving vessel to rest before it can

strike the gate. While the gates below are being opened the chains drop

into recesses in the walls and across the floor.

Near the upper end of the locks and 200 feet above the uppermost gate,

an emergency dam of the swing bridge type will be provided to be used

in case of accident to the upper gates.

The following precautions against accident are to be observed:

First. All vessels must stop some distance from the gates.

Second. The lock operators here take the vessel in charge and control

its passage through the locks.

Third. If a vessel breaks away from the operators or fails to stop at

the proper place, it comes against the heavy chains stretched across

the locks and is either brought to a full stop or is greatly retarded.

Fourth. In case a chain breaks, the vessel has two sets of gates to

break, if at the upper level, where an accident would be most serious.

Should all these barriers fail the emergency dam can be swung into

place in a very short time.

The floors of the Miraflores and Pedro Miguel locks will have 1 foot

thickness of concrete on top of the rock as a wearing surface. At

Gatun, however the rock is of a character susceptible to the weather.

It has therefore been considered necessary, in constructing the floor

here, to leave the rock above grade until just before the concrete is

to be placed and then to scrape and wash the surface to be covered. The

floor in the lower portion of the upper chamber is to be of concrete

3 feet thick. The rock here is considered thick enough to withstand

the pressure from the water-bearing stratum below. Above the middle

gate, however, this stratum is too thin, and a floor 13 feet thick of

concrete is provided and anchored by rails set in holes and surrounded

by concrete.

The main floor level will be about 2 feet below the sills, in order

that small objects dropped from vessels may be passed without being

struck.

The sills for the gates are designed as concrete arches in a horizontal

plane, 31 feet thick throughout and of 100 feet radius at the extrados.

The filling system is designed so that, with all valves opened the

chamber can be filled in 8 minutes, but to prevent possible damage to

vessels in the lock the maximum rate will probably not be allowed to

exceed 3 feet a minute which would correspond to less than 15 minutes

for filling.

Most of the foregoing discussion is taken from the Engineering Record

of February 26, 1910.

There has been much criticism of the lock sites, but the engineers now

in charge seem to have perfect confidence in their work.

During the fiscal year 1908–’09 the work of excavating for the Gatun

locks was continued by steam shovels and one 20-inch suction dredge.

Material excavated in the dry amounted to 933,546 cubic yards, and that

in the wet to 479,950 cubic yards. It was decided to construct curtain

walls to stop any underflow; these will extend across the lock under

the sill of the emergency dam and downstream outside the walls to the

intermediate gates. As an additional precaution to making the concrete

floor 13 feet thick as before mentioned a system of sumps under the

floor with telltales in the walls will be built.

The plant for the construction of the locks is practically installed

and ready for work, it being operated entirely by electricity.

At the Pedro Miguel locks 715,726 cubic yards were removed in 1908–’09.

One lock chamber was completed to grade, but 45,000 cubic yards remain

for removal in the other one.

At Miraflores work was done the past year with steam shovels and one

suction dredge. The total amount excavated was 1,147,527 cubic yards

which is one-half of the total estimated quantity.

IX. CONSTRUCTION OF THE DAMS

The Gatun dam has aroused more adverse criticism than any other canal

feature. Most startling statements have been made concerning it. Its

history is worthy of notice. The first study of the Panama route under

United States authority was made by an Isthmian Canal Commission of

which Admiral Walker was chairman and Generals Hains and Ernst and Mr.

Noble were members. With respect to the location of locks, the report

of this commission said: “No location suitable for a dam exists in the

Chagres River below Bohio”. Hains and Ernst signed this report. In a

paper read before the American Society of Civil Engineers on March 5,

1902, Mr. George S. Morison, a very distinguished American engineer,

said: “All engineers who have examined the route of the Panama Canal

agree that the neighborhood of Bohio is the only available location for

a dam by which the summit level must be maintained”.

Under authority of the President, by executive order dated June 24,

1905, a board of consulting engineers was appointed to consider

the various plans proposed for the construction of a canal across

the Isthmus. The minority of the board, as has been stated before,

recommended a lock canal with a dam at Gatun. The majority of the

board, 8 to 5, opposed the idea of a dam and locks at Gatun on two

grounds: first, that the introduction of locks in a treatment of the

question was objectionable from many points of view; and, second,

that the maintenance of a summit by means of an earth dam of immense

magnitude to control the flood waters of this river introduced an

element of great danger since the dam, without sheet piling, was

proposed to be founded on the alluvial-filled gorges of the Chagres

River, where the depth at one point extended 258 feet below the level

of the sea.

Of the minority above mentioned one member, Mr. Noble, was a member of

the former Commission who had reported that Bohio was the lowest point

on the Chagres where a dam was practicable.

The report was reviewed by the Isthmian Canal Commission which included

among its members Major Harrod and Generals Hains and Ernst. They all

indorsed the minority report, notwithstanding the fact that in March,

1905, Major Harrod was opposed to any lock plan, and that his two

associates had said in 1901 that no proper site for a dam existed below

Bohio.

It is true that every consideration of the Panama Canal type by

any unauthorized body rejected the idea of a dam at Gatun, and its

indorsement is confined to a minority of the board of consulting

engineers and to three members of the canal commission who had

previously either been in favor of a sea-level canal or who had said,

in effect, that Gatun was not a proper site for the dam.

The attitude of the majority of the board of consulting engineers

upon this most important question is best shown by an extract from

its report. “The United States Government is proposing to expend

many millions of dollars for the construction of this great waterway

which is to serve the commerce of the world for all time and the very

existence of which would depend upon the permanent stability and

unquestioned safety of all dams. The board is therefore of the opinion

that the existence of such costly facilities for the world’s commerce

should not depend upon great reservoirs held by earth embankments

resting literally upon mud foundations or those of even sand and

gravel. The board is unqualifiedly of opinion that no such vast and

doubtful experiment should be indulged in, but, on the contrary, that

every work of whatever nature should be so designed and built as to

include only those features which experience has demonstrated to be

positively safe and efficient”.

The remarkable diversity of statement in regard to this dam is shown by

the following quotations.

Mr. Teller in a speech in the last session of Congress said in part,

“Let me say a word or two about the great dam to be built at Gatun. We

were told in the beginning that the engineers would find a foundation

upon which they could build a safe dam. The French Government declared

they had found such a foundation; our own engineers declared they had

found it. It turned out that they had struck some floating pieces of

rock in the mud, and when they had gone down 287 feet they found the

same conditions practically that they found in the first 50 feet. The

place where it is proposed to construct this dirt dam, which will be

half a mile wide and 135 feet high (now 115 feet), is a great swamp.

No such dam has ever been built in the history of the world, and the

engineers of the world, with few exceptions, have declared it cannot be

built. The dam at Gatun is to be built upon a foundation of doubtful

safety, and there is not an engineer in the country who does not know

that it is doubtful”.