THE FIRST HUDSON RIVER TUNNEL

Despite the ultimate success of Brunel's Thames Tunnel in 1843, the

shield in that case afforded only moderately reliable protection

because of the fluidity of the soil driven through, and its tendency

to enter the works through the smallest opening in the shield's

defense. An English doctor who had made physiological studies of the

effects on workmen of the high air pressure within diving bells is

said to have recommended to Brunel in 1828 that he introduce an

atmosphere of compressed air into the tunnel to exclude the water

and support the work face.

This plan was first formally described by Sir Thomas Cochrane

(1775-1860) in a British patent of 1830. Conscious of Brunel's

problems, he proposed a system of shaft sinking, mining, and tunneling

in water-bearing materials by filling the excavated area with air

sufficiently above atmospheric pressure to prevent the water from

entering and to support the earth. In this, and his description of air

locks for passage of men and materials between the atmosphere and the

pressurized area, Cochrane fully outlined the essential features of

pneumatic excavation as developed since.

[Illustration: Figure 37.--THE GIANT ROOTS LOBE-TYPE BLOWER used for

propelling the car.]

In 1839, a French engineer first used the system in sinking a mine

shaft through a watery stratum. From then on, the sinking of shafts,

and somewhat later the construction of bridge pier foundations, by the

pneumatic method became almost commonplace engineering practice in

Europe and America. Not until 1879 however, was the system tried in

tunneling work, and then, as with the shield ten years earlier, almost

simultaneously here and abroad. The first application was in a small

river tunnel in Antwerp, only 5 feet in height. This project was

successfully completed relying on compressed air alone to support the

earth, no shield being used. The importance of the work cannot be

considered great due to its lack of scope.

[Illustration: Figure 38.--TESTING ALIGNMENT of the Broadway Subway at

night by driving a jointed rod up to street level. (_Scientific

American_, March 5, 1870.)]

In 1871 Dewitt C. Haskin (1822-1900), a west coast mine and railroad

builder, became interested in the pneumatic caissons then being used

to found the river piers of Eads' Mississippi River bridge at St.

Louis. In apparent total ignorance of the Cochrane patent, he evolved

a similar system for tunneling water-bearing media, and in 1873

proposed construction of a tunnel through the silt beneath the Hudson

to provide rail connection between New Jersey and New York City.

[Illustration: Figure 39.--HASKIN'S pneumatically driven tunnel

under the Hudson River, 1880. In the engine room at top left was the

machinery for hoisting, generating electricity for lighting, and air

compressing. The air lock is seen in the wall of the brick shaft.

MHT model--0.3" scale. (Smithsonian photo 49260.)]

[Illustration: Figure 40.--ARTIST'S CONCEPTION OF MINERS escaping

into the air lock during the blowout in Haskin's tunnel.]

It would be difficult to imagine a site more in need of such

communication. All lines from the south terminated along the west

shore of the river and the immense traffic--cars, freight and

passengers--was carried across to Manhattan Island by ferry and barge

with staggering inconvenience and at enormous cost. A bridge would

have been, and still is, almost out of the question due not only to

the width of the crossing, but to the flatness of both banks. To

provide sufficient navigational clearance (without a drawspan),

impracticably long approaches would have been necessary to obtain

a permissibly gentle grade.

Haskin formed a tunneling company and began work with the sinking of

a shaft in Hoboken on the New Jersey side. In a month it was halted

because of an injunction by, curiously, the D L & W Railroad, who

feared for their vast investment in terminal and marine facilities.

Not until November of 1879 was the injunction lifted and work again

commenced. The shaft was completed and an air lock located in one wall

from which the tunnel proper was to be carried forward. It was

Haskin's plan to use no shield, relying solely on the pressure of

compressed air to maintain the work faces and prevent the entry of

water. The air was admitted in late December, and the first

large-scale pneumatic tunneling operation launched. A single 26-foot,

double-track bore was at first undertaken, but a work face of such

diameter proved unmanageable and two oval tubes 18 feet high by 16

feet wide were substituted, each to carry a single track. Work went

forward with reasonable facility, considering the lack of precedent.

A temporary entrance was formed of sheet-iron rings from the air lock

down to the tunnel grade, at which point the permanent work of the

north tube was started. Immediately behind the excavation at the face,

a lining of thin wrought-iron plates was built up, to provide form for

the 2-foot, permanent brick lining that followed. The three stages are

shown in the model in about their proper relationship of progress. The

work is shown passing beneath an old timber-crib bulkhead, used for

stabilizing the shoreline.

The silt of the riverbed was about the consistency of putty and under

good conditions formed a secure barrier between the excavation and the

river above. It was easily excavated, and for removal was mixed with

water and blown out through a pipe into the shaft by the higher

pressure in the tunnel. About half was left in the bore for removal

later. The basic scheme was workable, but in operation an extreme

precision was required in regulating the air pressure in the work

area.[5] It was soon found that there existed an 11-psi difference

between the pressure of water on the top and the bottom of the working

face, due to the 22-foot height of the unlined opening. Thus, it was

impossible to maintain perfect pneumatic balance of the external

pressure over the entire face. It was necessary to strike an average

with the result that some water entered at the bottom of the face

where the water pressure was greatest, and some air leaked out at the

top where the water pressure was below the air pressure. Constant

attention was essential: several men did nothing but watch the

behavior of the leaks and adjusted the pressure as the ground density

changed with advance. Air was supplied by several steam-driven

compressors at the surface.

The air lock permitted passage back and forth of men and supplies

between the atmosphere and the work area, without disturbing the

pressure differential. This principle is demonstrated by an animated

model set into the main model, to the left of the shaft (fig. 39). The

variation of pressure within the lock chamber to match the atmosphere

or the pressurized area, depending on the direction of passage, is

clearly shown by simplified valves and gauges, and by the use of light

in varying color density. In the Haskin tunnel, 5 to 10 minutes were

taken to pass the miners through the lock so as to avoid too abrupt a

physiological change.

Despite caution, a blowout occurred in July 1880 due to air leakage

not at the face, but around the temporary entrance. One door of the

air lock jammed and twenty men drowned, resulting in an inquiry which

brought forth much of the distrust with which Haskin was regarded by

the engineering profession. His ability and qualifications were

subjected to the bitterest attack in and by the technical press. There

is some indication that, although the project began with a staff of

competent engineers, they were alienated by Haskin in the course of

work and at least one withdrew. Haskin's remarks in his own defense

indicate that some of the denunciation was undoubtedly justified. And

yet, despite this reaction, the fundamental merit of the pneumatic

tunneling method had been demonstrated by Haskin and was immediately

recognized and freely acknowledged. It was apparent at the same time,

however, that air by itself did not provide a sufficiently reliable

support for large-area tunnel works in unstable ground, and this

remains the only major subaqueous tunnel work driven with air alone.

[Illustration: Figure 41.--LOCATION OF HUDSON RIVER TUNNEL. (_Leslie's

Weekly_, 1879.)]

After the accident, work continued under Haskin until 1882 when funds

ran out. About 1600 feet of the north tube and 600 feet of the south

tube had been completed. Greathead resumed operations with a shield

for a British company in 1889, but exhaustion of funds again caused

stoppage in 1891. The tunnel was finally completed in 1904, and is

now in use as part of the Hudson and Manhattan rapid-transit system,

never providing the sought-after rail link. A splendid document of the

Haskin portion of the work is S. D. V. Burr's _Tunneling Under the

Hudson River_ published in 1885. It is based entirely upon firsthand

material and contains drawings of most of the work, including the

auxiliary apparatus. It is interesting to note that electric

illumination (arc, not incandescent, lights) and telephones were used,

unquestionably the first employment of either in tunnel work.

[Illustration: Figure 42.--ST. CLAIR TUNNEL. View of front of shield

showing method of excavation in firm strata. Incandescent electric

illumination was used. 1889-90. MHT model--1" scale. (Smithsonian

photo 49260-D.)]

Smithsonian Institution - United States National Museum - Bulletin 240 Contributions From the Museum of History and Technology Papers 34-44 on Science and Technology · 第 219 / 318 题