Figure 12.--ADVERTISEMENT in the _Railroad Advocate_, August 1855.]

The world's first major iron bridge, the famed cast-iron arch at

Coalbrookdale, England, had been constructed in 1779. Its erection was

followed by rather sporadic interest in this use of the material. The

first significant use of iron in this country was in a series of small

trussed highway arches erected by Squire Whipple over the Erie Canal in

the early 1840's, over 60 years later. In these, as in most of the

earlier iron structures, an arch of cast iron was the primary support.

The thrust of the arches was counteracted by open wrought-iron links

with other wrought- and cast-iron members contributing to the truss

action.

The Whipple bridges promoted a certain amount of interest in the

material. In the B. & O.'s annual report for the fiscal year 1849

appears the first record of Latrobe's interest in this important matter.

In the president's message is found the following, rather offhand,

statement:

$6,183.19 have been expended toward the renewal of the Stone

Bridges on the Washington Branch, carried off by the flood of

Oct. 7th, 1847. Preparations are made and contracts entered

into, for the reconstruction of the large Bridges at Little

Patuxent and at Bladensburg which will be executed in a few

months.... It is proposed to erect a superstructure of Iron

upon stone abutments, at each place--with increased span, for

greater security against future floods.

It is interesting to note that it was indeed Bollman trusses to which

the president of the railroad had referred. How much earlier than this

date Bollman had evolved his peculiar trussing system is not clear. The

certain influence of Latrobe's radiating strut system of trussing has

been mentioned. As likely an influence was another basic technique

commonly used to increase the capacity of a simple timber beam--that of

trussing--i.e., placing beneath the beam a rod of iron that was anchored

at the ends of the beam and held a certain distance below it at the

center by a vertical strut or post. This combination thus became a truss

in that the timber portion was no longer subject to a bending stress but

to a simple one of compression, the rod absorbing the tensile stress of

the combination. The effect was to deepen the beam, increasing the

distance between its extreme fibers and--by thus reducing the bending

moment--reducing the stress in them (see fig. 3).

[Illustration: Figure 13.--THE FOUR BOLLMAN SPANS at Harpers Ferry that

survived the Civil War. The spans were completed in 1862-1863. (_Photo

courtesy of Baltimore and Ohio Railroad._)]

It apparently occurred to Bollman that by extending the number of rods

in a longitudinal direction, this effect could be practically amplified

to such an extent as to be capable of spanning considerable distances.

He almost certainly did not at first contemplate an all-iron system, but

rather a composite one such as described. It is entirely likely that

such trussed beams, with multiple systems of tension rods, were used by

Bollman as bridging in temporary trestlework along the line as early as

1845 (see fig. 4).

It is impossible to say whether Bollman himself, or Latrobe, was struck

with the logic of further elaborating upon the system and,

simultaneously, translating the timber compression member into one of

cast iron. Cast iron would naturally have been selected for a member

that resisted a compressive stress, as it was considerably cheaper than

wrought iron. But more important, at that time wrought iron was not

available in shapes of sufficient sectional area to resist the

appreciable buckling stresses induced in long compression members. The

cost of building up members to sufficient size from the very limited

selection of small shapes then rolled would have been prohibitive.

The trussing rods, subjected to tension, were of wrought iron inasmuch

as the sectional area had only to be sufficient to resist the primary

axial stress.

The first all-iron Bollman truss was constructed over the Little

Patuxent River at Savage Factory, near Laurel, Maryland, in 1850. In the

chief engineer's report for the year 1850, Latrobe was able to state

that the truss had been completed and was giving "much satisfaction."

He went on at some length to praise the "valuable mechanical features"

embodied therein, and expressed great confidence that iron would become

as important a material in the field of civil engineering as it was in

mechanical engineering.

[Illustration: Figure 14.--THE HARPERS FERRY BRIDGE as completed after

the Civil War. It was used by the Baltimore and Ohio until 1894, and as

a highway bridge until 1936. (Photo 690, Baltimore and Ohio Collection,

Museum of History and Technology.)]

The cost of this first major Bollman bridge was $23,825.00. Its span was

76 feet. Latrobe's confidence was well placed. The Savage span and

another at Bladensburg may be considered successful pilot models, for,

in spite of a certain undercurrent of mistrust of iron bridges within

the engineering profession--due mainly to a number of failures of

improperly designed spans--Latrobe felt there was sufficient

justification for the unqualified adoption of iron in all subsequent

major bridge structures on the B. & O.

Almost immediately following completion of the Savage Bridge, Bollman

undertook the design of replacements for the large Patapsco River span

at Elysville (now Daniels), Maryland, and the so-called Winchester span

of the B. & O.'s largest and most important bridge, that over the

Potomac at Harpers Ferry. Harpers Ferry bridge, a timber structure, had

been designed by Latrobe and built in 1836-1837 by the noted bridge

constructor Lewis Wernwag. It was peculiar in having a turnout, near the

Virginia shore, whereby a subsidiary road branched off to Winchester

(see fig. 6). Only the single span on this line, situated between the

midriver switch and the shore, was slated for replacement, as the other

seven spans of the bridge had been virtually reconstructed in the decade

or so of their history and were in sound condition at the time.

The Winchester span (fig. 8), which was the first Bollman truss to

embody sufficient refinement of detail to be considered a prototype, was

completed in 1851. Bollman was extremely proud of the work, with perfect

justification it may be said. The 124-foot span was fabricated in the

railroad's extensive Mount Clair shops. It was subdivided into eight

panels by seven struts and seven pairs of truss rods. An interesting

difference between this span and Bollman's succeeding bridges was his

use of granite rather than cast iron for the towers. The span consisted

of three parallel lines of trussing to accommodate a common road in

addition to the single-track Winchester line.

The distinctive feature of the Bollman system was the previously

mentioned series of diagonal truss links in combination with a cast-iron

compression chord, which Bollman called the "stretcher." The spacing

between the chord and the junction of each pair of links was maintained

by a vertical post or strut, also cast.

[Illustration: Figure 15.--NORTH STREET (now Guilford Avenue) bridge,

Baltimore. In this transitional composite structure cast iron was used

only in the relatively short sections of the upper chord. For the long

unsupported compression members of the web system, standard wrought-iron

angles and channels were built up into a large section. The decorative

cast-iron end posts were non-structural. (Photo in the L. N. Edwards

Collection, Museum of History and Technology.)]

Much of the appeal of this design lay unquestionably in the sense of

security derived from the fact that each of the systems acted

independently to carry its load to the abutments. The lower chords,

actually nonfunctional in the primary structure, were included merely to

preserve the proper longitudinal spacing between the lower ends of the

struts. A certain lack of rigidity was inherent in the system due to

that very discontinuity which characterized its action; however, this

was compensated for by a pair of light diagonal stay rods crossing each

panel. These rods served the additional function of distributing

concentrated loads to adjacent struts much in the manner of the bridging

between floor joists in a building.

In the Winchester span the floor system was of timber for reasons of

economy. This was a very minor weakness inasmuch as any stick could be

quickly replaced, and without disturbing the function of the structure.

Bollman received a patent for his truss in January 1852, and in the same

year published a booklet describing his system in general and the

Harpers Ferry span in particular. Here, he first calls it a "suspension

and trussed bridge," which is indeed an accurate designation for a

system which is not strictly a truss because it has no active lower

chord. (The analogy to a suspension bridge is quite clear, each pair of

primary rods being comparable to a suspension cable.) Thereafter,

Bollman's invention was generally termed a suspension truss.