Such reduction in the time taken is not attained at the expense of

efficiency; the premium job is carefully inspected, and unless it is

of the highest standard the bonus is forfeited; so that the workman is

continuously careful to avoid any risk which will result in the loss

of the reward for his extra work. The reduction in time taken is, in

a large measure, due to the exercise of foresight and ingenuity on

the part of the workman. He is ever on the alert to ensure that he

will not be kept waiting for material to enable work to progress. The

machine-man makes certain that before one unit is out of his machine

the casting, forging, or bar for the next is alongside. This is further

facilitated by a man in each shop whose only duty is to see that there

is a supply of work for every tool. Encouragement is always accorded

to those who suggest modifications to increase the output from any

machine. Again, in the erecting of engines, considerable economy has

been attained, owing to similar foresight being exercised to ensure

that each unit is machined before it is wanted by the erector.

To the employer also there is gain in the increased production, from

a given number of machines and men, for a constant establishment

expenditure--rent, rates, taxes, etc. While the wage paid to the men

is increased, there is a reduction in the cost of production, which

of itself encourages capital expenditure on improved methods and

appliances. Concurrently with the adoption of the bonus system there

has been a great increase in the cutting speed of tools, which has also

augmented the rate of production. This "speeding-up" is partly due

to the fitting of new machines, to the substitution of forged steel

machine-cut gear for cast spur-wheels, to the strengthening of lathe

headstocks, to wider belts, to the application of reversible motors to

some machines, and to quicker return speeds.

Some indication may be given of the increased economy resulting from

the bonus system and from the "speeding-up" of tools, as compared with

the former system, with slower speeds and piece-work rates. A typical

job, which had formerly occupied eighty hours, was, after experience,

given a standard time of sixty hours. When first carried out under the

bonus system the time actually taken was forty-five hours, the labour

cost being reduced from £2 13s. 4d. at piece-work rate to £1 17s. 6d.

under the bonus system, while the wage of the worker was increased by

2d. per hour. Subsequently, a repeat of this job was machined by the

same man, who, having confidence that the time allowed would not be

reduced, finished the work in thirty-nine hours, saving twenty-one

hours on the standard time, reducing the cost to £1 15s. 0d., and

increasing his rate of pay by 2.8d. per hour. Other comparisons might

be given to show the advantage over the piece-work. In successive

fortnights after the introduction of the system, the percentage of

time saved on the time taken on piece-work in one department steadily

advanced from 16 per cent. to 47 per cent., and ultimately the pay

of the men per hour was increased 75 per cent., while the saving to the

employer was 50 per cent.

[Illustration: Plate XXXIX. ENGINE CONSTRUCTION. (_See page_ 108.)]

The client profits, as the contract price is reduced without any

diminution in the satisfactory character of the work done; indeed it

is probable that this is improved because of the special inspection

to ascertain if the bonus has been conscientiously earned. A lower

contract price, therefore, is possible; and this places the firm,

both directly and indirectly, in a better position in competition in

shipbuilding. There is more work obtainable, more constant employment

for the workmen, with the additional inducement of higher wages to

capable and diligent men.

[Illustration: decoration]

[Illustration: decoration]

The Shipbuilding Yard.

[Illustration: decoration]

Covering an area of 40 acres, the Works have ten berths for the

construction of ships of all sizes, with departments for producing all

the accessories and machinery--engine and boiler works, steam-turbine

factory, foundries, brass, copper, and sheet-iron shops, saw-mill

and extensive wood-working department--and these give employment to

four thousand workmen. The equipment has been greatly extended and

modernised during the past few years. The building of the China Steam

Navigation Company's steamer _Fengtien_ in nineteen weeks, from the

laying of the keel to the trials, is one of several instances of rapid

construction which might be enumerated.

The plans of ships prepared in the designing department and drawing

offices, to which reference has been made in the previous Chapter,

are passed to the moulding loft, where the work of construction is

commenced. This loft is situated in a substantial four-storey building,

accommodating practically all the wood-finishing departments. Each

floor has an area of 12,500 square feet; the ground and first floors

are given up to the joiners and cabinet-makers, with their numerous

machine tools, while the top floor is at present utilised for storing

completed joiner work, etc. The moulding loft monopolises the

third floor, and as the length is 240 ft. and the width 52 ft., there

is ample space, as is shown on the engraving in Plate XL., facing page

94, for laying down full size deck-plating, stringers, margin plates,

deck girders, etc., so that moulds or templates may be prepared for the

iron workers. Armour-plates for warship belts, barbettes, and casemates

are similarly prepared in template, to assist the makers to form them

to the required curvature and size.

[Illustration: Plate XL. THE MOULDING LOFT.]

[Illustration: Plate XLI. BEAM SHEARING MACHINE. BEVELLING MACHINE.

HYDRAULIC JOGGLING MACHINE.]

The ironworkers' department is extensive and important. When the

material is delivered into the yard, it is discharged from the railway

wagons by a 5-ton electric overhead travelling high-speed crane, which

stacks the plates and bars in such a way that any piece can be readily

removed by the same crane for conveyance to the furnaces.

There are six furnaces suitable for heating shell plates of the largest

size, and angles and bars for frames, etc., up to 60 ft. in length.

Adjacent to the furnaces are the screeve boards and the frame-bending

blocks. The channel, bulb angle, or Z bars, used so extensively now for

framing in large ships, are bevelled as they pass from the furnace to

the bending blocks. This is done in a special machine made by Messrs.

Davis and Primrose, Leith, and illustrated on Plate XLI., adjoining

this page. The bars, as delivered from the rolling mills, have flanges

at an angle of 90 deg., which is not suitable for taking the skin

plating of ships. One angle has therefore to be altered, so that while

the inner flange may lie at right angles to the keel-plate, that to the

outside will fit closely to the shell plating throughout the entire

length of the frame from keel to shear stroke, which may be 50 ft. or

60 ft.

As the bar passes through the machine, the web is carried on an

ordinary flat roller, while bevelling rolls, set to the desired angle,

work on each side of one of the flanges to give it the desired set.

There are several of these machines in use, and they run on rails laid

across the front of the furnace, so that the angles, Z sections, or

channels may be bevelled while passing out of the furnace on to the

bending blocks. The manipulation of the plates from the furnace is by

means of steam and electric winches.

Formerly, the turning of the frames to the required curvature against

the pins on the bending blocks was carried out by hand. To suit the

heavier scantlings of the larger ships of the present day, a portable

hydraulic machine is now utilised. It is fixed at its base by pins,

which fit into the ordinary holes in the blocks, and hydraulic pressure

is supplied through a flexible pipe to work the ram-head against the

angles, forcing them to take the desired form. The machine is a great

labour economiser, as it ensures work on the heaviest of bulb angles

being carried out in the minimum of time, and therefore at top heat.

The bars are usually cut to length by a guillotine, but it was

considered that this tended to twist the metal, and perhaps unduly

fatigue it; and as a consequence the firm have fitted John's shearing

and notching machine, as constructed by Messrs. Henry Pels and Co.,

of Berlin. This new machine is illustrated on Plate XLI., adjoining

page 95. The tool is shown in the act of cutting through a channel

section. The cutting tool is seen immediately in front of the operator,

and is actuated by gearing accommodated within the standards of the

machine. When the cutting tool is brought down on the angle or beam

to be sheared, and the shaft at the rear started, the rotation of

an eccentric actuated by the shaft causes the point of the tool to

slide idly a short distance to-and-fro on the bar. The hand lever on

the right hand side of the machine is depressed, forcing the tool

downwards, and the continued rotation of the eccentric causes the tool

to pierce through the bar with a downward and inward motion. Where

there is a deep web with flanges, the beam is reversed on the anvil,

to enable the other flange to be cut. The cutting of any bar in this

machine is a matter of only a few seconds.

[Illustration: Plate XLII. IN ONE OF THE PLATERS' SHEDS.]

Of the platers' shed, where the plates, angles, bulbs, bars, etc., are

machined, two views are given on Plates XLII. and XLIII., facing pages

96 and 98 respectively. It may be said generally that the machines are

designed to deal with plates up to 50 ft. in length, and with angles

up to 60 ft. in length, and of corresponding sections. It follows that

the straightening and bending rolls, edge-planers, and punching and

shearing machines, are of great power. It is scarcely necessary to make

detailed references to all of the tools for these and other purposes.

All the tools are electrically driven. The plate-flattening rolls,

which have 15 and 20 horse-power reversible motors, take plates 8 ft.

wide, and the rolls are from 21-1/2 in. to 19 in. in diameter. The

bending rolls are driven by a 20 horse-power motor. The plate-edge

planers, shown to the left in the view, Plate XLII., facing page 96,

are operated by 16 horse-power motors, and the plate is held on the

table by means of hydraulic rams as well as screw-jacks. For drilling

and countersinking plates there are several modern tools, each actuated

by an independent electric motor. One of these is a three-standard

drill, to deal with plates of the largest size. The spindles have a

rise and fall of 10 in., and are fitted with self-acting, as well as

hand, feed, and with the usual rack arrangement for the traverse of

the head. Several radial countersinking machines, with 11-ft. jibs and

spindles 2-1/2 in. in diameter, are driven by 10 horse-power motors.

There are many heavy punching and shearing machines, nearly all of them

having 42-in. gaps, so that they can punch holes at any part of the

widest plates. As a rule, they are arranged to punch 1-1/2-in. holes

through 1-1/2-in. plates at the rate of thirty holes per minute. The

shears are of corresponding power.

For dealing with angles and bars there are several interesting tools,

in addition to shears and punches. Some of the shears cut 8-in. by

4-in. angles, and are driven by 10 horse-power motors. There are

channel-angle shearing machines, taking work 16 in. by 6 in., and

operated by hydraulic pressure. These machines are made with revolving

gear to suit almost any angle of flange.

There is also an hydraulic stamping press for bending angles and tees

to form knee-bars and other stiffening pieces, the cylinders being 14

in. in diameter, working at a pressure of 800 lb. per square inch,

with a stroke of 18 in. The machine, which has been constructed by Sir

William Arrol and Company, Limited, consists of an hydraulic cylinder

mounted horizontally on a massive table. On the ram-head there are

former blocks, while on the table in front there are corresponding

dies. The bar is placed on the table between the blocks and dies, and

as these are forced together by hydraulic pressure, the bar between

them is squeezed into the exact shape required. Not only is the

operation expeditiously executed, but there is no uncertainty. The

whole of the metal within the bar is retained inside the knee, which

becomes thicker and broader, materially adding to its strength. As

the moulds or dies can be made to suit any form, the machine can be

utilised in the preparation of various details of structures, provided

they are designed with a view to their production by aid of dies.

The great economy resulting from the use of special machines is only

realised when the designing staff remember that they must be kept

employed.

A specially powerful tool is provided for bending channel irons

and beams, and for drilling horizontal holes in them. Hydraulic

manhole-punching and flanging machines are employed, each having a ram

of 27 in. in diameter, and capable of punching a hole 42 in. by 16 in.

through a plate 3/4 in. thick. There are provided dies for forming

flanges 4 ft. 6 in. deep in the widest of plates.

[Illustration: Plate XLIII. PUNCHING AND SHEARING.]

The modern practice of joggling and of scarfing the laps and edges of

plates is applied in many instances, and special hydraulic tools are

provided to carry out this work. The firm were also early in adopting

the practice of joggling frames, deck beams, etc. The frames and beams

are joggled when cold, to suit each alternate inner strake of plating,

in a special design of hydraulic press, of which there are several in

the works. This tool, illustrated on Plate XLI., adjoining page 95,

carries dies on the ram-head and on the anvil, to form between them

the obverse and reverse sides of the dent or joggle desired. Movable

centre-pieces on the ram-head and anvil are traversed in all directions

by screw thread to suit the position and width of the joggled part, and

a gauge shows variations of 0.1 in. in the position of the joggled part

of the frame. A 2 ft. length of angle can be joggled at each stroke.

The machines are by Messrs. Hugh Smith and Co., Limited, Glasgow.

The same machine joggles the lap or edge of a shell, inner bottom, or

deckplate in a similar way. The whole length of the frame or plate can

thus be worked in a very short time. A powerful jib crane, of 16 ft.

radius, assists materially in the rapidity of the work turned out by

these tools. The only slips required are at the ends of the vessel,

where the bevel of the frames precludes the use of joggling. A special

electrically-driven hammer is used for forming these taper slips.

The angles, etc., to form the frames are assembled at the head of the

building-berth, and when lying on skids are riveted to form the double

bottom, frames and margin plates. Hydraulic riveters are used wherever

possible. There are about a score of these at work in the shipbuilding

yard, with cylinders from 8 in. to 10-1/2 in. in diameter, a stroke of

7-1/2 in., and a gap of 55 in., so that heavy work can be done. Some of

them are specially designed for keel work, for closing rivets in beams,

and for difficult parts.

The frames thus riveted are conveyed down the berth by a simple and

ingenious cableway, known in the Works as the "switchback," from its

resemblance to the well-known amusement railway. A derrick-post stands

at the head of the berth adjacent to the skids on which the frames are

riveted. The cable stretches from a small derrick at the foot of the

shipbuilding berth over a pulley at the top of the large derrick-post,

and thence, through a similar block at its base, to an electric winch.

The frame or unit of the ship's structure is suspended on a running

block on the cable, which is then made taut, partly by the working

of the winch and partly by the large derrick post being inclined

backwards. The running block with its load travels down the taut cable

by gravity, under the guidance of the squad of fitters. The gradient of

the cableway is only sufficient to enable the load to move slowly to

its position in the shipbuilding berth.

The double-bottom frames and margin plates are united with the

keel-plate, and subsequently there are successively worked into the

structure the tank top plates, side frames, the skin plates, beams,

bulk-heads, and other units, portable hydraulic punches and riveters

being largely used. Pneumatic tools are also extensively employed for

boring, drilling, riveting, chipping, caulking, etc. There are from 130

to 140 of these tools in use on vessels in course of construction.

There are ten building berths ranging in length up to 700 ft.; but

slight alterations would enable the firm to build vessels of still

greater size. Several of these are shown on the engraving on Plate

XXXVII., facing page 88. The launching ground is probably the finest

in the river, the channel being here of great depth and very wide, as

is shown on the engraving opposite. Indeed, ordinary merchant vessels

with full lines are launched without any check chains; the fine-ended

ships--mail steamers and cruisers--are, as a precautionary measure,

checked by drags in the usual way. The engraving on Plate

XXXVIII., facing page 90, shows the launch of H.M.S. _Argyll_.

[Illustration: Plate XLIV. THE FITTING-OUT DOCK.]

[Illustration: Plate XLV. THE GRAVING DOCK.]

The ships launched are completed in the fitting-out dock, constructed

about two years ago, and illustrated on Plate XLIV. The engraving shows

H.M.S. _Argyll_ under the big jib-crane. This dock has a length of 560

ft. and a width of 172 ft., and opens directly into the channel of the

Clyde. The depth of water is never less than 28 ft., so that warships

are afloat at all states of the tide. A prominent feature in the view

is the crane, which was supplied by Messrs. George Russell and Co.,

Limited, of Motherwell, and lifts 120 tons at a radius of 70 ft. It is

carried on concrete foundations and piers, which rise 20 ft. above the

level of the quay. In addition to the pier for carrying the mast of the

crane, there are similar supports for each of the back legs through

which the crane is anchored.

One advantage of the derrick type is that the crane may be placed close

to the edge of the quay; in this case the centre is only 7 ft. from the

front of the wharf, so that the full load of 120 tons can be dealt with

at an effective outreach of 63 ft. from the quay. The maximum radius

of the heavy purchase with a load of over 60 tons is 90 ft., and of

the light purchase gear, with a load of 10 tons, 98 ft. The minimum

radius of the crane is 25 ft. There are four sets of gear: for lifting

heavy loads, for raising light weights, for derricking the jib, and

for slewing; a separate controller of the enclosed tramway type is

provided for each. The main hoisting and derricking motors are of 50

horse-power, and the others of 35 horse-power. The speed of hoisting

120 tons is 5 ft. per minute, while a 10-ton load is raised at the

rate of 40 ft. per minute. Automatic brakes are fitted for the slewing

motion, and powerful hand-brakes for the hoisting and derricking gears.

All motions are controlled by one man in the steelhouse fixed to the

mast of the crane 56 ft. above the quay level.

There is on the opposite wharf of the dock a 20-ton travelling electric

crane, and throughout the Works there are many portable and hydraulic

cranes, in addition to the hydraulic and other cranes commanding the

machine tools.

Reference may here be made to the Company's graving dock, illustrated

on Plate XLV., adjoining page 101. The length is 360 ft., and it is

largely used for docking ships for repair, as well as for cleaning

ships preparatory to trial. Our view shows a torpedo-boat destroyer

in the dock. The pumps for the emptying of the dock are electrically

driven.

We may return now to our narrative of the construction of a ship, and

deal with the supplementary departments, including those of joiners,

smiths, plumbers, sheet-iron, and other workers.

Wood-work forms a large and important item in most of Scotts' ships, as

many of them are for passenger service. We illustrate on Plate XLVI.

one of the saw-mills. It is self-contained, having its own power plant,

including a compound engine, having cylinders 15-1/4 in. and 27-1/2 in.

in diameter by 44-in. stroke. There are four vertical saw frames, the

largest having a 36-in. frame, six rollers, and two bogies to take in

the heaviest logs. In addition, there are circular saws, ranging up to

6 ft. in diameter, a swing cross-cut saw, special planing, moulding,

and turning machines to do heavy work, and saw-sharpeners, grindstones,

punching machines and anvils to carry out all repairs and fettling

of the blades, etc. There are also large steam-heated drying stoves,

and a timber-drying yard of about three acres in extent. The overhead

travelling cranes range up to 5 tons capacity, and the rails on which

they run are extended on columns across the yard. The saw-mill is the

largest and best-equipped in the district, and does the sawing and

planing of timber for three of the largest shipbuilding yards, as

well as the general work for two other firms.

[Illustration: Plate XLVI. THE SAW MILL.]

[Illustration: Plate XLVII. TWO VIEWS IN THE JOINER SHOPS.]

The joiners' and cabinet-makers' shop, as we have already indicated,

occupies two floors of a building 240 ft. long and 52 ft. wide; while

the fourth floor is utilised for the French polishing work, as well

as for storing the completed wood-work until the vessel is ready

to receive it. Provision is also made in the same building for the

model-making department, in which replicas of nearly all ships are

produced, and, being works of art, because of their completeness,

accuracy, and beauty, have earned high awards at many Exhibitions.

In the joiners' shops, illustrated by two engravings on Plate XLVII.,

adjoining this page, there is a complete equipment of wood-working

machines for sawing, turning, planing, moulding, sand-papering,

mortising, boring, tenoning, dovetailing, dowelling and joining.

These are electrically driven, and are grouped at three places in the

length of the shop on each floor, with benches around them, so that

the joiners do not require to carry their jobs any distance in order

to have them machined. There is also in use in connection with the

department a portable electric circular saw, which is specially useful

for carpenters and joiners, etc., on board the ship in the dock. An

electric deck-planer, of the lawnmower form, has proved serviceable in

reducing enormously the most laborious task experienced by carpenters

and joiners.

There are two large smithies convenient to the shipbuilding berths,

and in both cases the finishing department adjoins. In one case there

are fifty-four fires and eight hammers; in the other, forty fires,

with five hammers, ranging up to 15 cwt. The fires are operated by

mechanical blowers, and the smoke and waste gases are carried off

by overhead ventilating pipes. Extensive work is carried out by the

smiths. Die-stamping is largely adopted in connection with the making

of eye-plates, cleats, stanchions, clips, etc. In each finishing shop

there are band saws, radial and other drills, screwing machines, and

grindstones. Smiths' stores are arranged above the finishing shops.

The plumbers' shop is fitted with a special machine for bending pipes

when cold, as well as screwing and tapping machines, drills, saws,

grinders, and fires.

The sheet-iron department is equally well equipped, having

straightening rolls, shearing, punching, chipping, drilling, and other

tools, with various hammers; and here work is done in connection with

ventilating and other light ironwork.

In view of the warship contracts undertaken, the mechanics' shop, for

work peculiar to the ship as distinct from the propeller machinery,

etc., is extensive. The four lathes here range up to 27 ft. in length

over all, with a 14-in. headstock and a 22-ft. bed. There is a useful

shaping machine, a fair-sized planer, and several drills, all adequate

for the work required, which is remarkable more, perhaps, for its great

variety than for size.