All the machinery in the yard, and in several departments in the engine

and boiler works, is run from one central station, of which two views

are given on Plate XLVIII., opposite. The electric generators occupy

one side of the power station, and the air compressors and hydraulic

pumps the other. Steam at 200 lb. pressure is supplied by one marine

cylindrical, and four Babcock and Wilcox water-tube, boilers, with

superheater, coal conveyors, and mechanical stokers.

[Illustration: Plate XLVIII. ELECTRIC GENERATORS IN THE POWER STATION.

HYDRAULIC PUMPS AND AIR COMPRESSORS IN THE POWER STATION.]

There are three electric generating sets, with a total capacity of

1200 kilowatts, the voltage being 240. They are illustrated on Plate

XLVIII., facing this page. The engines are of the high-speed, enclosed,

forced lubrication, condensing type. The current is distributed from a

switchboard in the power station by overhead mains, with three-way

distributing panels in the various departments. The motors, of which

there are about 130 in the shipbuilding department alone, are of the

two- and four-pole type, partly or entirely enclosed, and mostly of

10 to 20 electric horse-power. Arc lamps are used for lighting, but

the shops and offices are also illumined by 16 and 32 candle-power

incandescent lamps. Plugs are arranged at various points throughout the

yard for portable lights, and for connecting mains for lighting the

various ships while being completed in the docks.

Hydraulic power at 800 lb. pressure is generated by two high-pressure

pumps, with steam cylinders 15 in. in diameter, and rams 4 in. in

diameter. There are separate accumulators for each. The pressure pipes

are led underground throughout the Works to the various hydraulic tools

already referred to.

There are two air compressors for supplying power for the pneumatic

tools. The combined capacity is 1800 cubic feet of free air per minute.

Each has two steam cylinders 6 in. in diameter, working respectively

high- and low-pressure air cylinders 15-1/4 in. and 21-1/4 in. in

diameter, the stroke being 18 in. The hydraulic pumps and the air

compressors are illustrated on Plate XLVIII., facing page 104.

As we have already stated, part of the power generated in this station

is utilised at the engine works, to which we may now turn our attention.

[Illustration: decoration]

[Illustration: decoration]

The Engine and Boiler Works.

[Illustration: decoration]

Rapidity of construction has been characteristic of the engine and

boiler works of the Scotts to at least as great an extent as in the

shipbuilding yard. Several instances might be noted, beginning with six

blockade-runners, built in a very short period, in 1864, and fitted

with engines to give a speed of 12 knots at sea and 13-1/2 knots on

trial. A recent and striking instance is the construction of boilers

and engines for twenty of the passenger steamers built for traffic on

the Thames, to the order of the London County Council, and described on

pages 83 and 84, _ante_. The contract for this work was signed towards

the end of November, 1904, and work was commenced about the beginning

of December. The various parts of the engines were being machined and

finished during the month of January and the beginning of February,

1905; and all of the twenty sets of engines and boilers were completed

by the end of May. Another noteworthy case is the construction of the

machinery for the steamship _Fengtien_, described on page 80, _ante_.

Work was commenced on the machinery in the middle of January, and

finished about the end of April. The machinery was fitted in the ship

and ready for the trials on the 29th May. The total time taken from

the beginning of work was well under five months.[69]

[Illustration: Plate XLIX. VIEW IN MAIN MACHINE SHOP.]

The pattern shop, where all work originates, is fitted with the usual

pattern-making machinery, including a core-making machine.

The iron foundry, which was begun in 1790,[70] and around which the

large engineering establishment has since been raised step by step,

continues to do sound work. There are four cupolas, of a combined

capacity of about 20 tons, and cylinders up to 120 in. in diameter are

cast. These facts suggest the satisfactory character of the equipment.

The brass foundry is an equally important department, where first-class

work is done. There are fifty-two crucible pots in use, varying in

size up to 150 lb., and of a collective capacity of about 2 tons; also

an air furnace capable of producing at one heat 12 tons of metal, for

such heavy castings as are required for preparing shaft liners, large

sea chests for naval ships, etc. The strength of Admiralty gun metal

made in this foundry is up to 18 tons per square inch, with 30 per

cent. of elongation in a 2-in. length. The foundry is served by an

electrically-operated jib crane.

In the forge and smiths' shops a large amount of detail work is done,

in units ranging up to 3 tons in weight. The hammers vary up to 15 cwt.

power. A considerable amount of die-stamping is done in connection with

auxiliary engine forgings, etc. All paddle-wheels are made in this

department. The blast for the fires is got from an electrically-driven

fan.

The machine shop, which was one of the first constructed with a

completely glazed roof, occupies a site on a steep slope, one side

being formed by a heavy retaining wall, as shown in the engraving on

Plate XLIX., facing page 106. At the level of the top of the wall,

which is 25 ft. high, there is the light machine shop, while at the end

of the bay and over the annexe situated to the left of the engraving,

is the brass-finishing shop. There is a 2-ton hoist between the

erecting-shop floor and the galleries, so that no inconvenience, so far

as transport is concerned, is involved by this arrangement.

Originally a stream ran down the hill and over the site on which the

Works are located, and its waters have for many years been utilised

as a source of power. A special 24-in. inward-flow turbine works in

the conduit which conveys the water across the site, and this turbine

develops continuously 80 horse-power. This serves to drive some of

the machines in the boiler works. The turbine runs in parallel with

a compound vertical engine, which drives the shafts actuating the

groups of small machines in the engine shop. Many of the larger tools,

however, are electrically-driven by separate motors, the current being

transmitted from the central station already described.

The engravings on Plates XXXIX. and XLIX., facing pages 92 and 106

respectively, illustrate the main machine shop, which has a width of

60 ft., and, with the adjoining bay, accommodates some of the finest

marine engineering tools made. Perhaps the best indication of their

efficiency is the fact that three weeks suffice for the machining of

the parts of a complete set of engines to develop 2000 horse-power. The

shops are traversed by five overhead electric cranes, ranging up to 40

tons lifting capacity.

[Illustration: Plate L. VERTICAL PLANING MACHINE.]

[Illustration: MULTIPLE SPINDLE DRILLING MACHINE.]

[Illustration: Plate LI. SURFACE AND BORING LATHE.]

The leading dimensions and the principal work done by the more

important tools afford an idea of the extent of the equipment. There

are several planing and slotting machines, one of which is shown in

the engraving on Plate L., facing this page. There are two combined

machines, to plane 21 ft. and to slot 18 ft., used in connection

with the condensers, cylinders, large bearing frames and sole-plates

of engines, while two other smaller tools are devoted to finishing the

castings for bed-plates and columns. For machining eccentric-rod ends,

etc., there is a 24-in. slotter with a circular table. There are two

high-speed planers with two tool-boxes on the cross-slide, which take

in pieces 10 ft. by 5 ft. by 5 ft., and one to take work 12 ft. by 3

ft. by 3 ft.

In the driving of some of the heavier tools very good results have

been attained by the application of a reversible motor, which in one

case has dispensed with four belts, a pair of bevel wheels, and two

countershafts, reducing enormously the frictional waste, and enabling

higher speeds and quicker return strokes to be attained.[71]

For drilling work there are several large tools. Recently there has

just been fitted a multiple machine which, while primarily intended for

drilling the tube-holes in drums and water-pockets of Yarrow water-tube

boilers, is also utilised in connection with ordinary machine work.

This tool, of which an engraving is given on Plate L., facing page 108,

was manufactured by Messrs. Campbells and Hunter, Limited, Leeds. It

has a massive cross-slide carrying four saddles, movable by a powerful

screw, driven by spur-gearing and friction-clutch, controlled from one

of the saddles. The steel spindles are balanced, and have a special

self-acting, variable, rack-feed motion, as well as a quick vertical

motion by hand for rapidly adjusting the drill through the jig. Each

spindle can be operated independently. The table has a sliding motion,

directed by two straight screws coupled to the cross shaft and vertical

shaft, and is carried by a straight bed with three bearing surfaces.

This machine, which weighs 20 tons, is driven by a 30 brake-horse-power

electric motor.

There are two vertical boring mills used for cylinder work, one being

capable of boring up to 120 in. in diameter, and the other to 94 in.

in diameter. A combined boring and facing machine, with a table 4 ft.

square, is usefully employed on propeller bosses, valve-chests, small

cylinders, and built-up bed-plates, machine bearings, etc.

The installation of high-speed lathes is specially noteworthy. In

one, the face-plate can take in 12 ft. in diameter, and, as the

length of bed is 30 ft., it is useful for large surfacing work, as

well as for turning crankshafts of the larger sizes. There are two

12-in. double-geared lathes for surfacing and screw cutting. These are

self-acting, and the lengths of bed are 19 ft. and 12 ft. respectively.

For turning piston and connecting rods, two screw-cutting lathes of

16-1/4-in. centres are in use, the length of the bed being 22-1/2

ft. These have each a triple-gear headstock, and a chuck 48 in. in

diameter; with rack motion and slide-rest feeds. A 20-in. centre lathe,

with a bed 28 ft. 6 in. long, is fitted with two saddles and four

slide-rests for shaft liners, etc. Amongst others, there is a 27-in.

centre lathe for shafting, the bed being 36 ft. long.

One of the lathes is illustrated on Plate LI., adjoining page 109. This

is a 48-in. surfacing and boring lathe, by Messrs. John Lang and Sons,

Limited, Johnstone. The two new features introduced are the variable

speed drive and automatic speed-changing mechanism. The headstocks

can be used for single or triple gear, and are so arranged that, even

when running at the greatest speed, there is a reduction by gearing.

With this arrangement the lathes have greater power when turning

small diameters than when the belt is used driving direct to the main

spindle. The spindles, which are hollow, with hexagonal turrets, are

of crucible cast steel, and run in gun-metal bearings. By means of

the speed-changing mechanism, the cutting speed of the tool is kept

practically constant when surfacing. This means that any surface can be

finished off in about one-half of the time taken by a lathe having

the ordinary step-cone drive, where the workman will not change the

position of the belt while surfacing. The self-acting feed-motions are

positive.

[Illustration: Plate LII. BRASS FINISHING SHOP.]

Milling is adopted in many instances in preference to planing or

slotting, and this is especially so in connection with valve quadrants,

columns, faces, etc. For the first-named there is a large vertical

miller, and for the latter a horizontal tool with a vertical milling

apparatus. For grinding bolts, etc., a machine having a separate head

for grinding taps is used, the emery wheel being 18 in. in diameter and

1-1/2 in. broad.

A shop, now in course of construction, is to be specially laid out for

the manufacture of turbine machinery of the greatest power. It is to

be 285 ft. long, with a span of 60 ft. Heavy lifts will be taken by a

100-ton overhead crane, and ordinary work will be handled by a 40-ton

electric crane. The heavy machine tools, while specially chosen for

turbine work, are also adaptable for use in the manufacture of the

heaviest reciprocating machinery. The principal tools are large lathes

suitable for turbine rotors and crank-shafts; vertical boring machines

which may be utilised for work on cylinders as well as on turbine

casings; and a heavy planer, 10 ft. by 10 ft. by 25 ft. stroke. The

necessary small machine tools for turbine work will be put down in this

department, whence also some of the large tools will be removed from

the existing shops, so that it will be fully equipped for the purpose

intended.

The brass-finishing shop, which is illustrated on Plate LII., facing

page 110, serves both for ship and engine work. It has only recently

been laid out anew. The machines, according to the latest practice, are

arranged down each side of the shop, and the benches occupy the centre.

Each alternate bench is utilised for the material to be operated upon,

so that the working bench is not littered in a confused way, as is too

often the case. There are representative types of the best makes of

automatic tools, turret lathes, brass-finishers' lathes, and grinding

machines with specially large discs.

A considerable amount of work is done to limit gauge in all the shops

which we have described. This practice has been considerably developed

recently, and a specially equipped department has been organised,

where gauges, templates, and cutting tools are made. This department

is illustrated on Plate LIII., facing this page. A word may first be

said as to the significance of this new department. Where three or

four ships have engines of the same type, a set of jigs and templates

for the most important parts are at once made, so that a unit from

an engine in one ship may be fitted to an engine in another. This

simplifies the ordering of new parts, and greatly reduces the number of

spare items which have to be kept in store by the owners, in order that

repairs or refits may be effected at short notice.

For some time the Scotts have adopted this system, so that it was a

simple matter to enforce it in connection with the machinery of the

twenty Thames Steamers, and in recent naval work, where the practice

is being applied in an extended form. In the recent Admiralty work

every part of an engine is made interchangeable and identical with

the corresponding parts of other engines for the same type of ship,

although built in different parts of the country; and this fact

alone will indicate the extent and intricacy as well as the care

and degree of accuracy necessary. This standardisation to ensure

interchangeability has reached its highest exemplification in the

case of the machinery for the armoured cruiser _Defence_, of 27,000

indicated horse-power, to be completed in twenty-one months from the

placing of the order by the Admiralty.

[Illustration: Plate LIII. TOOL, GAUGE, TEMPLATE, AND JIG DEPARTMENT.]

Then, as regards the tool-making and fettling--the other branch of work

carried out in the tool room--it has been recognised that, to make

the cutting tools efficient, it is necessary to utilise the most

suitable steel for the tools working on various metals and alloys; and

the selection of the tool steel for each metal has been systematised by

the careful collation of data of actual work. In the manufacture of the

tools special appliances are used and will be referred to presently.

The workmen are encouraged to use only tools in sound condition. Each

machine-man in the shops has ten checks, and may borrow from the store

a corresponding number of tools, but these must be returned as soon as

possible for overhaul and re-grinding. The bonus system further induces

the men to ensure that their tools are in good condition.

The tool department is separate from the main structure, and in it

all jigs, templates, and gauges, as well as tools, are constructed.

Standard gauges, as well as limit gauges, are used, and both are

marked in metrical and English dimensions. The tool room is not only

carefully maintained at a regular temperature, in order to prevent the

templates and jigs from varying in the course of their manufacture,

but the appliances adopted have been selected so as to get the most

precise results. In connection with the manufacture of large boiler

taps, drill gauges, milling cutters, etc., a specially designed gas

furnace has been built, with a number of compartments which can be used

separately or collectively, according to the size of the tool being

made. The toolsmith's forge is on the down-draught principle, so that,

in addition to carrying off all smoke and dust, it tends to keep the

atmosphere pure.

Amongst the principal machines used in this tool-manufacturing

department is an 8-in. Whitworth self-acting, sliding-surfacing,

and screw-cutting lathe, with a backing-off and taper-turning

attachment. The milling, drilling, and grinding machines are all by

the best makers. A 10-ft. machine is used for making the comparative

measurements from existing standards. This machine, also of Whitworth

make, has a measuring screw in a fast headstock with a large dividing

wheel, one division of the latter representing 0.0001-in. in the end

movement of the spindle. All transverse and tensile testing of bars is

done in this department.

A check system is used in connection with the distribution of

templates, tools, drawings, etc., and a separate store in the centre of

the works is arranged for this purpose.

[Illustration: HYDRAULIC PLATE-BENDING MACHINE.]

As to the boiler works, the fact that in 1905 the production was

practically one boiler per week is, of itself, testimony to the nature

of the plant adopted. The main boiler shop, together with its yard, has

an area of 7000 square yards, and a height of 45 ft. to the crane rail,

and is served by five overhead electric cranes, ranging in lifting

power up to 100 tons, with numerous jib and other cranes associated

with the various machine tools.

[Illustration: Plate LIV. IN THE BOILER SHOP.]

The machine tools fitted in the boiler works are all of a very powerful

character; but only a few of these need here be referred to. There

is a 13-ft. gap hydraulic plate-bending machine, which is entirely

automatic in its action, and can be set to any radius to bend plates up

to 2 in. thick when cold. The flanging for the front and back plates

of boilers is done in an hydraulic machine, exerting a pressure of

over 160 tons. This machine has four rams, two of which act downwards,

one upwards, and the other horizontally. It is served by a special

hydraulic jib-crane, capable of lifting the heaviest plates. There are

also plate-edge planers and triple boring mills of corresponding power,

while the vertical rolls take in plates up to 10-ft. wide.

For the riveting of the boilers there is a 13-ft. gap hydraulic

riveting machine, capable of exerting a load on each rivet of 200

tons. The weight of this riveting machine alone is about 60 tons, and

it is served by an independent hydraulic jib-crane. All the valves in

connection with the crane and riveter are led to a common platform, so

that one man is able to manipulate the whole of the work.

There is also a large installation of special plant for the manufacture

of water-tube boilers, but it is scarcely necessary to describe this in

detail.

A large part of the boiler work, especially for warships, is

galvanised, and a special department has been organised for this

purpose. The tubes, in the first place, are thoroughly cleaned, then

placed in a zinc bath, and coated by electrolysis to the desired

extent; the object being to expose defects, as well as to protect the

tubes from corrosion during manufacture. The amount of work done is,

perhaps, the best indication of the equipment of this department, as

well as of the water-tube department; and this will be realised when it

is stated that over 24,000 tubes are required for the boilers of one

cruiser, and that six months suffices for their construction.

It would be possible to give other indications of the splendid

equipment of the Works, but enough has been said to show that

there is directed towards the realisation of the best work in all

departments--firstly, the advantages of accumulated experience,

carefully collated throughout two hundred years; secondly, the benefits

which the psychologists claim for hereditary influence--applicable

here not only through the proprietors, but also through many of the

workmen; and, thirdly, a sound progressive spirit, which recognises the

necessity for continual improvement in administration and design, and

in machine tools and methods of manufacture.

[Illustration: decoration]

FOOTNOTES:

[69] For further references to the rate of construction, see

_Engineering_, vol. lx., page 813, where it is noted that ten vessels,

aggregating 26,000 tons, were built for the China Navigation Company in

nine months.

[70] See page 22, _ante_.

[71] See _Engineering_, vol. lxxx., page 418.

PRINTED AT THE BEDFORD PRESS, 20 AND 21, BEDFORDBURY, STRAND, LONDON,

W.C.

End of Project Gutenberg's Two Centuries of Shipbuilding, by Various

Two Centuries of Shipbuilding by the Scotts at Greenock · 第 8 / 8 段