There can be no doubt that vertical shafts are cheaper to operate

than inclines: the length of haul from a given depth is less; much

higher rope speed is possible, and thus the haulage hours are less

for the same output; the wear and tear on ropes, tracks, or guides

is not so great, and pumping is more economical where the Cornish

order of pump is used. On the other hand, with a vertical shaft

must be included the cost of operating crosscuts. On mines where

the volume of ore does not warrant mechanical haulage, the cost of

tramming through the extra distance involved is an expense which

outweighs any extra operating outlay in the inclined shaft itself.

Even with mechanical haulage in crosscuts, it is doubtful if there

is anything in favor of the vertical shaft on this score.

[Illustration: Fig. 6.--Cross-section showing auxiliary vertical

outlet.]

In deposits of very flat dips, under 30°, the case arises where the

length of incline is so great that the saving on haulage through

direct lift warrants a vertical shaft as an auxiliary outlet in

addition to the incline (Fig. 6). In such a combination the crosscut

question is eliminated. The mine is worked above and below the

intersection by incline, and the vertical shaft becomes simply a

more economical exit and an alternative to secure increased output.

The North Star mine at Grass Valley is an illustration in point. Such

a positive instance borders again on Case IV, deep-level projects.

In conclusion, it is the writer's belief that where mines are to

be worked from near the surface, coincidentally with sinking, and

where, therefore, crosscuts from a vertical shaft would need to be

installed frequently, inclines are warranted in all dips under 75°

and over 30°. Beyond 75° the best alternative is often undeterminable.

In the range under 30° and over 15°, although inclines are primarily

necessary for actual delivery of ore from levels, they can often

be justifiably supplemented by a vertical shaft as a relief to a

long haul. In dips of less than 15°, as in those over 75°, the

advantages again trend strongly in favor of the vertical shaft. There

arise, however, in mountainous countries, topographic conditions

such as the dip of deposits into the mountain, which preclude any

alternative on an incline at any angled dip.

CASE IV. INCLINED DEPOSITS WHICH MUST BE ATTACKED IN DEPTH (Fig.

7).--There are two principal conditions in which such properties

exist: first, mines being operated, or having been previously worked,

whose method of entry must be revised; second, those whose ore-bodies

to be attacked do not outcrop within the property.

The first situation may occur in mines of inadequate shaft capacity

or wrong location; in mines abandoned and resurrected; in mines

where a vertical shaft has reached its limit of useful extensions,

having passed the place of economical crosscutting; or in mines in

flat deposits with inclines whose haul has become too long to be

economical. Three alternatives present themselves in such cases: a

new incline from the surface (_A B F_, Fig. 7), or a vertical shaft

combined with incline extension (_C D F_), or a simple vertical

shaft (_H G_). A comparison can be first made between the simple

incline and the combined shaft. The construction of an incline from

the surface to the ore-body will be more costly than a combined

shaft, for until the horizon of the ore is reached (at _D_) no

crosscuts are required in the vertical section, while the incline

must be of greater length to reach the same horizon. The case arises,

however, where inclines can be sunk through old stopes, and thus

more cheaply constructed than vertical shafts through solid rock;

and also the case of mountainous topographic conditions mentioned

above.

[Illustration: Fig. 7.--Cross-section of inclined deposit which

must be attacked in depth.]

From an operating point of view, the bend in combined shafts (at

_D_) gives rise to a good deal of wear and tear on ropes and gear.

The possible speed of winding through a combined shaft is, however,

greater than a simple incline, for although haulage speed through

the incline section (_D F_) and around the bend of the combined

shaft is about the same as throughout a simple incline (_A F_), the

speed can be accelerated in the vertical portion (_D C_) above that

feasible did the incline extend to the surface. There is therefore an

advantage in this regard in the combined shaft. The net advantages

of the combined over the inclined shaft depend on the comparative

length of the two alternative routes from the intersection (_D_)

to the surface. Certainly it is not advisable to sink a combined

shaft to cut a deposit at 300 feet in depth if a simple incline

can be had to the surface. On the other hand, a combined shaft

cutting the deposit at 1,000 feet will be more advisable than a

simple incline 2,000 feet long to reach the same point. The matter

is one for direct calculation in each special case. In general, there

are few instances of really deep-level projects where a complete

incline from the surface is warranted.

In most situations of this sort, and in all of the second type

(where the outcrop is outside the property), actual choice usually

lies between combined shafts (_C D F_) and entire vertical shafts (_H

G_). The difference between a combined shaft and a direct vertical

shaft can be reduced to a comparison of the combined shaft below

the point of intersection (_D_) with that portion of a vertical

shaft which would cover the same horizon. The question then becomes

identical with that of inclined _versus_ verticals, as stated in Case

III, with the offsetting disadvantage of the bend in the combined

shaft. If it is desired to reach production at the earliest date,

the lower section of a simple vertical shaft must have crosscuts

to reach the ore lying above the horizon of its intersection (_E_).

If production does not press, the ore above the intersection (_EB_)

can be worked by rises from the horizon of intersection (_E_).

In the use of rises, however, there follow the difficulties of

ventilation and lowering the ore down to the shaft, which brings

expenses to much the same thing as operating through crosscuts.

The advantages of combined over simple vertical shafts are earlier

production, saving of either rises or crosscuts, and the ultimate

utility of the shaft to any depth. The disadvantages are the cost

of the extra length of the inclined section, slower winding, and

greater wear and tear within the inclined section and especially

around the bend. All these factors are of variable import, depending

upon the dip. On very steep dips,--over 70°,--the net result is in

favor of the simple vertical shaft. On other dips it is in favor

of the combined shaft.

CASES V AND VI. MINES TO BE WORKED TO GREAT DEPTHS,--OVER 3,000

FEET.--In Case V, with vertical or horizontal deposits, there is

obviously no desirable alternative to vertical shafts.

In Case VI, with inclined deposits, there are the alternatives

of a combined or of a simple vertical shaft. A vertical shaft in

locations (_H_, Fig. 7) such as would not necessitate extension in

depth by an incline, would, as in Case IV, compel either crosscuts

to the ore or inclines up from the horizon of intersection (_E_).

Apart from delay in coming to production and the consequent loss of

interest on capital, the ventilation problems with this arrangement

would be appalling. Moreover, the combined shaft, entering the deposit

near its shallowest point, offers the possibility of a separate

haulage system on the inclined and on the vertical sections, and

such separate haulage is usually advisable at great depths. In

such instances, the output to be handled is large, for no mine of

small output is likely to be contemplated at such depth. Several

moderate-sized inclines from the horizon of intersection have been

suggested (_EF_, _DG_, _CH_, Fig. 8) to feed a large primary shaft

(_AB_), which thus becomes the trunk road. This program would cheapen

lateral haulage underground, as mechanical traction can be used

in the main level, (_EC_), and horizontal haulage costs can be

reduced on the lower levels. Moreover, separate winding engines

on the two sections increase the capacity, for the effect is that

of two trains instead of one running on a single track.

SHAFT LOCATION.--Although the prime purpose in locating a shaft

is obviously to gain access to the largest volume of ore within

the shortest haulage distance, other conditions also enter, such

as the character of the surface and the rock to be intersected,

the time involved before reaching production, and capital cost.

As shafts must bear two relations to a deposit,--one as to the

dip and the other as to the strike,--they may be considered from

these aspects. Vertical shafts must be on the hanging-wall side

of the outcrop if the deposit dips at all. In any event, the shaft

should be far enough away to be out of the reach of creeps. An

inclined shaft may be sunk either on the vein, in which case a

pillar of ore must be left to support the shaft; or, instead, it

may be sunk a short distance in the footwall, and where necessary

the excavation above can be supported by filling. Following the

ore has the advantage of prospecting in sinking, and in many cases

the softness of the ground in the region of the vein warrants this

procedure. It has, however, the disadvantage that a pillar of ore

is locked up until the shaft is ready for abandonment. Moreover, as

veins or lodes are seldom of even dip, an inclined shaft, to have

value as a prospecting opening, or to take advantage of breaking

possibilities in the lode, will usually be crooked, and an incline

irregular in detail adds greatly to the cost of winding and maintenance.

These twin disadvantages usually warrant a straight incline in the

footwall. Inclines are not necessarily of the same dip throughout,

but for reasonably economical haulage change of angle must take

place gradually.

[Illustration: Fig. 8.--Longitudinal section showing shaft arrangement

proposed for very deep inclined deposits.]

In the case of deep-level projects on inclined deposits, demanding

combined or vertical shafts, the first desideratum is to locate

the vertical section as far from the outcrop as possible, and thus

secure the most ore above the horizon of intersection. This, however,

as stated before, would involve the cost of crosscuts or rises and

would cause delay in production, together with the accumulation

of capital charges. How important the increment of interest on

capital may become during the period of opening the mine may be

demonstrated by a concrete case. For instance, the capital of a

company or the cost of the property is, say, $1,000,000, and where

opening the mine for production requires four years, the aggregate

sum of accumulated compound interest at 5% (and most operators

want more from a mining investment) would be $216,000. Under such

circumstances, if a year or two can be saved in getting to production

by entering the property at a higher horizon, the difference in

accumulated interest will more than repay the infinitesimal extra

cost of winding through a combined shaft of somewhat increased

length in the inclined section.

The unknown character of the ore in depth is always a sound reason

for reaching it as quickly and as cheaply as possible. In result,

such shafts are usually best located when the vertical section

enters the upper portion of the deposit.

The objective in location with regard to the strike of the ore-bodies

is obviously to have an equal length of lateral ore-haul in every

direction from the shaft. It is easier to specify than to achieve

this, for in all speculative deposits ore-shoots are found to pursue

curious vagaries as they go down. Ore-bodies do not reoccur with

the same locus as in the upper levels, and generally the chances

to go wrong are more numerous than those to go right.

NUMBER OF SHAFTS.--The problem of whether the mine is to be opened

by one or by two shafts of course influences location. In metal

mines under Cases II and III (outcrop properties) the ore output

requirements are seldom beyond the capacity of one shaft. Ventilation

and escape-ways are usually easily managed through the old stopes.

Under such circumstances, the conditions warranting a second shaft

are the length of underground haul and isolation of ore-bodies or

veins. Lateral haulage underground is necessarily disintegrated by

the various levels, and usually has to be done by hand. By shortening

this distance of tramming and by consolidation of the material

from all levels at the surface, where mechanical haulage can be

installed, a second shaft is often justified. There is therefore

an economic limitation to the radius of a single shaft, regardless

of the ability of the shaft to handle the total output.

Other questions also often arise which are of equal importance

to haulage costs. Separate ore-shoots or ore-bodies or parallel

deposits necessitate, if worked from one shaft, constant levels

through unpayable ground and extra haul as well, or ore-bodies may

dip away from the original shaft along the strike of the deposit

and a long haulage through dead levels must follow. For instance,

levels and crosscuts cost roughly one-quarter as much per foot as

shafts. Therefore four levels in barren ground, to reach a parallel

vein or isolated ore-body 1,000 feet away, would pay for a shaft

1,000 feet deep. At a depth of 1,000 feet, at least six levels

might be necessary. The tramming of ore by hand through such a

distance would cost about double the amount to hoist it through

a shaft and transport it mechanically to the dressing plant at

surface. The aggregate cost and operation of barren levels therefore

soon pays for a second shaft. If two or more shafts are in question,

they must obviously be set so as to best divide the work.

Under Cases IV, V, and VI,--that is, deep-level projects,--ventilation

and escape become most important considerations. Even where the

volume of ore is within the capacity of a single shaft, another

usually becomes a necessity for these reasons. Their location is

affected not only by the locus of the ore, but, as said, by the time

required to reach it. Where two shafts are to be sunk to inclined

deposits, it is usual to set one so as to intersect the deposit at

a lower point than the other. Production can be started from the

shallower, before the second is entirely ready. The ore above the

horizon of intersection of the deeper shaft is thus accessible from

the shallower shaft, and the difficulty of long rises or crosscuts

from that deepest shaft does not arise.

CHAPTER VIII.

Development of Mines (_Continued_).

SHAPE AND SIZE OF SHAFTS; SPEED OF SINKING; TUNNELS.

SHAPE OF SHAFTS.--Shafts may be round or rectangular.[*] Round

vertical shafts are largely applied to coal-mines, and some engineers

have advocated their usefulness to the mining of the metals under

discussion. Their great advantages lie in their structural strength,

in the large amount of free space for ventilation, and in the fact

that if walled with stone, brick, concrete, or steel, they can be

made water-tight so as to prevent inflow from water-bearing strata,

even when under great pressure. The round walled shafts have a longer

life than timbered shafts. All these advantages pertain much more to

mining coal or iron than metals, for unsound, wet ground is often

the accompaniment of coal-measures, and seldom troubles metal-mines.

Ventilation requirements are also much greater in coal-mines. From

a metal-miner's standpoint, round shafts are comparatively much

more expensive than the rectangular timbered type.[**] For a larger

area must be excavated for the same useful space, and if support

is needed, satisfactory walling, which of necessity must be brick,

stone, concrete, or steel, cannot be cheaply accomplished under

the conditions prevailing in most metal regions. Although such

shafts would have a longer life, the duration of timbered shafts

is sufficient for most metal mines. It follows that, as timber

is the cheapest and all things considered the most advantageous

means of shaft support for the comparatively temporary character

of metal mines, to get the strains applied to the timbers in the

best manner, and to use the minimum amount of it consistent with

security, and to lose the least working space, the shaft must be

constructed on rectangular lines.

[Footnote *: Octagonal shafts were sunk in Mexico in former times.

At each face of the octagon was a whim run by mules, and hauling

leather buckets.]

[Footnote **: The economic situation is rapidly arising in a number

of localities that steel beams can be usefully used instead of

timber. The same arguments apply to this type of support that apply

to timber.]

The variations in timbered shaft design arise from the possible

arrangement of compartments. Many combinations can be imagined,

of which Figures 9, 10, 11, 12, 13, and 14 are examples.

[Illustration: FIG. 9. FIG. 10. FIG. 11. FIG. 12. FIG. 13. FIG.

14.]

The arrangement of compartments shown in Figures 9, 10, 11, and

13 gives the greatest strength. It permits timbering to the best

advantage, and avoids the danger underground involved in crossing

one compartment to reach another. It is therefore generally adopted.

Any other arrangement would obviously be impossible in inclined

or combined shafts.

SIZE OF SHAFTS.--In considering the size of shafts to be installed,

many factors are involved. They are in the main:--

_a_. Amount of ore to be handled.

_b_. Winding plant.

_c_. Vehicle of transport.

_d_. Depth.

_e_. Number of men to be worked underground.

_f_. Amount of water.

_g_. Ventilation.

_h_. Character of the ground.

_i_. Capital outlay.

_j_. Operating expense.

It is not to be assumed that these factors have been stated in

the order of relative importance. More or less emphasis will be

attached to particular factors by different engineers, and under

different circumstances. It is not possible to suggest any arbitrary

standard for calculating their relative weight, and they are so

interdependent as to preclude separate discussion. The usual result

is a compromise between the demands of all.

Certain factors, however, dictate a minimum position, which may

be considered as a datum from which to start consideration.

_First_, a winding engine, in order to work with any economy, must

be balanced, that is, a descending empty skip or cage must assist

in pulling up a loaded one. Therefore, except in mines of very

small output, at least two compartments must be made for hoisting

purposes. Water has to be pumped from most mines, escape-ways are

necessary, together with room for wires and air-pipes, so that at

least one more compartment must be provided for these objects.

We have thus three compartments as a sound minimum for any shaft

where more than trivial output is required.

_Second_, there is a certain minimum size of shaft excavation below

which there is very little economy in actual rock-breaking.[*]

In too confined a space, holes cannot be placed to advantage for

the blast, men cannot get round expeditiously, and spoil cannot be

handled readily. The writer's own experience leads him to believe

that, in so far as rock-breaking is concerned, to sink a shaft

fourteen to sixteen feet long by six to seven feet wide outside

the timbers, is as cheap as to drive any smaller size within the

realm of consideration, and is more rapid. This size of excavation

permits of three compartments, each about four to five feet inside

the timbers.

[Footnote *: Notes on the cost of shafts in various regions which

have been personally collected show a remarkable decrease in the

cost per cubic foot of material excavated with increased size of

shaft. Variations in skill, in economic conditions, and in method

of accounting make data regarding different shafts of doubtful

value, but the following are of interest:--

In Australia, eight shafts between 10 and 11 feet long by 4 to

5 feet wide cost an average of $1.20 per cubic foot of material

excavated. Six shafts 13 to 14 feet long by 4 to 5 feet wide cost

an average of $0.95 per cubic foot; seven shafts 14 to 16 feet

long and 5 to 7 feet wide cost an average of $0.82 per cubic foot.

In South Africa, eleven shafts 18 to 19 feet long by 7 to 8 feet

wide cost an average of $0.82 per cubic foot; five shafts 21 to

25 feet long by 8 feet wide, cost $0.74; and seven shafts 28 feet

by 8 feet cost $0.60 per cubic foot.]

The cost of timber, it is true, is a factor of the size of shaft,

but the labor of timbering does not increase in the same ratio.

In any event, the cost of timber is only about 15% of the actual

shaft cost, even in localities of extremely high prices.

_Third_, three reasons are rapidly making the self-dumping skip

the almost universal shaft-vehicle, instead of the old cage for

cars. First, there is a great economy in labor for loading into

and discharging from a shaft; second, there is more rapid despatch

and discharge and therefore a larger number of possible trips;

third, shaft-haulage is then independent of delays in arrival of

cars at stations, while tramming can be done at any time and

shaft-haulage can be concentrated into certain hours. Cages to

carry mine cars and handle the same load as a skip must either

be big enough to take two cars, which compels a much larger shaft

than is necessary with skips, or they must be double-decked, which

renders loading arrangements underground costly to install and

expensive to work. For all these reasons, cages can be justified only

on metal mines of such small tonnage that time is no consideration

and where the saving of men is not to be effected. In compartments

of the minimum size mentioned above (four to five feet either way)

a skip with a capacity of from two to five tons can be installed,

although from two to three tons is the present rule. Lighter loads

than this involve more trips, and thus less hourly capacity, and,

on the other hand, heavier loads require more costly engines. This

matter is further discussed under "Haulage Appliances."

We have therefore as the economic minimum a shaft of three compartments

(Fig. 9), each four to five feet square. When the maximum tonnage

is wanted from such a shaft at the least operating cost, it should

be equipped with loading bins and skips.

The output capacity of shafts of this size and equipment will depend

in a major degree upon the engine employed, and in a less degree

upon the hauling depth. The reason why depth is a subsidiary factor

is that the rapidity with which a load can be drawn is not wholly a

factor of depth. The time consumed in hoisting is partially expended

in loading, in acceleration and retardation of the engine, and in

discharge of the load. These factors are constant for any depth,

and extra distance is therefore accomplished at full speed of the

engine.

Vertical shafts will, other things being equal, have greater capacity

than inclines, as winding will be much faster and length of haul less

for same depth. Since engines have, however, a great tractive ability

on inclines, by an increase in the size of skip it is usually possible

partially to equalize matters. Therefore the size of inclines for

the same output need not differ materially from vertical shafts.

The maximum capacity of a shaft whose equipment is of the character

and size given above, will, as stated, decrease somewhat with extension

in depth of the haulage horizon. At 500 feet, such a shaft if vertical

could produce 70 to 80 tons per hour comfortably with an engine

whose winding speed was 700 feet per minute. As men and material

other than ore have to be handled in and out of the mine, and

shaft-sinking has to be attended to, the winding engine cannot

be employed all the time on ore. Twelve hours of actual daily

ore-winding are all that can be expected without auxiliary help.

This represents a capacity from such a depth of 800 to 1,000 tons

per day. A similar shaft, under ordinary working conditions, with

an engine speed of 2,000 feet per minute, should from, say, 3,000

feet have a capacity of about 400 to 600 tons daily.

It is desirable to inquire at what stages the size of shaft should

logically be enlarged in order to attain greater capacity. A

considerable measure of increase can be obtained by relieving the

main hoisting engine of all or part of its collateral duties. Where

the pumping machinery is not elaborate, it is often possible to

get a small single winding compartment into the gangway without

materially increasing the size of the shaft if the haulage compartments

be made somewhat narrower (Fig. 10). Such a compartment would be

operated by an auxiliary engine for sinking, handling tools and

material, and assisting in handling men. If this arrangement can

be effected, the productive time of the main engine can be expanded

to about twenty hours with an addition of about two-thirds to the

output.

Where the exigencies of pump and gangway require more than two

and one-half feet of shaft length, the next stage of expansion

becomes four full-sized compartments (Fig. 11). By thus enlarging the

auxiliary winding space, some assistance may be given to ore-haulage

in case of necessity. The mine whose output demands such haulage

provisions can usually stand another foot of width to the shaft,

so that the dimensions come to about 21 feet to 22 feet by 7 feet

to 8 feet outside the timbers. Such a shaft, with three- to four-ton

skips and an appropriate engine, will handle up to 250 tons per

hour from a depth of 1,000 feet.

The next logical step in advance is the shaft of five compartments

with four full-sized haulage ways (Fig. 13), each of greater size

than in the above instance. In this case, the auxiliary engine

becomes a balanced one, and can be employed part of the time upon

ore-haulage. Such a shaft will be about 26 feet to 28 feet long

by 8 feet wide outside the timbers, when provision is made for

one gangway. The capacity of such shafts can be up to 4,000 tons a

day, depending on the depth and engine. When very large quantities

of water are to be dealt with and rod-driven pumps to be used,

two pumping compartments are sometimes necessary, but other forms

of pumps do not require more than one compartment,--an additional

reason for their use.

For depths greater than 3,000 feet, other factors come into play.

Ventilation questions become of more import. The mechanical problems

on engines and ropes become involved, and their sum-effect is to

demand much increased size and a greater number of compartments.

The shafts at Johannesburg intended as outlets for workings 5,000

feet deep are as much as 46 feet by 9 feet outside timbers.

It is not purposed to go into details as to sinking methods or

timbering. While important matters, they would unduly prolong this

discussion. Besides, a multitude of treatises exist on these subjects

and cover all the minutiæ of such work.

SPEED OF SINKING.--Mines may be divided into two cases,--those

being developed only, and those being operated as well as developed.

In the former, the entrance into production is usually dependent

upon the speed at which the shaft is sunk. Until the mine is earning

profits, there is a loss of interest on the capital involved, which,

in ninety-nine instances out of a hundred, warrants any reasonable

extra expenditure to induce more rapid progress. In the case of

mines in operation, the volume of ore available to treatment or

valuation is generally dependent to a great degree upon the rapidity

of the extension of workings in depth. It will be demonstrated

later that, both from a financial and a technical standpoint, the

maximum development is the right one and that unremitting extension

in depth is not only justifiable but necessary.

Speed under special conditions or over short periods has a more

romantic than practical interest, outside of its value as a stimulant

to emulation. The thing that counts is the speed which can be maintained

over the year. Rapidity of sinking depends mainly on:--

_a_. Whether the shaft is or is not in use for operating the

mine.

_b_. The breaking character of the rock.

_c_. The amount of water.

The delays incident to general carrying of ore and men are such that

the use of the main haulage engine for shaft-sinking is practically

impossible, except on mines with small tonnage output. Even with a

separate winch or auxiliary winding-engine, delays are unavoidable

in a working shaft, especially as it usually has more water to contend

with than one not in use for operating the mine. The writer's own

impression is that an average of 40 feet per month is the maximum

possibility for year in and out sinking under such conditions. In

fact, few going mines manage more than 400 feet a year. In cases

of clean shaft-sinking, where every energy is bent to speed, 150

feet per month have been averaged for many months. Special cases

have occurred where as much as 213 feet have been achieved in a

single month. With ordinary conditions, 1,200 feet in a year is

very good work. Rock awkward to break, and water especially, lowers

the rate of progress very materially. Further reference to speed

will be found in the chapter on "Drilling Methods."

TUNNEL ENTRY.--The alternative of entry to a mine by tunnel is

usually not a question of topography altogether, but, like everything

else in mining science, has to be tempered to meet the capital

available and the expenditure warranted by the value showing.

In the initial prospecting of a mine, tunnels are occasionally

overdone by prospectors. Often more would be proved by a few inclines.

As the pioneer has to rely upon his right arm for hoisting and

drainage, the tunnel offers great temptations, even when it is

long and gains but little depth. At a more advanced stage of

development, the saving of capital outlay on hoisting and pumping

equipment, at a time when capital is costly to secure, is often

sufficient justification for a tunnel entry. But at the stage where

the future working of ore below a tunnel-level must be contemplated,

other factors enter. For ore below tunnel-level a shaft becomes

necessary, and in cases where a tunnel enters a few hundred feet

below the outcrop the shaft should very often extend to the surface,

because internal shafts, winding from tunnel-level, require large

excavations to make room for the transfer of ore and for winding

gear. The latter must be operated by transmitted power, either

that of steam, water, electricity, or air. Where power has to be

generated on the mine, the saving by the use of direct steam, generated

at the winding gear, is very considerable. Moreover, the cost of

haulage through a shaft for the extra distance from tunnel-level

to the surface is often less than the cost of transferring the

ore and removing it through the tunnel. The load once on the

winding-engine, the consumption of power is small for the extra

distance, and the saving of labor is of consequence. On the other

hand, where drainage problems arise, they usually outweigh all

other considerations, for whatever the horizon entered by tunnel,

the distance from that level to the surface means a saving of

water-pumpage against so much head. The accumulation of such constant

expense justifies a proportioned capital outlay. In other words,

the saving of this extra pumping will annually redeem the cost of

a certain amount of tunnel, even though it be used for drainage

only.

In order to emphasize the rapidity with which such a saving of

constant expense will justify capital outlay, one may tabulate the

result of calculations showing the length of tunnel warranted with

various hypothetical factors of quantity of water and height of lift

eliminated from pumping. In these computations, power is taken at

the low rate of $60 per horsepower-year, the cost of tunneling at

an average figure of $20 per foot, and the time on the basis of

a ten-year life for the mine.

Feet of Tunnel Paid for in 10 Years with Under-mentioned Conditions.

=============================================================

Feet of | 100,000 | 200,000 | 300,000 | 500,000 |1,000,000

Water Lift | Gallons | Gallons | Gallons | Gallons | Gallons

Avoided |per Diem |per Diem |per Diem |per Diem |per Diem

-----------|---------|---------|---------|---------|---------

100 | 600 | 1,200 | 1,800 | 3,000 | 6,000

200 | 1,200 | 2,400 | 3,600 | 6,000 | 12,000

300 | 1,800 | 3,600 | 5,400 | 9,000 | 18,000

500 | 3,000 | 6,000 | 9,000 | 15,000 | 30,000

1,000 | 6,000 | 12,000 | 18,000 | 30,000 | 60,000

=============================================================

The size of tunnels where ore-extraction is involved depends upon

the daily tonnage output required, and the length of haul. The

smallest size that can be economically driven and managed is about

6-1/2 feet by 6 feet inside the timbers. Such a tunnel, with single

track for a length of 1,000 feet, with one turn-out, permits handling

up to 500 tons a day with men and animals. If the distance be longer

or the tonnage greater, a double track is required, which necessitates

a tunnel at least 8 feet wide by 6-1/2 feet to 7 feet high, inside

the timbers.

There are tunnel projects of a much more impressive order than those

designed to operate upper levels of mines; that is, long crosscut

tunnels designed to drain and operate mines at very considerable

depths, such as the Sutro tunnel at Virginia City. The advantage

of these tunnels is very great, especially for drainage, and they

must be constructed of large size and equipped with appliances

for mechanical haulage.

CHAPTER IX.

Development of Mines (_Concluded_).

SUBSIDIARY DEVELOPMENT;--STATIONS; CROSSCUTS; LEVELS; INTERVAL

BETWEEN LEVELS; PROTECTION OF LEVELS; WINZES AND RISES. DEVELOPMENT

IN THE PROSPECTING STAGE; DRILLING.

SUBSIDIARY DEVELOPMENT.

Stations, crosscuts, levels, winzes, and rises follow after the

initial entry. They are all expensive, and the least number that

will answer is the main desideratum.

STATIONS.--As stations are the outlets of the levels to the shaft,

their size and construction is a factor of the volume and character

of the work at the levels which they are to serve. If no timber

is to be handled, and little ore, and this on cages, the stations

need be no larger than a good sized crosscut. Where timber is to

be let down, they must be ten to fifteen feet higher than the floor

of the crosscut. Where loading into skips is to be provided for,

bins must be cut underneath and sufficient room be provided to

shift the mine cars comfortably. Such bins are built of from 50 to

500 tons' capacity in order to contain some reserve for hoisting

purposes, and in many cases separate bins must be provided on opposite

sides of the shaft for ore and waste. It is a strong argument in

favor of skips, that with this means of haulage storage capacity

at the stations is possible, and the hoisting may then go on

independently of trucking and, as said before, there are no idle

men at the stations.

[Illustration: Fig. 15.--Cross-section of station arrangement for

skip-haulage in vertical shaft.]

[Illustration: Fig. 16.--Cross-section of station arrangement for

skip-haulage in vertical shaft.]

It is always desirable to concentrate the haulage to the least

number of levels, for many reasons. Among them is that, where haulage

is confined to few levels, storage-bins are not required at every

station. Figures 15, 16, 17, and 18 illustrate various arrangements

of loading bins.

CROSSCUTS.--Crosscuts are for two purposes, for roadway connection

of levels to the shaft or to other levels, and for prospecting

purposes. The number of crosscuts for roadways can sometimes be

decreased by making the connections with the shaft at every second

or even every third level, thus not only saving in the construction

cost of crosscuts and stations, but also in the expenses of scattered

tramming. The matter becomes especially worth considering where

the quantity of ore that can thus be accumulated warrants mule

or mechanical haulage. This subject will be referred to later on.

[Illustration: Fig. 17.--Arrangement of loading chutes in vertical

shaft.]

On the second purpose of crosscuts,--that of prospecting,--one

observation merits emphasis. This is, that the tendency of ore-fissures

to be formed in parallels warrants more systematic crosscutting

into the country rock than is done in many mines.

[Illustration: Fig. 18.--Cross-section of station arrangement for

skip-haulage in inclined shaft.]

LEVELS.

The word "level" is another example of miners' adaptations in

nomenclature. Its use in the sense of tunnels driven in the direction

of the strike of the deposit has better, but less used, synonyms in

the words "drifts" or "drives." The term "level" is used by miners

in two senses, in that it is sometimes applied to all openings on one

horizon, crosscuts included. Levels are for three purposes,--for a

stoping base; for prospecting the deposit; and for roadways. As a

prospecting and a stoping base it is desirable that the level should

be driven on the deposit; as a roadway, that it should constitute

the shortest distance between two points and be in the soundest

ground. On narrow, erratic deposits the levels usually must serve

all three purposes at once; but in wider and more regular deposits

levels are often driven separately for roadways from the level

which forms the stoping base and prospecting datum.

There was a time when mines were worked by driving the level on ore

and enlarging it top and bottom as far as the ground would stand,

then driving the next level 15 to 20 feet below, and repeating the

operation. This interval gradually expanded, but for some reason

100 feet was for years assumed to be the proper distance between

levels. Scattered over every mining camp on earth are thousands

of mines opened on this empirical figure, without consideration

of the reasons for it or for any other distance.

The governing factors in determining the vertical interval between

levels are the following:--

_a_. The regularity of the deposit.

_b_. The effect of the method of excavation of winzes and rises.

_c_. The dip and the method of stoping.

REGULARITY OF THE DEPOSIT.--From a prospecting point of view the

more levels the better, and the interval therefore must be determined

somewhat by the character of the deposit. In erratic deposits there

is less risk of missing ore with frequent levels, but it does not

follow that every level need be a through roadway to the shaft or

even a stoping base. In such deposits, intermediate levels for

prospecting alone are better than complete levels, each a roadway.

Nor is it essential, even where frequent levels are required for

a stoping base, that each should be a main haulage outlet to the

shaft. In some mines every third level is used as a main roadway,

the ore being poured from the intermediate ones down to the haulage

line. Thus tramming and shaft work, as stated before, can be

concentrated.

EFFECT OF METHOD OF EXCAVATING WINZES AND RISES.--With hand drilling

and hoisting, winzes beyond a limited depth become very costly to

pull spoil out of, and rises too high become difficult to ventilate,

so that there is in such cases a limit to the interval desirable

between levels, but these difficulties largely disappear where

air-winches and air-drills are used.

THE DIP AND METHOD OF STOPING.--The method of stoping is largely

dependent upon the dip, and indirectly thus affects level intervals.

In dips under that at which material will "flow" in the stopes--about

45° to 50°--the interval is greatly dependent on the method of

stope-transport. Where ore is to be shoveled from stopes to the

roadway, the levels must be comparatively close together. Where

deposits are very flat, under 20°, and walls fairly sound, it is

often possible to use a sort of long wall system of stoping and to

lay tracks in the stopes with self-acting inclines to the levels.

In such instances, the interval can be expanded to 250 or even 400

feet. In dips between 20° and 45°, tracks are not often possible,

and either shoveling or "bumping troughs"[*] are the only help

to transport. With shoveling, intervals of 100 feet[**] are most

common, and with troughs the distance can be expanded up to 150

or 175 feet.

[Footnote *: Page 136.]

[Footnote **: Intervals given are measured on the dip.]

In dips of over 40° to 50°, depending on the smoothness of the foot

wall, the distance can again be increased, as stope-transport is

greatly simplified, since the stope materials fall out by gravity.

In timbered stopes, in dips over about 45°, intervals of 150 to

200 feet are possible. In filled stopes intervals of over 150 feet

present difficulties in the maintenance of ore-passes, for the wear

and tear of longer use often breaks the timbers. In shrinkage-stopes,

where no passes are to be maintained and few winzes put through, the

interval is sometimes raised to 250 feet. The subject is further

discussed under "Stoping."

Another factor bearing on level intervals is the needed insurance

of sufficient points of stoping attack to keep up a certain output.

This must particularly influence the manager whose mine has but

little ore in reserve.

[Illustration: Fig. 19.]

PROTECTION OF LEVELS.--Until recent years, timbering and occasional

walling was the only method for the support of the roof, and for

forming a platform for a stoping base. Where the rock requires no

support sublevels can be used as a stoping base, and timbering

for such purpose avoided altogether (Figs. 38, 39, 42). In such

cases the main roadway can then be driven on straight lines, either

in the walls or in the ore, and used entirely for haulage. The

subheading for a stoping base is driven far enough above or below

the roadway (depending on whether overhand or underhand stoping

is to be used) to leave a supporting pillar which is penetrated

by short passes for ore. In overhand stopes, the ore is broken

directly on the floor of an upper sublevel; and in underhand stopes,

broken directly from the bottom of the sublevel. The method entails

leaving a pillar of ore which can be recovered only with difficulty

in mines where stope-support is necessary. The question of its

adoption is then largely one of the comparative cost of timbering,

the extra cost of the sublevel, and the net value of the ore left.

In bad swelling veins, or badly crushing walls, where constant

repair to timbers would be necessary, the use of a sublevel is a

most useful alternative. It is especially useful with stopes to

be left open or worked by shrinkage-stoping methods.

If the haulage level, however, is to be the stoping base, some

protection to the roadway must be provided. There are three systems

in use,--by wood stulls or sets (Figs. 19, 30, 43), by dry-walling

with timber caps (Fig. 35), and in some localities by steel sets.

Stulls are put up in various ways, and, as their use entails the

least difficulty in taking the ore out from beneath the level,

they are much favored, but are applicable only in comparatively

narrow deposits.

WINZES AND RISES.

These two kinds of openings for connecting two horizons in a mine

differ only in their manner of construction. A winze is sunk underhand,

while a rise is put up overhand. When the connection between levels

is completed, a miner standing at the bottom usually refers to

the opening as a rise, and when he goes to the top he calls it

a winze. This confusion in terms makes it advisable to refer to

all such completed openings as winzes, regardless of how they are

constructed.

In actual work, even disregarding water, it costs on the average

about 30% less to raise than to sink such openings, for obviously

the spoil runs out or is assisted by gravity in one case, and in

the other has to be shoveled and hauled up. Moreover, it is easier

to follow the ore in a rise than in a winze. It usually happens,

however, that in order to gain time both things are done, and for

prospecting purposes sinking is necessary.

The number of winzes required depends upon the method of stoping

adopted, and is mentioned under "Stoping." After stoping, the number

necessary to be maintained open depends upon the necessities of

ventilation, of escape, and of passageways for material to be used

below. Where stopes are to be filled with waste, more winzes must

be kept open than when other methods are used, and these winzes

must be in sufficient alignment to permit the continuous flow of

material down past the various levels. In order that the winzes

should deliver timber and filling to the most advantageous points,

they should, in dipping ore-bodies, be as far as possible on the

hanging wall side.

DEVELOPMENT IN THE EARLY PROSPECTING STAGE.

The prime objects in the prospecting stage are to expose the ore

and to learn regarding the ore-bodies something of their size, their

value, metallurgical character, location, dip, strike, etc.,--so much

at least as may be necessary to determine the works most suitable

for their extraction or values warranting purchase. In outcrop mines

there is one rule, and that is "follow the ore." Small temporary

inclines following the deposit, even though they are eventually

useless; are nine times out of ten justified.

In prospecting deep-level projects, it is usually necessary to

layout work which can be subsequently used in operating the mine,

because the depth involves works of such considerable scale, even

for prospecting, that the initial outlay does not warrant any

anticipation of revision. Such works have to be located and designed

after a study of the general geology as disclosed in adjoining mines.

Practically the only method of supplementing such information is

by the use of churn- and diamond-drills.

DRILLING.--Churn-drills are applicable only to comparatively shallow

deposits of large volume. They have an advantage over the diamond

drill in exposing a larger section and in their application to

loose material; but inability to determine the exact horizon of

the spoil does not lend them to narrow deposits, and in any event

results are likely to be misleading from the finely ground state of

the spoil. They are, however, of very great value for preliminary

prospecting to shallow horizons.

Two facts in diamond-drilling have to be borne in mind: the indication

of values is liable to be misleading, and the deflection of the drill

is likely to carry it far away from its anticipated destination.

A diamond-drill secures a small section which is sufficiently large

to reveal the geology, but the values disclosed in metal mines must

be accepted with reservations. The core amounts to but a little

sample out of possibly large amounts of ore, which is always of

variable character, and the core is most unlikely to represent

the average of the deposit. Two diamond-drill holes on the Oroya

Brownhill mine both passed through the ore-body. One apparently

disclosed unpayable values, the other seemingly showed ore forty

feet in width assaying $80 per ton. Neither was right. On the other

hand, the predetermination of the location of the ore-body justified

expenditure. A recent experiment at Johannesburg of placing a copper

wedge in the hole at a point above the ore-body and deflecting

the drill on reintroducing it, was successful in giving a second

section of the ore at small expense.

The deflection of diamond-drill holes from the starting angle is

almost universal. It often amounts to a considerable wandering

from the intended course. The amount of such deflection varies

with no seeming rule, but it is probable that it is especially

affected by the angle at which stratification or lamination planes

are inclined to the direction of the hole. A hole has been known

to wander in a depth of 1,500 feet more than 500 feet from the

point intended. Various instruments have been devised for surveying

deep holes, and they should be brought into use before works are

laid out on the basis of diamond-drill results, although none of

the inventions are entirely satisfactory.

CHAPTER X.

Stoping.

METHODS OF ORE-BREAKING; UNDERHAND STOPES; OVERHAND STOPES; COMBINED

STOPE. VALUING ORE IN COURSE OF BREAKING.

There is a great deal of confusion in the application of the word

"stoping." It is used not only specifically to mean the actual

ore-breaking, but also in a general sense to indicate all the operations

of ore-breaking, support of excavations, and transportation between

levels. It is used further as a noun to designate the hole left

when the ore is taken out. Worse still, it is impossible to adhere

to miners' terms without employing it in every sense, trusting

to luck and the context to make the meaning clear.

The conditions which govern the method of stoping are in the main:--

_a_. The dip.

_b_. The width of the deposit.

_c_. The character of the walls.

_d_. The cost of materials.

_e_. The character of the ore.

Every mine, and sometimes every stope in a mine, is a problem special

to itself. Any general consideration must therefore be simply an

inquiry into the broad principles which govern the adaptability of

special methods. A logical arrangement of discussion is difficult,

if not wholly impossible, because the factors are partially

interdependent and of varying importance.

For discussion the subject may be divided into:

1. Methods of ore-breaking.

2. Methods of supporting excavation.

3. Methods of transport in stopes.

METHODS OF ORE-BREAKING.

The manner of actual ore-breaking is to drill and blast off slices

from the block of ground under attack. As rock obviously breaks

easiest when two sides are free, that is, when corners can be broken

off, the detail of management for blasts is therefore to set the holes

so as to preserve a corner for the next cut; and as a consequence

the face of the stope shapes into a series of benches (Fig.

22),--inverted benches in the case of overhand stopes (Figs. 20,

21). The size of these benches will in a large measure depend on

the depth of the holes. In wide stopes with machine-drills they

vary from 7 to 10 feet; in narrow stopes with hand-holes, from

two to three feet.

[Illustration: Fig. 20.]

The position of the men in relation to the working face gives rise

to the usual primary classification of the methods of stoping.

They are:--

1. Underhand stopes,

2. Overhand stopes,

3. Combined stopes.

These terms originated from the direction of the drill-holes, but

this is no longer a logical basis of distinction, for underhand

holes in overhand stopes,--as in rill-stoping,--are used entirely

in some mines (Fig. 21).

[Illustration: Fig. 21.]

UNDERHAND STOPES.--Underhand stopes are those in which the ore

is broken downward from the levels. Inasmuch as this method has

the advantage of allowing the miner to strike his blows downward

and to stand upon the ore when at work, it was almost universal

before the invention of powder; and was applied more generally

before the invention of machine-drills than since. It is never

rightly introduced unless the stope is worked back from winzes

through which the ore broken can be let down to the level below,

as shown in Figures 22 and 23.

[Illustration: Fig. 22.]

This system can be advantageously applied only in the rare cases

in which the walls require little or no support, and where very

little or no waste requiring separation is broken with the ore

in the stopes. To support the walls in bad ground in underhand

stopes would be far more costly than with overhand stopes, for

square-set timbering would be most difficult to introduce, and

to support the walls with waste and stulls would be even more

troublesome. Any waste broken must needs be thrown up to the level

above or be stored upon specially built stages--again a costly

proceeding.

A further drawback lies in the fact that the broken ore follows

down the face of the stope, and must be shoveled off each bench.

It thus all arrives at a single point,--the winze,--and must be

drawn from a single ore-pass into the level. This usually results

not only in more shoveling but in a congestion at the passes not

present in overhand stoping, for with that method several chutes

are available for discharging ore into the levels. Where the walls

require no support and no selection is desired in the stopes, the

advantage of the men standing on the solid ore to work, and of

having all down holes and therefore drilled wet, gives this method

a distinct place. In using this system, in order to protect the

men, a pillar is often left under the level by driving a sublevel,

the pillar being easily recoverable later. The method of sublevels

is of advantage largely in avoiding the timbering of levels.

[Illustration: Fig. 23.--Longitudinal section of an underhand stope.]

OVERHAND STOPES.--By far the greatest bulk of ore is broken overhand,

that is broken upward from one level to the next above. There are

two general forms which such stopes are given,--"horizontal" and

"rill."

[Illustration: Fig. 24.--Horizontal-cut overhand stope--longitudinal

section.]

The horizontal "flat-back" or "long-wall" stope, as it is variously

called, shown in Figure 24, is operated by breaking the ore in slices

parallel with the levels. In rill-stoping the ore is cut back from

the winzes in such a way that a pyramid-shaped room is created,

with its apex in the winze and its base at the level (Figs. 25 and

26). Horizontal or flat-backed stopes can be applied to almost any

dip, while "rill-stoping" finds its most advantageous application

where the dip is such that the ore will "run," or where it can be

made to "run" with a little help. The particular application of

the two systems is dependent not only on the dip but on the method

of supporting the excavation and the ore. With rill-stoping, it is

possible to cut the breaking benches back horizontally from the

winzes (Fig. 25), or to stagger the cuts in such a manner as to

take the slices in a descending angle (Figs. 21 and 26).

[Illustration: Fig. 25.--Rill-cut overhand stope--longitudinal section.]

In the "rill" method of incline cuts, all the drill-holes are "down"

holes (Fig. 21), and can be drilled wet, while in horizontal cuts

or flat-backed stopes, at least part of the holes must be "uppers"

(Fig. 20). Aside from the easier and cheaper drilling and setting

up of machines with this kind of "cut," there is no drill dust,--a

great desideratum in these days of miners' phthisis. A further

advantage in the "rill" cut arises in cases where horizontal jointing

planes run through the ore of a sort from which unduly large masses

break away in "flat-back" stopes. By the descending cut of the

"rill" method these calamities can be in a measure avoided. In

cases of dips over 40º the greatest advantage in "rill" stoping

arises from the possibility of pouring filling or timber into the

stope from above with less handling, because the ore and material

will run down the sides of the pyramid (Figs. 32 and 34). Thus

not only is there less shoveling required, but fewer ore-passes

and a less number of preliminary winzes are necessary, and a wider

level interval is possible. This matter will be gone into more

fully later.

[Illustration: Fig. 26.--Rill-cut overhand stope-longitudinal section.]

COMBINED STOPES.--A combined stope is made by the coincident working

of the underhand and "rill" method (Fig. 27). This order of stope

has the same limitations in general as the underhand kind. For

flat veins with strong walls, it has a great superiority in that

the stope is carried back more or less parallel with the winzes,

and thus broken ore after blasting lies in a line on the gradient

of the stope. It is, therefore, conveniently placed for mechanical

stope haulage. A further advantage is gained in that winzes may

be placed long distances apart, and that men are not required,

either when at work or passing to and from it, to be ever far from

the face, and they are thus in the safest ground, so that timber

and filling protection which may be otherwise necessary is not

required. This method is largely used in South Africa.

[Illustration: Fig. 27.--Longitudinal section of a combined stope.]

MINIMUM WIDTH OF STOPES.--The minimum stoping width which can be

consistently broken with hand-holes is about 30 inches, and this

only where there is considerable dip to the ore. This space is

so narrow that it is of doubtful advantage in any case, and 40

inches is more common in narrow mines, especially where worked

with white men. Where machine-drills are used about 4 feet is the

minimum width feasible.

RESUING.--In very narrow veins where a certain amount of wall-rock

must be broken to give working space, it pays under some circumstances

to advance the stope into the wall-rock ahead of the ore, thus

stripping the ore and enabling it to be broken separately. This

permits of cleaner selection of the ore; but it is a problem to

be worked out in each case, as to whether rough sorting of some

waste in the stopes, or further sorting at surface with inevitable

treatment of some waste rock, is more economical than separate

stoping cuts and inevitably wider stopes.

VALUING ORE IN COURSE OF BREAKING.--There are many ores whose payability

can be determined by inspection, but there are many of which it cannot.

Continuous assaying is in the latter cases absolutely necessary

to avoid the treatment of valueless material. In such instances,

sampling after each stoping-cut is essential, the unprofitable ore

being broken down and used as waste. Where values fade into the

walls, as in impregnation deposits, the width of stopes depends

upon the limit of payability. In these cases, drill-holes are put

into the walls and the drillings assayed. If the ore is found

profitable, the holes are blasted out. The gauge of what is profitable

in such situations is not dependent simply upon the average total

working costs of the mine, for ore in that position can be said to

cost nothing for development work and administration; moreover,

it is usually more cheaply broken than the average breaking cost,

men and machines being already on the spot.

CHAPTER XI.

Methods of Supporting Excavation.

TIMBERING; FILLING WITH WASTE; FILLING WITH BROKEN ORE; PILLARS

OF ORE; ARTIFICIAL PILLARS; CAVING SYSTEM.

Most stopes require support to be given to the walls and often to

the ore itself. Where they do require support there are five principal

methods of accomplishing it. The application of any particular method

depends upon the dip, width of ore-body, character of the ore and

walls, and cost of materials. The various systems are by:--

1. Timbering.

2. Filling with waste.

3. Filling with broken ore subsequently withdrawn.

4. Pillars of ore.

5. Artificial pillars built of timbers and waste.

6. Caving.

TIMBERING.--At one time timbering was the almost universal means of

support in such excavations, but gradually various methods for the

economical application of waste and ore itself have come forward,

until timbering is fast becoming a secondary device. Aside from

economy in working without it, the dangers of creeps, or crushing,

and of fires are sufficient incentives to do away with wood as

far as possible.

There are three principal systems of timber support to excavations,--by

stulls, square-sets, and cribs.

Stulls are serviceable only where the deposit is so narrow that

the opening can be bridged by single timbers between wall and wall

(Figs. 28 and 43). This system can be applied to any dip and is most

useful in narrow deposits where the walls are not too heavy. Stulls

in inclined deposits are usually set at a slightly higher angle than

that perpendicular to the walls, in order that the vertical pressure

of the hanging wall will serve to tighten them in position. The

"stull" system can, in inclined deposits, be further strengthened by

building waste pillars against them, in which case the arrangement

merges into the system of artificial pillars.

[Illustration: Fig. 28.--Longitudinal section of stull-supported

stope.]

[Illustration: Fig. 29.--Longitudinal section showing square-set

timbering.]

[Illustration: Fig. 30.--Square-set timbering on inclined ore-body.

Showing ultimate strain on timbers.]

Square-sets (Figs. 29 and 30), that is, trusses built in the opening

as the ore is removed, are applicable to almost any dip or width

of ore, but generally are applied only in deposits too wide, or to

rock too heavy, for stulls. Such trusses are usually constructed on

vertical and horizontal lines, and while during actual ore-breaking

the strains are partially vertical, ultimately, however, when the

weight of the walls begins to be felt, these strains, except in

vertical deposits, come at an angle to lines of strength in the

trusses, and therefore timber constructions of this type present

little ultimate resistance (Fig. 30). Square-set timbers are sometimes

set to present the maximum resistance to the direction of strain,

but the difficulties of placing them in position and variations in

the direction of strain on various parts of the stope do not often

commend the method. As a general rule square-sets on horizontal

lines answer well enough for the period of actual ore-breaking. The

crushing or creeps is usually some time later; and if the crushing

may damage the whole mine, their use is fraught with danger.

Reënforcement by building in waste is often resorted to. When done

fully, it is difficult to see the utility of the enclosed timber,

for entire waste-filling would in most cases be cheaper and equally

efficient.

[Illustration: Fig. 31.--"Cribs."]

There is always, with wood constructions, as said before, the very

pertinent danger of subsequent crushing and of subsidence in after

years, and the great risk of fires. Both these disasters have cost

Comstock and Broken Hill mines, directly or indirectly, millions of

dollars, and the outlay on timber and repairs one way or another

would have paid for the filling system ten times over. There are

cases where, by virtue of the cheapness of timber, "square-setting"

is the most economical method. Again, there are instances where the

ore lies in such a manner--particularly in limestone replacements--as

to preclude other means of support. These cases are being yearly

more and more evaded by the ingenuity of engineers in charge. The

author believes it soon will be recognized that the situation is

rare indeed where complete square-setting is necessarily without an

economical alternative. An objection is sometimes raised to filling

in favor of timber, in that if it become desirable to restope the

walls for low-grade ore left behind, such stopes could only be

entered by drawing the filling, with consequent danger of total

collapse. Such a contingency can be provided for in large ore-bodies

by installing an outer shell of sets of timber around the periphery

of the stope and filling the inside with waste. If the crushing

possibilities are too great for this method then, the subsequent

recovery of ore is hopeless in any event. In narrow ore-bodies

with crushing walls recovery of ore once left behind is not often

possible.

The third sort of timber constructions are cribs, a "log-house" sort

of structure usually filled with waste, and more fully discussed

under artificial pillars (Fig. 31). The further comparative merits

of timbering with other methods will be analyzed as the different

systems are described.

FILLING WITH WASTE.--The system of filling stope-excavations completely

with waste in alternating progress with ore-breaking is of wide

and increasingly general application (Figs. 32, 33, 34, 35).

Although a certain amount of waste is ordinarily available in the

stopes themselves, or from development work in the mine, such a

supply must usually be supplemented from other directions. Treatment

residues afford the easiest and cheapest handled material. Quarried

rock ranks next, and in default of any other easy supply, materials

from crosscuts driven into the stope-walls are sometimes resorted

to.

In working the system to the best advantage, the winzes through

the block of ore under attack are kept in alignment with similar

openings above, in order that filling may be poured through the

mine from the surface or any intermediate point. Winzes to be used

for filling should be put on the hanging-wall side of the area to

be filled, for the filling poured down will then reach the foot-wall

side of the stopes with a minimum of handling. In some instances,

one special winze is arranged for passing all filling from the

surface to a level above the principal stoping operations; and

it is then distributed along the levels into the winzes, and thus

to the operating stopes, by belt-conveyors.

[Illustration: Fig. 32.--Longitudinal section. Rill stope filled

with waste.]

[Illustration: Fig. 33.--Longitudinal section. Horizontal stope

filled with waste.]

[Illustration: Fig. 34.--Longitudinal section. Waste-filled stope

with dry-walling of levels and passes.]

In this system of stope support the ore is broken at intervals

alternating with filling. If there is danger of much loss from

mixing broken ore and filling, "sollars" of boards or poles are

laid on the waste. If the ore is very rich, old canvas or cowhides

are sometimes put under the boards. Before the filling interval,

the ore passes are built close to the face above previous filling

and their tops covered temporarily to prevent their being filled

with running waste. If the walls are bad, the filling is kept close

to the face. If the unbroken ore requires support, short stulls

set on the waste (as in Fig. 39) are usually sufficient until the

next cut is taken off, when the timber can be recovered. If stulls

are insufficient, cribs or bulkheads (Fig. 31) are also used and

often buried in the filling.

[Illustration: Fig. 35.--Cross-section of Fig. 34 on line _A-B_.]

Both flat-backed and rill-stope methods of breaking are employed in

conjunction with filled stopes. The advantages of the rill-stopes

are so patent as to make it difficult to understand why they are

not universally adopted when the dip permits their use at all. In

rill-stopes (Figs. 32 and 34) the waste flows to its destination

with a minimum of handling. Winzes and ore-passes are not required

with the same frequency as in horizontal breaking, and the broken

ore always lies on the slope towards the passes and is therefore

also easier to shovel. In flat-backed stopes (Fig. 33) winzes must

be put in every 50 feet or so, while in rill-stopes they can be

double this distance apart. The system is applicable by modification

to almost any width of ore. It finds its most economical field

where the dip of the stope floor is over 45°, when waste and ore,

with the help of the "rill," will flow to their destination. For

dips from under about 45° to about 30° or 35°, where the waste

and ore will not "flow" easily, shoveling can be helped by the

use of the "rill" system and often evaded altogether, if flow be

assisted by a sheet-iron trough described in the discussion of

stope transport. Further saving in shoveling can be gained in this

method, by giving a steeper pitch to the filling winzes and to the

ore-passes, by starting them from crosscuts in the wall, and by

carrying them at greater angles than the pitch of the ore (Fig.

36). These artifices combined have worked out most economically

on several mines within the writer's experience, with the dip as

flat as 30°. For very flat dips, where filling is to be employed,

rill-stoping has no advantage over flat-backed cuts, and in such

cases it is often advisable to assist stope transport by temporary

tracks and cars which obviously could not be worked on the tortuous

contour of a rill-stope, so that for dips under 30° advantage lies

with "flat-backed" ore-breaking.

[Illustration: Fig. 36.--Cross-section showing method of steepening

winzes and ore passes.]

On very wide ore-bodies where the support of the standing ore itself

becomes a great problem, the filling system can be applied by combining

it with square-setting. In this case the stopes are carried in

panels laid out transversally to the strike as wide as the standing

strength of the ore permits. On both sides of each panel a fence

of lagged square-sets is carried up and the area between is filled

with waste. The panels are stoped out alternately. The application

of this method at Broken Hill will be described later. (See pages

120 and Figs. 41 and 42.) The same type of wide ore-body can be

managed also on the filling system by the use of frequent "bulkheads"

to support the ore (Fig. 31).

Compared with timbering methods, filling has the great advantage

of more effective support to the mine, less danger of creeps, and

absolute freedom from the peril of fire. The relative expense of

the two systems is determined by the cost of materials and labor.

Two extreme cases illustrate the result of these economic factors

with sufficient clearness. It is stated that the cost of timbering

stopes on the Le Roi Mine by square-sets is about 21 cents per

ton of ore excavated. In the Ivanhoe mine of West Australia the

cost of filling stopes with tailings is about 22 cents per ton

of ore excavated. At the former mine the average cost of timber

is under $10 per M board-measure, while at the latter its price

would be $50 per M board-measure; although labor is about of the

same efficiency and wage, the cost in the Ivanhoe by square-setting

would be about 65 cents per ton of ore broken. In the Le Roi, on the

other hand, no residues are available for filling. To quarry rock

or drive crosscuts into the walls might make this system cost 65

cents per ton of ore broken if applied to that mine. The comparative

value of the filling method with other systems will be discussed

later.

FILLING WITH BROKEN ORE SUBSEQUENTLY WITHDRAWN.--This order of support

is called by various names, the favorite being "shrinkage-stoping."

The method is to break the ore on to the roof of the level, and by

thus filling the stope with broken ore, provide temporary support

to the walls and furnish standing floor upon which to work in making

the next cut (Figs. 37, 38, and 39.) As broken material occupies 30

to 40% more space than rock _in situ_, in order to provide working

space at the face, the broken ore must be drawn from along the level

after each cut. When the area attacked is completely broken through

from level to level, the stope will be full of loose broken ore,

which is then entirely drawn off.

A block to be attacked by this method requires preliminary winzes

only at the extremities of the stope,--for entry and for ventilation.

Where it is desired to maintain the winzes after stoping, they

must either be strongly timbered and lagged on the stope side,

be driven in the walls, or be protected by a pillar of ore (Fig.

37). The settling ore and the crushing after the stope is empty

make it difficult to maintain timbered winzes.

[Illustration: Fig. 37.--Longitudinal section of stope filled with

broken ore.]

Where it can be done without danger to the mine, the empty stopes

are allowed to cave. If such crushing would be dangerous, either

the walls must be held up by pillars of unbroken ore, as in the

Alaska Treadwell, where large "rib" pillars are left, or the open

spaces must be filled with waste. Filling the empty stope is usually

done by opening frequent passes along the base of the filled stope

above, and allowing the material of the upper stope to flood the

lower one. This program continued upwards through the mine allows

the whole filling of the mine to descend gradually and thus requires

replenishment only into the top. The old stopes in the less critical

and usually exhausted territory nearer the surface are sometimes

left without replenishing their filling.

The weight of broken ore standing at such a high angle as to settle

rapidly is very considerable upon the level; moreover, at the moment

when the stope is entirely drawn off, the pressure of the walls

as well is likely to be very great. The roadways in this system

therefore require more than usual protection. Three methods are

used: (_a_) timbering; (_b_) driving a sublevel in the ore above

the main roadway as a stoping-base, thus leaving a pillar of ore

over the roadway (Fig. 39); (_c_) by dry-walling the levels, as in

the Baltic mine, Michigan (Figs. 34 and 35). By the use of sublevels

the main roadways are sometimes driven in the walls (Fig. 38) and in

many cases all timbering is saved. To recover pillars left below

sublevels is a rather difficult task, especially if the old stope

above is caved or filled. The use of pillars in substitution for

timber, if the pillars are to be lost, is simply a matter of economics

as to whether the lost ore would repay the cost of other devices.

[Illustration: Fig. 38.--Cross-section of "shrinkage" stope.]

Frequent ore-chutes through the level timbers, or from the sublevels,

are necessary to prevent lodgment of broken ore between such passes,

because it is usually too dangerous for men to enter the emptying

stope to shovel out the lodged remnants. Where the ore-body is

wide, and in order that there may be no lodgment of ore, the timbers

over the level are set so as to form a trough along the level;

or where pillars are left, they are made "A"-shaped between the

chutes, as indicated in Figure 37.

[Illustration: Fig. 39.--Cross-section of "shrinkage" stope.]

The method of breaking the ore in conjunction with this means of

support in comparatively narrow deposits can be on the rill, in order

to have the advantage of down holes. Usually, however, flat-back

or horizontal cuts are desirable, as in such an arrangement it

is less troublesome to regulate the drawing of the ore so as to

provide proper head room. Where stopes are wide, ore is sometimes

cut arch-shaped from wall to wall to assure its standing. Where

this method of support is not of avail, short, sharply tapering

stulls are put in from the broken ore to the face (Fig. 39). When

the cut above these stulls is taken out, they are pulled up and

are used again.

This method of stoping is only applicable when:--

1. The deposit dips over 60°, and thus broken material will freely

settle downward to be drawn off from the bottom.

2. The ore is consistently payable in character. No selection can be

done in breaking, as all material broken must be drawn off together.

3. The hanging wall is strong, and will not crush or spall off waste

into the ore.

4. The ore-body is regular in size, else loose ore will lodge on

the foot wall. Stopes opened in this manner when partially empty

are too dangerous for men to enter for shoveling out remnants.

The advantages of this system over others, where it is applicable,

are:--

(_a_) A greater distance between levels can be operated and few

winzes and rises are necessary, thus a great saving of development

work can be effected. A stope 800 to 1000 feet long can be operated

with a winze at either end and with levels 200 or 220 feet apart.

(_b_) There is no shoveling in the stopes at all.

(_c_) No timber is required. As compared with timbering by stulling,

it will apply to stopes too wide and walls too heavy for this method.

Moreover, little staging is required for working the face, since

ore can be drawn from below in such a manner as to allow just the

right head room.

(_d_) Compared to the system of filling with waste, coincidentally

with breaking (second method), it saves altogether in some cases

the cost of filling. In any event, it saves the cost of ore-passes,

of shoveling into them, and of the detailed distribution of the

filling.

Compared with other methods, the system has the following disadvantages,

that:

_A_. The ore requires to be broken in the stopes to a degree of

fineness which will prevent blocking of the chutes at the level.

When pieces too large reach the chutes, nothing will open them but

blasting,--to the damage of timbers and chutes. Some large rocks

are always liable to be buried in the course of ore-breaking.

_B_. Practically no such perfection of walls exists, but some spalling

of waste into the ore will take place. A crushing of the walls

would soon mean the loss of large amounts of ore.

_C_. There is no possibility of regulating the mixture of grade

of ore by varying the working points. It is months after the ore

is broken before it can reach the levels.

_D_. The breaking of 60% more ore than immediate treatment demands

results in the investment of a considerable sum of money. An equilibrium

is ultimately established in a mine worked on this system when a

certain number of stopes full of completely broken ore are available

for entire withdrawal, and there is no further accumulation. But,

in any event, a considerable amount of broken ore must be held in

reserve. In one mine worked on this plan, with which the writer

has had experience, the annual production is about 250,000 tons

and the broken ore represents an investment which, at 5%, means

an annual loss of interest amounting to 7 cents per ton of ore

treated.

_E_. A mine once started on the system is most difficult to alter,

owing to the lack of frequent winzes or passes. Especially is this

so if the only alternative is filling, for an alteration to the

system of filling coincident with breaking finds the mine short

of filling winzes. As the conditions of walls and ore often alter

with depth, change of system may be necessary and the situation

may become very embarrassing.

_F_. The restoping of the walls for lower-grade ore at a later

period is impossible, for the walls of the stope will be crushed,

or, if filled with waste, will usually crush when it is drawn off

to send to a lower stope.

The system has much to recommend it where conditions are favorable.

Like all other alternative methods of mining, it requires the most

careful study in the light of the special conditions involved. In many

mines it can be used for some stopes where not adaptable generally.

It often solves the problem of blind ore-bodies, for they can by

this means be frequently worked with an opening underneath only.

Thus the cost of driving a roadway overhead is avoided, which would

be required if timber or coincident filling were the alternatives.

In such cases ventilation can be managed without an opening above,

by so directing the current of air that it will rise through a

winze from the level below, flow along the stope and into the level

again at the further end of the stope through another winze.

[Illustration: Fig. 40.--Longitudinal section. Ore-pillar support

in narrow stopes.]

SUPPORT BY PILLARS OF ORE.--As a method of mining metals of the

sort under discussion, the use of ore-pillars except in conjunction

with some other means of support has no general application. To

use them without assistance implies walls sufficiently strong to

hold between pillars; to leave them permanently anywhere implies

that the ore abandoned would not repay the labor and the material

of a substitute. There are cases of large, very low-grade mines

where to abandon one-half the ore as pillars is more profitable

than total extraction, but the margin of payability in such ore must

be very, very narrow. Unpayable spots are always left as pillars,

for obvious reasons. Permanent ore-pillars as an adjunct to other

methods of support are in use. Such are the rib-pillars in the

Alaska Treadwell, the form of which is indicated by the upward

extension of the pillars adjacent to the winzes, shown in Figure

37. Always a careful balance must be cast as to the value of the ore

left, and as to the cost of a substitute, because every ore-pillar

can be removed at some outlay. Temporary pillars are not unusual,

particularly to protect roadways and shafts. They are, when left

for these purposes, removed ultimately, usually by beginning at

the farther end and working back to the final exit.

[Illustration: Fig. 41.--Horizontal plan at levels of Broken Hill.

Method of alternate stopes and ore-pillars.]

[Illustration: Fig. 42.--Longitudinal section of Figure 41.]

A form of temporary ore-pillars in very wide deposits is made use

of in conjunction with both filling and timbering (Figs. 37, 39,

40). In the use of temporary pillars for ore-bodies 100 to 250

feet wide at Broken Hill, stopes are carried up at right angles

to the strike, each fifty feet wide and clear across the ore-body

(Figs. 41 and 42). A solid pillar of the same width is left in the

first instance between adjacent stopes, and the initial series of

stopes are walled with one square-set on the sides as the stope is

broken upward. The room between these two lines of sets is filled

with waste alternating with ore-breaking in the usual filling method.

When the ore from the first group of alternate stopes (_ABC_, Fig.

42) is completely removed, the pillars are stoped out and replaced

with waste. The square-sets of the first set of stopes thus become

the boundaries of the second set. Entry and ventilation are obtained

through these lines of square-sets, and the ore is passed out of

the stopes through them.

[Illustration: Fig. 43.--Cross-section of stull support with waste

reënforcement.]

ARTIFICIAL PILLARS.--This system also implies a roof so strong

as not to demand continuous support. Artificial pillars are built

in many different ways. The method most current in fairly narrow

deposits is to reënforce stulls by packing waste above them (Figs.

43 and 44). Not only is it thus possible to economize in stulls by

using the waste which accumulates underground, but the principle

applies also to cases where the stulls alone are not sufficient

support, and yet where complete filling or square-setting is

unnecessary. When the conditions are propitious for this method, it

has the comparative advantage over timber systems of saving timber,

and over filling systems of saving imported filling. Moreover,

these constructions being pillar-shaped (Fig. 44), the intervals

between them provide outlets for broken ore, and specially built

passes are unnecessary. The method has two disadvantages as against

the square-set or filling process, in that more staging must be

provided from which to work, and in stopes over six feet the erection

of machine-drill columns is tedious and costly in time and wages.

[Illustration: Fig. 44.--Longitudinal section of stull and waste

pillars.]

In wide deposits of markedly flat, irregular ore-bodies, where a

definite system is difficult and where timber is expensive, cribs

of cord-wood or logs filled with waste after the order shown in

Figure 31, often make fairly sound pillars. They will not last

indefinitely and are best adapted to the temporary support of the

ore-roof pending filling. The increased difficulty in setting up

machine drills in such stopes adds to the breaking costs,--often

enough to warrant another method of support.

[Illustration: Fig. 45.--Sublevel caving system.]

CAVING SYSTEMS.--This method, with variations, has been applied

to large iron deposits, to the Kimberley diamond mines, to some

copper mines, but in general it has little application to the metal

mines under consideration, as few ore-bodies are of sufficiently

large horizontal area. The system is dependent upon a large area of

loose or "heavy" ground pressing directly on the ore with weight,

such that if the ore be cut into pillars, these will crush. The

details of the system vary, but in general the _modus operandi_

is to prepare roadways through the ore, and from the roadways to

put rises, from which sublevels are driven close under the floating

mass of waste and ore,--sometimes called the "matte" (Fig. 45).

The pillars between these sublevels are then cut away until the

weight above crushes them down. When all the crushed ore which

can be safely reached is extracted, retreat is made and another

series of subopenings is then driven close under the "matte." The

pillar is reduced until it crushes and the operation is repeated.

Eventually the bottom strata of the "matte" become largely ore,

and a sort of equilibrium is reached when there is not much loss

in this direction. "Top slicing" is a variation of the above method

by carrying a horizontal stope from the rises immediately under the

matte, supporting the floating material with timber. At Kimberley

the system is varied in that galleries are run out to the edge of

the diamond-iferous area and enlarged until the pillar between

crushes.

In the caving methods, between 40 and 50% of the ore is removed

by the preliminary openings, and as they are all headings of some

sort, the average cost per ton of this particular ore is higher

than by ordinary stoping methods. On the other hand, the remaining

50 to 60% of the ore costs nothing to break, and the average cost

is often remarkably low. As said, the system implies bodies of large

horizontal area. They must start near enough to the surface that

the whole superincumbent mass may cave and give crushing weight,

or the immediately overhanging roof must easily cave. All of these

are conditions not often met with in mines of the character under

review.

CHAPTER XII.

Mechanical Equipment.

CONDITIONS BEARING ON MINE EQUIPMENT; WINDING APPLIANCES; HAULAGE

EQUIPMENT IN SHAFTS; LATERAL UNDERGROUND TRANSPORT; TRANSPORT IN

STOPES.

There is no type of mechanical engineering which presents such

complexities in determination of the best equipment as does that of

mining. Not only does the economic side dominate over pure mechanics,

but machines must be installed and operated under difficulties which

arise from the most exceptional and conflicting conditions, none of

which can be entirely satisfied. Compromise between capital outlay,

operating efficiency, and conflicting demands is the key-note of

the work.

These compromises are brought about by influences which lie outside

the questions of mechanics of individual machines, and are mainly

as follows:--

1. Continuous change in horizon of operations.

2. Uncertain life of the enterprise.

3. Care and preservation of human life.

4. Unequal adaptability of power transmission mediums.

5. Origin of power.

_First._--The depth to be served and the volume of ore and water

to be handled, are not only unknown at the initial equipment, but

they are bound to change continuously in quantity, location, and

horizon with the extension of the workings.

_Second._--From the mine manager's point of view, which must embrace

that of the mechanical engineer, further difficulty presents itself

because the life of the enterprise is usually unknown, and therefore

a manifest necessity arises for an economic balance of capital

outlay and of operating efficiency commensurate with the prospects

of the mine. Moreover, the initial capital is often limited, and

makeshifts for this reason alone must be provided. In net result,

no mineral deposit of speculative ultimate volume of ore warrants

an initial equipment of the sort that will meet every eventuality,

or of the kind that will give even the maximum efficiency which

a free choice of mining machinery could obtain.

_Third._--In the design and selection of mining machines, the safety

of human life, the preservation of the health of workmen under

conditions of limited space and ventilation, together with reliability

and convenience in installing and working large mechanical tools,

all dominate mechanical efficiency. For example, compressed-air

transmission of power best meets the requirements of drilling,

yet the mechanical losses in the generation, the transmission,

and the application of compressed air probably total, from first

to last, 70 to 85%.

_Fourth._--All machines, except those for shaft haulage, must be

operated by power transmitted from the surface, as obviously power

generation underground is impossible. The conversion of power into

a transmission medium and its transmission are, at the outset,

bound to be the occasions of loss. Not only are the various forms

of transmission by steam, electricity, compressed air, or rods, of

different efficiency, but no one system lends itself to universal

or economical application to all kinds of mining machines. Therefore

it is not uncommon to find three or four different media of power

transmission employed on the same mine. To illustrate: from the

point of view of safety, reliability, control, and in most cases

economy as well, we may say that direct steam is the best motive

force for winding-engines; that for mechanical efficiency and

reliability, rods constitute the best media of power transmission

to pumps; that, considering ventilation and convenience, compressed

air affords the best medium for drills. Yet there are other conditions

as to character of the work, volume of water or ore, and the origin

of power which must in special instances modify each and every one

of these generalizations. For example, although pumping water with

compressed air is mechanically the most inefficient of devices,

it often becomes the most advantageous, because compressed air may

be of necessity laid on for other purposes, and the extra power

required to operate a small pump may be thus most cheaply provided.

_Fifth._--Further limitations and modifications arise out of the

origin of power, for the sources of power have an intimate bearing on

the type of machine and media of transmission. This very circumstance

often compels giving away efficiency and convenience in some machines

to gain more in others. This is evident enough if the principal

origins of power generation be examined. They are in the main as

follows:--

_a_. Water-power available at the mine.

_b_. Water-power available at a less distance than three

or four miles.

_c_. Water-power available some miles away, thus necessitating

electrical transmission (or purchased electrical power).

_d_. Steam-power to be generated at the mine.

_e_. Gas-power to be generated at the mine.

_a_. With water-power at the mine, winding engines can be operated

by direct hydraulic application with a gain in economy over direct

steam, although with the sacrifice of control and reliability. Rods

for pumps can be driven directly with water, but this superiority

in working economy means, as discussed later, a loss of flexibility

and increased total outlay over other forms of transmission to pumps.

As compressed air must be transmitted for drills, the compressor

would be operated direct from water-wheels, but with less control

in regularity of pressure delivery.

_b_. With water-power a short distance from the mine, it would

normally be transmitted either by compressed air or by electricity.

Compressed-air transmission would better satisfy winding and drilling

requirements, but would show a great comparative loss in efficiency

over electricity when applied to pumping. Despite the latter drawback,

air transmission is a method growing in favor, especially in view

of the advance made in effecting compression by falling water.

_c_. In the situation of transmission too far for using compressed

air, there is no alternative but electricity. In these cases, direct

electric winding is done, but under such disadvantages that it

requires a comparatively very cheap power to take precedence over

a subsidiary steam plant for this purpose. Electric air-compressors

work under the material disadvantage of constant speed on a variable

load, but this installation is also a question of economics. The

pumping service is well performed by direct electrical pumps.

_d_. In this instance, winding and air-compression are well accomplished

by direct steam applications; but pumping is beset with wholly

undesirable alternatives, among which it is difficult to choose.

_e_. With internal combustion engines, gasoline (petrol) motors

have more of a position in experimental than in systematic mining,

for their application to winding and pumping and drilling is fraught

with many losses. The engine must be under constant motion, and

that, too, with variable loads. Where power from producer gas is

used, there is a greater possibility of installing large equipments,

and it is generally applied to the winding and lesser units by

conversion into compressed air or electricity as an intermediate

stage.

One thing becomes certain from these examples cited, that the right

installation for any particular portion of the mine's equipment cannot

be determined without reference to all the others. The whole system

of power generation for surface work, as well as the transmission

underground, must be formulated with regard to furnishing the best

total result from all the complicated primary and secondary motors,

even at the sacrifice of some members.

Each mine is a unique problem, and while it would be easy to sketch

an ideal plant, there is no mine within the writer's knowledge

upon which the ideal would, under the many variable conditions,

be the most economical of installation or the most efficient of

operation. The dominant feature of the task is an endeavor to find

a compromise between efficiency and capital outlay. The result is

a series of choices between unsatisfying alternatives, a number of

which are usually found to have been wrong upon further extension

of the mine in depth.

In a general way, it may be stated that where power is generated

on the mine, economy in labor of handling fuel, driving engines,

generation and condensing steam where steam is used, demand a

consolidated power plant for the whole mine equipment. The principal

motors should be driven direct by steam or gas, with power distribution

by electricity to all outlying surface motors and sometimes to

underground motors, and also to some underground motors by compressed

air.

Much progress has been made in the past few years in the perfection

of larger mining tools. Inherently many of our devices are of a

wasteful character, not only on account of the need of special

forms of transmission, but because they are required to operate

under greatly varying loads. As an outcome of transmission losses

and of providing capacity to cope with heavy peak loads, their

efficiency on the basis of actual foot-pounds of work accomplished

is very low.

The adoption of electric transmission in mine work, while in certain

phases beneficial, has not decreased the perplexity which arises

from many added alternatives, none of which are as yet a complete or

desirable answer to any mine problem. When a satisfactory electric

drill is invented, and a method is evolved of applying electricity

to winding-engines that will not involve such abnormal losses due

to high peak load then we will have a solution to our most difficult

mechanical problems, and electricity will deserve the universal

blessing which it has received in other branches of mechanical

engineering.

It is not intended to discuss mine equipment problems from the

machinery standpoint,--there are thousands of different devices,--but

from the point of view of the mine administrator who finds in the

manufactory the various machines which are applicable, and whose

work then becomes that of choosing, arranging, and operating these

tools.

The principal mechanical questions of a mine may be examined under

the following heads:--

1. Shaft haulage.

2. Lateral underground transport.

3. Drainage.

4. Rock drilling.

5. Workshops.

6. Improvements in equipment.

SHAFT HAULAGE.

WINDING APPLIANCES.--No device has yet been found to displace the

single load pulled up the shaft by winding a rope on a drum. Of

driving mechanisms for drum motors the alternatives are the

steam-engine, the electrical motor, and infrequently water-power

or gas engines.

All these have to cope with one condition which, on the basis of

work accomplished, gives them a very low mechanical efficiency.

This difficulty is that the load is intermittent, and it must be

started and accelerated at the point of maximum weight, and from

that moment the power required diminishes to less than nothing

at the end of the haul. A large number of devices are in use to

equalize partially the inequalities of the load at different stages

of the lift. The main lines of progress in this direction have

been:--

_a_. The handling of two cages or skips with one engine

or motor, the descending skip partially balancing

the ascending one.

_b_. The use of tail-ropes or balance weights to compensate

the increasing weight of the descending rope.

_c_. The use of skips instead of cages, thus permitting of

a greater percentage of paying load.

_d_. The direct coupling of the motor to the drum shaft.

_e_. The cone-shaped construction of drums,--this latter

being now largely displaced by the use of the tail-rope.

The first and third of these are absolutely essential for anything

like economy and speed; the others are refinements depending on

the work to be accomplished and the capital available.

Steam winding-engines require large cylinders to start the load,

but when once started the requisite power is much reduced and the

load is too small for steam economy. The throttling of the engine

for controlling speed and reversing the engine at periodic stoppages

militates against the maximum expansion and condensation of the

steam and further increases the steam consumption. In result, the

best of direct compound condensing engines consume from 60 to 100

pounds of steam per horse-power hour, against a possible efficiency

of such an engine working under constant load of less than 16 pounds

of steam per horse-power hour.

It is only within very recent years that electrical motors have

been applied to winding. Even yet, all things considered, this

application is of doubtful value except in localities of extremely

cheap electrical power. The constant speed of alternating current

motors at once places them at a disadvantage for this work of high

peak and intermittent loads. While continuous-current motors can

be made to partially overcome this drawback, such a current, where

power is purchased or transmitted a long distance, is available

only by conversion, which further increases the losses. However,

schemes of electrical winding are in course of development which

bid fair, by a sort of storage of power in heavy fly-wheels or

storage batteries after the peak load, to reduce the total power

consumption; but the very high first cost so far prevents their

very general adoption for metal mining.

Winding-engines driven by direct water- or gas-power are of too rare

application to warrant much discussion. Gasoline driven hoists have a

distinct place in prospecting and early-stage mining, especially in

desert countries where transport and fuel conditions are onerous,

for both the machines and their fuel are easy of transport. As direct

gas-engines entail constant motion of the engine at the power demand

of the peak load, they are hopeless in mechanical efficiency.

Like all other motors in mining, the size and arrangement of the

motor and drum are dependent upon the duty which they will be called

upon to perform. This is primarily dependent upon the depth to be

hoisted from, the volume of the ore, and the size of the load.

For shallow depths and tonnages up to, say, 200 tons daily, geared

engines have a place on account of their low capital cost. Where

great rope speed is not essential they are fully as economical as

direct-coupled engines. With great depths and greater capacities,

speed becomes a momentous factor, and direct-coupled engines are

necessary. Where the depth exceeds 3,000 feet, another element

enters which has given rise to much debate and experiment; that

is, the great increase of starting load due to the increased length

and size of ropes and the drum space required to hold it. So far

the most advantageous device seems to be the Whiting hoist, a

combination of double drums and tail rope.

On mines worked from near the surface, where depth is gained by

the gradual exhaustion of the ore, the only prudent course is to

put in a new hoist periodically, when the demand for increased

winding speed and power warrants. The lack of economy in winding

machines is greatly augmented if they are much over-sized for the

duty. An engine installed to handle a given tonnage to a depth of

3,000 feet will have operated with more loss during the years the

mine is progressing from the surface to that depth than several

intermediate-sized engines would have cost. On most mines the

uncertainty of extension in depth would hardly warrant such a

preliminary equipment. More mines are equipped with over-sized

than with under-sized engines. For shafts on going metal mines

where the future is speculative, an engine will suffice whose size

provides for an extension in depth of 1,000 feet beyond that reached

at the time of its installation. The cost of the engine will depend

more largely upon the winding speed desired than upon any other

one factor. The proper speed to be arranged is obviously dependent

upon the depth of the haulage, for it is useless to have an engine

able to wind 3,000 feet a minute on a shaft 500 feet deep, since it

could never even get under way; and besides, the relative operating

loss, as said, would be enormous.

HAULAGE EQUIPMENT IN THE SHAFT.--Originally, material was hoisted

through shafts in buckets. Then came the cage for transporting mine

cars, and in more recent years the "skip" has been developed. The

aggrandized bucket or "kibble" of the Cornishman has practically

disappeared, but the cage still remains in many mines. The advantages

of the skip over the cage are many. Some of them are:--

_a_. It permits 25 to 40% greater load of material in

proportion to the dead weight of the vehicle.

_b_. The load can be confined within a smaller horizontal

space, thus the area of the shaft need not be so great

for large tonnages.

_c_. Loading and discharging are more rapid, and the latter

is automatic, thus permitting more trips per hour and

requiring less labor.

_d_. Skips must be loaded from bins underground, and by

providing in the bins storage capacity, shaft haulage is

rendered independent of the lateral transport in the

mine, and there are no delays to the engine awaiting

loads. The result is that ore-winding can be concentrated

into fewer hours, and indirect economies in labor

and power are thus effected.

_e_. Skips save the time of the men engaged in the lateral

haulage, as they have no delay waiting for the winding

engine.

Loads equivalent to those from skips are obtained in some mines

by double-decked cages; but, aside from waste weight of the cage,

this arrangement necessitates either stopping the engine to load the

lower deck, or a double-deck loading station. Double-deck loading

stations are as costly to install and more expensive to work than

skip-loading station ore-bins. Cages are also constructed large

enough to take as many as four trucks on one deck. This entails a

shaft compartment double the size required for skips of the same

capacity, and thus enormously increases shaft cost without gaining

anything.

Altogether the advantages of the skip are so certain and so important

that it is difficult to see the justification for the cage under

but a few conditions. These conditions are those which surround

mines of small output where rapidity of haulage is no object, where

the cost of station-bins can thus be evaded, and the convenience

of the cage for the men can still be preserved. The easy change

of the skip to the cage for hauling men removes the last objection

on larger mines. There occurs also the situation in which ore is

broken under contract at so much per truck, and where it is desirable

to inspect the contents of the truck when discharging it, but even

this objection to the skip can be obviated by contracting on a

cubic-foot basis.

Skips are constructed to carry loads of from two to seven tons,

the general tendency being toward larger loads every year. One

of the most feasible lines of improvement in winding is in the

direction of larger loads and less speed, for in this way the sum

total of dead weight of the vehicle and rope to the tonnage of

ore hauled will be decreased, and the efficiency of the engine

will be increased by a less high peak demand, because of this less

proportion of dead weight and the less need of high acceleration.

LATERAL UNDERGROUND TRANSPORT.

Inasmuch as the majority of metal mines dip at considerable angles,

the useful life of a roadway in a metal mine is very short because

particular horizons of ore are soon exhausted. Therefore any method

of transport has to be calculated upon a very quick redemption of

the capital laid out. Furthermore, a roadway is limited in its

daily traffic to the product of the stopes which it serves.

MEN AND ANIMALS.--Some means of transport must be provided, and

the basic equipment is light tracks with push-cars, in capacity

from half a ton to a ton. The latter load is, however, too heavy

to be pushed by one man. As but one car can be pushed at a time,

hand-trucking is both slow and expensive. At average American or

Australian wages, the cost works out between 25 and 35 cents a

ton per mile. An improvement of growing import where hand-trucking

is necessary is the overhead mono-rail instead of the track.

If the supply to any particular roadway is such as to fully employ

horses or mules, the number of cars per trip can be increased up

to seven or eight. In this case the expense, including wages of

the men and wear, tear, and care of mules, will work out roughly

at from 7 to 10 cents per ton mile. Manifestly, if the ore-supply

to a particular roadway is insufficient to keep a mule busy, the

economy soon runs off.

MECHANICAL HAULAGE.--Mechanical haulage is seldom applicable to

metal mines, for most metal deposits dip at considerable angles,

and therefore, unlike most coal-mines, the horizon of haulage must

frequently change, and there are no main arteries along which haulage

continues through the life of the mine. Any mechanical system entails

a good deal of expense for installation, and the useful life of

any particular roadway, as above said, is very short. Moreover,

the crooked roadways of most metal mines present difficulties of

negotiation not to be overlooked. In order to use such systems it

is necessary to condense the haulage to as few roadways as possible.

Where the tonnage on one level is not sufficient to warrant other

than men or animals, it sometimes pays (if the dip is steep enough)

to dump everything through winzes from one to two levels to a main

road below where mechanical equipment can be advantageously provided.

The cost of shaft-winding the extra depth is inconsiderable compared

to other factors, for the extra vertical distance of haulage can

be done at a cost of one or two cents per ton mile. Moreover, from

such an arrangement follows the concentration of shaft-bins, and of

shaft labor, and winding is accomplished without so much shifting

as to horizon, all of which economies equalize the extra distance

of the lift.

There are three principal methods of mechanical transport in use:--

1. Cable-ways.

2. Compressed-air locomotives.

3. Electrical haulage.

Cable-ways or endless ropes are expensive to install, and to work

to the best advantage require double tracks and fairly straight

roads. While they are economical in operation and work with little

danger to operatives, the limitations mentioned preclude them from

adoption in metal mines, except in very special circumstances such

as main crosscuts or adit tunnels, where the haulage is straight

and concentrated from many sources of supply.

Compressed-air locomotives are somewhat heavy and cumbersome, and

therefore require well-built tracks with heavy rails, but they

have very great advantages for metal mine work. They need but a

single track and are of low initial cost where compressed air is

already a requirement of the mine. No subsidiary line equipment is

needed, and thus they are free to traverse any road in the mine and

can be readily shifted from one level to another. Their mechanical

efficiency is not so low in the long run as might appear from the

low efficiency of pneumatic machines generally, for by storage of

compressed air at the charging station a more even rate of energy

consumption is possible than in the constant cable and electrical

power supply which must be equal to the maximum demand, while the

air-plant consumes but the average demand.

Electrical haulage has the advantage of a much more compact locomotive

and the drawback of more expensive track equipment, due to the

necessity of transmission wire, etc. It has the further disadvantages

of uselessness outside the equipped haulage way and of the dangers

of the live wire in low and often wet tunnels.

In general, compressed-air locomotives possess many attractions

for metal mine work, where air is in use in any event and where

any mechanical system is at all justified. Any of the mechanical

systems where tonnage is sufficient in quantity to justify their

employment will handle material for from 1.5 to 4 cents per ton

mile.

TRACKS.--Tracks for hand, mule, or rope haulage are usually built

with from 12- to 16-pound rails, but when compressed-air or electrical

locomotives are to be used, less than 24-pound rails are impossible.

As to tracks in general, it may be said that careful laying out

with even grades and gentle curves repays itself many times over in

their subsequent operation. Further care in repair and lubrication

of cars will often make a difference of 75% in the track resistance.

TRANSPORT IN STOPES.--Owing to the even shorter life of individual

stopes than levels, the actual transport of ore or waste in them is

often a function of the aboriginal shovel plus gravity. As shoveling

is the most costly system of transport known, any means of stoping

that decreases the need for it has merit. Shrinkage-stoping eliminates

it altogether. In the other methods, gravity helps in proportion to

the steepness of the dip. When the underlie becomes too flat for

the ore to "run," transport can sometimes be helped by pitching

the ore-passes at a steeper angle than the dip (Fig. 36). In some

cases of flat deposits, crosscuts into the walls, or even levels

under the ore-body, are justifiable. The more numerous the ore-passes,

the less the lateral shoveling, but as passes cost money for

construction and for repair, there is a nice economic balance in

their frequency.

Mechanical haulage in stopes has been tried and finds a field under

some conditions. In dips under 25° and possessing fairly sound

hanging-wall, where long-wall or flat-back cuts are employed, temporary

tracks can often be laid in the stopes and the ore run in cars to

the main passes. In such cases, the tracks are pushed up close

to the face after each cut. Further self-acting inclines to lower

cars to the levels can sometimes be installed to advantage. This

arrangement also permits greater intervals between levels and less

number of ore-passes. For dips between 25° and 50° where the mine

is worked without stope support or with occasional pillars, a very

useful contrivance is the sheet-iron trough--about eighteen inches

wide and six inches deep--made in sections ten or twelve feet long

and readily bolted together. In dips 35° to 50° this trough, laid

on the foot-wall, gives a sufficiently smooth surface for the ore

to run upon. When the dip is flat, the trough, if hung from plugs

in the hanging-wall, may be swung backward and forward. The use of

this "bumping-trough" saves much shoveling. For handling filling

or ore in flat runs it deserves wider adoption. It is, of course,

inapplicable in passes as a "bumping-trough," but can be fixed to

give smooth surface. In flat mines it permits a wider interval

between levels and therefore saves development work. The life of

this contrivance is short when used in open stopes, owing to the

dangers of bombardment from blasting.

In dips steeper than 50° much of the shoveling into passes can be

saved by rill-stoping, as described on page 100. Where flat-backed

stopes are used in wide ore-bodies with filling, temporary tracks

laid on the filling to the ore-passes are useful, for they permit

wider intervals between passes.

In that underground engineer's paradise, the Witwatersrand, where

the stopes require neither timber nor filling, the long, moderately

pitched openings lend themselves particularly to the swinging iron

troughs, and even endless wire ropes have been found advantageous

in certain cases.

Where the roof is heavy and close support is required, and where

the deposits are very irregular in shape and dip, there is little

hope of mechanical assistance in stope transport.

CHAPTER XIII.

Mechanical Equipment. (_Continued_).

DRAINAGE: CONTROLLING FACTORS; VOLUME AND HEAD OF WATER; FLEXIBILITY;

RELIABILITY; POWER CONDITIONS; MECHANICAL EFFICIENCY; CAPITAL OUTLAY.

SYSTEMS OF DRAINAGE,--STEAM PUMPS, COMPRESSED-AIR PUMPS, ELECTRICAL

PUMPS, ROD-DRIVEN PUMPS, BAILING; COMPARATIVE VALUE OF VARIOUS

SYSTEMS.

With the exception of drainage tunnels--more fully described in

Chapter VIII--all drainage must be mechanical. As the bulk of mine

water usually lies near the surface, saving in pumping can sometimes

be effected by leaving a complete pillar of ore under some of the

upper levels. In many deposits, however, the ore has too many channels

to render this of much avail.

There are six factors which enter into a determination of mechanical

drainage systems for metal mines:--

1. Volume and head of water.

2. Flexibility to fluctuation in volume and head.

3. Reliability.

4. Capital cost.

5. The general power conditions.

6. Mechanical efficiency.

In the drainage appliances, more than in any other feature of the

equipment, must mechanical efficiency be subordinated to the other

issues.

FLEXIBILITY.--Flexibility in plant is necessary because volume and

head of water are fluctuating factors. In wet regions the volume

of water usually increases for a certain distance with the extension

of openings in depth. In dry climates it generally decreases with the

downward extension of the workings after a certain depth. Moreover,

as depth progresses, the water follows the openings more or less

and must be pumped against an ever greater head. In most cases

the volume varies with the seasons. What increase will occur, from

what horizon it must be lifted, and what the fluctuations in volume

are likely to be, are all unknown at the time of installation. If

a pumping system were to be laid out for a new mine, which would

peradventure meet every possible contingency, the capital outlay would

be enormous, and the operating efficiency would be very low during

the long period in which it would be working below its capacity. The

question of flexibility does not arise so prominently in coal-mines,

for the more or less flat deposits give a fixed factor of depth.

The flow is also more steady, and the volume can be in a measure

approximated from general experience.

RELIABILITY.--The factor of reliability was at one time of more

importance than in these days of high-class manufacture of many

different pumping systems. Practically speaking, the only insurance

from flooding in any event lies in the provision of a relief system

of some sort,--duplicate pumps, or the simplest and most usual

thing, bailing tanks. Only Cornish and compressed-air pumps will

work with any security when drowned, and electrical pumps are easily

ruined.

GENERAL POWER CONDITIONS.--The question of pumping installation

is much dependent upon the power installation and other power

requirements of the mine. For instance, where electrical power is

purchased or generated by water-power, then electrical pumps have

every advantage. Or where a large number of subsidiary motors can be

economically driven from one central steam- or gas-driven electrical

generation plant, they again have a strong call,--especially if

the amount of water to be handled is moderate. Where the water

is of limited volume and compressed-air plant a necessity for the

mine, then air-driven pumps may be the most advantageous, etc.

MECHANICAL EFFICIENCY.--The mechanical efficiency of drainage machinery

is very largely a question of method of power application. The

actual pump can be built to almost the same efficiency for any

power application, and with the exception of the limited field

of bailing with tanks, mechanical drainage is a matter of pumps.

All pumps must be set below their load, barring a few possible

feet of suction lift, and they are therefore perforce underground,

and in consequence all power must be transmitted from the surface.

Transmission itself means loss of power varying from 10 to 60%,

depending upon the medium used. It is therefore the choice of

transmission medium that largely governs the mechanical efficiency.

SYSTEMS OF DRAINAGE.--The ideal pumping system for metal mines

would be one which could be built in units and could be expanded

or contracted unit by unit with the fluctuation in volume; which

could also be easily moved to meet the differences of lifts; and

in which each independent unit could be of the highest mechanical

efficiency and would require but little space for erection. Such

an ideal is unobtainable among any of the appliances with which

the writer is familiar.

The wide variations in the origin of power, in the form of transmission,

and in the method of final application, and the many combinations

of these factors, meet the demands for flexibility, efficiency,

capital cost, and reliability in various degrees depending upon

the environment of the mine. Power nowadays is generated primarily

with steam, water, and gas. These origins admit the transmission of

power to the pumps by direct steam, compressed air, electricity,

rods, or hydraulic columns.

DIRECT STEAM-PUMPS.--Direct steam has the disadvantage of radiated

heat in the workings, of loss by the radiation, and, worse still,

of the impracticability of placing and operating a highly efficient

steam-engine underground. It is all but impossible to derive benefit

from the vacuum, as any form of surface condenser here is impossible,

and there can be no return of the hot soft water to the boilers.

Steam-pumps fall into two classes, rotary and direct-acting; the former

have the great advantage of permitting the use of steam expansively

and affording some field for effective use of condensation, but

they are more costly, require much room, and are not fool-proof.

The direct-acting pumps have all the advantage of compactness and

the disadvantage of being the most inefficient of pumping machines

used in mining. Taking the steam consumption of a good surface

steam plant at 15 pounds per horse-power hour, the efficiency of

rotary pumps with well-insulated pipes is probably not over 50%,

and of direct-acting pumps from 40% down to 10%.

The advantage of all steam-pumps lies in the low capital outlay,--hence

their convenient application to experimental mining and temporary

pumping requirements. For final equipment they afford a great deal

of flexibility, for if properly constructed they can be, with slight

alteration, moved from one horizon to another without loss of relative

efficiency. Thus the system can be rearranged for an increased

volume of water, by decreasing the lift and increasing the number

of pumps from different horizons.

COMPRESSED-AIR PUMPS.--Compressed-air transmission has an application

similar to direct steam, but it is of still lower mechanical efficiency,

because of the great loss in compression. It has the superiority

of not heating the workings, and there is no difficulty as to the

disposal of the exhaust, as with steam. Moreover, such pumps will

work when drowned. Compressed air has a distinct place for minor

pumping units, especially those removed from the shaft, for they

can be run as an adjunct to the air-drill system of the mine, and

by this arrangement much capital outlay may be saved. The cost of

the extra power consumed by such an arrangement is less than the

average cost of compressed-air power, because many of the compressor

charges have to be paid anyway. When compressed air is water-generated,

they have a field for permanent installations. The efficiency of

even rotary air-driven pumps, based on power delivered into a good

compressor, is probably not over 25%.

ELECTRICAL PUMPS.--Electrical pumps have somewhat less flexibility

than steam- or air-driven apparatus, in that the speed of the pumps can

be varied only within small limits. They have the same great advantage

in the easy reorganization of the system to altered conditions of

water-flow. Electricity, when steam-generated, has the handicap

of the losses of two conversions, the actual pump efficiency being

about 60% in well-constructed plants; the efficiency is therefore

greater than direct steam or compressed air. Where the mine is

operated with water-power, purchased electric current, or where

there is an installation of electrical generating plant by steam or

gas for other purposes, electrically driven pumps take precedence

over all others on account of their combined moderate capital outlay,

great flexibility, and reasonable efficiency.

In late years, direct-coupled, electric-driven centrifugal pumps

have entered the mining field, but their efficiency, despite makers'

claims, is low. While they show comparatively good results on low

lifts the slip increases with the lift. In heads over 200 feet

their efficiency is probably not 30% of the power delivered to the

electrical generator. Their chief attractions are small capital

cost and the compact size which admits of easy installation.

ROD-DRIVEN PUMPS.--Pumps of the Cornish type in vertical shafts,

if operated to full load and if driven by modern engines, have

an efficiency much higher than any other sort of installation,

and records of 85 to 90% are not unusual. The highest efficiency

in these pumps yet obtained has been by driving the pump with rope

transmission from a high-speed triple expansion engine, and in

this plant an actual consumption of only 17 pounds of steam per

horse-power hour for actual water lifted has been accomplished.

To provide, however, for increase of flow and change of horizon,

rod-driven pumps must be so overpowered at the earlier stage of

the mine that they operate with great loss. Of all pumping systems

they are the most expensive to provide. They have no place in crooked

openings and only work in inclines with many disadvantages.

In general their lack of flexibility is fast putting them out of

the metal miner's purview. Where the pumping depth and volume of

water are approximately known, as is often the case in coal mines,

this, the father of all pumps, still holds its own.

HYDRAULIC PUMPS.--Hydraulic pumps, in which a column of water is

used as the transmission fluid from a surface pump to a corresponding

pump underground has had some adoption in coal mines, but little

in metal mines. They have a certain amount of flexibility but low

efficiency, and are not likely to have much field against electrical

pumps.

Principles of Mining: Valuation, Organization and Administration · 第 21 / 22 章