CHAPTER XX.

The Character, Training, and Obligations of the Mining Engineering

Profession

Index

PRINCIPLES OF MINING.

CHAPTER I.

Valuation of Copper, Gold, Lead, Silver, Tin, and Zinc Lode Mines.

DETERMINATION OF AVERAGE METAL CONTENT; SAMPLING, ASSAY PLANS,

CALCULATIONS OF AVERAGES, PERCENTAGE OF ERRORS IN ESTIMATE FROM

SAMPLING.

The following discussion is limited to _in situ_ deposits of copper,

gold, lead, silver, tin, and zinc. The valuation of alluvial deposits,

iron, coal, and other mines is each a special science to itself and

cannot be adequately discussed in common with the type of deposits

mentioned above.

The value of a metal mine of the order under discussion depends

upon:--

_a_. The profit that may be won from ore exposed;

_b_. The prospective profit to be derived from extension of the

ore beyond exposures;

_c_. The effect of a higher or lower price of metal (except in

gold mines);

_d_. The efficiency of the management during realization.

The first may be termed the positive value, and can be approximately

determined by sampling or test-treatment runs. The second and the

third may be termed the speculative values, and are largely a matter

of judgment based on geological evidence and the industrial outlook.

The fourth is a question of development, equipment, and engineering

method adapted to the prospects of the enterprise, together with

capable executive control of these works.

It should be stated at the outset that it is utterly impossible to

accurately value any mine, owing to the many speculative factors

involved. The best that can be done is to state that the value

lies between certain limits, and that various stages above the

minimum given represent various degrees of risk. Further, it would

be but stating truisms to those engaged in valuing mines to repeat

that, because of the limited life of every mine, valuation of such

investments cannot be based upon the principle of simple interest;

nor that any investment is justified without a consideration of

the management to ensue. Yet the ignorance of these essentials

is so prevalent among the public that they warrant repetition on

every available occasion.

To such an extent is the realization of profits indicated from

the other factors dependent upon the subsequent management of the

enterprise that the author considers a review of underground engineering

and administration from an economic point of view an essential to

any essay upon the subject. While the metallurgical treatment of

ores is an essential factor in mine economics, it is considered that

a detailed discussion of the myriad of processes under hypothetic

conditions would lead too far afield. Therefore the discussion is

largely limited to underground and administrative matters.

The valuation of mines arises not only from their change of ownership,

but from the necessity in sound administration for a knowledge

of some of the fundamentals of valuation, such as ore reserves

and average values, that managerial and financial policy may be

guided aright. Also with the growth of corporate ownership there

is a demand from owners and stockholders for periodic information

as to the intrinsic condition of their properties.

The growth of a body of speculators and investors in mining stocks

and securities who desire professional guidance which cannot be based

upon first-hand data is creating further demand on the engineer.

Opinions in these cases must be formed on casual visits or second-hand

information, and a knowledge of men and things generally. Despite

the feeling of some engineers that the latter employment is not

properly based professionally, it is an expanding phase of engineers'

work, and must be taken seriously. Although it lacks satisfactory

foundation for accurate judgment, yet the engineer can, and should,

give his experience to it when the call comes, out of interest

to the industry as a whole. Not only can he in a measure protect

the lamb, by insistence on no investment without the provision of

properly organized data and sound administration for his client, but

he can do much to direct the industry from gambling into industrial

lines.

An examination of the factors which arise on the valuation of mines

involves a wide range of subjects. For purposes of this discussion

they may be divided into the following heads:--

1. _Determination of Average Metal Contents of the Ore._

2. _Determination of Quantities of Ore._

3. _Prospective Value._

4. _Recoverable Percentage of Gross Value._

5. _Price of Metals._

6. _Cost of Production._

7. _Redemption or Amortization of Capital and Interest._

8. _Valuation of Mines without Ore in Sight._

9. _General Conduct of Examination and Reports._

DETERMINATION OF AVERAGE METAL CONTENTS OF THE ORE.

Three means of determination of the average metal content of standing

ore are in use--Previous Yield, Test-treatment Runs, and Sampling.

PREVIOUS YIELD.--There are certain types of ore where the previous

yield from known space becomes the essential basis of determination

of quantity and metal contents of ore standing and of the future

probabilities. Where metals occur like plums in a pudding, sampling

becomes difficult and unreliable, and where experience has proved

a sort of regularity of recurrence of these plums, dependence must

necessarily be placed on past records, for if their reliability is

to be questioned, resort must be had to extensive test-treatment

runs. The Lake Superior copper mines and the Missouri lead and zinc

mines are of this type of deposit. On the other sorts of deposits

the previous yield is often put forward as of important bearing

on the value of the ore standing, but such yield, unless it can

be _authentically_ connected with blocks of ore remaining, is not

necessarily a criterion of their contents. Except in the cases

mentioned, and as a check on other methods of determination, it

has little place in final conclusions.

TEST PARCELS.--Treatment on a considerable scale of sufficiently

regulated parcels, although theoretically the ideal method, is,

however, not often within the realm of things practical. In examination

on behalf of intending purchasers, the time, expense, or opportunity

to fraud are usually prohibitive, even where the plant and facilities

for such work exist. Even in cases where the engineer in management

of producing mines is desirous of determining the value of standing

ore, with the exception of deposits of the type mentioned above,

it is ordinarily done by actual sampling, because separate mining

and treatment of test lots is generally inconvenient and expensive.

As a result, the determination of the value of standing ore is,

in the great majority of cases, done by sampling and assaying.

SAMPLING.--The whole theory of sampling is based on the distribution

of metals through the ore-body with more or less regularity, so

that if small portions, that is samples, be taken from a sufficient

number of points, their average will represent fairly closely the

unit value of the ore. If the ore is of the extreme type of irregular

metal distribution mentioned under "previous yield," then sampling

has no place.

How frequently samples must be taken, the manner of taking them,

and the quantity that constitutes a fair sample, are matters that

vary with each mine. So much depends upon the proper performance

of this task that it is in fact the most critical feature of mine

examination. Ten samples properly taken are more valuable than

five hundred slovenly ones, like grab samples, for such a number

of bad ones would of a surety lead to wholly wrong conclusions.

Given a good sampling and a proper assay plan, the valuation of a

mine is two-thirds accomplished. It should be an inflexible principle

in examinations for purchase that every sample must be taken under

the personal supervision of the examining engineer or his trusted

assistants. Aside from throwing open the doors to fraud, the average

workman will not carry out the work in a proper manner, unless

under constant supervision, because of his lack of appreciation of

the issues involved. Sampling is hard, uncongenial, manual labor.

It requires a deal of conscientiousness to take enough samples and

to take them thoroughly. The engineer does not exist who, upon

completion of this task, considers that he has got too many, and

most wish that they had taken more.

The accuracy of sampling as a method of determining the value of

standing ore is a factor of the number of samples taken. The average,

for example, of separate samples from each square inch would be

more accurate than those from each alternate square inch. However,

the accumulated knowledge and experience as to the distribution

of metals through ore has determined approximately the manner of

taking such samples, and the least number which will still by the

law of averages secure a degree of accuracy commensurate with the

other factors of estimation.

As metals are distributed through ore-bodies of fissure origin

with most regularity on lines parallel to the strike and dip, an

equal portion of ore from every point along cross-sections at right

angles to the strike will represent fairly well the average values

for a certain distance along the strike either side of these

cross-sections. In massive deposits, sample sections are taken

in all directions. The intervals at which sample sections must

be cut is obviously dependent upon the general character of the

deposit. If the values are well distributed, a longer interval

may be employed than in one subject to marked fluctuations. As

a general rule, five feet is the distance most accepted. This,

in cases of regular distribution of values, may be stretched to

ten feet, or in reverse may be diminished to two or three feet.

The width of ore which may be included for one sample is dependent

not only upon the width of the deposit, but also upon its character.

Where the ore is wider than the necessary stoping width, the sample

should be regulated so as to show the possible locus of values.

The metal contents may be, and often are, particularly in deposits

of the impregnation or replacement type, greater along some streak

in the ore-body, and this difference may be such as to make it

desirable to stope only a portion of the total thickness. For deposits

narrower than the necessary stoping width the full breadth of ore

should be included in one sample, because usually the whole of

the deposit will require to be broken.

In order that a payable section may not possibly be diluted with

material unnecessary to mine, if the deposit is over four feet and

under eight feet, the distance across the vein or lode is usually

divided into two samples. If still wider, each is confined to a

span of about four feet, not only for the reason given above, but

because the more numerous the samples, the greater the accuracy.

Thus, in a deposit twenty feet wide it may be taken as a good guide

that a test section across the ore-body should be divided into

five parts.

As to the physical details of sample taking, every engineer has

his own methods and safeguards against fraud and error. In a large

organization of which the writer had for some years the direction,

and where sampling of mines was constantly in progress on an extensive

scale, not only in contemplation of purchase, but where it was also

systematically conducted in operating mines for working data, he

adopted the above general lines and required the following details.

A fresh face of ore is first broken and then a trench cut about

five inches wide and two inches deep. This trench is cut with a

hammer and moil, or, where compressed air is available and the

rock hard, a small air-drill of the hammer type is used. The spoil

from the trench forms the sample, and it is broken down upon a

large canvas cloth. Afterwards it is crushed so that all pieces

will pass a half-inch screen, mixed and quartered, thus reducing the

weight to half. Whether it is again crushed and quartered depends

upon what the conditions are as to assaying. If convenient to assay

office, as on a going mine, the whole of the crushing and quartering

work can be done at that office, where there are usually suitable

mechanical appliances. If the samples must be taken a long distance,

the bulk for transport can be reduced by finer breaking and repeated

quartering, until there remain only a few ounces.

PRECAUTIONS AGAINST FRAUD.--Much has been written about the precautions

to be taken against fraud in cases of valuations for purchase. The

best safeguards are an alert eye and a strong right arm. However,

certain small details help. A large leather bag, arranged to lock

after the order of a mail sack, into which samples can be put

underground and which is never unfastened except by responsible

men, not only aids security but relieves the mind. A few samples

of country rock form a good check, and notes as to the probable

value of the ore, from inspection when sampling, are useful. A

great help in examination is to have the assays or analyses done

coincidentally with the sampling. A doubt can then always be settled

by resampling at once, and much knowledge can be gained which may

relieve so exhaustive a program as might be necessary were results

not known until after leaving the mine.

ASSAY OF SAMPLES.--Two assays, or as the case may be, analyses,

are usually made of every sample and their average taken. In the

case of erratic differences a third determination is necessary.

ASSAY PLANS.--An assay plan is a plan of the workings, with the

location, assay value, and width of the sample entered upon it. In

a mine with a narrow vein or ore-body, a longitudinal section is

sufficient base for such entries, but with a greater width than one

sample span it is desirable to make preliminary plans of separate

levels, winzes, etc., and to average the value of the whole payable

widths on such plans before entry upon a longitudinal section. Such

a longitudinal section will, through the indicated distribution

of values, show the shape of the ore-body--a step necessary in

estimating quantities and of the most fundamental importance in

estimating the probabilities of ore extension beyond the range of

the openings. The final assay plan should show the average value

of the several blocks of ore, and it is from these averages that

estimates of quantities must be made up.

CALCULATIONS OF AVERAGES.--The first step in arriving at average

values is to reduce erratic high assays to the general tenor of

other adjacent samples. This point has been disputed at some length,

more often by promoters than by engineers, but the custom is very

generally and rightly adopted. Erratically high samples may indicate

presence of undue metal in the assay attributable to unconscious

salting, for if the value be confined to a few large particles

they may find their way through all the quartering into the assay.

Or the sample may actually indicate rich spots of ore; but in any

event experience teaches that no dependence can be put upon regular

recurrence of such abnormally rich spots. As will be discussed

under percentage of error in sampling, samples usually indicate

higher than the true value, even where erratic assays have been

eliminated. There are cases of profitable mines where the values

were all in spots, and an assay plan would show 80% of the assays

_nil_, yet these pockets were so rich as to give value to the whole.

Pocket mines, as stated before, are beyond valuation by sampling,

and aside from the previous yield recourse must be had to actual

treatment runs on every block of ore separately.

After reduction of erratic assays, a preliminary study of the runs of

value or shapes of the ore-bodies is necessary before any calculation

of averages. A preliminary delineation of the boundaries of the

payable areas on the assay plan will indicate the sections of the

mine which are unpayable, and from which therefore samples can

be rightly excluded in arriving at an average of the payable ore

(Fig. 1). In a general way, only the ore which must be mined need

be included in averaging.

The calculation of the average assay value of standing ore from

samples is one which seems to require some statement of elementals.

Although it may seem primitive, it can do no harm to recall that if

a dump of two tons of ore assaying twenty ounces per ton be added

to a dump of five tons averaging one ounce per ton, the result has

not an average assay of twenty-one ounces divided by the number of

dumps. Likewise one sample over a width of two feet, assaying twenty

ounces per ton, if averaged with another sample over a width of five

feet, assaying one ounce, is no more twenty-one ounces divided by

two samples than in the case of the two dumps. If common sense were

not sufficient demonstration of this, it can be shown algebraically.

Were samples equidistant from each other, and were they of equal

width, the average value would be the simple arithmetical mean of

the assays. But this is seldom the case. The number of instances,

not only in practice but also in technical literature, where the

fundamental distinction between an arithmetical and a geometrical

mean is lost sight of is amazing.

To arrive at the average value of samples, it is necessary, in

effect, to reduce them to the actual quantity of the metal and volume

of ore represented by each. The method of calculation therefore

is one which gives every sample an importance depending upon the

metal content of the volume of ore it represents.

The volume of ore appertaining to any given sample can be considered

as a prismoid, the dimensions of which may be stated as follows:--

_W_ = Width in feet of ore sampled.

_L_ = Length in feet of ore represented by the sample.

_D_ = Depth into the block to which values are assumed to penetrate.

We may also let:--

_C_ = The number of cubic feet per ton of ore.

_V_ = Assay value of the sample.

Then _WLD_/C_ = tonnage of the prismoid.*

_V WLD_/C_ = total metal contents.

[Footnote *: Strictly, the prismoidal formula should be used, but

it complicates the study unduly, and for practical purposes the

above may be taken as the volume.]

The average value of a number of samples is the total metal contents

of their respective prismoids, divided by the total tonnage of

these prismoids. If we let _W_, _W_1, _V_, _V_1 etc., represent

different samples, we have:--

_V(_WLD_/_C_) + _V_1 (_W_1 _L_1 _D_1/_C_) + _V_2 (_W_2 _L_2 _D_2/_C_)

---------------------------------------------------------------------

_WLD_/_C_ + _W_1 _L_1 _D_1/_C_ + _W_2 _L_2 _D_2/_C_

= average value.

This may be reduced to:--

(_VWLD_) + (_V_1 _W_1 _L_1 _D_1) + (_V_2 _W_2 _L_2 _D_2,), etc.

---------------------------------------------------------------

(_WLD_) + (_W_1 _L_1 _D_1) + (_W_2 _L_2 _D_2), etc.

As a matter of fact, samples actually represent the value of

the outer shell of the block of ore only, and the continuity of

the same values through the block is a geological assumption.

From the outer shell, all the values can be taken to penetrate

equal distances into the block, and therefore _D_, _D_1, _D_2

may be considered as equal and the equation becomes:--

(_VWL_) + (_V_1 _W_1 _L_1) + (_V_2 _W_2 _L_2), etc.

---------------------------------------------------

(_WL_) + (_W_1 _L_1) + (_W_2 _L_2), etc.

The length of the prismoid base _L_ for any given sample will be

a distance equal to one-half the sum of the distances to the two

adjacent samples. As a matter of practice, samples are usually taken

at regular intervals, and the lengths _L_, _L_1, _L_2 becoming thus

equal can in such case be eliminated, and the equation becomes:--

(_VW_) + (_V_1 _W_1) + (_V_2 _W_2), etc.

----------------------------------------

_W_ + _W_1 + _W_2 , etc.

The name "assay foot" or "foot value" has been given to the relation

_VW_, that is, the assay value multiplied by the width sampled.[*]

It is by this method that all samples must be averaged. The same

relation obviously can be evolved by using an inch instead of a

foot, and in narrow veins the assay inch is generally used.

[Footnote *: An error will be found in this method unless the two

end samples be halved, but in a long run of samples this may be

disregarded.]

Where the payable cross-section is divided into more than one sample,

the different samples in the section must be averaged by the above

formula, before being combined with the adjacent section. Where

the width sampled is narrower than the necessary stoping width,

and where the waste cannot be broken separately, the sample value

must be diluted to a stoping width. To dilute narrow samples to

a stoping width, a blank value over the extra width which it is

necessary to include must be averaged with the sample from the

ore on the above formula. Cases arise where, although a certain

width of waste must be broken with the ore, it subsequently can

be partially sorted out. Practically nothing but experience on

the deposit itself will determine how far this will restore the

value of the ore to the average of the payable seam. In any event,

no sorting can eliminate all such waste; and it is necessary to

calculate the value on the breaking width, and then deduct from

the gross tonnage to be broken a percentage from sorting. There

is always an allowance to be made in sorting for a loss of good

ore with the discards.

PERCENTAGE OF ERROR IN ESTIMATES FROM SAMPLING.--It must be remembered

that the whole theory of estimation by sampling is founded upon

certain assumptions as to evenness of continuity and transition

in value and volume. It is but a basis for an estimate, and an

estimate is not a statement of fact. It cannot therefore be too

forcibly repeated that an estimate is inherently but an approximation,

take what care one may in its founding. While it is possible to

refine mathematical calculation of averages to almost any nicety,

beyond certain essentials it adds nothing to accuracy and is often

misleading.

It is desirable to consider where errors are most likely to creep

in, assuming that all fundamental data are both accurately taken

and considered. Sampling of ore _in situ_ in general has a tendency

to give higher average value than the actual reduction of the ore

will show. On three West Australian gold mines, in records covering

a period of over two years, where sampling was most exhaustive as

a daily régime of the mines, the values indicated by sampling were

12% higher than the mill yield plus the contents of the residues.

On the Witwatersrand gold mines, the actual extractable value is

generally considered to be about 78 to 80% of the average shown

by sampling, while the mill extractions are on average about 90

to 92% of the head value coming to the mill. In other words, there

is a constant discrepancy of about 10 to 12% between the estimated

value as indicated by mine samples, and the actual value as shown

by yield plus the residues. At Broken Hill, on three lead mines,

the yield is about 12% less than sampling would indicate. This

constancy of error in one direction has not been so generally

acknowledged as would be desirable, and it must be allowed for

in calculating final results. The causes of the exaggeration seem

to be:--

_First_, inability to stope a mine to such fine limitations of

width, or exclusion of unpayable patches, as would appear practicable

when sampling, that is by the inclusion when mining of a certain

amount of barren rock. Even in deposits of about normal stoping

width, it is impossible to prevent the breaking of a certain amount

of waste, even if the ore occurrence is regularly confined by walls.

If the mine be of the impregnation type, such as those at Goldfield,

or Kalgoorlie, with values like plums in a pudding, and the stopes

themselves directed more by assays than by any physical differences

in the ore, the discrepancy becomes very much increased. In mines

where the range of values is narrower than the normal stoping width,

some wall rock must be broken. Although it is customary to allow for

this in calculating the average value from samples, the allowance

seldom seems enough. In mines where the ore is broken on to the

top of stopes filled with waste, there is some loss underground

through mixture with the filling.

_Second_, the metal content of ores, especially when in the form of

sulphides, is usually more friable than the matrix, and in actual

breaking of samples an undue proportion of friable material usually

creeps in. This is true more in lead, copper, and zinc, than in

gold ores. On several gold mines, however, tests on accumulated

samples for their sulphide percentage showed a distinctly greater

ratio than the tenor of the ore itself in the mill. As the gold is

usually associated with the sulphides, the samples showed higher

values than the mill.

In general, some considerable factor of safety must be allowed

after arriving at calculated average of samples,--how much it is

difficult to say, but, in any event, not less than 10%.

CHAPTER II.

Mine Valuation (_Continued_).

CALCULATION OF QUANTITIES OF ORE, AND CLASSIFICATION OF ORE IN SIGHT.

As mines are opened by levels, rises, etc., through the ore, an

extension of these workings has the effect of dividing it into

"blocks." The obvious procedure in determining tonnages is to calculate

the volume and value of each block separately. Under the law of

averages, the multiplicity of these blocks tends in proportion

to their number to compensate the percentage of error which might

arise in the sampling or estimating of any particular one. The

shapes of these blocks, on longitudinal section, are often not

regular geometrical figures. As a matter of practice, however, they

can be subdivided into such figures that the total will approximate

the whole with sufficient closeness for calculations of their areas.

The average width of the ore in any particular block is the arithmetical

mean of the width of the sample sections in it,[*] if the samples be

an equal distance apart. If they are not equidistant, the average

width is the sum of the areas between samples, divided by the total

length sampled. The cubic foot contents of a particular block is

obviously the width multiplied by the area of its longitudinal

section.

[Footnote *: This is not strictly true unless the sum of the widths

of the two end-sections be divided by two and the result incorporated

in calculating the means. In a long series that error is of little

importance.]

The ratio of cubic feet to tons depends on the specific gravity

of the ore, its porosity, and moisture. The variability of ores

throughout the mine in all these particulars renders any method

of calculation simply an approximation in the end. The factors

which must remain unknown necessarily lead the engineer to the

provision of a margin of safety, which makes mathematical refinement

and algebraic formulæ ridiculous.

There are in general three methods of determination of the specific

volume of ores:--

_First_, by finding the true specific gravity of a sufficient number

of representative specimens; this, however, would not account for

the larger voids in the ore-body and in any event, to be anything

like accurate, would be as expensive as sampling and is therefore

of little more than academic interest.

_Second_, by determining the weight of quantities broken from measured

spaces. This also would require several tests from different portions

of the mine, and, in examinations, is usually inconvenient and

difficult. Yet it is necessary in cases of unusual materials, such

as leached gossans, and it is desirable to have it done sooner

or later in going mines, as a check.

_Third_, by an approximation based upon a calculation from the

specific gravities of the predominant minerals in the ore. Ores

are a mixture of many minerals; the proportions vary through the

same ore-body. Despite this, a few partial analyses, which are

usually available from assays of samples and metallurgical tests,

and a general inspection as to the compactness of the ore, give a

fairly reliable basis for approximation, especially if a reasonable

discount be allowed for safety. In such discount must be reflected

regard for the porosity of the ore, and the margin of safety necessary

may vary from 10 to 25%. If the ore is of unusual character, as

in leached deposits, as said before, resort must be had to the

second method.

The following table of the weights per cubic foot and the number

of cubic feet per ton of some of the principal ore-forming minerals

and gangue rocks will be useful for approximating the weight of

a cubic foot of ore by the third method. Weights are in pounds

avoirdupois, and two thousand pounds are reckoned to the ton.

============================================

| | Number of

| Weight per | Cubic Feet

| Cubic Foot | per Ton of

| | 2000 lb.

------------------|------------|------------

Antimony | 417.50 | 4.79

Sulphide | 285.00 | 7.01

Arsenical Pyrites | 371.87 | 5.37

Barium Sulphate | 278.12 | 7.19

Calcium: | |

Fluorite | 198.75 | 10.06

Gypsum | 145.62 | 13.73

Calcite | 169.37 | 11.80

Copper | 552.50 | 3.62

Calcopyrite | 262.50 | 7.61

Bornite | 321.87 | 6.21

Malachite | 247.50 | 8.04

Azurite | 237.50 | 8.42

Chrysocolla | 132.50 | 15.09

Iron (Cast) | 450.00 | 4.44

Magnetite | 315.62 | 6.33

Hematite | 306.25 | 6.53

Limonite | 237.50 | 8.42

Pyrite | 312.50 | 6.40

Carbonate | 240.62 | 8.31

Lead | 710.62 | 2.81

Galena | 468.75 | 4.27

Carbonate | 406.87 | 4.81

Manganese Oxide | 268.75 | 6.18

Rhodonite | 221.25 | 9.04

Magnesite | 187.50 | 10.66

Dolomite | 178.12 | 11.23

Quartz | 165.62 | 12.07

Quicksilver | 849.75 | 2.35

Cinnabar | 531.25 | 3.76

Sulphur | 127.12 | 15.74

Tin | 459.00 | 4.35

Oxide | 418.75 | 4.77

Zinc | 437.50 | 4.57

Blende | 253.12 | 7.90

Carbonate | 273.12 | 7.32

Silicate | 215.62 | 9.28

Andesite | 165.62 | 12.07

Granite | 162.62 | 12.30

Diabase | 181.25 | 11.03

Diorite | 171.87 | 11.63

Slates | 165.62 | 12.07

Sandstones | 162.50 | 12.30

Rhyolite | 156.25 | 12.80

============================================

The specific gravity of any particular mineral has a considerable

range, and a medium has been taken. The possible error is

inconsequential for the purpose of these calculations.

For example, a representative gold ore may contain in the main

96% quartz, and 4% iron pyrite, and the weight of the ore may be

deduced as follows:--

Quartz, 96% x 12.07 = 11.58

Iron Pyrite, 4% x 6.40 = .25

-----

11.83 cubic feet per ton.

Most engineers, to compensate porosity, would allow twelve to thirteen

cubic feet per ton.

CLASSIFICATION OF ORE IN SIGHT.

The risk in estimates of the average value of standing ore is dependent

largely upon how far values disclosed by sampling are assumed to

penetrate beyond the tested face, and this depends upon the geological

character of the deposit. From theoretical grounds and experience,

it is known that such values will have some extension, and the

assumption of any given distance is a calculation of risk. The

multiplication of development openings results in an increase of

sampling points available and lessens the hazards. The frequency

of such openings varies in different portions of every mine, and

thus there are inequalities of risk. It is therefore customary in

giving estimates of standing ore to classify the ore according

to the degree of risk assumed, either by stating the number of

sides exposed or by other phrases. Much discussion and ink have

been devoted to trying to define what risk may be taken in such

matters, that is in reality how far values may be assumed to penetrate

into the unbroken ore. Still more has been consumed in attempts

to coin terms and make classifications which will indicate what

ratio of hazard has been taken in stating quantities and values.

The old terms "ore in sight" and "profit in sight" have been of

late years subject to much malediction on the part of engineers

because these expressions have been so badly abused by the charlatans

of mining in attempts to cover the flights of their imaginations. A

large part of Volume X of the "Institution of Mining and Metallurgy"

has been devoted to heaping infamy on these terms, yet not only

have they preserved their places in professional nomenclature,

but nothing has been found to supersede them.

Some general term is required in daily practice to cover the whole

field of visible ore, and if the phrase "ore in sight" be defined,

it will be easier to teach the laymen its proper use than to abolish

it. In fact, the substitutes are becoming abused as much as the

originals ever were. All convincing expressions will be misused

by somebody.

The legitimate direction of reform has been to divide the general

term of "ore in sight" into classes, and give them names which will

indicate the variable amount of risk of continuity in different parts

of the mine. As the frequency of sample points, and consequently the

risk of continuity, will depend upon the detail with which the mine

is cut into blocks by the development openings, and upon the number

of sides of such blocks which are accessible, most classifications

of the degree of risk of continuity have been defined in terms of

the number of sides exposed in the blocks. Many phrases have been

coined to express such classifications; those most currently used

are the following:--

Positive Ore \ Ore exposed on four sides in blocks of a size

Ore Developed / variously prescribed.

Ore Blocked Out Ore exposed on three sides within reasonable

distance of each other.

Probable Ore \

Ore Developing / Ore exposed on two sides.

Possible Ore \ The whole or a part of the ore below the

Ore Expectant / lowest level or beyond the range of vision.

No two of these parallel expressions mean quite the same thing;

each more or less overlies into another class, and in fact none

of them is based upon a logical footing for such a classification.

For example, values can be assumed to penetrate some distance from

every sampled face, even if it be only ten feet, so that ore exposed

on one side will show some "positive" or "developed" ore which, on

the lines laid down above, might be "probable" or even "possible"

ore. Likewise, ore may be "fully developed" or "blocked out" so far

as it is necessary for stoping purposes with modern wide intervals

between levels, and still be in blocks too large to warrant an

assumption of continuity of values to their centers (Fig. 1). As

to the third class of "possible" ore, it conveys an impression

of tangibility to a nebulous hazard, and should never be used in

connection with positive tonnages. This part of the mine's value

comes under extension of the deposit a long distance beyond openings,

which is a speculation and cannot be defined in absolute tons without

exhaustive explanation of the risks attached, in which case any

phrase intended to shorten description is likely to be misleading.

[Illustration: Fig. 1.--Longitudinal section of a mine, showing

classification of the exposed ore. Scale, 400 feet = 1 inch.]

Therefore empirical expressions in terms of development openings

cannot be made to cover a geologic factor such as the distribution

of metals through a rock mass. The only logical basis of ore

classification for estimation purposes is one which is founded

on the chances of the values penetrating from the surface of the

exposures for each particular mine. Ore that may be calculated

upon to a certainty is that which, taking into consideration the

character of the deposit, can be said to be so sufficiently surrounded

by sampled faces that the distance into the mass to which values

are assumed to extend is reduced to a minimum risk. Ore so far

removed from the sampled face as to leave some doubt, yet affording

great reason for expectation of continuity, is "probable" ore.

The third class of ore mentioned, which is that depending upon

extension of the deposit and in which, as said above, there is great

risk, should be treated separately as the speculative value of the

mine. Some expressions are desirable for these classifications, and

the writer's own preference is for the following, with a definition

based upon the controlling factor itself.

They are:--

Proved Ore Ore where there is practically no risk of

failure of continuity.

Probable Ore Ore where there is some risk, yet warrantable

justification for assumption of continuity.

Prospective Ore Ore which cannot be included in the above

classes, nor definitely known or stated in

any terms of tonnage.

What extent of openings, and therefore of sample faces, is required

for the ore to be called "proved" varies naturally with the type

of deposit,--in fact with each mine. In a general way, a fair rule

in gold quartz veins below influence of secondary alteration is

that no point in the block shall be over fifty feet from the points

sampled. In limestone or andesite replacements, as by gold or lead

or copper, the radius must be less. In defined lead and copper

lodes, or in large lenticular bodies such as the Tennessee copper

mines, the radius may often be considerably greater,--say one hundred

feet. In gold deposits of such extraordinary regularity of values

as the Witwatersrand bankets, it can well be two hundred or two

hundred and fifty feet.

"Probable ore" should be ore which entails continuity of values

through a greater distance than the above, and such distance must

depend upon the collateral evidence from the character of the deposit,

the position of openings, etc.

Ore beyond the range of the "probable" zone is dependent upon the

extension of the deposit beyond the realm of development and will

be discussed separately.

Although the expression "ore in sight" may be deprecated, owing to

its abuse, some general term to cover both "positive" and "probable"

ore is desirable; and where a general term is required, it is the

intention herein to hold to the phrase "ore in sight" under the

limitations specified.

CHAPTER III.

Mine Valuation (_Continued_).

PROSPECTIVE VALUE.[*] EXTENSION IN DEPTH; ORIGIN AND STRUCTURAL

CHARACTER OF THE DEPOSIT; SECONDARY ENRICHMENT; DEVELOPMENT IN

NEIGHBORING MINES; DEPTH OF EXHAUSTION.

[Footnote *: The term "extension in depth" is preferred by many

to the phrase "prospective value." The former is not entirely

satisfactory, as it has a more specific than general application.

It is, however, a current miner's phrase, and is more expressive.

In this discussion "extension in depth" is used synonymously, and

it may be taken to include not alone the downward prolongation of

the ore below workings, but also the occasional cases of lateral

extension beyond the range of development work. The commonest instance

is continuance below the bottom level. In any event, to the majority

of cases of different extension the same reasoning applies.]

It is a knotty problem to value the extension of a deposit beyond

a short distance from the last opening. A short distance beyond

it is "proved ore," and for a further short distance is "probable

ore." Mines are very seldom priced at a sum so moderate as that

represented by the profit to be won from the ore in sight, and what

value should be assigned to this unknown portion of the deposit

admits of no certainty. No engineer can approach the prospective

value of a mine with optimism, yet the mining industry would be

non-existent to-day were it approached with pessimism. Any value

assessed must be a matter of judgment, and this judgment based on

geological evidence. Geology is not a mathematical science, and

to attach a money equivalence to forecasts based on such evidence

is the most difficult task set for the mining engineer. It is here

that his view of geology must differ from that of his financially

more irresponsible brother in the science. The geologist, contributing

to human knowledge in general, finds his most valuable field in the

examination of mines largely exhausted. The engineer's most valuable

work arises from his ability to anticipate in the youth of the mine

the symptoms of its old age. The work of our geologic friends is,

however, the very foundation on which we lay our forecasts.

Geologists have, as the result of long observation, propounded for

us certain hypotheses which, while still hypotheses, have proved

to account so widely for our underground experience that no engineer

can afford to lose sight of them. Although there is a lack of safety

in fixed theories as to ore deposition, and although such conclusions

cannot be translated into feet and metal value, they are nevertheless

useful weights on the scale where probabilities are to be weighed.

A method in vogue with many engineers is, where the bottom level

is good, to assume the value of the extension in depth as a sum

proportioned to the profit in sight, and thus evade the use of

geological evidence. The addition of various percentages to the

profit in sight has been used by engineers, and proposed in technical

publications, as varying from 25 to 50%. That is, they roughly

assess the extension in depth to be worth one-fifth to one-third

of the whole value of an equipped mine. While experience may have

sometimes demonstrated this to be a practical method, it certainly

has little foundation in either science or logic, and the writer's

experience is that such estimates are untrue in practice. The quantity

of ore which may be in sight is largely the result of managerial

policy. A small mill on a large mine, under rapid development,

will result in extensive ore-reserves, while a large mill eating

away rapidly on the same mine under the same scale of development

would leave small reserves. On the above scheme of valuation the

extension in depth would be worth very different sums, even when the

deepest level might be at the same horizon in both cases. Moreover,

no mine starts at the surface with a large amount of ore in sight.

Yet as a general rule this is the period when its extension is most

valuable, for when the deposit is exhausted to 2000 feet, it is

not likely to have such extension in depth as when opened one hundred

feet, no matter what the ore-reserves may be. Further, such bases

of valuation fail to take into account the widely varying geologic

character of different mines, and they disregard any collateral

evidence either of continuity from neighboring development, or from

experience in the district. Logically, the prospective value can

be simply a factor of how _far_ the ore in the individual mine

may be expected to extend, and not a factor of the remnant of ore

that may still be unworked above the lowest level.

An estimation of the chances of this extension should be based

solely on the local factors which bear on such extension, and these

are almost wholly dependent upon the character of the deposit.

These various geological factors from a mining engineer's point

of view are:--

1. The origin and structural character of the ore-deposit.

2. The position of openings in relation to secondary alteration.

3. The size of the deposit.

4. The depth to which the mine has already been exhausted.

5. The general experience of the district for continuity and

the development of adjoining mines.

THE ORIGIN AND STRUCTURAL CHARACTER OF THE DEPOSIT.--In a general

way, the ore-deposits of the order under discussion originate primarily

through the deposition of metals from gases or solutions circulating

along avenues in the earth's crust.[*] The original source of metals

is a matter of great disagreement, and does not much concern the

miner. To him, however, the origin and character of the avenue

of circulation, the enclosing rock, the influence of the rocks

on the solution, and of the solutions on the rocks, have a great

bearing on the probable continuity of the volume and value of the

ore.

[Footnote *: The class of magmatic segregations is omitted, as

not being of sufficiently frequent occurrence in payable mines to

warrant troubling with it here.]

All ore-deposits vary in value and, in the miner's view, only those

portions above the pay limit are ore-bodies, or ore-shoots. The

localization of values into such pay areas in an ore-deposit are

apparently influenced by:

1. The distribution of the open spaces created by structural

movement, fissuring, or folding as at Bendigo.

2. The intersection of other fractures which, by mingling of

solutions from different sources, provided precipitating

conditions, as shown by enrichments at cross-veins.

3. The influence of the enclosing rocks by:--

(a) Their solubility, and therefore susceptibility to replacement.

(b) Their influence as a precipitating agent on solutions.

(c) Their influence as a source of metal itself.

(d) Their texture, in its influence on the character of

the fracture. In homogeneous rocks the tendency

is to open clean-cut fissures; in friable

rocks, zones of brecciation; in slates or schistose

rocks, linked lenticular open spaces;--these

influences exhibiting themselves in miner's terms

respectively in "well-defined fissure veins,"

"lodes," and "lenses."

(e) The physical character of the rock mass and the

dynamic forces brought to bear upon it. This

is a difficult study into the physics of stress in

cases of fracturing, but its local application has

not been without results of an important order.

4. Secondary alteration near the surface, more fully discussed

later.

It is evident enough that the whole structure of the deposit is

a necessary study, and even a digest of the subject is not to be

compressed into a few paragraphs.

From the point of view of continuity of values, ore-deposits may

be roughly divided into three classes. They are:--

1. Deposits of the infiltration type in porous beds, such as

Lake Superior copper conglomerates and African gold bankets.

2. Deposits of the fissure vein type, such as California quartz veins.

3. Replacement or impregnation deposits on the lines of fissuring

or otherwise.

In a general way, the uniformity of conditions of deposition in

the first class has resulted in the most satisfactory continuity of

ore and of its metal contents. In the second, depending much upon

the profundity of the earth movements involved, there is laterally

and vertically a reasonable basis for expectation of continuity

but through much less distance than in the first class.

The third class of deposits exhibits widely different phenomena

as to continuity and no generalization is of any value. In gold

deposits of this type in West Australia, Colorado, and Nevada,

continuity far beyond a sampled face must be received with the

greatest skepticism. Much the same may be said of most copper

replacements in limestone. On the other hand the most phenomenal

regularity of values have been shown in certain Utah and Arizona

copper mines, the result of secondary infiltration in porphyritic

gangues. The Mississippi Valley lead and zinc deposits, while irregular

in detail, show remarkable continuity by way of reoccurrence over

wide areas. The estimation of the prospective value of mines where

continuity of production is dependent on reoccurrence of ore-bodies

somewhat proportional to the area, such as these Mississippi deposits

or to some extent as in Cobalt silver veins, is an interesting

study, but one that offers little field for generalization.

THE POSITION OF THE OPENINGS IN RELATION TO SECONDARY ALTERATION.--The

profound alteration of the upper section of ore-deposits by oxidation

due to the action of descending surface waters, and their associated

chemical agencies, has been generally recognized for a great many

years. Only recently, however, has it been appreciated that this

secondary alteration extends into the sulphide zone as well. The

bearing of the secondary alteration, both in the oxidized and upper

sulphide zones, is of the most sweeping economic character. In

considering extension of values in depth, it demands the most rigorous

investigation. Not only does the metallurgical character of the ores

change with oxidation, but the complex reactions due to descending

surface waters cause leaching and a migration of metals from one

horizon to another lower down, and also in many cases a redistribution

of their sequence in the upper zones of the deposit.

The effect of these agencies has been so great in many cases as

to entirely alter the character of the mine and extension in depth

has necessitated a complete reëquipment. For instance, the Mt.

Morgan gold mine, Queensland, has now become a copper mine; the

copper mines at Butte were formerly silver mines; Leadville has

become largely a zinc producer instead of lead.

From this alteration aspect ore-deposits may be considered to have

four horizons:--

1. The zone near the outcrop, where the dominating feature

is oxidation and leaching of the soluble minerals.

2. A lower horizon, still in the zone of oxidation, where the

predominant feature is the deposition of metals as native,

oxides, and carbonates.

3. The upper horizon of the sulphide zone, where the special

feature is the enrichment due to secondary deposition

as sulphides.

4. The region below these zones of secondary alteration, where

the deposit is in its primary state.

These zones are seldom sharply defined, nor are they always all

in evidence. How far they are in evidence will depend, among other

things, upon the amount and rapidity of erosion, the structure and

mineralogical character of the deposit, and upon the enclosing

rock.

If erosion is extremely rapid, as in cold, wet climates, and rough

topography, or as in the case of glaciation of the Lake copper

deposits, denudation follows close on the heels of alteration,

and the surface is so rapidly removed that we may have the primary

ore practically at the surface. Flat, arid regions present the

other extreme, for denudation is much slower, and conditions are

most perfect for deep penetration of oxidizing agencies, and the

consequent alteration and concentration of the metals.

The migration of metals from the top of the oxidized zone leaves

but a barren cap for erosion. The consequent effect of denudation

that lags behind alteration is to raise slowly the concentrated

metals toward the surface, and thus subject them to renewed attack

and repeated migration. In this manner we can account for the enormous

concentration of values in the lower oxidized and upper sulphide

zones overlying very lean sulphides in depth.

Some minerals are more freely soluble and more readily precipitated

than others. From this cause there is in complex metal deposits a

rearrangement of horizontal sequence, in addition to enrichment at

certain horizons and impoverishment at others. The whole subject

is one of too great complexity for adequate consideration in this

discussion. No engineer is properly equipped to give judgment on

extension in depth without a thorough grasp of the great principles

laid down by Van Hise, Emmons, Lindgren, Weed, and others. We may,

however, briefly examine some of the theoretical effects of such

alteration.

Zinc, iron, and lead sulphides are a common primary combination.

These metals are rendered soluble from their usual primary forms

by oxidizing agencies, in the order given. They reprecipitate as

sulphides in the reverse sequence. The result is the leaching of

zinc and iron readily in the oxidized zone, thus differentially

enriching the lead which lags behind, and a further extension of

the lead horizon is provided by the early precipitation of such

lead as does migrate. Therefore, the lead often predominates in

the second and the upper portion of the third zone, with the zinc

and iron below. Although the action of all surface waters is toward

oxidation and carbonation of these metals, the carbonate development

of oxidized zones is more marked when the enclosing rocks are

calcareous.

In copper-iron deposits, the comparatively easy decomposition and

solubility and precipitation of the copper and some iron salts

generally result in more extensive impoverishment of these metals

near the surface, and more predominant enrichment at a lower horizon

than is the case with any other metals. The barren "iron hat" at the

first zone, the carbonates and oxides at the second, the enrichment

with secondary copper sulphides at the top of the third, and the

occurrence of secondary copper-iron sulphides below, are often

most clearly defined. In the easy recognition of the secondary

copper sulphides, chalcocite, bornite, etc., the engineer finds a

finger-post on the road to extension in depth; and the directions

upon this post are not to be disregarded. The number of copper

deposits enriched from unpayability in the first zone to a profitable

character in the next two, and unpayability again in the fourth,

is legion.

Silver occurs most abundantly in combination with either lead,

copper, iron, or gold. As it resists oxidation and solution more

strenuously than copper and iron, its tendency when in combination

with them is to lag behind in migration. There is thus a differential

enrichment of silver in the upper two zones, due to the reduction

in specific gravity of the ore by the removal of associated metals.

Silver does migrate somewhat, however, and as it precipitates more

readily than copper, lead, zinc, or iron, its tendency when in

combination with them is towards enrichment above the horizons of

enrichment of these metals. When it is in combination with lead

and zinc, its very ready precipitation from solution by the galena

leaves it in combination more predominantly with the lead. The

secondary enrichment of silver deposits at the top of the sulphide

zone is sometimes a most pronounced feature, and it seems to be

the explanation of the origin of many "bonanzas."

In gold deposits, the greater resistance to solubility of this

metal than most of the others, renders the phenomena of migration to

depth less marked. Further than this, migration is often interfered

with by the more impervious quartz matrix of many gold deposits.

Where gold is associated with large quantities of base metals,

however, the leaching of the latter in the oxidized zone leaves the

ore differentially richer, and as gold is also slightly soluble,

in such cases the migration of the base metals does carry some of

the gold. In the instance especially of impregnation or replacement

deposits, where the matrix is easily permeable, the upper sulphide

zone is distinctly richer than lower down, and this enrichment is

accompanied by a considerable increase in sulphides and tellurides.

The predominant characteristic of alteration in gold deposits is,

however, enrichment in the oxidized zone with the maximum values

near the surface. The reasons for this appear to be that gold in its

resistance to oxidation and wholesale migration gives opportunities

to a sort of combined mechanical and chemical enrichment.

In dry climates, especially, the gentleness of erosion allows of

more thorough decomposition of the outcroppings, and a mechanical

separation of the gold from the detritus. It remains on or near

the deposit, ready to be carried below, mechanically or otherwise.

In wet climates this is less pronounced, for erosion bears away

the croppings before such an extensive decomposition and freeing

of the gold particles. The West Australian gold fields present an

especially prominent example of this type of superficial enrichment.

During the last fifteen years nearly eight hundred companies have

been formed for working mines in this region. Although from four

hundred of these high-grade ore has been produced, some thirty-three

only have ever paid dividends. The great majority have been unpayable

below oxidation,--a distance of one or two hundred feet. The writer's

unvarying experience with gold is that it is richer in the oxidized

zone than at any point below. While cases do occur of gold deposits

richer in the upper sulphide zone than below, even the upper sulphides

are usually poorer than the oxidized region. In quartz veins

preëminently, evidence of enrichment in the third zone is likely

to be practically absent.

Tin ores present an anomaly among the base metals under discussion,

in that the primary form of this metal in most workable deposits

is an oxide. Tin in this form is most difficult of solution from

ground agencies, as witness the great alluvial deposits, often of

considerable geologic age. In consequence the phenomena of migration

and enrichment are almost wholly absent, except such as are due

to mechanical penetration of tin from surface decomposition of

the matrix akin to that described in gold deposits.

In general, three or four essential facts from secondary alteration

must be kept in view when prognosticating extensions.

Oxidation usually alters treatment problems, and oxidized ore

of the same grade as sulphides can often be treated more cheaply.

This is not universal. Low-grade ores of lead, copper, and zinc

may be treatable by concentration when in the form of sulphides,

and may be valueless when oxidized, even though of the same grade.

Copper ores generally show violent enrichment at the base of the

oxidized, and at the top of the sulphide zone.

Lead-zinc ores show lead enrichment and zinc impoverishment in

the oxidized zone but have usually less pronounced enrichment

below water level than copper. The rearrangement of the metals

by the deeper migration of the zinc, also renders them

metallurgically of less value with depth.

Silver deposits are often differentially enriched in the oxidized

zone, and at times tend to concentrate in the upper sulphide zone.

Gold deposits usually decrease in value from the surface through

the whole of the three alteration zones.

SIZE OF DEPOSITS.--The proverb of a relation between extension

in depth and size of ore-bodies expresses one of the oldest of

miners' beliefs. It has some basis in experience, especially in

fissure veins, but has little foundation in theory and is applicable

over but limited areas and under limited conditions.

From a structural view, the depth of fissuring is likely to be more

or less in proportion to its length and breadth and therefore the

volume of vein filling with depth is likely to be proportional to

length and width of the fissure. As to the distribution of values,

if we eliminate the influence of changing wall rocks, or other

precipitating agencies which often cause the values to arrange

themselves in "floors," and of secondary alteration, there may be

some reason to assume distribution of values of an extent equal

vertically to that displayed horizontally. There is, as said, more

reason in experience for this assumption than in theory. A study

of the shape of a great many ore-shoots in mines of fissure type

indicates that when the ore-shoots or ore-bodies are approaching

vertical exhaustion they do not end abruptly, but gradually shorten

and decrease in value, their bottom boundaries being more often

wedge-shaped than even lenticular. If this could be taken as the usual

occurrence, it would be possible (eliminating the evident exceptions

mentioned above) to state roughly that the minimum extension of an

ore-body or ore-shoot in depth below any given horizon would be

a distance represented by a radius equal to one-half its length. By

length is not meant necessarily the length of a horizontal section,

but of one at right angles to the downward axis.

On these grounds, which have been reënforced by much experience among

miners, the probabilities of extension are somewhat in proportion

to the length and width of each ore-body. For instance, in the A

mine, with an ore-shoot 1000 feet long and 10 feet wide, on its

bottom level, the minimum extension under this hypothesis would

be a wedge-shaped ore-body with its deepest point 500 feet below

the lowest level, or a minimum of say 200,000 tons. Similarly,

the B mine with five ore-bodies, each 300 hundred feet long and

10 feet wide, exposed on its lowest level, would have a minimum of

five wedges 100 feet deep at their deepest points, or say 50,000

tons. This is not proposed as a formula giving the total amount of

extension in depth, but as a sort of yardstick which has experience

behind it. This experience applies in a much less degree to deposits

originating from impregnation along lines of fissuring and not at

all to replacements.

DEVELOPMENT IN NEIGHBORING MINES.--Mines of a district are usually

found under the same geological conditions, and show somewhat the same

habits as to extension in depth or laterally, and especially similar

conduct of ore-bodies and ore-shoots. As a practical criterion, one

of the most intimate guides is the actual development in adjoining

mines. For instance, in Kalgoorlie, the Great Boulder mine is (March,

1908) working the extension of Ivanhoe lodes at points 500 feet

below the lowest level in the Ivanhoe; likewise, the Block 10 lead

mine at Broken Hill is working the Central ore-body on the Central

boundary some 350 feet below the Central workings. Such facts as

these must have a bearing on assessing the downward extension.

DEPTH OF EXHAUSTION.--All mines become completely exhausted at

some point in depth. Therefore the actual distance to which ore

can be expected to extend below the lowest level grows less with

every deeper working horizon. The really superficial character of

ore-deposits, even outside of the region of secondary enrichment

is becoming every year better recognized. The prospector's idea

that "she gets richer deeper down," may have some basis near the

surface in some metals, but it is not an idea which prevails in

the minds of engineers who have to work in depth. The writer, with

some others, prepared a list of several hundred dividend-paying

metal mines of all sorts, extending over North and South America,

Australasia, England, and Africa. Notes were made as far as possible

of the depths at which values gave out, and also at which dividends

ceased. Although by no means a complete census, the list indicated

that not 6% of mines (outside banket) that have yielded profits,

ever made them from ore won below 2000 feet. Of mines that paid

dividends, 80% did not show profitable value below 1500 feet, and

a sad majority died above 500. Failures at short depths may be

blamed upon secondary enrichment, but the majority that reached

below this influence also gave out. The geological reason for such

general unseemly conduct is not so evident.

CONCLUSION.--As a practical problem, the assessment of prospective

value is usually a case of "cut and try." The portion of the capital

to be invested, which depends upon extension, will require so many

tons of ore of the same value as that indicated by the standing

ore, in order to justify the price. To produce this tonnage at

the continued average size of the ore-bodies will require their

extension in depth so many feet--or the discovery of new ore-bodies

of a certain size. The five geological weights mentioned above

may then be put into the scale and a basis of judgment reached.

CHAPTER IV.

Mine Valuation (_Continued_).

RECOVERABLE PERCENTAGE OF THE GROSS ASSAY VALUE; PRICE OF METALS;

COST OF PRODUCTION.

The method of treatment for the ore must be known before a mine

can be valued, because a knowledge of the recoverable percentage

is as important as that of the gross value of the ore itself. The

recoverable percentage is usually a factor of working costs. Practically

every ore can be treated and all the metal contents recovered, but

the real problem is to know the method and percentage of recovery

which will yield the most remunerative result, if any. This limit to

profitable recovery regulates the amount of metal which should be

lost, and the amount of metal which consequently must be deducted

from the gross value before the real net value of the ore can be

calculated. Here, as everywhere else in mining, a compromise has to

be made with nature, and we take what we can get--profitably. For

instance, a copper ore may be smelted and a 99% recovery obtained.

Under certain conditions this might be done at a loss, while the

same ore might be concentrated before smelting and yield a profit

with a 70% recovery. An additional 20% might be obtained by roasting

and leaching the residues from concentration, but this would probably

result in an expenditure far greater than the value of the 20%

recovered. If the ore is not already under treatment on the mine,

or exactly similar ore is not under treatment elsewhere, with known

results, the method must be determined experimentally, either by

the examining engineer or by a special metallurgist.

Where partially treated products, such as concentrates, are to be

sold, not only will there be further losses, but deductions will

be made by the smelter for deleterious metals and other charges.

All of these factors must be found out,--and a few sample smelting

returns from a similar ore are useful.

To cover the whole field of metallurgy and discuss what might apply,

and how it might apply, under a hundred supposititious conditions

would be too great a digression from the subject in hand. It is

enough to call attention here to the fact that the residues from

every treatment carry some metal, and that this loss has to be

deducted from the gross value of the ore in any calculations of

net values.

PRICE OF METALS.

Unfortunately for the mining engineer, not only has he to weigh

the amount of risk inherent in calculations involved in the mine

itself, but also that due to fluctuations in the value of metals.

If the ore is shipped to custom works, he has to contemplate also

variations in freights and smelting charges. Gold from the mine

valuer's point of view has no fluctuations. It alone among the

earth's products gives no concern as to the market price. The price

to be taken for all other metals has to be decided before the mine

can be valued. This introduces a further speculation and, as in

all calculations of probabilities, amounts to an estimate of the

amount of risk. In a free market the law of supply and demand governs

the value of metals as it does that of all other commodities. So

far, except for tariff walls and smelting rings, there is a free

market in the metals under discussion.

The demand for metals varies with the unequal fluctuations of the

industrial tides. The sea of commercial activity is subject to

heavy storms, and the mine valuer is compelled to serve as weather

prophet on this ocean of trouble. High prices, which are the result

of industrial booms, bring about overproduction, and the collapse of

these begets a shrinkage of demand, wherein consequently the tide

of price turns back. In mining for metals each pound is produced

actually at a different cost. In case of an oversupply of base metals

the price will fall until it has reached a point where a portion of

the production is no longer profitable, and the equilibrium is

established through decline in output. However, in the backward

swing, due to lingering overproduction, prices usually fall lower

than the cost of producing even a much-diminished supply. There is

at this point what we may call the "basic" price, that at which

production is insufficient and the price rises again. The basic

price which is due to this undue backward swing is no more the

real price of the metal to be contemplated over so long a term

of years than is the highest price. At how much above the basic

price of depressed times the product can be safely expected to

find a market is the real question. Few mines can be bought or

valued at this basic price. An indication of what this is can be

gained from a study of fluctuations over a long term of years.

It is common to hear the average price over an extended period

considered the "normal" price, but this basis for value is one which

must be used with discretion, for it is not the whole question when

mining. The "normal" price is the average price over a long term.

The lives of mines, and especially ore in sight, may not necessarily

enjoy the period of this "normal" price. The engineer must balance

his judgments by the immediate outlook of the industrial weather.

When lead was falling steadily in December, 1907, no engineer would

accept the price of that date, although it was then below "normal";

his product might go to market even lower yet.

It is desirable to ascertain what the basic and normal prices are,

for between them lies safety. Since 1884 there have been three cycles

of commercial expansion and contraction. If the average prices

are taken for these three cycles separately (1885-95), 1895-1902,

1902-08) it will be seen that there has been a steady advance in

prices. For the succeeding cycles lead on the London Exchange,[*]

the freest of the world's markets was £12 12_s._ 4_d._, £13 3_s._

7_d._, and £17 7_s._ 0_d._ respectively; zinc, £17 14_s._ 10_d._,

£19 3_s._ 8_d._, and £23 3_s._ 0_d._; and standard copper, £48 16_s._

0_d._, £59 10_s._ 0_d._, and £65 7_s._ 0_d._ It seems, therefore,

that a higher standard of prices can be assumed as the basic and

normal than would be indicated if the general average of, say,

twenty years were taken. During this period, the world's gold output

has nearly quadrupled, and, whether the quantitative theory of

gold be accepted or not, it cannot be denied that there has been

a steady increase in the price of commodities. In all base-metal

mining it is well to remember that the production of these metals

is liable to great stimulus at times from the discovery of new

deposits or new processes of recovery from hitherto unprofitable

ores. It is therefore for this reason hazardous in the extreme

to prophesy what prices will be far in the future, even when the

industrial weather is clear. But some basis must be arrived at,

and from the available outlook it would seem that the following

metal prices are justifiable for some time to come, provided the

present tariff schedules are maintained in the United States:

[Footnote *: All London prices are based on the long ton of 2,240

lbs. Much confusion exists in the copper trade as to the classification

of the metal. New York prices are quoted in electrolytic and "Lake";

London's in "Standard." "Standard" has now become practically an

arbitrary term peculiar to London, for the great bulk of copper

dealt in is "electrolytic" valued considerably over "Standard."]

==========================================================================

| Lead | Spelter | Copper | Tin | Silver

|------------|----------|----------|----------|---------------

|London| N.Y.|Lon.| N.Y.|Lon.| N.Y.|Lon.| N.Y.| Lon. | N.Y.

| Ton |Pound|Ton |Pound|Ton |Pound|Ton |Pound|Per oz.|Per oz.

------------|------|-----|----|-----|----|-----|----|-----|-------|-------

Basic Price | £11. |$.035|£17 |$.040|£52 |$.115|£100|$.220| 22_d._|$.44

Normal Price| 13.5| .043| 21 | .050| 65 | .140| 130| .290| 26 | .52

==========================================================================

In these figures the writer has not followed strict averages, but

has taken the general outlook combined with the previous records.

The likelihood of higher prices for lead is more encouraging than

for any other metal, as no new deposits of importance have come

forward for years, and the old mines are reaching considerable

depths. Nor does the frenzied prospecting of the world's surface

during the past ten years appear to forecast any very disturbing

developments. The zinc future is not so bright, for metallurgy

has done wonders in providing methods of saving the zinc formerly

discarded from lead ores, and enormous supplies will come forward

when required. The tin outlook is encouraging, for the supply from

a mining point of view seems unlikely to more than keep pace with

the world's needs. In copper the demand is growing prodigiously,

but the supplies of copper ores and the number of copper mines

that are ready to produce whenever normal prices recur was never

so great as to-day. One very hopeful fact can be deduced for the

comfort of the base metal mining industry as a whole. If the growth

of demand continues through the next thirty years in the ratio of

the past three decades, the annual demand for copper will be over

3,000,000 tons, of lead over 1,800,000 tons, of spelter 2,800,000

tons, of tin 250,000 tons. Where such stupendous amounts of these

metals are to come from at the present range of prices, and even

with reduced costs of production, is far beyond any apparent source

of supply. The outlook for silver prices is in the long run not

bright. As the major portion of the silver produced is a bye product

from base metals, any increase in the latter will increase the

silver production despite very much lower prices for the precious

metal. In the meantime the gradual conversion of all nations to

the gold standard seems a matter of certainty. Further, silver

may yet be abandoned as a subsidiary coinage inasmuch as it has

now but a token value in gold standard countries if denuded of

sentiment.

COST OF PRODUCTION.

It is hardly necessary to argue the relative importance of the

determination of the cost of production and the determination of

the recoverable contents of the ore. Obviously, the aim of mine

valuation is to know the profits to be won, and the profit is the

value of the metal won, less the cost of production.

The cost of production embraces development, mining, treatment,

management. Further than this, it is often contended that, as the

capital expended in purchase and equipment must be redeemed within

the life of the mine, this item should also be included in production

costs. It is true that mills, smelters, shafts, and all the

paraphernalia of a mine are of virtually negligible value when it

is exhausted; and that all mines are exhausted sometime and every

ton taken out contributes to that exhaustion; and that every ton of

ore must bear its contribution to the return of the investment,

as well as profit upon it. Therefore it may well be said that the

redemption of the capital and its interest should be considered

in costs per ton. The difficulty in dealing with the subject from

the point of view of production cost arises from the fact that,

except possibly in the case of banket gold and some conglomerate

copper mines, the life of a metal mine is unknown beyond the time

required to exhaust the ore reserves. The visible life at the time

of purchase or equipment may be only three or four years, yet the

average equipment has a longer life than this, and the anticipation

for every mine is also for longer duration than the bare ore in sight.

For clarity of conclusions in mine valuation the most advisable

course is to determine the profit in sight irrespective of capital

redemption in the first instance. The questions of capital redemption,

purchase price, or equipment cost can then be weighed against the

margin of profit. One phase of redemption will be further discussed

under "Amortization of Capital" and "Ratio of Output to the Mine."

The cost of production depends upon many things, such as the cost of

labor, supplies, the size of the ore-body, the treatment necessary,

the volume of output, etc.; and to discuss them all would lead

into a wilderness of supposititious cases. If the mine is a going

concern, from which reliable data can be obtained, the problem is

much simplified. If it is virgin, the experience of other mines

in the same region is the next resource; where no such data can be

had, the engineer must fall back upon the experience with mines

still farther afield. Use is sometimes made of the "comparison ton"

in calculating costs upon mines where data of actual experience

are not available. As costs will depend in the main upon items

mentioned above, if the known costs of a going mine elsewhere be

taken as a basis, and subtractions and additions made for more

unfavorable or favorable effect of the differences in the above

items, a fairly close result can be approximated.

Mine examinations are very often inspired by the belief that extended

operations or new metallurgical applications to the mine will expand

the profits. In such cases the paramount questions are the reduction

of costs by better plant, larger outputs, new processes, or alteration

of metallurgical basis and better methods. If every item of previous

expenditure be gone over and considered, together with the equipment,

and method by which it was obtained, the possible savings can be

fairly well deduced, and justification for any particular line

of action determined. One view of this subject will be further

discussed under "Ratio of Output to the Mine." The conditions which

govern the working costs are on every mine so special to itself,

that no amount of advice is very useful. Volumes of advice have

been published on the subject, but in the main their burden is

not to underestimate.

In considering the working costs of base-metal mines, much depends

upon the opportunity for treatment in customs works, smelters,

etc. Such treatment means a saving of a large portion of equipment

cost, and therefore of the capital to be invested and subsequently

recovered. The economics of home treatment must be weighed against

the sum which would need to be set aside for redemption of the

plant, and unless there is a very distinct advantage to be had by

the former, no risks should be taken. More engineers go wrong by

the erection of treatment works where other treatment facilities

are available, than do so by continued shipping. There are many

mines where the cost of equipment could never be returned, and

which would be valueless unless the ore could be shipped. Another

phase of foreign treatment arises from the necessity or advantage

of a mixture of ores,--the opportunity of such mixtures often gives

the public smelter an advantage in treatment with which treatment

on the mine could never compete.

Fluctuation in the price of base metals is a factor so much to be

taken into consideration, that it is desirable in estimating mine

values to reduce the working costs to a basis of a "per unit" of

finished metal. This method has the great advantage of indicating

so simply the involved risks of changing prices that whoso runs

may read. Where one metal predominates over the other to such an

extent as to form the "backbone" of the value of the mine, the

value of the subsidiary metals is often deducted from the cost of

the principal metal, in order to indicate more plainly the varying

value of the mine with the fluctuating prices of the predominant

metal. For example, it is usual to state that the cost of copper

production from a given ore will be so many cents per pound, or so

many pounds sterling per ton. Knowing the total metal extractable

from the ore in sight, the profits at given prices of metal can

be readily deduced. The point at which such calculation departs

from the "per-ton-of-ore" unto the per-unit-cost-of-metal basis,

usually lies at the point in ore dressing where it is ready for the

smelter. To take a simple case of a lead ore averaging 20%: this

is to be first concentrated and the lead reduced to a concentrate

averaging 70% and showing a recovery of 75% of the total metal

content. The cost per ton of development, mining, concentration,

management, is to this point say $4 per ton of original crude ore.

The smelter buys the concentrate for 95% of the value of the metal,

less the smelting charge of $15 per ton, or there is a working

cost of a similar sum by home equipment. In this case 4.66 tons of

ore are required to produce one ton of concentrates, and therefore

each ton of concentrates costs $18.64. This amount, added to the

smelting charge, gives a total of $33.64 for the creation of 70%

of one ton of finished lead, or equal to 2.40 cents per pound which

can be compared with the market price less 5%. If the ore were

to contain 20 ounces of silver per ton, of which 15 ounces were

recovered into the leady concentrates, and the smelter price for

the silver were 50 cents per ounce, then the $7.50 thus recovered

would be subtracted from $33.64, making the apparent cost of the

lead 1.86 cents per pound.

CHAPTER V.

Mine Valuation (_Continued_).

REDEMPTION OR AMORTIZATION OF CAPITAL AND INTEREST.

It is desirable to state in some detail the theory of amortization

before consideration of its application in mine valuation.

As every mine has a limited life, the capital invested in it must

be redeemed during the life of the mine. It is not sufficient that

there be a bare profit over working costs. In this particular,

mines differ wholly from many other types of investment, such as

railways. In the latter, if proper appropriation is made for

maintenance, the total income to the investor can be considered as

interest or profit; but in mines, a portion of the annual income

must be considered as a return of capital. Therefore, before the

yield on a mine investment can be determined, a portion of the

annual earnings must be set aside in such a manner that when the

mine is exhausted the original investment will have been restored.

If we consider the date due for the return of the capital as the time

when the mine is exhausted, we may consider the annual instalments

as payments before the due date, and they can be put out at compound

interest until the time for restoration arrives. If they be invested

in safe securities at the usual rate of about 4%, the addition of

this amount of compound interest will assist in the repayment of

the capital at the due date, so that the annual contributions to

a sinking fund need not themselves aggregate the total capital to

be restored, but may be smaller by the deficiency which will be

made up by their interest earnings. Such a system of redemption

of capital is called "Amortization."

Obviously it is not sufficient for the mine investor that his capital

shall have been restored, but there is required an excess earning

over and above the necessities of this annual funding of capital.

What rate of excess return the mine must yield is a matter of the

risks in the venture and the demands of the investor. Mining business

is one where 7% above provision for capital return is an absolute

minimum demanded by the risks inherent in mines, even where the

profit in sight gives warranty to the return of capital. Where

the profit in sight (which is the only real guarantee in mine

investment) is below the price of the investment, the annual return

should increase in proportion. There are thus two distinct directions

in which interest must be computed,--first, the internal influence

of interest in the amortization of the capital, and second, the

percentage return upon the whole investment after providing for

capital return.

There are many limitations to the introduction of such refinements

as interest calculations in mine valuation. It is a subject not

easy to discuss with finality, for not only is the term of years

unknown, but, of more importance, there are many factors of a highly

speculative order to be considered in valuing. It may be said that

a certain life is known in any case from the profit in sight, and

that in calculating this profit a deduction should be made from

the gross profit for loss of interest on it pending recovery. This

is true, but as mines are seldom dealt with on the basis of profit

in sight alone, and as the purchase price includes usually some

proportion for extension in depth, an unknown factor is introduced

which outweighs the known quantities. Therefore the application of

the culminative effect of interest accumulations is much dependent

upon the sort of mine under consideration. In most cases of uncertain

continuity in depth it introduces a mathematical refinement not

warranted by the speculative elements. For instance, in a mine

where the whole value is dependent upon extension of the deposit

beyond openings, and where an expected return of at least 50% per

annum is required to warrant the risk, such refinement would be

absurd. On the other hand, in a Witwatersrand gold mine, in gold

and tin gravels, or in massive copper mines such as Bingham and

Lake Superior, where at least some sort of life can be approximated,

it becomes a most vital element in valuation.

In general it may be said that the lower the total annual return

expected upon the capital invested, the greater does the amount

demanded for amortization become in proportion to this total income,

and therefore the greater need of its introduction in calculations.

Especially is this so where the cost of equipment is large

proportionately to the annual return. Further, it may be said that

such calculations are of decreasing use with increasing proportion of

speculative elements in the price of the mine. The risk of extension in

depth, of the price of metal, etc., may so outweigh the comparatively

minor factors here introduced as to render them useless of attention.

In the practical conduct of mines or mining companies, sinking

funds for amortization of capital are never established. In the

vast majority of mines of the class under discussion, the ultimate

duration of life is unknown, and therefore there is no basis upon

which to formulate such a definite financial policy even were it

desired. Were it possible to arrive at the annual sum to be set

aside, the stockholders of the mining type would prefer to do their

own reinvestment. The purpose of these calculations does not lie

in the application of amortization to administrative finance. It

is nevertheless one of the touchstones in the valuation of certain

mines or mining investments. That is, by a sort of inversion such

calculations can be made to serve as a means to expose the amount

of risk,--to furnish a yardstick for measuring the amount of risk

in the very speculations of extension in depth and price of metals

which attach to a mine. Given the annual income being received,

or expected, the problem can be formulated into the determination

of how many years it must be continued in order to amortize the

investment and pay a given rate of profit. A certain length of

life is evident from the ore in sight, which may be called the

life in sight. If the term of years required to redeem the capital

and pay an interest upon it is greater than the life in sight,

then this extended life must come from extension in depth, or ore

from other direction, or increased price of metals. If we then take

the volume and profit on the ore as disclosed we can calculate the

number of feet the deposit must extend in depth, or additional tonnage

that must be obtained of the same grade, or the different prices of

metal that must be secured, in order to satisfy the demanded term

of years. These demands in actual measure of ore or feet or higher

price can then be weighed against the geological and industrial

probabilities.

The following tables and examples may be of assistance in these

calculations.

Table 1. To apply this table, the amount of annual income or dividend

and the term of years it will last must be known or estimated factors.

It is then possible to determine the _present_ value of this annual

income after providing for amortization and interest on the investment

at various rates given, by multiplying the annual income by the

factor set out.

A simple illustration would be that of a mine earning a profit of

$200,000 annually, and having a total of 1,000,000 tons in sight,

yielding a profit of $2 a ton, or a total profit in sight of $2,000,000,

thus recoverable in ten years. On a basis of a 7% return on the

investment and amortization of capital (Table I), the factor is

6.52 x $200,000 = $1,304,000 as the present value of the gross

profits exposed. That is, this sum of $1,304,000, if paid for the

mine, would be repaid out of the profit in sight, together with

7% interest if the annual payments into sinking fund earn 4%.

TABLE I.

Present Value of an Annual Dividend Over -- Years at --% and Replacing

Capital by Reinvestment of an Annual Sum at 4%.

=======================================================

Years | 5% | 6% | 7% | 8% | 9% | 10%

-------|-------|-------|-------|-------|-------|-------

1 | .95 | .94 | .93 | .92 | .92 | .91

2 | 1.85 | 1.82 | 1.78 | 1.75 | 1.72 | 1.69

3 | 2.70 | 2.63 | 2.56 | 2.50 | 2.44 | 2.38

4 | 3.50 | 3.38 | 3.27 | 3.17 | 3.07 | 2.98

5 | 4.26 | 4.09 | 3.93 | 3.78 | 3.64 | 3.51

6 | 4.98 | 4.74 | 4.53 | 4.33 | 4.15 | 3.99

7 | 5.66 | 5.36 | 5.09 | 4.84 | 4.62 | 4.41

8 | 6.31 | 5.93 | 5.60 | 5.30 | 5.04 | 4.79

9 | 6.92 | 6.47 | 6.08 | 5.73 | 5.42 | 5.14

10 | 7.50 | 6.98 | 6.52 | 6.12 | 5.77 | 5.45

| | | | | |

11 | 8.05 | 7.45 | 6.94 | 6.49 | 6.09 | 5.74

12 | 8.58 | 7.90 | 7.32 | 6.82 | 6.39 | 6.00

13 | 9.08 | 8.32 | 7.68 | 7.13 | 6.66 | 6.24

14 | 9.55 | 8.72 | 8.02 | 7.42 | 6.91 | 6.46

15 | 10.00 | 9.09 | 8.34 | 7.79 | 7.14 | 6.67

16 | 10.43 | 9.45 | 8.63 | 7.95 | 7.36 | 6.86

17 | 10.85 | 9.78 | 8.91 | 8.18 | 7.56 | 7.03

18 | 11.24 | 10.10 | 9.17 | 8.40 | 7.75 | 7.19

19 | 11.61 | 10.40 | 9.42 | 8.61 | 7.93 | 7.34

20 | 11.96 | 10.68 | 9.65 | 8.80 | 8.09 | 7.49

| | | | | |

21 | 12.30 | 10.95 | 9.87 | 8.99 | 8.24 | 7.62

22 | 12.62 | 11.21 | 10.08 | 9.16 | 8.39 | 7.74

23 | 12.93 | 11.45 | 10.28 | 9.32 | 8.52 | 7.85

24 | 13.23 | 11.68 | 10.46 | 9.47 | 8.65 | 7.96

25 | 13.51 | 11.90 | 10.64 | 9.61 | 8.77 | 8.06

26 | 13.78 | 12.11 | 10.80 | 9.75 | 8.88 | 8.16

27 | 14.04 | 12.31 | 10.96 | 9.88 | 8.99 | 8.25

28 | 14.28 | 12.50 | 11.11 | 10.00 | 9.09 | 8.33

29 | 14.52 | 12.68 | 11.25 | 10.11 | 9.18 | 8.41

30 | 14.74 | 12.85 | 11.38 | 10.22 | 9.27 | 8.49

| | | | | |

31 | 14.96 | 13.01 | 11.51 | 10.32 | 9.36 | 8.56

32 | 15.16 | 13.17 | 11.63 | 10.42 | 9.44 | 8.62

33 | 15.36 | 13.31 | 11.75 | 10.51 | 9.51 | 8.69

34 | 15.55 | 13.46 | 11.86 | 10.60 | 9.59 | 8.75

35 | 15.73 | 13.59 | 11.96 | 10.67 | 9.65 | 8.80

36 | 15.90 | 13.72 | 12.06 | 10.76 | 9.72 | 8.86

37 | 16.07 | 13.84 | 12.16 | 10.84 | 9.78 | 8.91

38 | 16.22 | 13.96 | 12.25 | 10.91 | 9.84 | 8.96

39 | 16.38 | 14.07 | 12.34 | 10.98 | 9.89 | 9.00

40 | 16.52 | 14.18 | 12.42 | 11.05 | 9.95 | 9.05

=======================================================

Condensed from Inwood's Tables.

Table II is practically a compound discount table. That is, by

it can be determined the present value of a fixed sum payable at

the end of a given term of years, interest being discounted at

various given rates. Its use may be illustrated by continuing the

example preceding.

TABLE II.

Present Value of $1, or £1, payable in -- Years, Interest taken

at --%.

===================================

Years | 4% | 5% | 6% | 7%

------|------|------|------|-------

1 | .961 | .952 | .943 | .934

2 | .924 | .907 | .890 | .873

3 | .889 | .864 | .840 | .816

4 | .854 | .823 | .792 | .763

5 | .821 | .783 | .747 | .713

6 | .790 | .746 | .705 | .666

7 | .760 | .711 | .665 | .623

8 | .731 | .677 | .627 | .582

9 | .702 | .645 | .592 | .544

10 | .675 | .614 | .558 | .508

| | | |

11 | .649 | .585 | .527 | .475

12 | .625 | .557 | .497 | .444

13 | .600 | .530 | .469 | .415

14 | .577 | .505 | .442 | .388

15 | .555 | .481 | .417 | .362

16 | .534 | .458 | .394 | .339

17 | .513 | .436 | .371 | .316

18 | .494 | .415 | .350 | .296

19 | .475 | .396 | .330 | .276

20 | .456 | .377 | .311 | .258

| | | |

21 | .439 | .359 | .294 | .241

22 | .422 | .342 | .277 | .266

23 | .406 | .325 | .262 | .211

24 | .390 | .310 | .247 | .197

25 | .375 | .295 | .233 | .184

26 | .361 | .281 | .220 | .172

27 | .347 | .268 | .207 | .161

28 | .333 | .255 | .196 | .150

29 | .321 | .243 | .184 | .140

30 | .308 | .231 | .174 | .131

| | | |

31 | .296 | .220 | .164 | .123

32 | .285 | .210 | .155 | .115

33 | .274 | .200 | .146 | .107

34 | .263 | .190 | .138 | .100

35 | .253 | .181 | .130 | .094

36 | .244 | .172 | .123 | .087

37 | .234 | .164 | .116 | .082

38 | .225 | .156 | .109 | .076

39 | .216 | .149 | .103 | .071

40 | .208 | .142 | .097 | .067

===================================

Condensed from Inwood's Tables.

If such a mine is not equipped, and it is assumed that $200,000

are required to equip the mine, and that two years are required

for this equipment, the value of the ore in sight is still less,

because of the further loss of interest in delay and the cost of

equipment. In this case the present value of $1,304,000 in two

years, interest at 7%, the factor is .87 X 1,304,000 = $1,134,480.

From this comes off the cost of equipment, or $200,000, leaving

$934,480 as the present value of the profit in sight. A further

refinement could be added by calculating the interest chargeable

against the $200,000 equipment cost up to the time of production.

TABLE III.

===========================================================================

Annual | Number of years of life required to yield--% interest, and in

Rate of | addition to furnish annual instalments which, if reinvested at

Dividend.| 4% will return the original investment at the end of the period.

---------|-----------------------------------------------------------------

% | 5% | 6% | 7% | 8% | 9% | 10%

| | | | | |

6 | 41.0 | | | | |

7 | 28.0 | 41.0 | | | |

8 | 21.6 | 28.0 | 41.0 | | |

9 | 17.7 | 21.6 | 28.0 | 41.0 | |

10 | 15.0 | 17.7 | 21.6 | 28.0 | 41.0 |

| | | | | |

11 | 13.0 | 15.0 | 17.7 | 21.6 | 28.0 | 41.0

12 | 11.5 | 13.0 | 15.0 | 17.7 | 21.6 | 28.0

13 | 10.3 | 11.5 | 13.0 | 15.0 | 17.7 | 21.6

14 | 9.4 | 10.3 | 11.5 | 13.0 | 15.0 | 17.7

15 | 8.6 | 9.4 | 10.3 | 11.5 | 13.0 | 15.0

| | | | | |

16 | 7.9 | 8.6 | 9.4 | 10.3 | 11.5 | 13.0

17 | 7.3 | 7.9 | 8.6 | 9.4 | 10.3 | 11.5

18 | 6.8 | 7.3 | 7.9 | 8.6 | 9.4 | 10.3

19 | 6.4 | 6.8 | 7.3 | 7.9 | 8.6 | 9.4

20 | 6.0 | 6.4 | 6.8 | 7.3 | 7.9 | 8.6

| | | | | |

21 | 5.7 | 6.0 | 6.4 | 6.8 | 7.3 | 7.9

22 | 5.4 | 5.7 | 6.0 | 6.4 | 6.8 | 7.3

23 | 5.1 | 5.4 | 5.7 | 6.0 | 6.4 | 6.8

24 | 4.9 | 5.1 | 5.4 | 5.7 | 6.0 | 6.4

25 | 4.7 | 4.9 | 5.1 | 5.4 | 5.7 | 6.0

| | | | | |

26 | 4.5 | 4.7 | 4.9 | 5.1 | 5.4 | 5.7

27 | 4.3 | 4.5 | 4.7 | 4.9 | 5.1 | 5.4

28 | 4.1 | 4.3 | 4.5 | 4.7 | 4.9 | 5.1

29 | 3.9 | 4.1 | 4.3 | 4.5 | 4.7 | 4.9

30 | 3.8 | 3.9 | 4.1 | 4.3 | 4.5 | 4.7

===========================================================================

Table III. This table is calculated by inversion of the factors

in Table I, and is the most useful of all such tables, as it is

a direct calculation of the number of years that a given rate of

income on the investment must continue in order to amortize the

capital (the annual sinking fund being placed at compound interest

at 4%) and to repay various rates of interest on the investment. The

application of this method in testing the value of dividend-paying

shares is very helpful, especially in weighing the risks involved in

the portion of the purchase or investment unsecured by the profit

in sight. Given the annual percentage income on the investment from

the dividends of the mine (or on a non-producing mine assuming a

given rate of production and profit from the factors exposed), by

reference to the table the number of years can be seen in which

this percentage must continue in order to amortize the investment

and pay various rates of interest on it. As said before, the ore

in sight at a given rate of exhaustion can be reduced to terms of

life in sight. This certain period deducted from the total term

of years required gives the life which must be provided by further

discovery of ore, and this can be reduced to tons or feet of extension

of given ore-bodies and a tangible position arrived at. The test

can be applied in this manner to the various prices which must

be realized from the base metal in sight to warrant the price.

Taking the last example and assuming that the mine is equipped,

and that the price is $2,000,000, the yearly return on the price is

10%. If it is desired besides amortizing or redeeming the capital to

secure a return of 7% on the investment, it will be seen by reference

to the table that there will be required a life of 21.6 years. As the

life visible in the ore in sight is ten years, then the extensions

in depth must produce ore for 11.6 years longer--1,160,000 tons. If

the ore-body is 1,000 feet long and 13 feet wide, it will furnish

of gold ore 1,000 tons per foot of depth; hence the ore-body must

extend 1,160 feet deeper to justify the price. Mines are seldom so

simple a proposition as this example. There are usually probabilities

of other ore; and in the case of base metal, then variability of price

and other elements must be counted. However, once the extension

in depth which is necessary is determined for various assumptions

of metal value, there is something tangible to consider and to

weigh with the five geological weights set out in Chapter III.

The example given can be expanded to indicate not only the importance

of interest and redemption in the long extension in depth required,

but a matter discussed from another point of view under "Ratio of

Output." If the plant on this mine were doubled and the earnings

increased to 20% ($400,000 per annum) (disregarding the reduction

in working expenses that must follow expansion of equipment), it

will be found that the life required to repay the purchase

money,--$2,000,000,--and 7% interest upon it, is about 6.8 years.

As at this increased rate of production there is in the ore in

sight a life of five years, the extension in depth must be depended

upon for 1.8 years, or only 360,000 tons,--that is, 360 feet of

extension. Similarly, the present value of the ore in sight is

$268,000 greater if the mine be given double the equipment, for

thus the idle money locked in the ore is brought into the interest

market at an earlier date. Against this increased profit must be

weighed the increased cost of equipment. The value of low grade

mines, especially, is very much a factor of the volume of output

contemplated.

CHAPTER VI.

Mine Valuation (_Concluded_).

VALUATION OF MINES WITH LITTLE OR NO ORE IN SIGHT; VALUATIONS ON

SECOND-HAND DATA; GENERAL CONDUCT OF EXAMINATIONS; REPORTS.

A large number of examinations arise upon prospecting ventures

or partially developed mines where the value is almost wholly

prospective. The risks in such enterprises amount to the possible loss

of the whole investment, and the possible returns must consequently

be commensurate. Such business is therefore necessarily highly

speculative, but not unjustifiable, as the whole history of the

industry attests; but this makes the matter no easier for the mine

valuer. Many devices of financial procedure assist in the limitation

of the sum risked, and offer a middle course to the investor between

purchase of a wholly prospective value and the loss of a possible

opportunity to profit by it. The usual form is an option to buy the

property after a period which permits a certain amount of development

work by the purchaser before final decision as to purchase.

Aside from young mines such enterprises often arise from the possibility

of lateral extension of the ore-deposit outside the boundaries of

the property of original discovery (Fig. 3), in which cases there

is often no visible ore within the property under consideration

upon which to found opinion. In regions where vertical side lines

obtain, there is always the possibility of a "deep level" in inclined

deposits. Therefore the ground surrounding known deposits has a

certain speculative value, upon which engineers are often called to

pass judgment. Except in such unusual occurrences as South African

bankets, or Lake Superior coppers, prospecting for deep level of

extension is also a highly speculative phase of mining.

The whole basis of opinion in both classes of ventures must be

the few geological weights,--the geology of the property and the

district, the development of surrounding mines, etc. In any event,

there is a very great percentage of risk, and the profit to be gained

by success must be, proportionally to the expenditure involved,

very large. It is no case for calculating amortization and other

refinements. It is one where several hundreds or thousands of per

cent hoped for on the investment is the only justification.

OPINIONS AND VALUATIONS UPON SECOND-HAND DATA.

Some one may come forward and deprecate the bare suggestion of an

engineer's offering an opinion when he cannot have proper first-hand

data. But in these days we have to deal with conditions as well as

theories of professional ethics. The growing ownership of mines

by companies, that is by corporations composed of many individuals,

and with their stocks often dealt in on the public exchanges, has

resulted in holders whose interest is not large enough to warrant

their undertaking the cost of exhaustive examinations. The system

has produced an increasing class of mining speculators and investors

who are finding and supplying the enormous sums required to work

our mines,--sums beyond the reach of the old-class single-handed

mining men. Every year the mining investors of the new order are

coming more and more to the engineer for advice, and they should

be encouraged, because such counsel can be given within limits,

and these limits tend to place the industry upon a sounder footing

of ownership. As was said before, the lamb can be in a measure

protected. The engineer's interest is to protect him, so that the

industry which concerns his own life-work may be in honorable repute,

and that capital may be readily forthcoming for its expansion.

Moreover, by constant advice to the investor as to what constitutes

a properly presented and managed project, the arrangement of such

proper presentation and management will tend to become an _a priori_

function of the promoter.

Sometimes the engineer can make a short visit to the mine for data

purposes,--more often he cannot. In the former case, he can resolve

for himself an approximation upon all the factors bearing on value,

except the quality of the ore. For this, aside from inspection of

the ore itself, a look at the plans is usually enlightening. A

longitudinal section of the mine showing a continuous shortening of

the stopes with each succeeding level carries its own interpretation.

In the main, the current record of past production and estimates

of the management as to ore-reserves, etc., can be accepted in

ratio to the confidence that can be placed in the men who present

them. It then becomes a case of judgment of men and things, and

here no rule applies.

Advice must often be given upon data alone, without inspection

of the mine. Most mining data present internal evidence as to

credibility. The untrustworthy and inexperienced betray themselves

in their every written production. Assuming the reliability of data,

the methods already discussed for weighing the ultimate value of

the property can be applied. It would be possible to cite hundreds

of examples of valuation based upon second-hand data. Three will,

however, sufficiently illustrate. First, the R mine at Johannesburg.

With the regularity of this deposit, the development done, and

a study of the workings on the neighboring mines and in deeper

ground, it is a not unfair assumption that the reefs will maintain

size and value throughout the area. The management is sound, and

all the data are given in the best manner. The life of the mine

is estimated at six years, with some probabilities of further ore

from low-grade sections. The annual earnings available for dividends

are at the rate of about £450,000 per annum. The capital is £440,000

in £1 shares. By reference to the table on page 46 it will be seen

that the present value of £450,000 spread over six years to return

capital at the end of that period, and give 7% dividends in the

meantime, is 4.53 x £450,000 = £2,036,500 ÷ 440,000 = £4 12_s_.

7_d_. per share. So that this mine, on the assumption of continuity

of values, will pay about 7% and return the price. Seven per cent

is, however, not deemed an adequate return for the risks of labor

troubles, faults, dykes, or poor patches. On a 9% basis, the mine

is worth about £4 4_s_. per share.

Second, the G mine in Nevada. It has a capital of $10,000,000 in

$1 shares, standing in the market at 50 cents each. The reserves

are 250,000 tons, yielding a profit for yearly division of $7 per

ton. It has an annual capacity of about 100,000 tons, or $700,000

net profit, equal to 14% on the market value. In order to repay

the capital value of $5,000,000 and 8% per annum, it will need

a life of (Table III) 13 years, of which 2-1/2 are visible. The

size of the ore-bodies indicates a yield of about 1,100 tons per

foot of depth. At an exhaustion rate of 100,000 tons per annum,

the mine would need to extend to a depth of over a thousand feet

below the present bottom. There is always a possibility of finding

parallel bodies or larger volumes in depth, but it would be a sanguine

engineer indeed who would recommend the stock, even though it pays

an apparent 14%.

Third, the B mine, with a capital of $10,000,000 in 2,000,000 shares

of $5 each. The promoters state that the mine is in the slopes of

the Andes in Peru; that there are 6,000,000 tons of "ore blocked

out"; that two assays by the assayers of the Bank of England average

9% copper; that the copper can be produced at five cents per pound;

that there is thus a profit of $10,000,000 in sight. The evidences

are wholly incompetent. It is a gamble on statements of persons

who have not the remotest idea of sound mining.

GENERAL CONDUCT OF EXAMINATION.

Complete and exhaustive examination, entailing extensive sampling,

assaying, and metallurgical tests, is very expensive and requires

time. An unfavorable report usually means to the employer absolute

loss of the engineer's fee and expenses. It becomes then the initial

duty of the latter to determine at once, by the general conditions

surrounding the property, how far the expenditure for exhaustive

examination is warranted. There is usually named a money valuation

for the property, and thus a peg is afforded upon which to hang

conclusions. Very often collateral factors with a preliminary sampling,

or indeed no sampling at all, will determine the whole business.

In fact, it is becoming very common to send younger engineers to

report as to whether exhaustive examination by more expensive men

is justified.

In the course of such preliminary inspection, the ore-bodies may

prove to be too small to insure adequate yield on the price, even

assuming continuity in depth and represented value. They may be

so difficult to mine as to make costs prohibitive, or they may

show strong signs of "petering out." The ore may present visible

metallurgical difficulties which make it unprofitable in any event.

A gold ore may contain copper or arsenic, so as to debar cyanidation,

where this process is the only hope of sufficiently moderate costs.

A lead ore may be an amorphous compound with zinc, and successful

concentration or smelting without great penalties may be precluded.

A copper ore may carry a great excess of silica and be at the same

time unconcentratable, and there may be no base mineral supply

available for smelting mixture. The mine may be so small or so

isolated that the cost of equipment will never be justified. Some

of these conditions may be determined as unsurmountable, assuming

a given value for the ore, and may warrant the rejection of the

mine at the price set.

It is a disagreeable thing to have a disappointed promoter heap

vituperation on an engineer's head because he did not make an exhaustive

examination. Although it is generally desirable to do some sampling

to give assurance to both purchaser and vendor of conscientiousness,

a little courage of conviction, when this is rightly and adequately

grounded, usually brings its own reward.

Supposing, however, that conditions are right and that the mine is

worth the price, subject to confirmation of values, the determination

of these cannot be undertaken unless time and money are available

for the work. As was said, a sampling campaign is expensive, and

takes time, and no engineer has the moral right to undertake an

examination unless both facilities are afforded. Curtailment is

unjust, both to himself and to his employer.

How much time and outlay are required to properly sample a mine

is obviously a question of its size, and the character of its ore.

An engineer and one principal assistant can conduct two sampling

parties. In hard rock it may be impossible to take more than five

samples a day for each party. But, in average ore, ten samples for

each is reasonable work. As the number of samples is dependent

upon the footage of openings on the deposit, a rough approximation

can be made in advance, and a general idea obtained as to the time

required. This period must be insisted upon.

REPORTS.

Reports are to be read by the layman, and their first qualities

should be simplicity of terms and definiteness of conclusions.

Reports are usually too long, rather than too short. The essential

facts governing the value of a mine can be expressed on one sheet

of paper. It is always desirable, however, that the groundwork data

and the manner of their determination should be set out with such

detail that any other engineer could come to the same conclusion

if he accepted the facts as accurately determined. In regard to the

detailed form of reports, the writer's own preference is for a single

page summarizing the main factors, and an assay plan, reduced to a

longitudinal section where possible. Then there should be added,

for purposes of record and for submission to other engineers, a

set of appendices going into some details as to the history of

the mine, its geology, development, equipment, metallurgy, and

management. A list of samples should be given with their location,

and the tonnages and values of each separate block. A presentation

should be made of the probabilities of extension in depth, together

with recommendations for working the mine.

GENERAL SUMMARY.

The bed-rock value which attaches to a mine is the profit to be

won from proved ore and in which the price of metal is calculated

at some figure between "basic" and "normal." This we may call the

"_A_" value. Beyond this there is the speculative value of the

mine. If the value of the "probable" ore be represented by _X_,

the value of extension of the ore by _Y_, and a higher price for

metal than the price above assumed represented by _Z_, then if

the mine be efficiently managed the value of the mine is _A_ +

_X_ + _Y_ + _Z_. What actual amounts should be attached to _X,

Y, Z_ is a matter of judgment. There is no prescription for good

judgment. Good judgment rests upon a proper balancing of evidence.

The amount of risk in _X, Y, Z_ is purely a question of how much

these factors are required to represent in money,--in effect, how

much more ore must be found, or how many feet the ore must extend

in depth; or in convertible terms, what life in years the mine

must have, or how high the price of metal must be. In forming an

opinion whether these requirements will be realized, _X, Y, Z_

must be balanced in a scale whose measuring standards are the five

geological weights and the general industrial outlook. The wise

engineer will put before his clients the scale, the weights, and

the conclusion arrived at. The shrewd investor will require to

know these of his adviser.

CHAPTER VII.

Development of Mines.

ENTRY TO THE MINE; TUNNELS; VERTICAL, INCLINED, AND COMBINED SHAFTS;

LOCATION AND NUMBER OF SHAFTS.

Development is conducted for two purposes: first, to search for

ore; and second, to open avenues for its extraction. Although both

objects are always more or less in view, the first predominates

in the early life of mines, the prospecting stage, and the second

in its later life, the producing stage. It is proposed to discuss

development designed to embrace extended production purposes first,

because development during the prospecting stage is governed by

the same principles, but is tempered by the greater degree of

uncertainty as to the future of the mine, and is, therefore, of

a more temporary character.

ENTRY TO THE MINE.

There are four methods of entry: by tunnel, vertical shaft, inclined

shaft, or by a combination of the last two, that is, by a shaft

initially vertical then turned to an incline. Combined shafts are

largely a development of the past few years to meet "deep level"

conditions, and have been rendered possible only by skip-winding. The

angle in such shafts (Fig. 2) is now generally made on a parabolic

curve, and the speed of winding is then less diminished by the

bend.

The engineering problems which present themselves under "entry"

may be divided into those of:--

1. Method.

2. Location.

3. Shape and size.

The resolution of these questions depends upon the:--

a. Degree of dip of the deposit.

b. Output of ore to be provided for.

c. Depth at which the deposit is to be attacked.

d. Boundaries of the property.

e. Surface topography.

f. Cost.

g. Operating efficiency.

h. Prospects of the mine.

[Illustration: Fig. 2.--Showing arrangement of the bend in combined

shafts.]

From the point of view of entrance, the coöperation of a majority

of these factors permits the division of mines into certain broad

classes. The type of works demanded for moderate depths (say vertically

2,500 to 3,000 feet) is very different from that required for great

depths. To reach great depths, the size of shafts must greatly

expand, to provide for extended ventilation, pumping, and winding

necessities. Moreover inclined shafts of a degree of flatness possible

for moderate depths become too long to be used economically from

the surface. The vast majority of metal-mining shafts fall into

the first class, those of moderate depths. Yet, as time goes on

and ore-deposits are exhausted to lower planes, problems of depth

will become more common. One thing, however, cannot be too much

emphasized, especially on mines to be worked from the outcrop, and

that is, that no engineer is warranted, owing to the speculation

incidental to extension in depth, in initiating early in the mine's

career shafts of such size or equipment as would be available for

great depths. Moreover, the proper location of a shaft so as to

work economically extension of the ore-bodies is a matter of no

certainty, and therefore shafts of speculative mines are tentative

in any event.

Another line of division from an engineering view is brought about

by a combination of three of the factors mentioned. This is the

classification into "outcrop" and "deep-level" mines. The former

are those founded upon ore-deposits to be worked from or close

to the surface. The latter are mines based upon the extension in

depth of ore-bodies from outcrop mines. Such projects are not so

common in America, where the law in most districts gives the outcrop

owner the right to follow ore beyond his side-lines, as in countries

where the boundaries are vertical on all sides. They do, however,

arise not alone in the few American sections where the side-lines

are vertical boundaries, but in other parts owing to the pitch of

ore-bodies through the end lines (Fig. 3). More especially do such

problems arise in America in effect, where the ingress questions

have to be revised for mines worked out in the upper levels (Fig.

7).

[Illustration: Fig. 3.--Longitudinal section showing "deep level"

project arising from dip of ore-body through end-line.]

If from a standpoint of entrance questions, mines are first classified

into those whose works are contemplated for moderate depths, and those

in which work is contemplated for great depth, further clarity in

discussion can be gained by subdivision into the possible cases arising

out of the factors of location, dip, topography, and boundaries.

MINES OF MODERATE DEPTHS.

Case I. Deposits where topographic conditions permit the

alternatives of shaft or tunnel.

Case II. Vertical or horizontal deposits, the only practical

means of attaining which is by a vertical shaft.

Case III. Inclined deposits to be worked from near the surface.

There are in such instances the alternatives of either

a vertical or an inclined shaft.

Case IV. Inclined deposits which must be attacked in depth,

that is, deep-level projects. There are the alternatives

of a compound shaft or of a vertical shaft, and

in some cases of an incline from the surface.

MINES TO GREAT DEPTHS.

Case V. Vertical or horizontal deposits, the only way of reaching

which is by a vertical shaft.

Case VI. Inclined deposits. In such cases the alternatives are

a vertical or a compound shaft.

CASE I.--Although for logical arrangement tunnel entry has been

given first place, to save repetition it is proposed to consider

it later. With few exceptions, tunnels are a temporary expedient

in the mine, which must sooner or later be opened by a shaft.

CASE II. VERTICAL OR HORIZONTAL DEPOSITS.--These require no discussion

as to manner of entry. There is no justifiable alternative to a

vertical shaft (Fig. 4).

[Illustration: Fig. 4.--Cross-sections showing entry to vertical

or horizontal deposits. Case II.]

[Illustration: Fig. 5.--Cross-section showing alternative shafts

to inclined deposit to be worked from surface. Case III.]

CASE III. INCLINED DEPOSITS WHICH ARE INTENDED TO BE WORKED FROM

THE OUTCROP, OR FROM NEAR IT (Fig. 5).--The choice of inclined or

vertical shaft is dependent upon relative cost of construction,

subsequent operation, and the useful life of the shaft, and these

matters are largely governed by the degree of dip. Assuming a shaft

of the same size in either alternative, the comparative cost per

foot of sinking is dependent largely on the breaking facilities

of the rock under the different directions of attack. In this,

the angles of the bedding or joint planes to the direction of the

shaft outweigh other factors. The shaft which takes the greatest

advantage of such lines of breaking weakness will be the cheapest

per foot to sink. In South African experience, where inclined shafts

are sunk parallel to the bedding planes of hard quartzites, the cost

per foot appears to be in favor of the incline. On the other hand,

sinking shafts across tight schists seems to be more advantageous

than parallel to the bedding planes, and inclines following the

dip cost more per foot than vertical shafts.

An inclined shaft requires more footage to reach a given point

of depth, and therefore it would entail a greater total expense

than a vertical shaft, assuming they cost the same per foot. The

excess amount will be represented by the extra length, and this

will depend upon the flatness of the dip. With vertical shafts,

however, crosscuts to the deposit are necessary. In a comparative

view, therefore, the cost of the crosscuts must be included with

that of the vertical shaft, as they would be almost wholly saved

in an incline following near the ore.

The factor of useful life for the shaft enters in deciding as to

the advisability of vertical shafts on inclined deposits, from the

fact that at some depth one of two alternatives has to be chosen.

The vertical shaft, when it reaches a point below the deposit where

the crosscuts are too long (_C_, Fig. 5), either becomes useless,

or must be turned on an incline at the intersection with the ore

(_B_). The first alternative means ultimately a complete loss of

the shaft for working purposes. The latter has the disadvantage

that the bend interferes slightly with haulage.

The following table will indicate an hypothetical extreme case,--not

infrequently met. In it a vertical shaft 1,500 feet in depth is taken

as cutting the deposit at the depth of 750 feet, the most favored

position so far as aggregate length of crosscuts is concerned. The

cost of crosscutting is taken at $20 per foot and that of sinking

the vertical shaft at $75 per foot. The incline is assumed for two

cases at $75 and $100 per foot respectively. The stoping height

upon the ore between levels is counted at 125 feet.

Dip of | Depth of | Length of |No. of Crosscuts| Total Length

Deposit from | Vertical | Incline | Required from | of Crosscuts,

Horizontal | Shaft | Required | V Shaft | Feet

-------------|-------------|-------------|----------------|---------------

80° | 1,500 | 1,522 | 11 | 859

70° | 1,500 | 1,595 | 12 | 1,911

60° | 1,500 | 1,732 | 13 | 3,247

50° | 1,500 | 1,058 | 15 | 5,389

40° | 1,500 | 2,334 | 18 | 8,038

30° | 1,500 | 3,000 | 23 | 16,237

==========================================================================

Cost of |Cost Vertical| Total Cost | Cost of Incline|Cost of Incline

Crosscuts $20| Shaft $75 | of Vertical | $75 per Foot | $100 per Foot

per Foot | per Foot |and Crosscuts| |

-------------|-------------|-------------|----------------|---------------

$17,180 | $112,500 | $129,680 | $114,150 | $152,200

38,220 | 112,500 | 150,720 | 118,625 | 159,500

64,940 | 112,500 | 177,440 | 129,900 | 172,230

107,780 | 112,500 | 220,280 | 114,850 | 195,800

178,760 | 112,500 | 291,260 | 175,050 | 233,400

324,740 | 112,500 | 437,240 | 225,000 | 300,000

From the above examples it will be seen that the cost of crosscuts

put at ordinary level intervals rapidly outruns the extra expense

of increased length of inclines. If, however, the conditions are

such that crosscuts from a vertical shaft are not necessary at so

frequent intervals, then in proportion to the decrease the advantages

sway to the vertical shaft. Most situations wherein the crosscuts

can be avoided arise in mines worked out in the upper levels and

fall under Case IV, that of deep-level projects.

Principles of Mining: Valuation, Organization and Administration · 第 20 / 22 章