CHAPTER VIII: THE DESERT RAILWAY

It often happens that in prosperous public enterprises the applause of

the nation and the rewards of the sovereign are bestowed on those whose

offices are splendid and whose duties have been dramatic. Others whose

labours were no less difficult, responsible, and vital to success are

unnoticed. If this be true of men, it is also true of things. In a tale

of war the reader's mind is filled with the fighting. The battle--with

its vivid scenes, its moving incidents, its plain and tremendous

results--excites imagination and commands attention. The eye is fixed

on the fighting brigades as they move amid the smoke; on the swarming

figures of the enemy; on the General, serene and determined, mounted

in the middle of his Staff. The long trailing line of communications

is unnoticed. The fierce glory that plays on red, triumphant bayonets

dazzles the observer; nor does he care to look behind to where, along a

thousand miles of rail, road, and river, the convoys are crawling to

the front in uninterrupted succession. Victory is the beautiful,

bright-coloured flower. Transport is the stem without which it could

never have blossomed. Yet even the military student, in his zeal to

master the fascinating combinations of the actual conflict, often

forgets the far more intricate complications of supply.

It cannot be denied that a battle, the climax to which all military

operations tend, is an event which is not controlled by strategy or

organisation. The scheme may be well planned, the troops well fed, the

ammunition plentiful, and the enemy entangled, famished, or numerically

inferior. The glorious uncertainties of the field can yet reverse

everything. The human element--in defiance of experience and

probability--may produce a wholly irrational result, and a starving,

out-manœuvred army win food, safety, and honour by their bravery. But

such considerations apply with greater force to wars where both sides

are equal in equipment and discipline. In savage warfare in a flat

country the power of modern machinery is such that flesh and blood can

scarcely prevail, and the chances of battle are reduced to a minimum.

Fighting the Dervishes was primarily a matter of transport. The Khalifa

was conquered on the railway.

Hitherto, as the operations have progressed, it has been convenient to

speak of the railway in a general manner as having been laid or extended

to various points, and merely to indicate the direction of the lines

of communication. The reader is now invited to take a closer view.

This chapter is concerned with boats, railways, and pack animals, but

particularly with railways.

Throughout the Dongola campaign in 1896 the Nile was the main channel of

communication between the Expeditionary Force and its base in Egypt.

All supplies were brought to the front as far as possible by water

transport. Wherever the Nile was navigable, it was used. Other means of

conveyance--by railways and pack animals--though essential, were merely

supplementary. Boats carry more and cost less than any other form of

transport. The service is not so liable to interruption; the plant needs

only simple repair; the waterway is ready-made. But the Nile is not

always available. Frequent cataracts obstruct its course for many miles.

Other long reaches are only navigable when the river is in flood. To

join the navigable reaches, and thus preserve the continuity of the

communications, a complex system of railways and caravans was necessary.

In the expedition to Dongola a line of railway was required to connect

the two navigable reaches of the Nile which extend from Assuan to Wady

Halfa, and from Kerma to Merawi. Before the capture of Dongola, however,

this distance was shortened by the fact that the river at high Nile is

navigable between the Third Cataract and Kerma. In consequence it was at

first only necessary to construct the stretch of 108 miles between Wady

Halfa and Kosheh. During the years when Wady Halfa was the southernmost

garrison of the Egyptian forces a strong post had been maintained at

Sarras. In the Nile expeditions of 1885 the railway from Halfa had been

completed through Sarras and as far as Akasha, a distance of eighty-six

miles. After the abandonment of the Soudan the Dervishes destroyed the

line as far north as Sarras. The old embankments were still standing,

but the sleepers had been burnt and the rails torn up, and in many cases

bent or twisted. The position in 1896 may, in fact, be summed up as

follows: The section of thirty-three miles from Wady Halfa to Sarras was

immediately available and in working order. The section of fifty-three

miles from Sarras to Akasha required partial reconstruction. The section

of thirty-two miles from Akasha to Kosheh must, with the exception of

ten miles of embankment completed in 1885, at once be newly made. And,

finally, the section from Kosheh to Kerma must be completed before the

Nile flood subsided.

The first duty, therefore, which the Engineer officers had to perform

was the reconstruction of the line from Sarras to Akasha. No trained

staff or skilled workmen were available. The lack of men with technical

knowledge was doubtfully supplied by the enlistment of a 'Railway

Battalion' 800 strong. These men were drawn from many tribes and

classes. Their only qualification was capacity and willingness for work.

They presented a motley appearance. Dervish prisoners, released but

still wearing their jibbas, assisted stalwart Egyptians in unloading

rails and sleepers. Dinkas, Shillooks, Jaalin, and Barabras shovelled

contentedly together at the embankments. One hundred civilian

Soudanese--chiefly time-expired soldiers--were also employed; and these,

since they were trustworthy and took an especial pride in their work,

soon learned the arts of spiking rails and sleepers, fishing rails

together, and straightening. To direct and control the labours of

these men of varied race and language, but of equal inexperience, some

civilian foremen platelayers were obtained at high rates of pay

from Lower Egypt. These, however, with very few exceptions were not

satisfactory, and they were gradually replaced by intelligent men of the

'Railway Battalion,' who had learned their trade as the line progressed.

The projection, direction, and execution of the whole work were

entrusted to a few subalterns of Engineers, of whom the best-known was

Edouard Girouard.

Work was begun south of Sarras at the latter end of March. At first

the efforts of so many unskilled workmen, instructed by few experienced

officers, were productive of results ridiculous rather than important.

Gradually, however, the knowledge and energy of the young director and

the intelligence and devotion of his still more youthful subordinates

began to take effect. The pace of construction increased, and the labour

was lightened by the contrivances of experience and skill.

As the line grew longer, native officers and non-commissioned officers

from the active and reserve lists of the Egyptian Army were appointed

station-masters. Intelligent non-commissioned officers and men were

converted into shunters, guards, and pointsmen. Traffic was controlled

by telephone. To work the telephone, men were discovered who could read

and write--very often who could read and write only their own names, and

even that with such difficulty that they usually preferred a seal. They

developed into clerks by a simple process of selection. To improve their

education, and to train a staff in the office work of a railway, two

schools were instituted at Halfa. In these establishments, which were

formed by the shade of two palm-trees, twenty pupils received the

beginnings of knowledge. The simplicity of the instruction was aided by

the zeal of the students, and learning grew beneath the palm-trees more

quickly perhaps than in the magnificent schools of civilisation.

The rolling stock of the Halfa-Sarras line was in good order and

sufficient quantity, but the eight locomotives were out of all repair,

and had to be patched up again and again with painful repetition. The

regularity of their break-downs prevented the regularity of the road,

and the Soudan military railway gained a doubtful reputation during the

Dongola expedition and in its early days. Nor were there wanting those

who employed their wits in scoffing at the undertaking and in pouring

thoughtless indignation on the engineers. Nevertheless the work went on

continually.

The initial difficulties of the task were aggravated by an unexpected

calamity. On the 26th of August the violent cyclonic rain-storm of which

some account has been given in the last chapter broke over the Dongola

province.

A writer on the earlier phases of the war [A. Hilliard Atteridge,

TOWARDS FREEDOM.] has forcibly explained why the consequences were so

serious:

'In a country where rain is an ordinary event the engineer lays his

railway line, not in the bottom of a valley, but at a higher level on

one slope or the other. Where he passes across branching side valleys,

he takes care to leave in all his embankments large culverts to carry

off flood-water. But here, in what was thought to be the rainless

Soudan, the line south of Sarras followed for mile after mile the bottom

of the long valley of Khor Ahrusa, and no provision had been made, or

had been thought necessary, for culverts in the embankments where minor

hollows were crossed. Thus, when the flood came, it was not merely that

the railway was cut through here and there by the rushing deluge. It was

covered deep in water, the ballast was swept away, and some of the banks

so destroyed that in places rails and sleepers were left hanging in the

air across a wide gap.'

Nearly fourteen miles of track were destroyed. The camp of the

construction gangs was wrecked and flooded. Some of the rifles of the

escort--for the conditions of war were never absent--were afterwards

recovered from a depth of three feet of sand. In one place, where the

embankment had partly withstood the deluge, a great lake several miles

square appeared. By extraordinary exertions the damage was repaired in a

week.

As soon as the line as far as Kosheh was completed, the advance towards

Dongola began. After the army had been victorious at Hafir the whole

province was cleared of Dervishes, and the Egyptian forces pushed on to

Merawi. Here they were dependent on river transport. But the Nile was

falling rapidly, and the army were soon in danger of being stranded by

the interruption of river traffic between the Third Cataract and Kenna.

The extension of the line from Kosheh to Kerma was therefore of vital

importance. The survey was at once undertaken, and a suitable route

was chosen through the newly acquired and unmapped territory. Of the

ninety-five miles of extended track, fifty-six were through the desert,

and the constructors here gained the experience which was afterwards

of value on the great Desert Railway from Wady Halfa to the Atbara.

Battalions of troops were distributed along the line and ordered to

begin to make the embankments. Track-laying commenced south of Kosheh on

the 9th of October, and the whole work was carried forward with feverish

energy. As it progressed, and before it was completed, the reach of the

river from the Third Cataract to Kenna ceased to be navigable. The army

were now dependent for their existence on the partly finished railway,

from the head of which supplies were conveyed by an elaborate system of

camel transport. Every week the line grew, Railhead moved forward, and

the strain upon the pack animals diminished. But the problem of feeding

the field army without interfering with the railway construction was one

of extraordinary intricacy and difficulty. The carrying capacity of the

line was strictly limited. The worn-out engines frequently broke down.

On many occasions only three were in working order, and the other five

undergoing 'heavy repairs' which might secure them another short span

of usefulness. Three times the construction had to be suspended to allow

the army to be revictualled. Every difficulty was, however, overcome.

By the beginning of May the line to Kenna was finished, and the whole

of the Railway Battalion, its subalterns and its director, turned their

attention to a greater enterprise.

In the first week in December the Sirdar returned from England with

instructions or permission to continue the advance towards Khartoum,

and the momentous question of the route to be followed arose. It may at

first seem that the plain course was to continue to work along the Nile,

connecting its navigable reaches by sections of railway. But from Merawi

to Abu Hamed the river is broken by continual cataracts, and the

broken ground of both banks made a railway nearly an impossibility. The

movements of the French expeditions towards the Upper Nile counselled

speed. The poverty of Egypt compelled economy. The Nile route, though

sure, would be slow and very expensive. A short cut must be found. Three

daring and ambitious schemes presented themselves: (1) the line followed

by the Desert Column in 1884 from Korti to Metemma; (2) the celebrated,

if not notorious, route from Suakin to Berber; (3) across the Nubian

desert from Korosko or Wady Halfa to Abu Hamed.

The question involved the whole strategy of the war. No more important

decision was ever taken by Sir Herbert Kitchener, whether in office or

in action. The request for a British division, the attack On Mahmud's

zeriba, the great left wheel towards Omdurman during that battle, the

treatment of the Marchand expedition, were matters of lesser resolve

than the selection of the line of advance. The known strength of the

Khalifa made it evident that a powerful force would be required for

the destruction of his army and the capture of his capital. The use of

railway transport to some point on the Nile whence there was a clear

waterway was therefore imperative. Berber and Metemma were known, and

Abu Hamed was believed, to fulfil this condition. But both Berber and

Metemma were important strategic points. It was improbable that the

Dervishes would abandon these keys to Khartoum and the Soudan without

severe resistance. It seemed likely, indeed, that the Khalifa would

strongly reinforce both towns, and desperately contest their possession.

The deserts between Korti and Metemma, and between Suakin and Berber,

contained scattered wells, and small raiding parties might have cut the

railway and perhaps have starved the army at its head. It was therefore

too dangerous to project the railway towards either Berber or Metemma

until they were actually in our hands. The argument is circular. The

towns could not be taken without a strong force; so strong a force could

not advance until the railway was made; and the railway could not be

made till the towns were taken.

Both the Korti-Metemma and the Suakin-Berber routes were therefore

rejected. The resolution to exclude the latter was further strengthened

by the fact that the labour of building a railway over the hills behind

Suakin would have been very great.

The route via Abu Hamed was selected by the exclusion of the

alternatives. But it had distinct and apparent advantages. Abu Hamed

was within striking distance of the army at Merawi. It was not a point

essential to the Dervish defences, and not, therefore, likely to be

so strongly garrisoned as Berber or Metemma. It might, therefore, be

captured by a column marching along the river, and sufficiently small

to be equipped with only camel transport. The deserts through which

the railway to Abu Hamed would pass contain few wells, and therefore it

would be difficult for small raiding parties to cut the line or attack

the construction gangs; and before the line got within reach of the

Dervish garrison at Abu Hamed, that garrison would be dislodged and the

place seized.

The plan was perfect, and the argument in its favour conclusive. It

turned, however, on one point: Was the Desert Railway a possibility?

With this question the General was now confronted. He appealed to expert

opinion. Eminent railway engineers in England were consulted. They

replied with unanimity that, having due regard to the circumstances, and

remembering the conditions of war under which the work must be executed,

it was impossible to construct such a line. Distinguished soldiers were

approached on the subject. They replied that the scheme was not only

impossible, but absurd. Many other persons who were not consulted

volunteered the opinion that the whole idea was that of a lunatic, and

predicted ruin and disaster to the expedition. Having received this

advice, and reflected on it duly, the Sirdar ordered the railway to be

constructed without more delay.

A further question immediately arose: Should the railway to Abu Hamed

start from Korosko or from Wady Halfa? There were arguments on both

sides. The adoption of the Korosko line would reduce the river stage

from Assuan by forty-eight hours up stream. The old caravan route, by

which General Gordon had travelled to Khartoum on his last journey, had

been from Korosko via Murat Wells to Abu Hamed. On the other hand, many

workshops and appliances for construction were already existing at Wady

Halfa. It was the northern terminus of the Dongola railway. This was an

enormous advantage. Both routes were reconnoitred: that from Wady Halfa

was selected. The decision having been taken, the enterprise was at once

begun.

Lieutenant Girouard, to whom everything was entrusted, was told to make

the necessary estimates. Sitting in his hut at Wady Halfa, he drew up a

comprehensive list. Nothing was forgotten. Every want was provided for;

every difficulty was foreseen; every requisite was noted. The questions

to be decided were numerous and involved. How much carrying capacity was

required? How much rolling stock? How many engines? What spare parts?

How much oil? How many lathes? How many cutters? How many punching and

shearing machines? What arrangements of signals would be necessary?

How many lamps? How many points? How many trolleys? What amount of coal

should be ordered? How much water would be wanted? How should it be

carried? To what extent would its carriage affect the hauling power and

influence all previous calculations? How much railway plant was needed?

How many miles of rail? How many thousand sleepers? Where could they be

procured at such short notice? How many fishplates were necessary?

What tools would be required? What appliances? What machinery? How much

skilled labour was wanted? How much of the class of labour available?

How were the workmen to be fed and watered? How much food would they

want? How many trains a day must be run to feed them and their escort?

How many must be run to carry plant? How did these requirements affect

the estimate for rolling stock? The answers to all these questions, and

to many others with which I will not inflict the reader, were set forth

by Lieutenant Girouard in a ponderous volume several inches thick; and

such was the comprehensive accuracy of the estimate that the working

parties were never delayed by the want even of a piece of brass wire.

In any circumstances the task would have been enormous. It was, however,

complicated by five important considerations: It had to be executed with

military precautions. There was apparently no water along the line. The

feeding of 2,000 platelayers in a barren desert was a problem in itself.

The work had to be completed before the winter. And, finally, the money

voted was not to be outrun. The Sirdar attended to the last condition.

Girouard was sent to England to buy the plant and rolling stock. Fifteen

new engines and two hundred trucks were ordered. The necessary new

workshops were commenced at Halfa. Experienced mechanics were procured

to direct them. Fifteen hundred additional men were enlisted in the

Railway Battalion and trained. Then the water question was dealt

with. The reconnoitring surveys had reported that though the line

was certainly 'good and easy' for 110 miles--and, according to Arab

accounts, for the remaining 120 miles--no drop of water was to be found,

and only two likely spots for wells were noted. Camel transport was, of

course, out of the question. Each engine must first of all haul enough

water to carry it to Railhead and back, besides a reserve against

accidents. It was evident that the quantity of water required by any

locomotive would continually increase as the work progressed and the

distance grew greater, until finally the material trains would have

one-third of their carrying power absorbed in transporting the water

for their own consumption. The amount of water necessary is largely

dependent on the grades of the line. The 'flat desert' proved to be

a steady slope up to a height of 1,600 feet above Halfa, and the

calculations were further complicated. The difficulty had, however, to

be faced, and a hundred 1,500-gallon tanks were procured. These

were mounted on trucks and connected by hose; and the most striking

characteristic of the trains of the Soudan military railway was the long

succession of enormous boxes on wheels, on which the motive power of the

engine and the lives of the passengers depended.

The first spadeful of sand of the Desert Railway was turned on the first

day of 1897; but until May, when the line to Kerma was finished, no

great efforts were made, and only forty miles of track had been laid. In

the meanwhile the men of the new Railway Battalion were being trained;

the plant was steadily accumulating; engines, rolling stock, and

material of all sorts had arrived from England. From the growing

workshops at Wady Halfa the continual clatter and clang of hammers and

the black smoke of manufacture rose to the African sky. The malodorous

incense of civilisation was offered to the startled gods of Egypt. All

this was preparation; nor was it until the 8th of May that track-laying

into the desert was begun in earnest. The whole of the construction

gangs and railroad staff were brought from Kerma to Wady Halfa, and the

daring pioneers of modern war started on their long march through the

wilderness, dragging their railway behind them--safe and sure road

which infantry, cavalry, guns, and gunboats might follow with speed and

convenience.

It is scarcely within the power of words to describe the savage

desolation of the regions into which the line and its constructors

plunged. A smooth ocean of bright-coloured sand spread far and wide to

distant horizons. The tropical sun beat with senseless perseverance upon

the level surface until it could scarcely be touched with a naked hand,

and the filmy air glittered and shimmered as over a furnace. Here and

there huge masses of crumbling rock rose from the plain, like islands of

cinders in a sea of fire. Alone in this vast expanse stood Railhead--a

canvas town of 2,500 inhabitants, complete with station, stores,

post-office, telegraph-office, and canteen, and only connected with the

living world of men and ideas by two parallel iron streaks, three feet

six inches apart, growing dim and narrower in a long perspective

until they were twisted and blurred by the mirage and vanished in the

indefinite distance.

Every morning in the remote nothingness there appeared a black speck

growing larger and clearer, until with a whistle and a welcome clatter,

amid the aching silence of ages, the 'material' train arrived, carrying

its own water and 2,500 yards of rails, sleepers, and accessories. At

noon came another speck, developing in a similar manner into a

supply train, also carrying its own water, food and water for the

half-battalion of the escort and the 2,000 artificers and platelayers,

and the letters, newspapers, sausages, jam, whisky, soda-water,

and cigarettes which enable the Briton to conquer the world without

discomfort. And presently the empty trains would depart, reversing the

process of their arrival, and vanishing gradually along a line which

appeared at last to turn up into the air and run at a tangent into an

unreal world.

The life of the strange and lonely town was characterised by a

machine-like regularity, born perhaps of the iron road from which it

derived its nourishment. Daily at three o'clock in the morning the

'camp-engine' started with the 'bank parties.' With the dawn the

'material' train arrived, the platelaying gangs swarmed over it like

clusters of flies, and were carried to the extreme limit of the track.

Every man knew his task, and knew, too, that he would return to camp

when it was finished, and not before. Forthwith they set busily to

work without the necessity of an order. A hundred yards of material was

unloaded. The sleepers were arranged in a long succession. The rails

were spiked to every alternate sleeper, and then the great 80-ton engine

moved cautiously forward along the unballasted track, like an elephant

trying a doubtful bridge. The operation was repeated continually through

the hours of the burning day. Behind the train there followed other

gangs of platelayers, who completed the spiking and ballasting process;

and when the sun sank beneath the sands of the western horizon, and the

engine pushed the empty trucks and the weary men home to the Railhead

camp, it came back over a finished and permanent line. There was a brief

interval while the camp-fires twinkled in the waste, like the lights

of a liner in mid-ocean, while the officers and men chatted over their

evening meal, and then the darkness and silence of the desert was

unbroken till morning brought the glare and toil of another long day.

So, week in, week out, the work went on. Every few days saw a

further advance into the wilderness. The scene changed and remained

unaltered--'another, yet the same.' As Wady Halfa became more remote and

Abu Hamed grew near, an element of danger, the more appalling since

it was peculiar, was added to the strange conditions under which the

inhabitants of Railhead lived. What if the Dervishes should cut the line

behind them? They had three days' reserve of water. After that, unless

the obstruction were removed and traffic restored, all must wither

and die in the sand, and only their bones and their cooking-pots would

attest the folly of their undertaking.

By the 20th of July a hundred and thirty miles of line had been

finished, and it became too dangerous to advance further until Abu Hamed

had been cleared of the Dervish force. They were still a hundred miles

away, but camels travel fast and far, and the resources of the enemy

were uncertain. It appeared that progress would be checked, but on the

7th of August General Hunter, marching from Merawi along the river

bank, attacked and took Abu Hamed--an operation which will be described

hereafter. Work was at once resumed with renewed energy. The pace of

construction now became remarkable. As much as 5,300 yards of track was

surveyed, embanked, and laid in a single day. On the 1st of November Abu

Hamed was reached, and by the banks of the Nile the men who had fought

their way across the desert joined hands with those who had fought their

way along the river.

The strain and hardship had not, however, been without effect on the

constructors. Two of the Engineer subalterns--Polwhele and Cator--out of

the eight concerned in the laying of the Dongola and the Desert railways

had died. Their places were eagerly filled by others.

The completion of the line was accelerated by nearly a month through the

fortunate discovery of water. At the beginning of July a well was

sunk in what was thought to be a likely place at 'No. 4 Station,'

seventy-seven miles from Halfa. After five weeks' work water was found

in abundance at a depth of 90 feet. A steam-pump was erected, and the

well yielded a continual supply. In October a second well was sunk at

'No. 6 Station,' fifty-five miles further on, whence water was obtained

in still greater quantity. These discoveries modified, though they did

not solve, the water question. They substantially increased the carrying

capacity of the line, and reduced the danger to which the construction

gangs were exposed. The sinking of the wells, an enterprise at which the

friendly Arabs scoffed, was begun on the Sirdar's personal initiative;

but the chronicler must impartially observe that the success was won

by luck as much as by calculation, for, since the first two wells were

made, eight others of greater depth have been bored and in no case has

water been obtained.

As the railway had been made, the telegraph-wire had, of course,

followed it. Every consignment of rails and sleepers had been

accompanied by its proportion of telegraph-poles, insulators, and wire.

Another subaltern of Engineers, Lieutenant Manifold, who managed this

part of the military operations against the Arabs, had also laid a line

from Merawi to Abu Hamed, so that immediate correspondence was effected

round the entire circle of rail and river.

The labours of the Railway Battalion and its officers did not end with

the completion of the line to Abu Hamed. The Desert Railway was made. It

had now to be maintained, worked, and rapidly extended. The terminus

at Halfa had become a busy town. A mud village was transformed into a

miniature Crewe. The great workshops that had grown with the line

were equipped with diverse and elaborate machines. Plant of all kinds

purchased in Cairo or requisitioned from England, with odds and

ends collected from Ishmail's scrap heaps, filled the depots with

an extraordinary variety of stores. Foundries, lathes, dynamos,

steam-hammers, hydraulic presses, cupola furnaces, screw-cutting

machines, and drills had been set up and were in continual work. They

needed constant attention. Every appliance for repairing each must be

provided. To haul the tonnage necessary to supply the army and extend

the line nearly forty engines were eventually required. Purchased at

different times and from different countries, they included ten distinct

patterns; each pattern needed a special reserve of spare parts. The

permutations and combinations of the stores were multiplied. Some of the

engines were old and already worn out. These broke down periodically.

The frictional parts of all were affected by the desert sand, and needed

ceaseless attention and repair. The workshops were busy night and day

for seven days a week.

To the complication of machinery was added the confusion of tongues.

Natives of various races were employed as operatives. Foremen had been

obtained from Europe. No fewer than seven separate languages were spoken

in the shops. Wady Halfa became a second Babel. Yet the undertaking

prospered. The Engineer officers displayed qualities of tact and temper:

their director was cool and indefatigable. Over all the Sirdar

exercised a regular control. Usually ungracious, rarely impatient,

never unreasonable, he moved among the workshops and about the line,

satisfying himself that all was proceeding with economy and despatch.

The sympathy of common labour won him the affection of the subalterns.

Nowhere in the Soudan was he better known than on the railroad. Nowhere

was he so ardently believed in.

It is now necessary to anticipate the course of events. As soon as the

railway reached Abu Hamed, General Hunter's force, which was holding

that place, dropped its slender camel communications with Merawi and

drew its supplies along the new line direct from Wady Halfa. After the

completion of the desert line there was still left seventeen miles of

material for construction, and the railway was consequently at once

extended to Dakhesh, sixteen miles south of Abu Hamed. Meanwhile Berber

was seized, and military considerations compelled the concentration of

a larger force to maintain that town. The four battalions which had

remained at Merawi were floated down stream to Kerma, and, there

entraining, were carried by Halfa and Abu Hamed to Dakhesh--a journey of

450 miles.

When the railway had been begun across the desert, it was believed that

the Nile was always navigable above Abu Hamed. In former campaigns it

had been reconnoitred and the waterway declared clear. But as the river

fell it became evident that this was untrue. With the subsidence of the

waters cataracts began to appear, and to avoid these it became necessary

first of all to extend the railway to Bashtinab, later on to Abadia, and

finally to the Atbara. To do this more money had to be obtained, and the

usual financial difficulties presented themselves. Finally, however, the

matter was settled, and the extension began at the rate of about a mile

a day. The character of the country varies considerably between Abu

Hamed and the Atbara River. For the first sixty miles the line ran

beside the Nile, at the edge of the riparian belt. On the right was the

cultivable though mostly uncultivated strip, long neglected and silted

up with fine sand drifted into dunes, from which scattered, scraggy

dom palms and prickly mimosa bushes grew. Between the branches of these

sombre trees the river gleamed, a cool and attractive flood. On the left

was the desert, here broken by frequent rocks and dry watercourses. From

Bashtinab to Abadia another desert section of fifty miles was necessary

to avoid some very difficult ground by the Nile bank. From Abadia to the

Atbara the last stretch of the line runs across a broad alluvial expanse

from whose surface plane-trees of mean appearance, but affording welcome

shade, rise, watered by the autumn rains. The fact that the railway

was approaching regions where rain is not an almost unknown phenomenon

increased the labour of construction. To prevent the embankments from

being washed away in the watercourses, ten bridges and sixty culverts

had to be made; and this involved the transport over the railway of more

than 1,000 tons of material in addition to the ordinary plant.

By the arrival of the reinforcements at Berber the fighting force at the

front was doubled: doubled also was the business of supply. The task of

providing the food of an army in a desert, a thousand miles from their

base, and with no apparent means of subsistence at the end of the day's

march, is less picturesque, though not less important, than the building

of railways along which that nourishment is drawn to the front. Supply

and transport stand or fall together; history depends on both; and in

order to explain the commissariat aspect of the River War, I must again

both repeat and anticipate the account. The Sirdar exercised a direct

and personal supervision over the whole department of supply, but

his action was restricted almost entirely to the distribution of the

rations. Their accumulation and regular supply were the task of Colonel

Rogers, and this officer, by three years of exact calculation and

unfailing allowance for the unforeseen, has well deserved his high

reputation as a feeder of armies.

The first military necessity of the war was, as has been described, to

place the bulk of the Egyptian army at Akasha. In ordinary circumstances

this would not have been a serious commissariat problem. The frontier

reserves of food were calculated to meet such an emergency. But in 1895

the crops in Egypt had been much below the average. At the beginning of

1896 there was a great scarcity of grain. When the order for the advance

was issued, the frontier grain stores were nearly exhausted. The new

crops could not be garnered until the end of April. Thus while the world

regarded Egypt as a vast granary, her soldiers were obliged to purchase

4,000 tons of doura and 1,000 tons of barley from India and Russia on

which to begin the campaign.

The chief item of a soldier's diet in most armies is bread. In several

of our wars the health, and consequently the efficiency, of the troops

has been impaired by bad bread or by the too frequent substitution of

hard biscuit. For more than a year the army up the river ate 20 tons

of flour daily, and it is easy to imagine how bitter amid ordinary

circumstances would have been the battle between the commissariat

officers, whose duty it was to insist on proper quality, and the

contractors--often, I fear, meriting the epithet 'rascally'--intent

only upon profit. But in the well-managed Egyptian Service no such

difficulties arose. The War Department had in 1892 converted one of

Ismail Pasha's gun factories near Cairo into a victualling-yard.

Here were set up their own mills for grinding flour, machinery for

manufacturing biscuit to the extent of 60,000 rations daily, and

even for making soap. Three great advantages sprang from this wise

arrangement. Firstly, the good quality of the supply was assured.

Complaints about bread and biscuit were practically unknown, and the

soap--since the soldier, in contrast to the mixture of rubble and grease

with which the contractors had formerly furnished him, could actually

wash himself and his clothes with it--was greatly prized. Secondly, all

risk of contractors failing to deliver in time was avoided. Lastly,

the funds resulting from the economy had been utilised to form a useful

corps of 150 bakers. And thus, although the purchase of foreign grain

added to the expense, the beginning of the war found the commissariat of

the Egyptian Army in a thoroughly efficient state.

Vast reserves of stores were quickly accumulated at Assuan. From these

not an ounce of food was issued without the Sirdar's direct sanction. At

the subsidiary depot, formed at Wady Halfa, the same rule prevailed. The

man who was responsible to no one took all the responsibility; and

the system whereby a Chief of the Staff is subjected to the continual

bombardment of heads of departments was happily avoided. Sufficient

supplies having been accumulated at Akasha to allow of a forward

movement, Firket was fought. After Firket the situation became

difficult, and the problem of the supply officers was to keep the troops

alive without delaying the progress of the railway with the carriage of

their food. A small quantity of provisions was painfully dragged, with

an average loss of 50 per cent from theft and water damage, up the

succession of cataracts which obstruct the river-way from Halfa to

Kosheh. Camel convoys from Railhead carried the rest. But until the line

reached Kosheh the resources of the transport were terribly strained,

and at one time it was even necessary to send the mounted troops north

to avoid actual famine. The apparent inadequacy of the means to the end

reached a climax when the army moved southward from Dulgo. The marches

and halts to Dongola were estimated to take ten days, which was the

utmost capacity of camel and steam transport, A few boat-loads of

grain might be captured; a few handfuls of dates might be plucked; but

scarcely any local supplies would be available. The sailing-boats,

which were the only regular means of transport, were all delayed by the

adverse winds. Fortune returned at the critical moment. By good luck

on the first day of the march the north wind began to blow, and twelve

days' supplies, over and above those moved by camel and steamer, reached

Dongola with the troops. With this reserve in hand, the occupation of

the province was completed, and although the army only existed from hand

to mouth until the railway reached Kerma, no further serious difficulty

was experienced in supplying them.

The account of the commissariat is now complete to the end of the

Dongola Expedition; but it may conveniently be carried forward with

the railway construction. In the Abu Hamed phase the supplies were so

regulated that a convoy travelling from Murat Wells along the caravan

route arrived the day after the fight; and thereafter communications

were opened with Merawi. The unexpected occupation of Berber, following

Abu Hamed, created the most difficult situation of the war. Until the

railway was forced on to Berber a peculiarly inconvenient line of supply

had to be used; and strings of camels, scattering never less than 30

per cent of their loads, meandered through the rough and thorny country

between Merawi and Abu Hamed. This line was strengthened by other

convoys from Murat and the approaching Railhead, and a system of boats

and camel portages filtered the supplies to their destination.

Even when the railway had reached Dakhesh the tension was only slightly

relaxed. The necessity of supplying the large force at Berber, 108 miles

from Railhead, still required the maintenance of a huge and complicated

system of boat and camel transport. Of course, as the railway advanced,

it absorbed stage after stage of river and portage, and the difficulties

decreased. But the reader may gain some idea of their magnitude by

following the progress of a box of biscuits from Cairo to Berber in the

month of December 1897. The route was as follows: From Cairo to Nagh

Hamadi (340 miles) by rail; from Nagh Hamadi to Assuan (205 miles) by

boat; from Assuan to Shellal (6 miles) by rail; from Shellal to Halfa

(226 miles) by boat; from Halfa to Dakhesh (Railhead)--248 miles--by

military railway; from Dakhesh to Shereik (45 miles) by boat; from

Shereik by camel (13 miles) round a cataract to Bashtinab; from

Bashtinab by boat (25 miles) to Omsheyo; from Omsheyo round another

impracticable reach (11 miles) by camel to Geneinetti, and thence (22

miles) to Berber by boat. The road taken by this box of biscuits was

followed by every ton of supplies required by 10,000 men in the field.

The uninterrupted working of the long and varied chain was vital to

the welfare of the army and the success of the war. It could only be

maintained if every section was adequately supplied and none were either

choked or starved. This problem had to be solved correctly every day by

the transport officers, in spite of uncertain winds that retarded the

boats, of camels that grew sick or died, and of engines that repeatedly

broke down. In the face of every difficulty a regular supply was

maintained. The construction of the railway was not delayed, nor the

food of the troops reduced.

The line continued to grow rapidly, and as it grew the difficulties of

supply decreased. The weight was shifted from the backs of the camels

and the bottoms of the sailing-boats to the trucks of the iron road. The

strong hands of steam were directed to the prosecution of the war,

and the swiftness of the train replaced the toilsome plodding of

the caravan. The advance of the Dervishes towards Berber checked

the progress of the railway. Military precautions were imperative.

Construction was delayed by the passage of the 1st British Brigade from

Cairo to the front, and by the consequently increased volume of daily

supplies. By the 10th of March, however, the line was completed to

Bashtinab. On the 5th of May it had reached Abadia. On the 3rd of July

the whole railway from Wady Halfa to the Atbara was finished, and the

southern terminus was established in the great entrenched camp at the

confluence of the rivers. The question of supply was then settled once

and for all. In less than a week stores sufficient for three months were

poured along the line, and the exhausting labours of the commissariat

officers ended. Their relief and achievement were merged in the greater

triumph of the Railway Staff. The director and his subalterns had

laboured long, and their efforts were crowned with complete success. On

the day that the first troop train steamed into the fortified camp

at the confluence of the Nile and the Atbara rivers the doom of the

Dervishes was sealed. It had now become possible with convenience and

speed to send into the heart of the Soudan great armies independent of

the season of the year and of the resources of the country; to supply

them not only with abundant food and ammunition, but with all the varied

paraphernalia of scientific war; and to support their action on land

by a powerful flotilla of gunboats, which could dominate the river and

command the banks, and could at any moment make their way past Khartoum

even to Sennar, Fashoda, or Sobat. Though the battle was not yet fought,

the victory was won. The Khalifa, his capital, and his army were now

within the Sirdar's reach. It remained only to pluck the fruit in the

most convenient hour, with the least trouble and at the smallest cost.

The River War: An Account of the Reconquest of the Sudan · 第 8 / 19 章