Industrial insurance $ 156.27
Grading, labor, teams, material, etc. 8,928.19
Explosives 102.08
Concrete drainage structures 14.70
Pipe culverts 287.03
Irrigation flume diversions 5.40
---------
Total $ 9,493.67
Engineering 275.21
---------
Total cost $ 9,768.88