Ashland Hill Grading and Undercrossing

On account of a contemplated undergrade crossing with the Southern

Pacific Railway, a stretch of 4,200 feet on the Pacific Highway just

north of Ashland was left unpaved between Ashland and Medford when the

balance of the distance between those points was paved in 1914. In 1917

arrangement was made between the County and Railway Company for the

construction of this undercrossing and the State Highway Commission set

aside funds to cover the cost of the 4,200 feet of grading in connection

therewith.

The Installation of the undercrossing structure was handled by the

Southern Pacific Railway Company. The grading was handled by the County

grading forces under the supervision of the Highway Department. Mr. F.

H. Walker acted as resident engineer. The grading was commenced on

January 7, 1918, and completed August 1, 1918. The total cost of the

grading was $9,768.88, and was paid entirely from State funds.