Grading--Comstock to the Lane County Line

This section runs through the northern portion of the Pass Creek Canyon,

and has been the dread of tourists heretofore. It has always been a hard

road to travel under summer conditions and absolutely impassable in

winter, even for horse-drawn conveyances.

The contract for this improvement involved 2.4 miles of grading and was

awarded to S. S. Schell of Oakland, Oregon on September 5, 1917. The

bulk of the grading was done that fall and the job was completed in the

spring of 1918. The road bed was graded to a width of 24 feet with 5 per

cent maximum grades and easy curves. In addition to the grading, the

contract included two drainage structures over Pass Creek, one a double

6x6 reinforced concrete box culvert and the other a 20-foot reinforced

concrete bridge. All construction charges were paid by Douglas County.

Engineering charges were paid by the State.

Mr. E. B. Bishop was the Resident Engineer in charge on this section.