A ninety-foot reinforced concrete bridge was built over Goble Creek on
the Columbia River Highway about one-half mile east of Goble. This
bridge has a pile foundation which was put in by the Warren Construction
Company on a cost plus basis for $1,583.32. The superstructure was built
by Lindstrom and Fiegeson on a unit price basis. The cost of the
structure complete was $5,907.14.
The engineering work in connection with this work was handled by H. C.
Compton, resident engineer, on the Goble Section, and the inspection of
the placement of steel and pouring of concrete was in charge of L. M.
Huggins.