Prescott Hill Section

This section of the highway was built along the steep hillside, several

slides having occurred narrowing the roadbed in some places to about

eight feet and making it very dangerous, it was necessary to build

several retaining walls, half viaducts and guard fences.

This was done by Oscar Lindstrom on a basis of cost plus ten per cent.

A half-viaduct seventy-five feet in length was built containing

fifty-three cubic yards of concrete and 4,100 pounds reinforcing steel,

with standard bridge railing for guard fence.

Two hundred and fourteen linear feet of rubble masonry walls were built

on a slope of three-fourths to one, and standard bridge railing placed

on top for guard fence. These walls contain 438 cubic yards of rock.

A reinforced concrete crib forty-one feet long, fifteen feet high and

seven feet wide was built and filled with large rock. The members were

cast on the dock in Rainier and hauled to the location. A reinforced

concrete slab on solid earth foundation was used for footing, on the

required angle to give the crib a batter of one-fourth to one.

The total cost of the Prescott Hill improvement was $9,039.86.