COST STATEMENT--GOBLE CREEK BRIDGE

Engineering $ 77.47

Construction--

Class A concrete, 135 cu. yds. at $18.40 $2,447.20

Reinforcing steel, 17,925 lbs. at 71/2c 1,344.38

Concrete hand rail, 186 lin. ft. at $1.75 325.50

Construction of cement shed and unloading cement 129.27

Pile foundation (force account) 1,583.32

---------

Total construction cost 5,829.67

---------

Grand total cost of bridge $5,907.14

Third biennial report of the Oregon State Highway Commission · 第 131 / 292 题