Westport-Clatskanie Macadam

On the Clatskanie-Westport Section, which extended from Clatskanie to

the Clatsop County Line, the work was handled originally by the Warren

Construction Company, on a cost plus ten per cent. basis. The State

Highway Department took this work over December 26, 1917, and from that

time on the work was handled by this Department. This work consisted of

8.62 miles of sixteen-foot waterbound macadam.

On this section the costs show that the Warren Construction Company laid

crushed rock slightly cheaper than the State. However, the State did all

the finishing on this section, which is more expensive than laying the

base rock and it was necessary to raise the wages twenty-five per cent.

after the work was taken over by the Department. C. L. Grutze was

resident engineer on this work.