Class A concrete, 64 cu. yds. at $22.43 $1,435.64
Reinforcing steel, 2,900 lbs. at 8c 232.00
---------
$1,667.64
Contractors percentage 166.96
---------
Total Cost $1,834.60
Paving work was started November 5, 1917, and completed December 20,
with the exception of about 200 feet of new fill made at the culvert
which was completed in June, 1918.
Engineering work was done by P. W. Marx, under the supervision of Chas.
H. Whitmore, assistant engineer.
DETAILED EXPENDITURE STATEMENT--PAVING--MULTNOMAH COUNTY LINE TO
SCAPPOOSE
Engineering $ 1,364.28
Right-of-way attorney fees 35.00
Contract Construction Work as follows:
Common excavation, 800 cu. yds. at 45c $ 360.00
Standard Bith. pavement, 24,248.2 sq. yds.
at $1.17 28,370.39
Broken stone, loose measure, 3,115.5 cu. yds.
at $1.90 5,919.45
Broken stone shoulders, 26,974 lin. ft. at 5c 1,348.70
Force account:
34 feet of 12-inch corrugated iron pipe and
120 feet of 6-inch porous drain tile 254.77
Total paid to contractor $ 36,253.31
-----------
Total cost $ 37,652.59