4. Pour settling chamber walls to level of siphon chamber excavation,
inserting submerged outlet pipe at the proper height.
5. Block siphon trap and connected branch and short pipes to correct
line and grade, and fill with concrete around the trap.
4. Pour settling chamber walls to level of siphon chamber excavation,
inserting submerged outlet pipe at the proper height.
5. Block siphon trap and connected branch and short pipes to correct
line and grade, and fill with concrete around the trap.