6. Pour siphon chamber floor, and place the form thereon.

7. Continue pouring all walls to their full height, inserting the inlet

pipe when the concrete reaches that elevation.

8. Do not remove forms till the concrete is hard; with favorable

weather, forms for walls only may be removed in 1 to 2 days; forms

supporting a cover slab should remain 1 to 2 weeks.

]

=Steel reinforcement.=--To stiffen the cover slab and guard against

cracking, a little steel should be embedded in the concrete about 1 inch

above the inside top. For this purpose a strip of heavy stock fencing is

convenient and inexpensive. The line wires should be not less than No.

10 gauge (about 1/8 inch) and the stay wires not less than No. 11 gauge.

The reinforcement should be cut at manholes and fastened around manhole

openings. If desired a standard wire-mesh reinforcement weighing about

one-third of a pound per square foot may be used. Another alternative is

to use 1/4-inch round rods, spacing the crosswise rods 6 inches apart and

the lengthwise rods 12 inches apart. Poultry netting should not be used,

because of its lightness.

=Sewer from tank to distribution field.=--The length of this sewer depends

on the situation of the field and the fall to it. The size of the sewer

depends on the fall that can be obtained and the size of siphon. The table

in figure 26 shows the minimum fall at which 4-inch, 5-inch, and 6-inch

sewers should be laid to take the discharge of the 3-inch and 4-inch

siphons specified. The line and grade should be set in the same manner

as for the house sewer (see fig. 20), and the construction should be as

specified under that caption.

=Distribution field.=--The distribution field or area is a sewage filter,

and its selection and the manner of preparing it largely determine the

success of subsoil disposal of sewage. As a rule farm land is not the best

filtering material. It is too fine grained and fertile. Its tendency is to

hold water too long, to admit insufficient air, to clog when even small

quantities of sewage are applied. Hence the distribution area should be

of liberal size--on the average 500 square feet for each person served.

It should be dry, porous, and well drained--qualities that characterize

sandy, gravelly, and light loam soils. It should be devoid of trees and

shrubbery, thus giving sunlight and air free access. It should be located

at least 300 feet downhill from a well or spring used for domestic water

supply. Preferably it should slope gently, but sharp slopes are not

prohibitive. Subsoiling the area is always desirable.

Clay and other compact, impervious soils require special treatment. Less

sewage can be applied to them, and hence it is well to have the area

larger than 500 square feet per person. Clay should be subsoiled as deep

as possible with a subsoil plow. In some instances dynamite has been

of service in opening up the ground to still greater depth. Drainage

and aeration should be further promoted by laying tile underdrains, as

outlined in figure 19 and shown in more detail in figure 31.

After the construction work the distribution area should be raked

and seeded with thick-growing grass. Grass is a safe crop; its water

requirement is high, and it affords considerable protection from frost.

Suitable grasses are redtop, white clover, blue grass, and Bermuda grass.

The area may be pastured or kept as grass land.

=Distribution system.=--Poor distribution of the sewage and failure to

protect the joints of the distribution tile account for most of the

failures. Each flush of the siphon should be so controlled that every part

of the field will receive its due proportion. The distribution tile must

be so laid that loose dirt will not fall or wash into the open joints.

Different methods of dividing the flush and laying out the distribution

tile are shown in figures 29 and 32. Layouts 1, 2, and 3, figure 29, are

suitable for flat or gently sloping areas and are planned for the shallow

siphon chambers tabulated on page 37. Layout 4, figure 29, is suitable for

steep slopes. In all four layouts use is made of one or more =V=-branches

(not =Y=-branches) to divide the flow equally among the several lines.

=V=-branches, sometimes called breeches, should be leveled with a

carpenter's level crosswise the ends of the legs, thus insuring equal

division of the flow.

The size and length of distribution tile and the spacing of the lines

or runs admit of considerable variation in different soils. Water sinks

rapidly in gravels and sands, and hence larger tile and shorter length are

permissible than in close soils. Lateral movement is slow in all soils,

but extends farther in gravels and sands than in close soils. In average

soils the effect on vegetation 5 feet away from the line is practically

nil.

From these considerations, with the siphon dose 20 gallons per person, it

is usually a safe rule to provide 50 feet of 3-inch tile for each person

served and to lay the lines 10 feet apart. Such provision gives a capacity

within the bore of the tile lines about equal to the siphon dose, and

as some sewage is wasted at each joint a reasonable factor of safety is

provided. A spacing of 10 feet will, it is believed, permanently prevent

the extension of lateral absorption from line to line, provided the area

is fairly well drained. As between 3-inch and 4-inch tile the smaller

size costs less and is better calculated to taper the dose to small

proportions. Four-inch tile is less likely to get out of alignment or to

become clogged; a length of 28 feet has the same capacity in the bore as

50 feet of 3-inch.

Good-quality drain tile in 1-foot lengths or second-quality sewer pipe

in 2-foot lengths may be used. The lines are generally laid in parallel

runs, but may be varied according to the topography. Layouts 1, 2, and 3,

figure 29, for flat or gently sloping land, run with the slope; layout 4,

for steep slopes, runs back and forth along the contour in a series of

long flat sweeps and short steep curves. The grade of the runs and sweeps

should be gentle, rarely more than 10 or 12 inches in 100 feet. In layouts

1, 2, and 3, figure 29 especially, it is desirable that the last 20 feet

of each run should be laid level or given a slight upward slope, thus

guarding against undue flow of sewage to the lowest ends of the system.

Fig. 29.--Methods of laying distribution system: Methods 1, 2, and 3 for

flat or gently sloping land; method 4 for steep slopes (see also fig. 32);

_A_, direction of slope; _B_, contour of field; _C_, sewer from tank,

preferably size 5 inch, though 4 or 6 inch may be used, depending on

the fall and the size of the siphon (see table, fig. 26); _D_, =V=-branch

set to divide the flow exactly; _E_, reducer, to 4 inches; F, 1/8 bend,

4-inch; _G_, increaser, from 4 inches; _H_, increaser, 3 to 4 inches; _I_,

reducer, 4 to 3 inches; _J_, distribution tile, 3-inch; _K_, distribution

tile, 4-inch.

The runs should be laid no deeper than necessary to give clearance when

plowing and prevent injury from frost. Ten inches of earth above the top

of the tile is sufficient generally throughout the southern half of the

United States and 18 inches generally in the North, but if the field

is exposed or lacks a thick heavy growth of grass the cover should be

increased to 2-1/2 or 3 feet near the Canadian line. What is better, the

tile in all instances may be laid with a 10-inch cover and in cold weather

the runs may be covered with hay, straw, or leaves weighted down, which

may be removed in the spring.

[Illustration: Fig. 30.--Four methods of protecting open joints in

distribution lines--an all-important work. Sketches show cross-section and

longitudinal views; the depth from the surface of the ground to the top of

the tile is about 10 inches.

1. _A_, Subsoil ground; _B_, 3 or 4 inch drain tile; _C_, strip of

tarred paper about 6 inches wide and extending three-fourths the

distance around the tile, allowing sewage to escape at the bottom; _D_,

coarse sand, gravel, broken stone or brick, slag, cinders, or coke, the

coarsest material placed around the tile (where the ground is naturally

very porous and well drained, special filling in the trench may be

omitted); _E_, natural soil.

2. Drain tile covered with a board laid flat, leaving the entire joint

open.

3. Drain tile laid in stoneware gutter pieces and the joint covered

with stoneware caps; gutter and cap pieces are inexpensive commercial

products; their radius is longer than that of the outside of the tile,

thus leaving open most of the joint space; the gutter aids in keeping

the tile in line.

4. Vitrified sewer pipe with hubs facing downhill; the spigot end should

be centered in the hub with a few small chinks or wedges.

]

Making the joints of the distribution tile demands especial attention.

For a short distance on the upper end of each run the tile should be laid

with ends abutting; the joint opening should be increased gradually to

one-eighth inch and this increased to one-fourth in the last 20 feet of

the run. All joints should be protected against the entrance of loose

dirt. Four methods are shown in figure 30. The lower end of each run

should be closed with a brick or flat stone; or, what is better, an elbow

or =T=-branch may be placed on the end and vented above the surface of the

ground, improving the flow of sewage, the ventilation of pipes, and the

aeration of the soil.

If the distribution tile must be laid in clay or other close, poorly

drained soil, special treatment is necessary. A common method is to

subsoil and underdrain the area thoroughly, as shown in figure 31.

It is not always possible to run the underdrain in lines between the

distribution lines as shown in figures 19 and 31, but it is a desirable

thing to do, as the sewage must then receive some filtration through

natural soil.

In some instances it is sufficient to lay the distribution tile on a

continuous bed, 8 to 12 inches thick, of coarse gravel, broken stone, or

brick, slag, coke, or cinders and complete the refill as shown in figure

18 or 31.

Figure 32 shows two other methods of controlling the flow on steep slopes

and diverting proper proportions to the several lateral distributors

laid along the contour of the field. This work can not be effected

properly with =T= or =Y= branches; the flow tends to shoot straight ahead,

comparatively little escaping laterally. To overcome this difficulty

recourse is had to diverting boxes, of which two types are shown in figure

32. These boxes involve expense, but permit inspection and division of the

flow according to the needs. They may be built of brick, stone, concrete,

or even wood.

[Illustration: Fig. 31.--Close soils should be deeply subsoiled and

underdrained. Porous, well-drained, air-filled soil is absolutely

necessary. _A_, Subsoiled ground; _B_, 3 or 4 inch distribution tile;

_C_, depth variable with the climate, 1-1/4 to 3-1/2 feet; _D_, 4-inch

underdrain; _E_, depth such as would prepare land for good crop

production, generally 3-1/2 to 4 feet; _F_, stone or other coarse

material; _G_, gravel grading upward to coarse sand; _H_, loose soil.]

Type 1 consists of a single box, into which all the lateral distributors

head. It will be noted that the laterals enter at slightly different

elevations, the two opposite the inlet sewer being the highest, the next

two slightly lower, and the next two the lowest. This staggering of the

outlets, in a measure, offsets the tendency of the flow to shoot across

and escape by the most direct route.

Type 2 calls for one or more diverting boxes, according to the number of

lateral distributors, and readily permits of wasting sewage at widely

separated elevations and distances. The outlet pipes enter the box at

slightly different elevations, for the reason already stated. With either

type, should the outlets not be set at the right elevations, partial

plugging of the holes and a little experimenting will enable one to

equalize or proportion the discharges.

[Illustration: Fig. 32.--Two systems of distribution on steep slopes--use

of diverting box. _A_ Direction of slope; _B_, contour of field; _C_,

4, 5 or 6 inch sewer from tank; _D_ diverting box; _E_, 3-inch or 4-inch

distribution tile.]

=Sewage switch.=--The clogging of filters and soils after long-continued

application of sewage has been previously referred to. It is, therefore,

desirable to arrange the distribution system in two units with a switch

between them, so that one area may drain and become aerated while the

other is in use. This procedure is especially desirable where the soil is

close and the installation of considerable size. It adds to the life and

effectiveness of the distribution area and permits use of a plant in case

it is necessary to repair, extend, or relay the tile in either unit.

Arrangement in two units does not necessarily mean doubling the amount

of tile and the area required in a single field. However desirable that

may be, expense or lack of suitable ground will often prevent. With open

sands and gravels and the assumed siphon dose of 20 gallons per person,

15 to 20 feet of 4-inch tile in each unit for each person will usually

suffice. With more compact soil it is advisable to more nearly double the

requirements previously described. Two simple types of switch are shown in

figure 33. The switch should be turned frequently, certainly as often as

is necessary to prevent saturation or bogginess of either area.

[Illustration: Fig. 33.--Two simple types of sewage switch. _A_, Sewer

from tank; _B_, switch box; _C_, cover; _D_, blade or stop board (in the

left-hand box the direction of flow is controlled by placing the blade in

alternate diagonal position; in the right-hand box the stop works in iron

guides cast integral with a short piece of light-weight pipe set in the

masonry; if desired the guides may be wood, fastened to the masonry with

expansion bolts); _E_, sewer to distribution area; _F_ (right-hand box),

alternate position of outlets or additional outlets if required.]

=A complete installation.=--The general layout and working plans of

a complete installation built in 1915-16 are shown in figure 34. The

plant is larger than those heretofore considered, and involves several

additional features. The settling chamber below the flow line has a

capacity of 1,000 gallons, and on a basis of 40 gallons per person per day

would serve 25 people.

For many years sewage had been discharged through two 4-inch sewers to

a cesspool in the rear of the house. The proximity of the well made it

unsafe, and the overflow of the cesspool dribbled over the low portion of

the garden and barnyard, creating nuisance.

The first step was to make borings with a soil auger in the pasture 400

or 500 feet from the house. The borings showed a heavy clay soil to a

depth of about 4 feet, underlaid with a sandy stratum only a few inches in

thickness. It was decided to locate the distribution area in the pasture

and to aid the seepage of sewage by digging numerous filter wells through

the clay to the sandy stratum. Levels were taken and a contour plan

prepared to serve for laying out the plant and establishing the grades.

[Illustration: Fig. 34.--A complete installation for a large rural

home. General layout on a contour plan and construction drawings. Note

abandonment of old cesspool near the well and garden and removal of sewage

to a lower and safer location in the pasture, where the treatment is

subsurface distribution, aided by numerous filter wells about 4 feet deep

filled with coarse gravel. Note that sludge is removed from the bottom of

the settling chamber by opening the gate on the sludge drain.]

The septic tank is built in one corner of the barnyard, and a 5-inch sewer

connects it with the old 4-inch sewers to the cesspool. All sewer pipe

joints were poured with a flexible jointing compound. The settling chamber

is of hopper shape at the bottom, and a 4-inch sludge drain with gate

provides for the gravity removal of sludge. The lower end of the sludge

drain is above the surface of the ground and 9 feet below the flow line.

The end is protected by a small retaining wall, and the sludge is readily

caught in barrels and hauled out on the land for burial. The outlet is low

enough to drain the settling chamber completely. If it is desired merely

to force out the sludge, the drain may be brought to the surface under a

head of 3 to 5 feet, discharging the sludge into a trench or drying bed,

to be applied later to the land. A 2-inch waste pipe about mid-depth of

the settling chamber permits drawing off the clearer portion of the sewage

to the siphon chamber and from thence through another 2-inch waste pipe

into the 6-inch sewer leading to the distribution field.

The 4-inch siphon has a drawing depth of 33 inches, and as the siphon

chamber is 4 feet wide by 6 feet long the dose is about 500 gallons. The

siphon cost $35. The 6-inch sewer to the switch box falls about 6 inches

in 50 feet. The distribution field was thoroughly subsoiled, and about 800

feet of 3-inch tile was laid in each unit. At intervals of 25 feet along

the distribution trenches 6-inch holes were dug through the clay stratum

with a posthole digger. These holes were filled with stone and constitute

the filter wells previously mentioned. All tile lines are surrounded with

stone and coarse gravel, and the ground has been trimmed to give a uniform

cover of 12 inches. All work was done by day labor in a thorough manner.

As the men were doing other work at the same time the actual cost is not

known, but it is believed the installation cost about $700.

=Cost data.=--Reliable cost figures are difficult to estimate. Labor,

materials, freight, haulage, and other items vary greatly in different

localities. The septic tank shown in figure 23 contains about 1,000 bricks

and is estimated to cost $60 complete. The septic tank shown in figure

25 for 5 persons is estimated to cost $135; for 10 persons, $170; for

15 persons, $240; for 20 persons, $280. In Maryland, in 1916, the cost

of installing a septic tank similar to that shown in figure 25 (for 5

people), including 86 feet of 5-inch house sewer (55 feet of cast-iron

pipe passing a well, and 31 feet of vitrified pipe) and 214 feet of

second-quality 4-inch sewer pipe in the distribution area, was as follows:

Excavation, labor $7.50

Materials delivered 46.60

Three-inch siphon, including freight 15.75

Construction, labor 28.00

Supervision 5.00

------

Total 102.85

The quotations in the following table will be found useful in making

estimates of cost:

_Cost of pipe and drain tile._

(February, 1921.)

------------------------------------+-----------------------------------

| Size, in inches.

Kind of pipe. +--------+--------+--------+--------

| 3 | 4 | 5 | 6

------------------------------------+--------+--------+--------+--------

Extra heavy cast-iron soil | | | |

pipe, on cars Chicago, Ill., per | | | |

or Washington, D. C. foot| $0.34 | $0.46 | $0.61 | $0.72

Vitrified salt-glazed sewer | | | |

pipe, on cars Chicago, Ill. do | .15 | .15 | .22½ | .22½

Vitrified salt-glazed sewer | | | |

pipe, at factory near | | | |

Washington, D. C. do | .12 | .12 | .18 | .18

Clay or shale drain tile, at | | | |

factory in Ohio do | .03 | .03½ | .04½ | .05½

Clay or shale drain tile, at | | | |

factory near Washington, D. C. do | .04 | .05 | .06 | .07

------------------------------------+--------+--------+--------+--------

The cost of cast-iron fittings may be roughly estimated as follows: Bends,

one to one and one-half times the price of straight pipe; =T=-branches,

two times the price of straight pipe; reducers, average of the prices of

straight pipe at each end. The cost of clay bends, =T=-branches, reducers,

and increasers may be roughly estimated at four times the price of

straight pipe.

=Operation.=--Attention must be given to every plant to insure success.

Unusual or excessive foulness should be investigated. No chemicals should

be used in a septic tank; garbage, rags, newspaper, and other solids

not readily soluble in water should be kept out of sewers and tanks.

The plant should be inspected often, noting particularly if the siphon

is operating satisfactorily. If scum forms in the settling chamber it

should be removed, and the sludge should be bailed or pumped out yearly.

Frequently tanks are not cleaned out for three or four years, resulting in

large quantities of solid matter going through to the distribution system

and clogging it. Clogging may occur in the tile or in the adjacent soil.

In either case the tile should be dug up, cleaned, and relaid. In some

cases it has been found advantageous to relay the tile between the former

lines. When sewage is applied to fairly porous land at the slow rate here

recommended and the plant is well handled the tile lines should operate

satisfactorily for many years. Liming heavy soils tends to loosen and keep

them sweet.

=Field data.=--As a basis for outlining or designing a suitable

installation the following data should be known:

Sewage and sewerage of farm homes [1922] · 第 48 / 62 题