2. A detention period of about 24 hours; that is, the capacity of the
settling chamber below the flow line is approximately equal to the
quantity of sewage discharged from the house in 24 hours.
3. Where a siphon chamber is provided, its size is such that the dose of
sewage shall be approximately equal to 20 gallons per person; that is, the
capacity of the siphon chamber between the discharge and low-water lines
is roughly equal to the quantity of sewage discharged in 12 hours.
[Illustration: Fig. 23.--One-chamber septic tank--does nothing more
than a tight cesspool. Brick construction, heavily plastered inside;
size suitable for 180 to 280 gallons of sewage daily (nominally 4 to 7
persons).]
A simple one-chamber brick tank suitable for a household discharging 180
to 280 gallons of sewage daily is shown in figure 23. A small two-chamber
tank constructed of 24-inch vitrified pipe, suitable for a household
discharging about 125 gallons of sewage daily, is shown in figure 24. A
typical two-chamber concrete tank is shown in figure 25. Excepting the
submerged outlet, all pipes within the tank and built into the masonry
are cast-iron soil pipe with cast-iron fittings. Vitrified or concrete
sewer pipe and specials are generally used as they are frequently more
readily obtainable and a slight saving in first cost may be effected. Cast
iron is less liable to be broken in handling or after being set rigidly in
masonry, and the joints are more easily made water-tight. The submerged
outlet is midway of the depth of liquid in the settling chamber. The
inside depth of the siphon chamber is the drawing depth of the siphon plus
1 foot 5 inches.
The following table gives the principal dimensions with quantities of
materials for four sizes of tank as illustrated in figure 25:
_Dimensions and quantities for septic tanks._
--------+--------+--------+--------------------------------------------
|Quantity| | Settling chamber.
| of |Capacity|
Number | sewage | below +-------+-------+-------+----+-------+---+---
of | in 24 | flow |Length.| Depth.|Width. | W. | X. | Y.| Z.
persons.| hours. | line. | | | | | | |
--------+--------+--------+-------+-------+-------+----+-------+---+---
| Galls. | Galls. |Ft. In.|Ft. In.|Ft. In.| In.|Ft. In.|In.|In.
5 | 180-280| 240 | 4 0 | 5 0 | 2 0 | 6 | 2 0 | 4 | 6
10 | 320-480| 420 | 5 0 | 5 6 | 2 6 | 6 | 2 3 | 4 | 6
15 | 520-680| 620 | 5 6 | 6 0 | 3 0 | 8 | 2 6 | 5 | 8
20 | 720-960| 860 | 6 0 | 6 6 | 3 6 | 8 | 2 9 | 5 | 8
--------+--------+--------+-------+-------+-------+----+-------+---+---
--------+----------+------------------------------------------------
| Quantity | Siphon chamber.
Number |of sewage +-------+--------+--------+----+----+----+-------
of | in 24 |Length.| Depth. | Width. | A. | B. | C. | D.
persons.| hours. | | | | | | |
--------+----------+-------+--------+--------+----+----+----+-------
| Galls. |Ft. In.| Ft. In.| Ft. In.| In.| In.| In.| In.
5 | 180-280 | 5 0 | 2 8 | 2 0 | 3 | 4 | 15 | 18-1/4
10 | 320-480 | 8 0 | 2 8 | 2 6 | 3 | 4 | 15 | 20-1/4
15 | 520-680 | 8 8 | 2 10 | 3 0 | 4 | 4 | 17 | 20-1/4
20 | 720-960 |10 0 | 2 10 | 3 6 | 4 | 4 | 17 | 20-1/4
--------+----------+-------+--------+--------+----+----+----+-------
--------+---------+---------+--------+--------+---------+-------------
|Quantity | | | | |Reinforcement
| of | | | | | in top slab
Number | sewage | | | | | (strip of
of | in 24 |Concrete.| Cement.| Sand. | Stone. | heavy stock
persons.| hours. | | | | | fencing).
| | | | | +-------+------
| | | | | |Length.|Width.
--------+---------+---------+--------+--------+---------+-------+------
| Galls. | Cu. yds.| Bbls. |Cu. yds.| Cu. yds.| Ft. | In.
5 | 180-280 | 3 | 4-1/2 | 1-1/3 | 2-2/3 | 10 | 3
10 | 320-480 | 4-1/4 | 6-1/4 | 2 | 3-3/4 | 14 | 3
15 | 520-680 | 6-2/3 | 9-3/4 | 3 | 6 | 15-2/3| 4
20 | 720-960 | 8 | 12 | 3-1/2 | 7 | 17-1/2| 5
--------+---------+---------+--------+--------+---------+-------+------
=Siphons.=--Reference has already been made to the vital importance of air
in sewage filtration. If the spaces within a filter or soil are constantly
filled with water, air is excluded, and the action of the filtering
material is merely that of a mechanical strainer with its clogging
tendency. The purpose of a siphon is twofold: (1) To secure intermittent
discharge, thus allowing a considerable period of time for one dose to
work off in the soil and for air to enter the soil spaces before another
flush is received; (2) to secure distribution over a larger area and in a
more even manner than where the sewage is allowed to dribble and produce
the conditions of the old-fashioned sink drain--namely, a small area of
water-logged ground.
[Illustration: Fig. 24.--Two-chamber septic tank, simple and inexpensive.
Constructed of 24-inch vitrified sewer pipe; size suitable for 125
gallons of sewage daily (nominally 3 persons). _A_, House sewer; _B_,
settling chamber, made of one double =T= branch and one length of straight
pipe, each 3 feet long and 2 feet in diameter, supported by 4 inches of
concrete, all joints made water-tight; _C_, submerged outlet, consisting
of a metal =T= slipped into the sewer-pipe branch; _D_, wire screen,
2-inch mesh; _E_, siphon chamber made of one =T= branch 3 feet long and
2 feet in diameter; _F_, siphon; _G_, 3-inch overflow; _H_, sewer to
distribution field; _I_, tight cover with lifting ring; _J_, concrete
protection around sewer-pipe hubs.]
[Illustration: Fig. 25.--Typical two-chamber concrete septic tank. (See
table for dimensions and quantities for different sizes.)]
Three types of sewage siphon are shown in figure 26. In all, the essential
principle is the same: A column of air is entrapped between two columns
of water; when the water in the chamber rises to a predetermined height,
called the discharge line, the pressure forces out the confined air,
destroying the balance and causing a rush of water through the siphon to
the sewer. The entire operation is automatic and very simple. The siphons
shown are commercial products made of cast iron; they have few parts and
none that move, and the whole construction is simple and durable. The
table (fig. 26) lists stock sizes adapted to farm use. Manufacturers
furnish full information for setting their siphons and putting them in
operation. For example, take type 2, figure 26: (1) Set siphon trap
(=U=-shaped pipe) plumb, making E (height from floor to top of long leg) as
specified; (2) fill siphon trap with water till it begins to run out at B;
(3) place bell in position on top of long leg, and the siphon is ready for
service. Do not fill vent pipe on side of bell.
[Illustration: Fig. 26.--Three types of sewage siphon. The table gives
dimensions for setting standard 3 and 4 inch siphons; also the appropriate
size and grade of the sewer to carry the siphon discharge.]
[Transcriber Note: The data for Type 1 Siphon has been added to the table.
Type 2
INCHES
+---+-------+-------+-------+-------+
Diameter of siphon | A | 3 | 3 | 4 | 4 |
Diameter of outlet | B | 4 | 4 | 4 | 4 |
Drawing depth | C | 13 | 15 | 14 | 17 |
Depth to floor | D | 16¼ | 18¼ | 17¼ | 20¼ |
Height above floor | E | 7¼ | 9¼ | 8¾ | 11¾ |
Clearance under bell | F | 2 | 2 | 2 | 2 |
Inside bottom of outlet, | | | | | |
to discharge line | G | 20½ | 22½ | 22¾ | 25¾ |
Discharge line, to top of wall | H | | | | |
Depth of outlet sump | I | | | | |
Length and width of outlet sump | J | | | | |
+---+-------+-------+-------+-------+
| R | 4 | 4 | 4 | 4 |
| S | 2 ft. | 2 ft. | 7 ft. | 8 ft. |
Diameter of carrier (R), and +---+-------+-------+-------+-------+
minimum fall (S) in feet | R | 5 | 5 | 5 | 5 |
per 100 feet | S | 1½ ft.| 1½ ft.| 2 ft.| 2½ ft.|
+---+-------+-------+-------+-------+
| R | 6 | 6 | 6 | 6 |
| S | 1 ft. | 1 ft. | 1 ft. | 1 ft. |
+---+-------+-------+-------+-------+
Type 3 Type 1
INCHES INCHES
+---+----+----+----+----+ +----+
Diameter of siphon | A | 3 | 3 | 4 | 4 | | 4 |
Diameter of outlet. | B | | | | | | |
Drawing depth | C | 13 | 15 | 14 | 17 | | 5 |
Depth to floor. | D | 17 | 17 | 19 | 22 | | 15 |
Height above floor | E | 13 | 13 | 15 | 18 | | 19 |
Clearance under bell. | F | | | | | | |
Inside bottom of outlet, | | | | | | | |
to discharge line. | G | 19 | 21 | 20 | 25 | | |
Discharge line, to top of wall. | H | 6 | 6 | 8 | 8 | | |
Depth of outlet sump | I | 13 | 13 | 11 | 12 | | |
Length and width of outlet sump | J | 18 | 19 | 19 | 18 | | |
+---+----+----+----+----+ +----+
]
The overhead siphon, type 3, figure 26, may be installed readily in a tank
already built by addition of an outlet sump. If properly set and handled,
sewage siphons require very little attention and flush with certainty.
Like all plumbing fixtures they are liable to stoppage if rags, newspaper,
and similar solids get into the sewage. If fouling of the sniffing hole
or vent prevents the entrance of sufficient air into the bell to lock the
siphon properly, allowing sewage to dribble through, the remedy is to
clean the siphon. Siphons are for handling liquid; sludge if allowed to
accumulate will choke them.
=Submerged outlet.=--The purpose of a submerged outlet is to take the
outflow from a point between the sludge at the bottom and the floating
solids or scum. The outlet in figure 25 may be readily made of sheet
metal by a tinsmith. Wrought iron or steel pipe with elbows or light
lead pipe may be used, the pipe being set in the concrete and left in
place. Sometimes a galvanized wire screen (1/4-inch mesh) is fitted over
the inner end to prevent large solids leaving the settling chamber and
possibly clogging the siphon or distribution tile. If a screen is used it
should be easily removable for cleaning.
[Illustration: Fig. 27.--Home-made reinforced concrete covers. (1) Slabs
placed crosswise permit uncovering the whole tank for cleaning, but as
inspection is somewhat difficult, cleaning is the more likely to be
neglected; (2) manhole, 18 inches square; cover, 22 by 22 by 3 inches
thick, easy to make and to slide or lift from the opening.]
=Manhole frame and cover.=--The frame and cover shown in figure 25 are
stock patterns made of cast iron and weighing about 250 pounds per set.
The cover is 21 inches in diameter; it is tight and, on account of its
weight, is unlikely to be disturbed by small children. The frame or rim
is about 7 inches high and 31 inches in longest diameter. If desired,
light cast-iron cistern or cesspool covers obtainable from plumbing supply
houses, home-made slabs of reinforced concrete (see fig. 27), or wooden
covers (see fig. 23) may be used.
=Overflow.=--The purpose of an overflow is to pass sewage to the
distribution field should the siphon stop working. The overflow (fig. 25)
is a 3-inch riser pipe with top 3 inches above the discharge line and the
bottom calked or cemented into the side outlet of a =T=-branch. The run of
the =T=-branch should correspond with the size of the sewer from the tank
to the distribution field. If this sewer is 4-inch pipe, a 4 by 3 inch
=T=-branch is used, the 4-inch spigot end of the siphon being calked or
cemented into the branch, as shown in figure 25; if the sewer is 5-inch,
a 5 by 3 inch =T=-branch is used and connected to the siphon with a 5-inch
to 4-inch reducer (in vitrified specials the equivalent is a 4-inch to
5-inch increaser); if the sewer is 6-inch, a 6 by 3 inch =T=-branch is used
and connected to the siphon with a 6-inch to 4-inch reducer.
=Concrete work.=--Before excavation for the tank is begun, two wooden
forms should be built for shaping the inside of the settling and siphon
chambers. In most instances the ground is fairly firm, so that the lines
of excavation may conform to the outside dimensions of the tank, the
back of the walls being built against the earth. The forms may be made
of square-edged boards, braced and lightly nailed, as shown in figure
28. The forms should have no bottom. If it is desired to lay the sides
and covering slab in one operation, the top of the forms must be boarded
over. All pipe and manhole openings should be accurately placed and cut.
The faces of the forms may be covered with paper or smeared with soap or
grease to facilitate removal later.
The ground should next be excavated to the proper depth for placing the
floors in both chambers. The settling chamber floor, being the lower,
should be placed first. Effort should be made to secure water-tight
work, a feature of especial importance where leakage might endanger a
well or spring. A concrete mixture of 1:2:4 is generally preferred (1
volume cement, 2 volumes sand, 4 volumes stone). The ingredients should
be of best quality and thoroughly mixed. The concrete should be poured
promptly and worked with a spade or flat shovel to make the face smooth
and eliminate pockets or voids within the mass.[10] Before the settling
chamber floor has hardened the form should be set upon the floor and the
concrete work continued up the sides. The pipe form for the submerged
outlet should be set. When the side walls of the settling chamber have
reached the bottom of the excavation for the siphon chamber, the siphon
trap with its connecting branch and short piece of pipe should be set to
proper line and grade and blocked in position. The floor of the siphon
chamber should now be poured and the form for that chamber placed thereon,
leaving a 6-inch or 8-inch space (according to the thickness of the
division wall) between the ends of the two forms. Pouring of all side
walls and the top slab should continue without stop, making the entire
structure a monolith.
[10] See footnote, p. 17. For more detailed information on form and
concrete work the reader is referred to U. S. Department of Agriculture
Farmers' Bulletin No. 481, "Concrete Construction on the Live-Stock
Farm."
[Illustration: Fig. 28.--Forms for concrete work--how to use them.
1. Make the forms as shown and to the dimensions required by fig. 25
and the table on p. 37; nails to be driven from the inside and left
projecting for drawing with a claw hammer.
2. Excavate to lines 6 or 8 inches, as may be required, outside of the
forms and to the depths required for both chambers.