THE CANAL

The canal was formed by "fencing in" a portion of the river-bed by an

embankment built about a hundred feet out from the north shore and

deepening the intervening space where necessary. There are two

locks--one placed a little above the foot of the rapid (see map), and

the other at the end of the dam. Wooden piers are built at the upper and

lower ends--the former being 800 ft. long, and the latter 300 ft; both

are about 29 ft. high and 35 ft. wide.

The embankment is built, as shown by the cross section, Fig. 6. On the

canal side of it there is a wall of rubble masonry F, laid in hydraulic

cement, connecting the two locks, and backed by a puddle wall, E, three

feet thick; next the river there is crib work, G, from ten to twenty

feet wide and the space between brick-work and puddle filled with earth.

The outer slope is protected with riprap, composed of large bowlders.

This had to be made very strong to prevent the destruction of the bank

by the immense masses of moving ice in spring.

The distance between the locks is 3,300 feet.

In building the embankment the crib-work was first put in and followed

by a part (in width) of the earth-bank. From that to the shore temporary

cross-dams were built at convenient distances apart and the space pumped

out by sections, when the necessary excavation was done, and the walls

and embankments completed. The earth was put down in layers of not more

than a foot deep at a time, so that the bank, when completed, was solid.

The water at site of it varied in depth from 15 feet at lower end to 2

feet at upper.

The locks are 200 ft. long in the clear between the gates, and 45 ft

wide in the chamber at the bottom. The walls of the lower one are 29 ft.

high, and of the upper one 31 ft They are from 10 to 12 ft thick at the

bottom,

The locks are built similar to those on the new Lachine and Welland

canals, of the very best cut stone masonry, laid in hydraulic cement.

The gates are 24 in. thick, made of solid timber, somewhat similar to

those in use on the St. Lawrence canals. They are suspended from anchors

at the hollow quoins, and work very easily. The miter sills are made of

26 in. square oak. The bottom of the lower lock iis timbered throughout,

but the upper one only at the recesses, the rock there being good.

[Illustration: MAP OF THE OTTAWA RIVER AT CARILLON RAPIDS.

SECTION OF RIVER AT DAM. NOTE.--THE LOWEST DOTTED LINE IS LOW WATER

BEFORETHE DAM WAS BUILT. THEN THE LINE OF HIGH WATER WAS ABOUT A FOOT

ABOVE WHAT IS CREST OF DAM NOW.]

The rise to be overcome by the two locks is 16 ft., but except in medium

water, is not equally distributed. In high water nearly the whole lift

is on the upper lock, and in low water the lower one. In the very lowest

known stage of the river there will never be less than 9 ft. on the

miter sills.

As mentioned at the beginning of this article, four locks were required

on the old military canal to accomplish what is now done by two.

The canal was opened in May, 1882, and has been a great success, the

only drawback--although slight--being that in high water the current for

about three-quarters of a mile above the upper pier, and at what was

formerly the Chute a Biondeau, is rather strong. These difficulties can

be easily overcome--the former by building an embankment from the pier

to Brophy's Island, the latter by removing some of the natural dam of

rock which once formed the "Chute."

The following are, in round numbers, the quantities of the principal

materials used:

Earth and puddle in embankment ...cub. yds. 148,500

Rock excavation, " 38,000

Riprap, " 6,600

Lock masonry " 14,200

Rubble masonry, " 16,600

Timber in cribs, lock bottoms and gates " 368,000

Wrought and cast iron, lb ................. 173,000

Stone filling cu yds ...................... 45,300

Concrete " 830

The total cost to date has been about $570,000, not including surveys,

engineering, etc.

The contractors for the canal, locks, etc., were Messrs. R. P. Cooke &

Co., of Brockville, Ont., who have built some large works in the States,

and who are now engaged building other extensive works for the Canadian

Government. The work here reflects great credit on their skill.

On the enlarged Grenville Canal, now approaching completion, there

are five locks, taking the place of the seven small ones built by the

Imperial Government. It will be open for navigation all through in the

spring of 1884, when steamers somewhat larger than the largest now

navigating the St. Lawrence between Montreal and Hamilton can pass up to

Ottawa City.--_Engineering News_.

* * * * *

Scientific American Supplement, No. 384, May 12, 1883 · 第 13 / 40 题