TABLE 60

ACTUAL EVAPORATION FOR DIFFERENT PRESSURES AND TEMPERATURES OF FEED

WATER CORRESPONDING TO ONE HORSE POWER (34½ POUNDS PER HOUR FROM AND AT 212 DEGREES FAHRENHEIT)

-----------------------------------------------------------------------------------------------------------------------------------------

Temperature| |

of | Pressure by Gauge--Pounds per Square Inch |

Feed | |

Degrees | |

Fahrenheit | 50 | 60 | 70 | 80 | 90 | 100 | 110 | 120 | 130 | 140 | 150 | 160 | 170 | 180 | 190 | 200 | 210 | 220 | 230 | 240 | 250 |

-----------+-----------------------------------------------------------------------------------------------------------------------------|

32 |28.41|28.36|28.29|28.24|28.20|28.16|28.13|28.09|28.07|28.04|28.02|27.99|27.97|27.95|27.94|27.92|27.90|27.89|27.87|27.86|27.83|

40 |28.61|28.54|28.49|28.44|28.40|28.35|28.32|28.29|28.26|28.23|28.21|28.18|28.16|28.14|28.12|28.11|28.09|28.07|28.06|28.05|28.03|

50 |28.85|28.79|28.73|28.68|28.64|28.60|28.56|28.53|28.50|28.47|28.45|28.43|28.40|28.38|28.36|28.35|28.33|28.31|28.30|28.28|28.27|

60 |29.10|29.04|28.98|28.93|28.88|28.84|28.81|28.77|28.74|28.72|28.69|28.67|28.65|28.62|28.60|28.59|28.57|28.55|28.54|28.52|28.51|

70 |29.36|29.29|29.23|29.18|29.14|29.09|29.06|29.02|28.99|28.96|28.94|28.92|28.89|28.87|28.85|28.83|28.82|28.80|28.78|28.77|28.76|

80 |29.62|29.55|29.49|29.44|29.39|29.35|29.31|29.27|29.24|29.22|29.19|29.17|29.14|29.12|29.10|29.08|29.07|29.05|29.03|29.02|29.00|

90 |29.88|29.81|29.75|29.70|29.65|29.61|29.57|29.53|29.50|29.47|29.45|29.42|29.40|29.38|29.36|29.34|29.32|29.30|29.29|29.27|29.25|

100 |30.15|30.08|30.02|29.96|29.91|29.87|29.83|29.80|29.76|29.73|29.71|29.68|29.66|29.63|29.61|29.60|29.58|29.56|29.54|29.53|29.51|

110 |30.42|30.35|30.29|30.23|30.18|30.14|30.10|30.06|30.03|30.00|29.97|29.95|29.92|29.90|29.88|29.86|29.84|29.82|29.81|29.79|29.77|

120 |30.70|30.63|30.56|30.51|30.46|30.41|30.37|30.33|30.30|30.27|30.24|30.22|30.19|30.17|30.15|30.13|30.11|30.09|30.07|30.06|30.04|

130 |30.99|30.91|30.84|30.79|30.73|30.69|30.65|30.61|30.57|30.54|30.52|30.49|30.47|30.44|30.42|30.40|30.38|30.36|30.35|30.33|30.31|

140 |31.28|31.20|31.13|31.07|31.02|30.97|30.93|30.89|30.86|30.83|30.80|30.77|30.75|30.72|30.70|30.68|30.66|30.64|30.62|30.61|30.59|

150 |31.58|31.49|31.42|31.36|31.31|31.26|31.22|31.18|31.14|31.11|31.08|31.06|31.03|31.01|30.98|30.96|30.94|30.92|30.91|30.89|30.87|

160 |31.87|31.79|31.72|31.66|31.61|31.56|31.51|31.47|31.44|31.40|31.37|31.35|31.32|31.29|31.27|31.25|31.23|31.21|31.19|31.18|31.16|

170 |32.18|32.10|32.02|31.96|31.91|31.86|31.81|31.77|31.73|31.70|31.67|31.64|31.62|31.59|31.57|31.54|31.52|31.50|31.49|31.47|31.46|

180 |32.49|32.41|32.33|32.27|32.22|32.16|32.12|32.08|32.04|32.00|31.97|31.95|31.92|31.89|31.87|31.84|31.82|31.80|31.79|31.77|31.75|

190 |32.81|32.72|32.65|32.59|32.53|32.47|32.43|32.38|32.35|32.32|32.29|32.26|32.23|32.20|32.17|32.15|32.13|32.11|32.09|32.07|32.05|

200 |33.13|33.05|32.97|32.91|32.85|32.79|32.75|32.70|32.66|32.63|32.60|32.57|32.54|32.51|32.49|32.46|32.44|32.42|32.40|32.38|32.36|

210 |33.47|33.38|33.30|33.24|33.18|33.13|33.08|33.03|32.99|32.95|32.92|32.89|32.86|32.83|32.81|32.79|32.76|32.74|32.72|32.70|32.68|

-----------------------------------------------------------------------------------------------------------------------------------------

The proper consideration can be given to the adaptability of any boiler

for the service in view only after a thorough understanding of the

requirements of a good steam boiler, with the application of what has

been said on the proper operation to the special requirements of each

case. Of almost equal importance to the factors mentioned are the

experience, the skill and responsibility of the manufacturer.

With the design of boiler selected that is best adapted to the service

required, the next step is the determination of the boiler power

requirements.

The amount of steam that must be generated is determined from the steam

consumption of the prime movers. It has already been indicated that such

consumption can vary over wide limits with the size and type of the

apparatus used, but fortunately all types have been so tested that

manufacturers are enabled to state within very close limits the actual

consumption under any given set of conditions. It is obvious that

conditions of operation will have a bearing on the steam consumption

that is as important as the type and size of the apparatus itself. This

being the case, any tabular information that can be given on such steam

consumption, unless it be extended to an impracticable size, is only of

use for the most approximate work and more definite figures on this

consumption should in all cases be obtained from the manufacturer of the

apparatus to be used for the conditions under which it will operate.

To the steam consumption of the main prime movers, there is to be added

that of the auxiliaries. Again it is impossible to make a definite

statement of what this allowance should be, the figure depending wholly

upon the type and the number of such auxiliaries. For approximate work,

it is perhaps best to allow 15 or 20 per cent of the steam requirements

of the main engines, for that of auxiliaries. Whatever figure is used

should be taken high enough to be on the conservative side.

When any such figures are based on the actual weight of steam required,

Table 60, which gives the actual evaporation for various pressures and

temperatures of feed corresponding to one boiler horse power (34.5

pounds of water per hour from and at 212 degrees), may be of service.

With the steam requirements known, the next step is the determination of

the number and size of boiler units to be installed. This is directly

affected by the capacity at which a consideration of the economical load

indicates is the best for the operating conditions which will exist. The

other factors entering into such determination are the size of the plant

and the character of the feed water.

The size of the plant has its bearing on the question from the fact that

higher efficiencies are in general obtained from large units, that labor

cost decreases with the number of units, the first cost of brickwork is

lower for large than for small size units, a general decrease in the

complication of piping, etc., and in general the cost per horse power of

any design of boiler decreases with the size of units. To illustrate

this, it is only necessary to consider a plant of, say, 10,000 boiler

horse power, consisting of 40-250 horse-power units or 17-600

horse-power units.

The feed water available has its bearing on the subject from the other

side, for it has already been shown that very large units are not

advisable where the feed water is not of the best.

The character of an installment is also a factor. Where, say, 1000 horse

power is installed in a plant where it is known what the ultimate

capacity is to be, the size of units should be selected with the idea of

this ultimate capacity in mind rather than the amount of the first

installation.

Boiler service, from its nature, is severe. All boilers have to be

cleaned from time to time and certain repairs to settings, etc., are a

necessity. This makes it necessary, in determining the number of boilers

to be installed, to allow a certain number of units or spares to be

operated when any of the regular boilers must be taken off the line.

With the steam requirements determined for a plant of moderate size and

a reasonably constant load, it is highly advisable to install at least

two spare boilers where a continuity of service is essential. This

permits the taking off of one boiler for cleaning or repairs and still

allows a spare boiler in the event of some unforeseen occurrence, such

as the blowing out of a tube or the like. Investment in such spare

apparatus is nothing more nor less than insurance on the necessary

continuity of service. In small plants of, say, 500 or 600 horse power,

two spares are not usually warranted in view of the cost of such

insurance. A large plant is ordinarily laid out in a number of sections

or panels and each section should have its spare boiler or boilers even

though the sections are cross connected. In central station work, where

the peaks are carried on the boilers brought up from the bank, such

spares are, of course, in addition to these banked boilers. From the

aspect of cleaning boilers alone, the number of spare boilers is

determined by the nature of any scale that may be formed. If scale is

formed so rapidly that the boilers cannot be kept clean enough for good

operating results, by cleaning in rotation, one at a time, the number of

spares to take care of such proper cleaning will naturally increase.

In view of the above, it is evident that only a suggestion can be made

as to the number and size of units, as no recommendation will hold for

all cases. In general, it will be found best to install units of the

largest possible size compatible with the size of the plant and

operating conditions, with the total power requirements divided among

such a number of units as will give proper flexibility of load, with

such additional units for spares as conditions of cleaning and insurance

against interruption of service warrant.

In closing the subject of the selection of boilers, it may not be out of

place to refer to the effect of the builder's guarantee upon the

determination of design to be used. Here in one of its most important

aspects appears the responsibility of the manufacturer. Emphasis has

been laid on the difference between test results and those secured in

ordinary operating practice. That such a difference exists is well known

and it is now pretty generally realized that it is the responsible

manufacturer who, where guarantees are necessary, submits the

conservative figures, figures which may readily be exceeded under test

conditions and which may be closely approached under the ordinary plant

conditions that will be met in daily operation.