4. APPARATUS AND INSTRUMENTS[63]

The apparatus and instruments required for boiler tests are:

(A) Platform scales for weighing coal and ashes.

(B) Graduated scales attached to the water glasses.

(C) Tanks and platform scales for weighing water (or water

meters calibrated in place). Wherever practicable the feed water

should be weighed, especially for guarantee tests. The most

satisfactory and reliable apparatus for this purpose consists of

one or more tanks each placed on platform scales, these being

elevated a sufficient distance above the floor to empty into a

receiving tank placed below, the latter being connected to the

feed pump. Where only one weighing tank is used the receiving

tank should be of larger size than the weighing tank, to afford

sufficient reserve supply to the pump while the upper tank is

filling. If a single weighing tank is used it should preferably

be of such capacity as to require emptying not oftener than

every 5 minutes. If two or more are used the intervals between

successive emptyings should not be less than 3 minutes.

(D) Pressure gauges, thermometers, and draft gauges.

(E) Calorimeters for determining the calorific value of fuel and

the quality of steam.

(F) Furnaces pyrometers.

(G) Gas analyzing apparatus.