CHAPTER XVII

THE LEOPOLDINA RAILWAY

South America has constituted a happy hunting-ground for the railway

engineer determined to carry out his conquest with steam and steel in

the face of all opposition on the part of Nature. The famous Oroya line

is described in another part of this volume, but on the eastern side of

the continent is another railway which is equally as remarkable, and

which constitutes one of the most interesting engineering achievements

in this particular field of endeavour south of the Equator. Indeed,

in many respects it ranks as one of the most interesting lines in the

world.

This is the Leopoldina railway, which, with its hub resting on the

Atlantic seaboard, has its tentacles spreading through the provinces

of Rio, Minaes and Espirito Santo to the extent of some 1,500 or more

miles. In reality it is a combination of many units. In the ’sixties of

the nineteenth century, Brazil resolved to criss-cross its territory

with steel, and short lengths of line were laid on all sides. But the

finances of the country became so strained from internal troubles and

the decline in the price of coffee that money could not be spared to

build or to operate railways successfully. An English company was

organised, therefore, to take over a number of these individual roads,

and they were combined into a homogeneous whole to form the Leopoldina

system.

When the Englishmen entered into possession they found a sorry state of

things. The finances were in a hopelessly involved tangle, and months

elapsed before they were straightened out. The tracks likewise were

in a pitiable condition of decay. They had been built cheaply, and

had suffered severely from the innumerable enemies to railways in a

tropical country. Lack of funds had militated against repairs being

carried out upon a comprehensive or thorough scale, with the result

that the whole system presented a patched and dilapidated appearance.

However, no time was lost in placing the undertaking upon a firm

footing. Within two months of the acquisition of the railways a

large staff of men for both the administration and engineering sides

of the enterprise were dispatched to South America, with Mr. F. W.

Barrow as general manager and Mr. Norman B. Dickson, M.INST.C.E., as

engineer-in-chief. The engineer was commanded to overhaul the whole

network, to reconstruct it if necessary, so that the lines might be

capable of meeting the exigencies of the traffic awaiting creation from

the development of the country.

At that time Rio de Janeiro was an insalubrious city--in fact, it was

almost a graveyard for Englishmen. Mr. Dickson found this out in a very

short space of time. The company lost three accountants and a number of

British assistants under the malignant scourge that prevailed--yellow

fever. Since those days Rio de Janeiro has made great strides and has

undergone extensive improvement. The city has been rebuilt, and has

been provided with a complete sanitation system, to bring it into

line with the other great ports of the world. But in those days it

was absolutely untenantable from the white man’s point of view, and

the railway authorities were compelled to provide accommodation for

their imported staff in a healthy spot outside the city, where the

men underwent what might be described as a process of acclimatisation

lasting over eighteen months.

The first few years were strenuous to the engineer-in-chief. He was

confronted with a formidable task on all sides. The line is of metre,

or 39.3 inches, gauge throughout, and had been built in a somewhat

flimsy and haphazard manner. The majority of the bridges and culverts

had been erected of timber, the greater part of which either had

reached, or were approaching closely, the span of life. These had to

be replaced by permanent structures in masonry or steel. The track,

too, had to be overhauled from end to end, reballasted, provided with

new sleepers and rails, and at frequent points where it was in an

exposed position, and liable to suffer from the peculiar visitations

which wreak such widespread destruction in that country, had to be

strengthened and protected by heavy retaining walls and revetments of

masonry.

Yet the Brazilian engineers had attempted a daring engineering work in

the first instance. The configuration of Brazil is somewhat peculiar.

A few miles from the coast, and running roughly parallel with the

water-line, is a rugged range of mountains dividing the low-lying

stretch of shore from the fertile highlands in the interior. The

mountain ridge is not regular, but is badly broken up, forming, as

it were, a succession of walls placed one behind the other. In order

to gain the interior, and owing to the abrupt nature of the ascent,

the line has to climb sharply, at the same time winding in and out

among the clumps of mountains in a bewildering manner. In fact, the

differences in level are so sudden that the track could be lifted only

by means of resort to the rack rail, and other devices such as are

adopted in Switzerland to ascend the steep mountain slopes.

For instance, after leaving the coast, the first ridge is met within

30 miles, and in the course of 5 miles the line has to rise some

3000 feet. This involved the use of grades varying from 15 to 18 per

cent.--from 1 in 6⅔ to 1 in 5-5/9--and when first laid down the line

was worked upon the Riggenbach system.

It is worth while to recall that it was on the low-level part of this

section to Petropolis that the iron horse made its first appearance in

South America. The short length of line, representing about 13 or 14

miles, between Maua and Raiz da Serra was the first stretch of railway

to be laid and used on the continent south of the Equator.

[Illustration: A STEEP BANK SHOWING THE CENTRAL RACK RAIL]

[Illustration: TRAIN ON THE RACK SECTION OF THE PETROPOLIS DIVISION,

SHOWING THE CURIOUS TYPE OF LOCOMOTIVE ADOPTED

HOW THE LEOPOLDINA RAILWAY OVERCOMES HEAVY GRADES]

On another part of the system--the line running inland from Nictheroy,

on the eastern side of the bay of Rio de Janeiro--the Brazilian

engineers were compelled to overcome one of the most searching problems

in railway engineering in the world. After traversing forty miles of

the level country, the mountain ridge barred their way. They realised

that it could be surmounted only by some exceptional system, and the

local authorities seized a unique opportunity. The Mont Cenis tunnel,

connecting Italy and France, had been bored successfully, and this new

steel highway through the heart of the range displaced the construction

railway operating on the Fell system which had been laid over the

crest of the Cenis range. The Brazilian engineers thereupon approached

the Swiss authorities for the purchase of this abandoned stretch of

mountain line, and their offer was accepted. Thereupon the Mont Cenis

“Fell” railway was torn up, transported to South America, and pressed

into service to help the Brazilian engineers over the obstacle that

confronted them.

[Illustration: REBUILDING A BRIDGE ON THE LEOPOLDINA RAILWAY

The masonry structure had to be built beside the original iron

structure so as not to disturb traffic.]

The solution proved completely successful, and the engines fulfilled

their task upon the eight per cent. grades with perfect satisfaction

for several years. Then the Baldwin Company, of Philadelphia, undertook

to eliminate the special locomotives required on the “Fell” system, and

to convert the railway to adhesion working. Recalling the fact that

for every twelve and a half feet of advance one makes a vertical rise

of twelve inches, such a conversion appears remarkably daring, but the

experiment justified the transformation, for the adhesion locomotives,

notwithstanding the extreme severity of the gradient and the sharpness

of the curves, which have a minimum radius of seventy-five feet, have

accomplished the work formerly completed by the “Fell” locomotives with

equal success. The result is that this represents the steepest length

of line upon a trunk railway to be worked by adhesion traction in the

world.

The locomotives weigh forty tons, and they are capable of hauling

a train weighing forty-five tons on the drawbar up this bank. In

comparison with such climbs the “Big Hill” which worried the Canadian

Pacific railway engineers for so many years, appears insignificant.

The disadvantage of the grade on the latter system was the frequency

with which trains ran away down the declivity to enter one or other of

the switches or catch-points, which deflected the train or locomotive

from the main track and piled it against a bank of earth. Such

accidents on the “Big Hill” were nothing to what have occurred on the

Leopoldina line. The great difficulty is not in regard to ascending

the grade with a load, although there is a possibility of the engine

failing to take the hill, and to let its driving wheels spin round idly

on the metals without forging a foot ahead. The traffic destined for

the interior is comparatively light. The heaviest loads are brought

from the highlands to the coast, and consequently the question is to

hold the train in check as it descends. Ordinary braking is useless,

as, although the wheels may be locked, the whole train is liable to

toboggan down the metal slide almost as furiously as if the wheels

were running freely. The situation has been met by firstly reversing

the engines and letting a small amount of steam into the cylinders

sufficient to act as a break, and by retaining the centre rail of

the Fell system and to grip it by means of a strong scissors brake.

Inasmuch as the engineers are extremely careful when descending the

hill, runaways are few and far between.

[Illustration: A FLOOD ON THE LINE

The track is submerged by the torrential rainfall.]

[Illustration: A DERAILMENT CAUSED BY THE TRAIN COLLIDING WITH A COW!

CURIOUS TROUBLES EXPERIENCED ON THE LEOPOLDINA RAILWAY]

Now and again, however, a train gets out of control, especially when

the rails are wet and slippery. To meet this condition of affairs the

driver, of course, makes liberal use of sand, but here again the fates

are against him, for owing to the sharp curves it is no easy matter to

induce the sand falling from the engine’s sand-boxes to drop on the

face of, and not between or outside, the rails. When a train does get

out of hand on the descent the driver has to trust to luck to gain

the bottom of the bank in safety, or to regain control of his charge.

Sometimes he succeeds and sometimes he fails. In the latter case

derailment generally ensues, with more or less disastrous results. Mr.

Dickson had a narrow escape from this danger himself one day. He was

carrying out his periodical inspection of the line from his special

carriage coupled to a locomotive. In coming down the bank something

went wrong, and the train got away. The engineer-in-chief admits that

he had an uncomfortably anxious few minutes. He felt the train gather

speed, and suffered violent oscillation as the train swung round the

bends. Just as he was wondering what would be the end, there was a

jump and a crash. The engine had left the track, rolled over, and

his car was astride the overturned locomotive. He crawled out of the

wreck, badly shaken and bruised, but otherwise little the worse for his

adventure, though the unfortunate driver was killed.

[Illustration: AN INTERESTING ENGINEERING ACHIEVEMENT

This 160-feet bridge span had to be erected and pulled into position

over rollers.]

[Illustration: BRIDGE OVER THE PARAHYBUNA RIVER, SHOWING HEIGHT OF

RIVER IN FLOOD AND FORCE OF WATER SURGING ROUND THE PIERS

THE LEOPOLDINA RAILWAY IN BRAZIL]

In order to negotiate the third mountain range another solution of the

difficulty was adopted. The precipice was so steep that the engineers

could not introduce the loops requisite to carry the line continuously

from one level to the other. So they had recourse to the switch-back,

wherein the line runs down-hill for a short distance to a dead-end.

This brings the engine of the descending train to the rear, and by

giving the latter a slight push it is sent down another similar

switch-back to another dead-end, where the engine is brought once more

to the front of the train. In this manner, alternately pulling and

pushing, the train gains the bottom or top of the level of the line,

according to the direction in which it is travelling. In reality it is

a zigzag, similar in character to that which was used for so many years

upon the New South Wales railways, as described elsewhere.

Although on the eastern side of the continent the engineer is spared

the ravages of snow and avalanches, he suffers from other disturbing

elements which perhaps are more to be dreaded. These are floods,

wash-outs and landslides. The rainfall in this territory averages

between 90 and 100 inches during the year, and when the rainstorms

break the downfall is tremendous. The rivers are converted into roaring

cataracts, huge cavities are torn in the flanks of the mountains, and

enormous quantities of debris are released. Should the line be in

the way of such a visitation it suffers severely. It is no uncommon

circumstance for a huge gap to be cut in the railway, showing where

the tearing water or descending mass of earth has crashed through the

track, sweeping everything before it. Nothing can withstand the force

of these onslaughts, and although heavy retaining walls of masonry

may serve to check their fury, they are not completely successful.

The result is that when the rains are expending their violence, the

engineer-in-chief is prepared for some heavy repairing work, for

possibly 100,000 tons or more of earthen embankment may be demolished.

Then the engineer hurriedly completes a new survey, and replaces the

track around the scene of the accident, because reconstruction, as a

rule, is more economical and quicker than attempting to repair the

injury inflicted.

This, at times, and in a cramped valley, is no easy task, for the

curvature has to be borne in mind. Consequently the destruction often

precipitates a pretty engineering problem, extrication from which

depends upon the engineer’s resources and ingenious ability entirely.

There is no doubt that the control of a South American railway, where

such conditions as these prevail, imposes a supreme task upon a man’s

capacity. Wash-outs and landslips will find the engineer out more

quickly than any other emergency, because he is called upon to keep

the track going at all hazards, and when a breach does occur, his own

enterprise and initiative alone determine the length of the period

of interruption to traffic. On such a line as the Leopoldina railway

this is a serious factor, because there is a constant heavy volume of

produce, especially coffee, maize, tobacco and sugar, pouring towards

the coast. During a recent year floods, wash-outs and landslides

cost the railway no less than, £24,500, or $122,500. This was a

year of abnormal disaster in this direction, but the item generally

approximates between £12,000 and £14,000, or $60,000 and $70,000, in

the course of the twelve months.

[Illustration: THE BRIDGE OVER THE PARAHYBUNA RIVER AT CAMPOS UNDER

CONSTRUCTION]

[Illustration: THE PARAHYBUNA RIVER BRIDGE COMPLETED. TOTAL LENGTH

1,113½ FEET

The crossing of this waterway by the Leopoldina Railway created a riot

in Campos.]

The replacement of the decrepit bridges occasioned Mr. Dickson

no little perplexity, but this work became all the more urgent, as

the original structures could not withstand the heavier locomotives

and trains that were introduced by the British company. One of the

most difficult undertakings of this character was the erection of

a massive masonry arch bridge in three spans upon the rack system

of the Petropolis branch. Each span is of 50 feet, and the work was

complicated by being on a curve of 80 metres, or about 266 feet radius.

It had to replace a trestle bridge, and reconstruction had to progress

without interfering with traffic. Another notable piece of work which

he completed successfully was the erection of a single steel girder

bridge of 160 feet span across the Parahybuna River. Owing to the

velocity of the current and the great depth of water, false-work was

quite out of the question, so the steel-work had to be erected on

shore, rolled out, and launched into position, being held in check by

cables, which proved a trying ordeal owing to the current. When brought

into position between the abutments, the steel-work was lifted by means

of jacks, the temporary nose was dismantled, and the span lowered until

it rested in the desired position upon its supports.

[Illustration:

[_See page 224_

THE ROCKBOUND SHORE OF LAKE SUPERIOR SEVERELY TAXED THE ENGINEERS IN

THE BUILDING OF THE CANADIAN PACIFIC RAILWAY

At places, construction averaged as much as £70,000, or $350,000, per

mile.]

Occasionally the advance of the railway has been resented by the

inhabitants. For instance, when it was decided to carry the railway

across the Parahybuna River at Campos, the populace of the latter

town considered it an unwarranted intrusion. They were urged that

the railway bridge would cause their trade on the waterway to shrink

to infinitesimal proportions. Thereupon the inhabitants raided the

railway, and zealously set to work to destroy everything destined for

the bridge. The situation looked ugly, but the authorities took stern

measures and quelled the riot, though not before damage to the extent

of £40,000, or $200,000, had been wrought.

This bridge is one of the most important upon the whole system. From

end to end it measures 1,113½ feet, divided into six through truss

spans supported upon five pairs of piers in the waterway.

This outbreak of hostility, however, was quite exceptional. In the

interior the natives have welcomed the railway rather than attempted to

arrest its progress. This feeling has taken an unusual turn at places

where the communities have presented the land for the right-of-way,

and in other cases have built stations at their own expense. Since the

railway has been under British control the expansion of the country

has proceeded rapidly, and the exploitation of the soil has proved

highly profitable. The railway maintains an active progressive policy,

throwing out spur lines wherever the local conditions promise an

equitable return, to encourage development. These branches are not

built upon pioneer principles, but are equal in every respect to the

trunk roads.

The amount of earthwork incurred in the construction is enormous.

Ninety per cent. of the mileage of the line is carried out upon the

sides of the hills, necessitating cuttings sufficiently deep and

wide to carry the track. The location for the most part is along the

banks of the rivers, inasmuch as these offer the easiest channels to

penetrate the mountain ridges. As these waterways describe extremely

meandering courses, the railway is a maze of twists and turns. In

fact, the line might be described, after it leaves the flats along the

coast, as a continuous succession of curves and reverse curves, more

often than not, without an intervening stretch of tangent, or straight,

length of track. As a result fantastic “S” windings, horse-shoe bends,

and figure-eight loops abound, though the minimum curve is of 266 feet

radius.

Despite its remarkable serpentine character, however, the Brazilian

engineers displayed marked ability in the original location, bearing

in mind the state of railway engineering at the date these lines were

undertaken. When Mr. Dickson appeared on the scene to straighten out

the railway, the natives constituted his sole labour, and he found that

the Brazilian engineers were adapted eminently to the work of surveying

and locating, being possessed of a specially good eye for a railway

line through difficult country. The labour, too, in general, was

found to be of a high standard. The Chinaman is generally regarded as

the best navvy, but according to this engineer who has had experience

in railway construction in all parts of the world, his preference is

overwhelmingly in favour of the Brazilian Portugee. He takes a pride

in his work, is conscientious, and performs his task thoroughly.

These traits stood the engineer-in-chief in good stead in his work of

overhaul, for it enabled him to produce a line which, from the point of

excellence and solidity, would be difficult to rival in more advanced

countries. In the upkeep of the line the same characteristics are

observable. The men are tidy, keep the track in excellent condition,

and leave little cause for complaint in regard to the maintenance of

the railway buildings, taking pride in their individual sections. They

have proved first-class engine-drivers, displaying every care, for on a

railway of this character, bristling with sharp curves and steep banks,

accidents are liable to be caused from the slightest miscalculation.

When disasters have occurred, it has been found that the causes have

been quite beyond the men’s control.

Under British management the railway has been rescued completely from

its former moribund condition, greater stretches of fertile country

have been brought under cultivation, and a general air of prosperity

has been imparted to the territory which it serves. From the financial

point of view the investment has proved a complete success, with the

result that the Leopoldina railway to-day offers a most powerful

example of the beneficial influences of English management among the

railways of South America.

The Railway Conquest of the World · 第 17 / 26 章