CHAPTER XVIII

THE FIRST CANADIAN TRANS-CONTINENTAL RAILWAY

As the railway expansion of Canada developed by leaps and bounds,

ambitious spirits contemplated larger and larger conquests, culminating

in a desire to build a link of steel right across the country from

coast to coast. This feeling was natural. On the Atlantic seaboard,

settlement advanced at a rapid rate in the Lower Provinces and forced

its way steadily inland. On the Pacific side, civilisation firmly

planted in British Columbia spread towards the Rocky Mountains. These

two colonising forces, working in the same country, were as wide apart

as if at the Poles, for the intervening plains stretching from the

Great Lakes to the Rockies were considered useless.

British Columbia felt this isolation keenly. All traffic had to be

carried round the southern extremity of the American continent.

To travel from London to Vancouver in the ’fifties was an heroic

undertaking, involving a journey more than half-way round the globe.

Some of the trade, however, was maintained overland. For instance,

the provisions for the Hudson’s Bay post at Vancouver were dispatched

from Montreal over a trail some 3000 miles in length. But it was a

tremendous task, occupying several weeks. The pack train left Montreal

in May, and the water route was followed so far as practicable to Fort

Garry, where Winnipeg now stands. Here the rivers were abandoned in

favour of horses, mules and wagons which trekked slowly across the

prairies--the voyageurs living on the buffalo which roamed the plains

in their thousands--threaded the terrible mountain rifts, and dropped

down to the coast, reaching Vancouver about the end of September. The

trail was ill-defined and the journey bristled with exciting incidents

and adventures.

The disadvantages of this means of communication between the opposite

sides of the continent were realised only too fully, so when the

railway had become established in Eastern Canada and had demonstrated

its tremendous possibilities, an iron link across the Dominion was

advocated strenuously. But the vastness of the undertaking was

deemed to be beyond the possibilities of the country; the cost was

contemplated to be so huge that capitalists would not venture to commit

themselves to the fulfilment of such a project. One of the advocates

of the enterprise suggested that it should be built by convict-labour

in order to reduce the expense of construction, and curiously enough

he suggested that the line should be carried through the Kicking Horse

Pass, through which the Canadian Pacific makes its way to the Pacific

to-day.

It was in 1851 that the idea of a trans-continental railway first

crystallised into a tangible project; but as it eclipsed in conception

anything attempted in railway building up to that time, there was

considerable timidity in launching out upon a line some 3000 miles in

length. So matters drifted until the first trans-continental railway

was thrown across the United States, and San Francisco was brought

within a few days’ travel of New York. The agitation then broke out

anew for a trans-Canadian line, and Sir Hugh Allan approached the

Government with a definite scheme. However, he failed to enlist the

practical assistance of financiers, and so the theme ranked as a

perennial topic of discussion until the ratification of a project

supported by the Government in 1881.

It is doubtful in the history of British North America whether

any project of avowed benefit to the community has experienced

such vicissitudes as the first trans-Canadian railway. It wrecked

ministries, brought about the political extinction of more than one

promising member of Parliament, provoked heated agitation, and involved

the abortive expenditure of large sums of money.

The Government, however, decided to help private initiative

sufficiently daring to attempt the undertaking in a liberal manner.

In the first place a subsidy of £5,000,000, or $25,000,000, was

granted to aid construction; the Government undertook to build 713

miles with its own resources, and made a free gift of 25,000,000 acres

of land fringing its route. At that time the land was worthless, so

its bestowal was not of immediate value, but to-day it represents an

asset of incalculable value, and gives the company a sheet anchor of

tremendous strength.

In the end the Government went very much farther. It made a free

gift of the line it had constructed, which was worth at the very

least,£7,000,000, or $35,000,000. While construction was in progress

there was urgent need for further money. Financiers refused to provide

funds, and as a result the Government stepped in and advanced a loan

of £6,000,000--$30,000,000--which action was so bitterly criticised

at the time that the Ministry was urged to wipe off the debt once and

for all by making it a gift, for all the prospect there was of it

ever being repaid. But the loan was redeemed, partly by an issue of

stock, and partly by the Government buying back some 7,000,000 of the

25,000,000 acres which it had given to the company in the first place

at 6 shillings per acre, representing to all intents and purposes a

further gift of some,£2,000,000, or $10,000,000. Probably no railway

undertaking has ever been treated with such prodigal liberality in

the history of the iron horse; but at the time it was warranted

fully, bearing in mind the magnitude of the scheme and the tremendous

difficulties which confronted the company at every turn.

[Illustration: THE “GAP,” THE EASTERN ENTRANCE OF THE CANADIAN PACIFIC

RAILWAY TO THE ROCKY MOUNTAINS]

When construction commenced in grim earnest the builders found that

the critics had not erred on the side of under-estimation in regard

to the character of the difficulties to be overcome. The thin band

of steel was driven through country of which practically nothing was

known; where every succeeding mile revealed something unexpected. For

instance, in following the shore of Lake Superior it was one desperate

grapple with Nature for every yard. Mountains dropped sheer into

the lake, and their humps were divided by stretches of wicked muskeg,

the Indian name for swamp, where in many cases the bottom defied being

discovered, and where thousands of tons of rock were swallowed up

without showing any gratifying result.

[Illustration: WHERE THE “BIG HILL” WAS CUT OUT ON THE CANADIAN PACIFIC

RAILWAY, BETWEEN HECTOR AND FIELD

To secure easier gradients, over 8 miles of new line were built. The

new track is shown at left.]

To-day it is possible, from wider knowledge, to criticise the company

upon their selection of this route, but at the time it was taken in

hand there was no alternative. For a solid 100 miles along the shores

of Lake Superior the work assumed a spectacular aspect. The high rocky

cliffs either had to be tunnelled, blasted right out of the way, or

deep long cuts had to be driven through the solid obstruction.

In those days the camps did not enjoy the comforts that are possible

now. The food was of the coarsest description--in fact, often it

was nauseous. Yet it was the best that could be secured under the

circumstances. I met one of the men who had helped to drive the grade

along the shore of Lake Superior, and he described the interest

and curiosity that was provoked by the arrival of the first tin of

condensed milk. To them, milk was a luxury indeed, and they as much

anticipated its association with their tea or coffee as they would

have entertained the possibility of receiving a glass of champagne.

The tin of milk was produced, and when the first recipient had read

the story of the label it was handed round to every man in turn. They

scarcely could conceive the possibility of being able to preserve such

a perishable product in a tin, and they refrained from investigating

the contents. At last, one of the more daring spirits took out his

ponderous pocket- or jack-knife and plunged it into the lid. Tipping

the vessel slightly, he watched the contents exude in a thin viscous

stream on to his finger. Hesitatingly he tasted it, and the intense

satisfaction with which he smacked his lips showed that it was a tasty

article at all events, although it might be rank poison for aught they

knew. All in turn submitted the commodity to this preliminary test,

and there was a unanimous exclamation as to its palatable qualities.

Very little of that tin of condensed milk was employed for its avowed

purpose: the majority of the men preferred to enjoy it in its raw

condition, as it was something entirely new to their frontier table. As

a result the greater part of the coffee and tea was drunk that morning

in its black state, relieved with sugar only, as the contents of the

tin disappeared in a far from orthodox manner.

The resistance which the rock offered was heart-rending. The men,

by superhuman effort, could make their way forward only a few feet

per day. Under these circumstances the task swallowed money as

remorselessly as the muskeg absorbed dumped rock. Results proved that

the construction of the line along this shore for about 100 miles was

as expensive as threading the mountains, and in one instance the price

mounted to as high as £140,000, or $700,000, per mile, rendering it

easily one of the most costly stretches of road ever constructed.

But though the fight offered by the rock was stern, that presented

by the muskeg was every whit as bad, though it was of a different

character. The great danger against which the company had to contend

was the creeping of the rails. The spongy nature of the soil over which

the track was laid caused a movement of the metals under the weight

of a passing train. It was just as if the rails had been laid on a

mass of resilient india-rubber. The lines would move to one side or

the other and often widen out sufficiently to permit a train to drop

between them. It was observed that as a train passed the elastic soil

rose and fell in a series of little waves, often attaining a height

of six inches, while the engineers could see the rails moving under

the passing of the train. It was quite out of the question to spike

the rails firmly to the sleepers, since the movement was so great that

the metals would have forced themselves from their foundation. As it

was, the gangers had to overhaul the stretch of track crossing the

muskeg once every week. The engineer strove valiantly to overcome the

eccentric movement of the rails, and only succeeded by dint of great

effort in rendering it perfectly safe. But in this work he had to use

sleepers measuring 12 feet in length, instead of those of standard

dimensions of 8 feet.

Then trouble arose with the contractors in regard to the cost of

excavation. Naturally the expenditure under this heading varied

according to the character of the material encountered, for obviously

gravel, clay, and loam were far easier and cheaper to remove than rock,

and this latter varied in its workability according to its geological

formation. In one case this dispute became a bitter bone of contention

between the company and the contractors. Upon the completion of the

work the former came to the conclusion that it had been charged an

excessive sum for the work, and upon consideration of the returns of

the earth removed were convinced that an erroneous return had been

made. Amicable adjustment of the difference proving fruitless, recourse

had to be made to the courts, and the authorities ordered the cutting

to be re-measured so as to determine the quantity of soil removed.

In one instance the contractors were forced to return a sum of about

£60,000, or $300,000, and many other firms of constructional engineers

had to make repayments. It was not a question of fraud, but purely

misinterpretation of the character of the soil handled; yet it served

to promote inharmonious working between the company and its contractors.

On the prairie, constructional effort was not taxed to a supreme degree

except in regard to water. This was found to be scarce in many parts,

and is even so to-day. The country threaded is a continuation of the

arid stretches of North Dakota and Montana, and where the land can

only be brought to a state of remunerative productivity by recourse to

irrigation. Science, however, has discounted the deficiency of nature,

and to-day this dry belt is as generously supplied with water as those

more favoured with ample natural resources farther north, though of

course the settler is compelled to pay his quota to the expense of

irrigation in the form of a higher price for the land.

It was when the mountains were met, however, that the real troubles

of the company commenced. The battle against the rocky bluffs round

Lake Superior was as mere child’s play to what was encountered when

the mountain barrier was entered. The Government had surveyed a route

through the mountains, and its choice had fallen upon the Yellowhead

Pass, the lowest summit in the range, which is only 3,723 feet above

the level of the ocean. It was the obvious portal through the mountains

to the coast, but the company decided to thread the chain farther

to the south. This decision aroused considerable criticism, and the

Government only relented by stipulating that if the Rockies were

penetrated at any other point it should be at least 100 miles north

of the International Boundary. When the project was consummated it

was stipulated that grades should not exceed 1 in 52.8 feet, and the

Yellowhead fulfilled this requirement strictly to the letter.

However, the Government’s requirements being fulfilled, the line was

forced through the range by way of the Kicking Horse Pass, a high road

used by the _couriers du bois_ for some years previously. But it proved

a trying piece of work. The river is a boiling stream and difficult of

approach. The mountains rear up on all sides, and in order to force

their way forward the engineers had to resort to herculean efforts,

spanning tumultuous streams and carving narrow winding ledges on the

sides of the mountains. Moreover, it is a heavy up-hill pull for mile

after mile, until at last the summit is gained at an altitude of 5,329

feet. To gain this point the line winds in a bewildering manner, but

the vistas of mountain scenery that are unfolded are difficult to

parallel out of Switzerland.

[Illustration: HOW THE CANADIAN PACIFIC LINE CREEPS ROUND TOWERING

PRECIPICES ALONG THE FRASER RIVER]

When this part of the work was taken in hand the original arrangements

comprised tunnelling beneath a glacier and through the hump of Mount

Stephen, but as there was loud clamouring for the completion of the

line, this undertaking, which would have involved a great length of

time, and which would have proved exceedingly costly, was abandoned

for the time being in favour of a “temporary line.” That deviation,

however, fulfilled its temporary requirements for a prolonged period--a

matter of some thirty years to be precise--and only recently has been

improved.

[Illustration: IN THREADING THE FRASER RIVER CANYON THE ENGINEERS

WERE COMPELLED TO HUG THE WATERWAY, THOUGH IT INVOLVED THE BORING OF

NUMEROUS SHORT TUNNELS]

In making the deviation serious delays were experienced. A rocky

obstacle stood in the way and tunnelling was commenced, but this work

had to be abandoned owing to the collapse of the burrow, and a sharp

curve and heavy bank introduced. The result was that it was found

impossible to comply with the Government’s requirements concerning the

maximum gradient, because in order to descend from Hector to Field,

a distance of about 10 miles, a difference of 1,143 feet had to be

overcome. This introduced a grade adverse to eastbound traffic of

237 feet to the mile, and it proved a heavy stumbling-block against

the economical operation of the line for many years, and one which

increased in severity with every succeeding year.

Yet the conquest of the Rockies was a marvellous piece of engineering,

especially on three miles of this bank, which was so steep as to earn

the name of the “Big Hill,” for it rose 12 inches in every 22 feet,

and was one of the stiffest pieces of road to be worked by adhesion

that ever had been laid down on a railway. It was so steep as to be

dangerous, a fact testified by the number of safety switches, or “catch

points,” that were introduced. The man in charge of one of these

points, observing an engine coming down-hill, did not know whether it

had run away or not until the engine-driver whistled a signal which

conveyed the information that he desired the switch to be set to the

main line, for normally it was left open and a runaway at that point

would have been turned into the bank, to end its mad career in a wreck.

Now and again engines did run away, and the “Big Hill” has witnessed

many exciting escapes among the engine-drivers and train gangs. To

grasp the significance of this engine “pull,” one required to see the

“Limited” steaming from the Pacific to the Atlantic. It got to the

bottom of the hill, and there three other engines were attached to the

train to push it up the ever-dropping metals for over three miles,

while the clouds of smoke and live cinders belched into the air, and

the terrible roar of the engines straining at the load testified to the

tremendous effort that was required to get a speed of five miles an

hour on the train. It was this feature that led a humorist to remark

that the Canadian Pacific railway never had any occasion to ballast

the track on the “Big Hill.” The engines performed this operation

spontaneously and automatically in their labour, and to far better

effect than would have been possible by ordinary means.

Considerable excitement was experienced in its construction. According

to some of the men whom I met, and who had been connected with the

grading through the Kicking Horse Pass, the ballast trains failed

time after time to secure a grip on the metals, and with their

driving-wheels spinning round madly in the forward direction they

skidded backwards down-hill. Now and again there would be a nasty

smash, in which engine and the ballast cars were mixed up in an

inextricable heap. It is reported even that on one occasion, while the

snow-plough was out clearing the drift on the “Hill,” the driver of the

locomotive lost the plough, and did not discover the fact until he had

gained the top, although he was pushing the snow-clearing apparatus! It

was so difficult to keep the wheel gripping the rails that he did not

notice the difference in the resistance when the snow-plough went over

one side.

From the Government’s strict point of view the Canadian Pacific was not

completed until about two years ago, although trains have been running

between the Atlantic and Pacific for some thirty years. The authorities

pointed out that the grade was an essential part of the contract, and

yet, in order to pass through the Kicking Horse Pass, the company had

exceeded that grade to a very considerable extent. Consequently eight

miles of line was non-existent so far as the Government was concerned,

and it declined to contribute any subsidy to that short length of

the railway. Two years ago compliance was made with the Government’s

agreement. The route through the Kicking Horse Pass was re-aligned.

This piece of work was carried out by the late J. E. Schwitzer,

and from its daring nature it will always stand as a monument to

his engineering ability. He cut out the “Big Hill” entirely. Where

previously a bank rising 1 in 22¼ existed for 4.1 miles, he provided a

stretch of line double the length and of one-half the gradient, so that

the engines only have to overcome a climb of 1 in 45½.

In order to ease the grade the line swings from one side of the narrow

valley to the other. Travelling westwards it disappears into the flank

of Cathedral Mountain, describing a curve in the tunnel to emerge

into the valley about 40 feet below the point where it enters the

mountain side. It then strikes across the valley to enter the slopes

of Wapata Mountain, where another tunnel on a curve like a corkscrew

lowers the level of the line for another 40 feet. Once more it crosses

the valley, the meanderings being so bewildering as to form a perfect

maze. It recalls the wonderful spiral tunnel-work on the St. Gotthard

railway where a similar difficulty had to be overcome, and, indeed,

the conquest of the Kicking Horse Pass in this manner was based

evidently upon the great work in Switzerland. Still, it marks the first

application of this ingenious solution of a trying problem to the

American continent.

To bring the Kicking Horse Pass section of the line within the

recognition of the Government, however, entailed the expenditure of

some,£300,000, or $1,500,000, and found employment for about 1000

men for twenty months. Train-load after train-load of dynamite was

brought up in order to enable the path to be hewn through the mountain

flanks, and by the time the task was completed over 1,500,000 pounds

of explosives had been used--something like,£50,000, or $250,000, had

vanished literally in smoke to tear down the rock. But the outlay will

be recouped well. Where four engines were required formerly two now

suffice to handle a 700-ton train, and they can rattle through the Pass

at a steady 25 miles an hour, whereas previously a bare six miles could

be notched.

Emerging from the Rockies the engineers were confronted by another

towering obstacle--the Selkirks. This range was to be dreaded more than

the barrier just left behind, for there was a trail through the Rockies

to guide the engineers, whereas the Selkirks had never been threaded.

The Indians and Hudson’s Bay _voyageurs_, after emerging from the

Rockies, turned sharply south to follow the Columbia River.

The first task, therefore, was to discover a rift through the Selkirks

through which the metals might be carried. It was shorter to go

through the mountains than to go round them if any pass could be found

to exist. Major Albert B. Rogers, an American engineer, accordingly

saddled his horse and with a supply of provisions set off to search

for a “Pass.” He wandered up and down the range without success for

week after week, and then, just as he was despairing of success, his

eye alighted on a narrow breach between two serried lines of snow-clad

peaks. He spurred forward, traversing territory on which the feet

of neither white nor red man had been planted, climbing and toiling

arduously among the crags, until at last he gained an altitude of 4,351

feet, from which the opposite sides of the range sloped down once more

to the Columbia River Valley.

[Illustration: THE STEEL ARCH BRIDGE ACROSS STONEY CREEK IN THE SELKIRK

MOUNTAINS

This graceful structure replaced a wooden bridge supported on timber

towers 200 feet in height.]

Rogers’ Pass, as this defile through the Selkirks was named in

honour of the discoverer, was followed. It did not offer any great

difficulties from the grading point of view. The greatest enemy was

snow and avalanche. The snowfall among these mountains is the heaviest

along the line, while the avalanches are of terrible frequency.

Consequently the absorbing question was how to keep the line intact

after once it had been laid. It was impossible to avoid the defined

paths of the snow movements entirely, and in these cases huge sheds

had to be erected to carry the avalanche harmlessly over the track to

expend its violence in the gulch below. The extent of snow-shedding

through the Selkirks is amazing, and it has proved terribly costly.

[Illustration: THE RAILWAY TRAVERSING THE TUMBLED THOMPSON RIVER CANYON]

When the engineers attacked this country, as the laying of the

track was the paramount requirement it was pushed forward with all

speed during the short summer, and parties of men equipped with

meteorological instruments, and vehicles for movement during winter,

and supplies of stores, were left at different points to study the snow

question, so as to collect data for the situation of the snow-sheds.

There was no difficulty in determining this latter point, for the

avalanches appeared to rain down upon the track from all sides. The

question was not so much where to introduce the sheds, but where they

could be omitted. It appeared as if the line would have to be carried

almost continuously through a wooden tunnel to ensure its safety.

That the snow-fiend is no mean enemy was brought home forcibly some

three years ago. While a snow, train was climbing up the western slope,

clearing away the accumulated mass of snow and debris deposited by a

slide upon the track, another avalanche swept down upon the little band

working so desperately to cut a path for the mail. Over 100 men were on

the train when the terror of the mountains struck them and swept the

whole into the gulch below, the locomotives and plough weighing over

50 tons being bowled over and over like an india-rubber ball as they

were hurtled down the steep slopes. Over fifty lives were lost in that

catastrophe, and it was but one of many which have happened since the

Selkirks were first gridironed by the railway.

But snow-shedding, while securing the safety of the line, has its

drawbacks. If a structure is made too lengthy it becomes filled with

suffocating smoke which obscures all signals, and deadens all sounds.

In summer another danger exists. The district threaded is one ravaged

heavily by forest fires, and the danger from this enemy was only too

vividly apparent. At this juncture Mr. W. C. Van Horne came to the

rescue of the engineers, as he had done on many previous occasions, to

extricate them from their difficulty. He suggested that the maximum

length of a single shed should be 3000 feet, and where the conditions

demanded a long continuous length of this protection, that it should be

broken up into units with wide, clear intervals of open line between.

To prevent these “breaks” becoming filled with debris he resorted to an

ingenious expedient. Up on the mountain side he built what is known as

a “split fence.” This is a triangular erection, with the apex pointing

towards the mountain top, of heavy massive construction and filled and

banked with masonry. The descending slide strikes this obstruction,

becomes split in twain, one half is deflected so as to roll over

the roof of the snow-shed on one side, and the other half caused to

glance off in a similar manner on the other side. If one of these

constructions did not secure the desired end, then another was planted

above it higher up the mountain side. The success of this system has

been remarkable, and it has enabled the company to reduce the lengths

of the sheds very appreciably.

Shortly after the line was opened the protective handiwork of the

engineers was subjected to trying tests. The winter of 1886–7 was

one of excessive severity even for the Selkirks. In less than a week

8½ feet of snow fell, and the blizzard raged continuously for three

weeks. Slides were of daily occurrence, the silence of the mountains

being broken by the continuous roar of the avalanche. The snowfall on

the summits exceeded 35 feet, and the white mantle was piled upon the

roofs of the sheds to a depth of 50 feet. The slides were of terrific

fury, some rattling down the slopes with such force and speed as to

rebound 300 feet or so up the opposite mountain side. Thousands of

tons of rock, some pieces as large as a small villa, were caught up in

their frantic rushes, while tall, thick trees were snapped off like

matches and tossed about like straws. Yet with one exception the sheds

withstood the terrible bombardments to which they were subjected. The

solitary case had the roof torn off completely to be thrown well above

the track on the mountain side.

Mud-slides were another visitation which had to be respected, for time

after time a cutting had to be cleared of a viscous mass which had

slipped into the excavation. These movements are produced by a kind of

sand, which, when it becomes saturated with water, slips and slides in

all directions in an amazing manner, carrying everything with it. In

winter, when under the grip of frost, the soil looks perfectly safe and

stable, but when the weather breaks innumerable springs come to life,

and in a short time the whole mass commences to move like a lava stream.

In addition to resorting to extreme protective measures against the

avalanche where these could not be avoided, some magnificent pieces

of bridge-work were carried out at other points to avoid them. In

the first instance several were erected in wood to save time, to be

replaced by permanent metal structures at a later date. In many cases,

however, iron, and in others masonry, had to be adopted in the first

instance.

There was one gully which perplexed the engineers sorely. It was just a

cleft in the perpendicular mountain cliff. The engineers called it the

“Jaws of Death,” and the name was appropriate. They had to cross this

couloir, and a temporary timber bridge was built by dint of tremendous

effort. The engineers congratulated themselves upon their success, but

their gratification was short-lived. A constructional train ventured to

cross and the structure collapsed under its weight. Here was a dilemma.

Work was brought to a standstill and there was grave deliberation. Mr.

Van Horne heard of the accident, and hurried to the front. He surveyed

the gully, and there and then decided to throw an arched masonry bridge

across the breach. It was built, and what was more to the point, it

stood; the constructional gangs could get forward.

At Stoney Creek there was another trouble of a like nature. The

V-shaped ravine was deep and wide, and it was recognised that something

different from what had been done in bridge-building up to this point

was imperative. Two wooden towers were built on either side to a height

of 200 feet, and these supported a single span of 172 feet over the

gulch, which was carried out in wood also. From end to end the bridge

measured 490 feet, and for years it ranked as the highest wooden bridge

on the continent. The timber structure, however, has long since made

way for a noble arched steel bridge springing from the rocky sides of

the gulch, and it constitutes one of the most graceful bridges on the

whole of the system.

The descent from the Selkirk summit involved the execution of some

startling pieces of engineering to gain the banks of the Illecillewaet

River. The line makes its way down the mountain side in a series of

steps or terraces connected at the ends by sharp loops, doubling and

redoubling on itself to overcome a difference of 600 feet in altitude

in the most extraordinary manner. The train is first running eastwards,

disappears round the corner and then is making its way in the opposite

direction a few feet below, to round another curve and once more steams

eastwards, this alternate running backwards and forwards continuing

until the valley of the Illecillewaet River is gained, by which time

the train has travelled over 6 miles of metals to make an actual

advance of only 2 miles.

Issuing from the Selkirks, another barrier, the Gold Range, had to be

traversed, but this was a comparatively easy matter, as the Eagle Pass

is a natural causeway among the peaks for the iron road, although its

discovery taxed Walter Moberly to an extreme degree, as is narrated in

another chapter. In this pass the engineers, driving the line from the

east, met the forces advancing from the west. They shook hands at a

point known as Craigellachie, where the connection between the two arms

was made--where the “golden spike” was driven home--and the Pacific

seaboard was brought into touch with the Atlantic through Canadian

territory.

[Illustration: THE CISCO CANTILEVER BRIDGE CARRYING THE CANADIAN

PACIFIC RAILWAY ACROSS THE FRASER RIVER

The bridge leads to a tunnel driven through the precipitous wall of the

canyon.]

[Illustration:

_Hill, photo_] [_See page 240_

THE KEY WEST “LIMITED” PASSING OVER LONG KEY VIADUCT AT FULL SPEED]

The Pacific end of the line was taken in hand by the Government, and

it must be conceded that they had most difficult work to accomplish,

for they had to force their way through the Fraser and Thompson River

canyons, producing the heaviest 300 continuous miles of engineering on

the whole line. They had to fight for every inch of the way through

these ravines, as the bottom is entirely occupied by the water. The

line is laid on a gallery carved in the cliff-face 200 feet above the

waters boiling beneath, in a succession of cuts and tunnels, with some

fine examples of bridging, of which the cantilever structure across the

Fraser River of 300 feet span was the second of its character to be

built on the American continent. This link cost about £2,000,000, or

$10,000,000, to build, representing about £16,000, or $80,000, per mile

purely for the formation of the grade ready to receive the metals.

Considering the magnitude of this undertaking and the fact that the

railway extended through extremely diversified country from level

plain to tumbled lofty mountains, construction at the rate of some

five hundred miles per annum was a magnificent achievement. For the

greater part of the distance it traversed country where the white man

was not in occupation, and where several years were certain to pass

before it yielded any economic value capable of producing traffic to

the railway. The enterprise was jeopardised seriously by the financial

panic in the United States, and the Northern Pacific railway crisis,

which misfortunes did not augur well for the success of another

trans-continental railway. When it was finished, the inquiry as to

why it had been built through an absolute wilderness from end to

end was raised on all sides. The present day supplies the answer to

that criticism to a complete degree. From the day of its completion

the Dominion went forward with a rush, and it cannot be denied that

the province of British Columbia played an important part in the

development of the country when it insisted, as a return for its

entrance into the federation of the provinces, that a railway should be

built across the continent to link the east with the west within ten

years.

The Railway Conquest of the World · 第 18 / 26 章