CHAPTER III

ON THE PRESENT CONDITION OF THE CULEBRA CUT, AND ON THE METHODS EMPLOYED

FOR EXCAVATION AND DISPOSAL OF THE SPOIL

REFERENCE once more to the plan and profile on the map will show at a

glance the length and position of the rocky divide, the whole of which

is termed the Culebra Cut, from the name of the town near the highest

point. The proposed form and dimensions of this cut, throughout the 5

miles of the greatest height, is also shown (the section adopted at the

commencement of 1906), and the stage reached in April, 1908, is shown by

the photographs. The line drawn across the above section at a level of

120 feet above bottom (160 feet above sea), shows the general level of

the bottom of the workings at Culebra itself at the time the photographs

were taken. A narrow pilot cut, only, was then 20 feet lower.

[Illustration: ROCK DRILL.]

[Illustration: ROCK DRILLS AT WORK IN THE CUT.]

All that part of the section below this line (+160) remained to be

excavated.

Most of the rock above this line has been removed, but not all, for the

final width is not, of course, reached at any level until the central

portion has been excavated below that level.

The level of the original rock line shown in this section was +275,

_i.e._, 235 above canal bottom, so that the photographs show excavation

of 115 feet of rock. There was, however, soil above the hard basaltic

rock, of varying thickness--removed to the slope 1:2 as shown on the

section. The highest original surface of the soil on the centre line of

the Canal (between Golden Hill and Silver Hill at Culebra) was +312

feet,[17] so that the photographs in which Golden Hill appears show a

total excavation of 152 feet along the centre line. As this line passed

along a saddle between the two hills, the original surface at the sides

was considerably higher, so that the total height shown in the

photographs from the bottom of the cut to the highest berm, or ledge, on

Golden Hill is considerably more than 152 feet.

[17] The profile at end of volume shows the stage of excavation

when the height here had been reduced to +210.

The bottom of the Canal will be 272 feet below the original saddle, and

its depth below this berm, which is seen on the photograph, is

considerably more. Thus will the gorge appear when the excavation is

finished and before the water is allowed to flow in. When full, the

surface of the water will be 227 feet below the original saddle, and the

passenger on a vessel will gaze upon the scarped banks of a somewhat

greater height than this.

For a tide-level canal, not only would the depth be 85 feet greater,

but, as the slope could not be made steeper, the width of the whole

cutting would be correspondingly increased.

With reference to the slope of the sides, it is important to note that

it has not been found practicable to adhere always to the proposed

section, which has to be made flatter, thus considerably increasing the

amount of excavation required. The behaviour of living rock is not

susceptible of the precise specification which can be applied to

quarried stone on the one hand or loose gravel on the other.

Mechanically it is complex, both on account of its structure and of the

_role_ which water plays in its economy. In the case of the Culebra

rock, the volcanic dykes by which it is traversed have altered the

nature of the rock in their vicinity, and the part played by water is

considerable, owing to the wetness of the climate. Moreover, the rock

does not remain wholly unchanged when exposed to air, but deteriorates

by "weathering," a chemical and physical process which proceeds much

faster in an equatorial climate than in the temperate zones. The

climate, however, has a compensating action, in so far as the rapid

growth of vegetation soon clothes and protects the scarped slopes, thus

acting as a "revetment."

* * * * *

Alighting at Culebra station on the Panama Railway, and proceeding to

the western side of the cut, one obtains the most impressive view of the

Canal works, and this is the spot usually visited by travellers and

tourists. I first stood there in January, 1907, and returned in April,

1908. The impressions obtained were very different on these two

occasions. In January, 1907, after two and a half years of American

occupation, what struck me most was the enormous mass of material which

had been removed by the French companies, and the comparatively

insignificant appearance of the American excavations, which could

readily be distinguished from the older work, already coated with

vegetation. It was then that I began to appreciate the heroic labours of

the French engineers, whose achievements under circumstances of great

difficulty are being daily more and more appreciated and praised by

their successors. Turning to study the progress of work, I watched with

delight the operations of the 100-ton steam shovels, which at a

distance, when the human hands are not seen, appear endowed with

volition, and remind the spectator of elephants at work. The cars were

loaded with surprising celerity, and the dirt-train was hauled off to

the distant dump by an old Belgian locomotive, part of the machinery

taken over from the New Company. But then the hitch came--there were no

cars to take the place of those already filled, and the steam shovel was

idle. Looking round, I found that many other steam shovels and their

crews were idle from the same cause, the machinery for transportation

not having been provided in proper proportion to the machinery of

excavation. That the time required for the completion of the rock-cut

was limited by the possible rate of transportation of spoil, and not by

that of excavation, had long been known, and the report of the Board of

Consulting Engineers contains elaborate diagrams of space available for

shovels and for tracks. It was apparent, therefore, that the

organisation of the work was not yet perfected. In like manner, as far

as I could judge during my first short visit, the West Indian labour was

not yielding the best results, owing to white foremen and coloured

labourers not being in perfect harmony.

[Illustration: THE CUT, LOOKING NORTH FROM CULEBRA.]

[Illustration: THE CUT, LOOKING SOUTH FROM CULEBRA.]

While, however, the fighting force, so to speak, of the Isthmian army

was obviously imperfect in many respects, great results had evidently

been achieved by the auxiliary services. The Department of Sanitation

had already made the Isthmus healthier than most equatorial countries,

food and quarters were excellent, law and order were well maintained.

On the first day of my second and prolonged visit, April, 1908, fifteen

months later, I went at once to the same spot on the Culebra Cut

opposite to Golden Hill and again surveyed the scene of operations. The

change was enormous. The gorge below me was greatly enlarged, the shape

of the hills altered, the face of the landscape changed. As I gazed into

the deep trench below, the thought flashed across my mind, "If my life

be spared a few years longer, I will sail through this on a ship."

The reason of the great change was readily apparent: organisation had

now been perfected. In the first place, the whole width of the cut was

laid down in railway tracks, tier above tier at the different levels, so

that the view was like the approach to the metropolitan terminus of one

of the world's great railways. Up and down these tracks there came and

went without ceasing the spoil-trains, now composed of larger trucks

than formerly, with new and ingenious devices for rapid unloading. The

number of steam shovels visible was much larger than in 1906, yet they

were kept constantly busy, and all the time the drilling machines were

at work boring holes for charges of dynamite, and gangs of men were

completing the preparations for explosions in other holes already

made.[18] Yet if the eyes were raised for a moment from the busy scene

below, they rested on a silent wilderness of tropical forest, stretching

unbroken to the horizon. I stayed until, at the approach of sunset, the

work of the shovels ceased, and hundreds of men swarmed out of the Cut,

and sought their quarters and the evening meal. But all was not over for

the day, for now, when the Cut was cleared, the shot-firing began. At

intervals there occurred a deafening explosion, the earth trembled as in

a considerable, but preternaturally short, earthquake, and masses of

rock rolled down the slopes, disintegrated and ready for the shovel-man

when he should arrive next morning. I paid many visits to the Cut,

between Empire and Pedro Miguel, but oftenest at Culebra itself. The

sight never palls, and is one of the wonders of the world. The Pyramids

are another wonder of the world which in common with many thousands in

all ages I have thought it worth going to see--but to go to Culebra is

as if one were privileged to watch the building of the Pyramids. Yet how

few go to the Isthmus on purpose to see these things, and, _mirabile

dictu_, how few Americans! How is it that this people, so enthusiastic

in all that relates to national achievement and addicted to foreign

travel, does not include the Isthmus among its many recognised places of

pilgrimage? Of the Americans whom I met on the Zone there was scarcely

one who had come voluntarily for pleasure. The hotel accommodation, it

is true, is limited, but it is more than sufficient for present needs,

and is good, as hotels in the tropics are reckoned. Moreover, Panama is

now one of the healthiest places in the Equatorial Zone. English

tourists going out to the West Indies by the Royal Mail are generally

able to cross the Isthmus and see something of the work while their ship

is unloading at Colon; but I would venture to suggest, to such of these

as care to follow the world's progress, that they should make

arrangements beforehand to step off at Colon, cross to Panama, put up

there, visit thence the Canal works at various points, and proceed by

their next ship. The West Indian tourist season coincides with the dry

season on the Isthmus. At Panama the mosquito is almost an extinct

animal, and though the heat there is sometimes trying, a run up to

Culebra brings one to a dry and bracing atmosphere where a fresh breeze

is almost always blowing.

[18] During 1908 no less than one million dynamite charges were

exploded.

The steam shovel is the principal agent of excavation. It scoops out

loose soil directly, but the basaltic rock has to be broken up first by

blasting. One shovel will load 1,200 cubic yards of such materials upon

the cars within the working day of 8 hours, an amount equal to 600

two-horse loads.

For accelerating transportation railway trucks provided with flaps are

used, which make of the whole train a single platform. At the rear of

the train is a plough which can be drawn by a wire rope attached to a

drum carried on a special car in the fore part of the train. When the

train arrives at the dump the drum is started, and the plough,

advancing, clears the 320 cubic yards of earth and rock from the 16 cars

in 7 minutes. This is the Lidgerwood Unloader.

Another important piece of machinery is the track-shifter, which picks

up and relays the railway lines of the ever-shifting spoil-tracks. This

remarkably successful contrivance was invented by an employee on the

Isthmus, and is moreover manufactured there in the great workshops at

Gorgona.

[Illustration: FROM CULEBRA, LOOKING EAST TO DISTANT HILLS.]

[Illustration: FROM CULEBRA, LOOKING EAST ACROSS THE CUT.]

From Bas Obispo to Pedro Miguel, which constitutes the Cut, is a

distance of about 9 miles, and excavation is so planned that a summit is

maintained at Lirio, near Culebra, about half-way between these two

points. On the north slope are[19] 21 steam shovels, loading cars on 14

tracks. These, when loaded, are hauled down-grade to the northern dumps

at Tavernilla and elsewhere, or to the site of the Gatun dam, which is

also a dump. Nearly 4,000 cubic yards of rock are carried to the dam

daily, a distance of about 24 miles. The return up-grade is made with

empty cars. On the southern slope about the same number of steam shovels

are at work, the spoil being taken to the southern dumping grounds on

the Pacific side, including the trestle dump for the breakwater to Naos

Island. The spoil-trains follow one another at intervals of about three

minutes, and if, from any cause, delay occur, the steam shovels, and

indeed the whole process of excavation, is brought to a standstill. Any

cause of delay is therefore reported at once by telephone to the

Superintendent of Transportation at Empire, and all energies are at once

directed to clearing the way. On the Isthmus everything gives way to the

spoil-train, as in a city to the fire-engine. An excellent lesson both

in the complexity and urgency of the transportation is afforded by a run

through the Cut on a motor trolley in company with the Superintendent of

the Department of Excavation. Constantly shunted from one track to

another, and occasionally having to retreat, much ingenuity is required

to thread a way among the spoil-trains, but even the almost invaluable

time of the Superintendent himself is sacrificed rather than any delay

should occur to the "dirt" train, as it is usually called. It is this

dirt which stands between the American nation and the realisation of

their long cherished scheme, and nowhere is the classical definition of

dirt as "matter in the wrong place" so appropriate as on the Isthmus.

[19] This is for July, 1908.

* * * * *

Let us now see how much matter has been removed, and how much dirt

remains which has yet to be removed. I will give first the totals of

what has been got out in both dry and wet way, both in the Canal prism

itself and for auxiliary works.

TOTAL EXCAVATIONS IN CONNECTION WITH THE PANAMA CANAL.[20]

Cubic Yards.

By the French Companies about 81,548,000

By the American Isthmian Canal Commission up to the

end of June, 1908 40,923,533

-----------

122,471,533

[20] Canal Record, July 8, 1908.

Much of the work of the French Companies, however, consisted in dredging

out sea-level channels at both ends of the Canal, whereas the principal

American work has been rock-excavation in the Culebra Cut--or _the_ Cut,

as it might equally well be called. The figures relating to the Cut

are:--

EXCAVATION BETWEEN BAS OBISPO AND PEDEO MIGUEL, _i.e._, "THE CULEBEA

CUT," 9-1/2 MILES.

Cubic Yards.

By the French Companies 22,600,000

By the American Commission to end of June, 1908 20,125,185

-----------

Total excavated in the Cut 42,725,185

Remaining to be excavated 37,973,063

-----------

80,698,248

so that at the end of last June the Cut was half cut through, one

quarter having been done by the French Companies and one quarter by the

American Commission.[21]

[21] The total excavation for the prism of a sea-level canal was

calculated by the Board of Consulting Engineers at 231,026,477 cubic

yards.

This statement by itself, however, would give a very inadequate idea of

the rate at which the excavation is now proceeding, for of the total

taken out by the Commission since 1904, 11,000,000 cubic yards were due

to the work of the 12 months prior to June last. It will be seen from

what has gone before that the rate of progress is now even greater than

in the year June, 1907-May, 1908, for the daily output from the Cut for

July, 1908 (55,427 cubic yards), works out at 1,441,102 cubic yards,

allowing 26 working days of that month, which, moreover, is a wet month,

when work is much retarded.

[Illustration: FROM CULEBRA, LOOKING EAST TO GOLDEN HILL.]

[Illustration: THE CUT AT CULEBRA, LOOKING NORTH.]

_On the Date of Completion of the Canal._

Colonel Goethals, Chief of the Commission, when examined early in 1908

at Washington, declined to bind himself to a date for completion, or to

an estimate of cost; nevertheless, it is not difficult to calculate the

date of completion from the actual rate of progress on the assumption

that all goes well. The year 1915 is thus arrived at by the authorities

for the calculated, though not promised, completion. This is based

primarily upon the rate of excavation possible under the restrictions

imposed by the narrow gorge along which the spoil has to be transported.

It has been also calculated that the constructive works, the locks and

dams, would require about the same time as, but not longer than, the

excavations. This just balance between the time required for the two

elements, excavation and building, was one of the arguments employed in

favour of the 85-foot-level canal, as securing "the utmost practicable

speed of construction"[22] which could be obtained in a canal

"affording convenient passage for vessels of the largest tonnage."

[22] See address by President Roosevelt to Board of Consulting

Engineers, September 11, 1905. Report of the Board, p. 12.

* * * * *

One of the most impressive features on the Isthmus at the present time

is the great workshop at Gorgona, where repairs of all kinds are done,

and large machines such as the track-shifter are actually built. As I

passed from machine shop to boiler shop, smith shop, car shop, pattern

shop, and so on, I felt myself back among the circumstances of one of

the great manufacturing towns, and forgot for the time my actual

surroundings. It was with a feeling akin to surprise that, on quitting

the foundry, I found myself on the fringe of the tropical forest, now

darkening with the shadows of the swift-descending sun. I may here note

by the way that the furnaces of the foundry produced considerable relief

from the effects of the tropical heat, which that day was somewhat

oppressive.

_Relaying the Panama Railway._

Reference to the map at the end of the volume will show how

considerable is the task of reconstructing the Panama Railroad--what

embankments have to be formed, circuits made, and (near Milaflores) a

tunnel bored. The track, too, is being doubled, and the rolling stock

has been greatly improved. The passenger cars are both comfortable and

relatively cool, and the double journey from Pacific to Atlantic Ocean

and back again can be pleasantly performed between luncheon and dinner.

Much of the verdant forest land on which I have gazed with so much

delight from the windows of the cars will soon cease to be land at all.

It will be drowned beneath the waters of Lake Gatun; virgin forest,

cultivated patch, squatter's hut, villages, and even small towns will

disappear, their sites submerged by water, and presently to be covered

by the silt of rivers.