CHAPTER II

ON THE CANAL AS IT IS TO BE

BETWEEN Colon and Panama the American Isthmus is about 36 miles across

as the crow flies, and is therefore nearly, though not quite, at its

narrowest. In this portion of its sinuous course both coasts trend north

of east and Panama lies nearly south-east of Colon. The Isthmus in

general is a very confused mass of hills and mountains. It is crossed by

no transverse trench (such as sometimes occurs in mountainous regions),

neither by the trough provided by down-folded strata, nor the rift

valley produced by fracture and foundering of rock. A low-level

transverse can only be found by following up the course of a river,

crossing the divide, and following the course of another river

downwards to the other ocean. From the vicinity of Colon, by following

up the valley of the River Chagres, we are led in precisely the required

direction, _i.e._, directly towards the Pacific, for nearly two-thirds

of the way. The distance from the head of Limon Bay, following the

curves of the valley, is 26 miles to this place, Obispo, and for the

greater part of the distance the river flows in a broad valley of deep

alluvial deposits.

[Illustration: FRENCH DREDGER LAID UP.]

[Illustration: FRENCH TRUCKS PARTLY COVERED WITH FOREST GROWTH]

At the point mentioned, the Chagres abruptly changes its course, and, if

followed towards its source, will be found to be flowing from north-east

to south-west. Moreover, it is now confined to a narrow valley, with

steep hills of rocky substance on either side, and its gradient becomes

much greater than hitherto. The course of the Canal cannot therefore

follow the Chagres valley further. Fortunately, the valley has led us

not only a long distance towards the Pacific, but to a place where the

dividing ridge only attains an elevation of about 300 feet above

sea-level. Striking from Obispo straight for the Bay of Panama, we come

in 9 miles to the low alluvial plain of the Rio Grande, which leads

straight to the sea in another 6 miles. Thus, from shore to shore, the

course of the Canal along this route is 41 miles; but to reach deep

water 4-1/2 miles must be dredged beneath the sea at either end, so that

the total length of the artificial waterway is 50 miles. Of the

land-course less than a quarter, or about 9 miles, is hill country, and

most of this is less than 200 feet above the sea. The United States has

been committed to this route by the long chain of circumstances already

narrated.

Whatever type of canal was to be constructed along this route, there

were certain excavations which must necessarily be done. These were,

firstly, dredging the sea channels, and secondly, making a cut through

the solid rocks of the divide. Thus, although de Lesseps started

operations upon inadequate data, yet most of the work done by the first

Panama Canal Company is available, either for the tide-level canal

proposed by de Lesseps or for the 85-foot-level canal now being made by

the United States. Similarly, the New Panama Canal Company, although

hampered by many uncertainties, continued to work at the Culebra Cut, as

it is called, that is to say, the trench through the rocky hills which

separate the alluvial valleys of the Chagres and the Rio Grande.

Thus the works taken over by the United States in 1904 were available

for any type of canal, and the decision to adopt the 85-foot-level was

not taken until 1906. Even now, or in April, 1908, at the time of my

visit, when so much work has been done upon the locks, many of the rank

and file of the employees still cherish the hope of a tide-level canal,

and there are not wanting well-informed people, both on the Isthmus and

in the States, who, while accepting the high-level scheme as inevitable,

regard a tide-level canal as essentially a better thing.

Let us resume our description of the Isthmus, in order that we may be in

a position to understand the conditions with which the engineers have

to deal. The practicability of the Panama route is due to the fact that

rivers have already done a great part of the excavation, and if desert

conditions had supervened--if there were, as at Suez, practically no

rainfall--the construction of a tide-level canal would be simply the

excavation of a trench in dry material, which would be filled by the

inflowing waters of the sea. A tidal lock being added to regulate the

ebb and flow at Panama (for the Atlantic side is tideless), the canal

would be complete.

But as things actually are, the rainfall on the Isthmus is very heavy,

particularly on the Atlantic side, where it reaches 140 inches[5] per

annum, and the rivers have at all times considerable bodies of water,

and during the rainy season (commencing in May) are subject to sudden

and violent freshets. The Chagres at Gamboa has been known to rise

35-1/2 feet in 24 hours.[6] Suppose then that a tide-level trench were

suddenly formed across the Isthmus, as by a convulsion of nature. We

should then see the rivers pouring into this fjord in a number of

cascades of various height. Of these the greatest would be the Chagres

cascade, entering from the east near Gamboa and Obispo. The height of

the waterfall would be 46 feet in the driest season and as much as 80

feet in occasional floods.[7]

[5] Abbot, "Problems of the Panama Canal," p. 96.

[6] _Loc. cit._, p. 146.

[7] Abbot, _loc. cit._, p. 116.

[Illustration: EXCAVATION NEAR TAVERNILLA.]

[Illustration: RIVER CHAGRES AND RAILWAY NEAR GORGONA.]

In order therefore to make a tide-level canal, some means must be found

for disposing of the waters of the Chagres and other rivers. De

Lesseps's tide-level project was rather an aspiration than a plan. He

proposed to conduct the waters of the Chagres to the sea by other

channels. The magnitude of this task would be scarcely less than that of

cutting the Canal itself. The other rivers on both sides of the Canal

would likewise require diversion channels, so that the final result

would be roughly the formation of three channels, of which the centre

one would be for navigation. The Board of Consulting Engineers summoned

by President Roosevelt in 1905 to advise the Isthmian Canal Commission

recommended, in a majority report, a tide-level canal as practicable and

best fulfilling the national requirements, defined by the Spooner Act of

1902. But whereas they had detailed schemes for high-level canals before

them, they were in the matter of the sea-level project at the

disadvantage of having to act in a constructive capacity and elaborate

the details of a scheme before they could criticise it. Moreover, five

of the eight who constituted the majority were European engineers, who

returned to their duties as soon as the report was drafted. The report

of the minority in favour of the 85-foot-level scheme having been

adopted by Congress in 1906, all available engineering talent has for

the last two years been devoted to improving the details of this scheme.

The tide-level project of the majority of the Board has had no such

advantage, and the difficulty of estimating the relative advantages of

the two schemes is therefore all the greater.

Both schemes depend for their success upon the security of dams.

The tide-level scheme has a dam at Gamboa, near Obispo, thus making a

lake of the upper waters of the Chagres, whose surface would be 200 feet

above sea-level.[8] The floodwater would partly be accommodated in the

lake by reason of the great height of the dam above low-water stage, and

partly by running the excess into the Canal, by which it would escape to

the sea, generating currents which the Board calculated would not attain

an injurious velocity.

[8] Report, Board of Consulting Engineers, p. 205.

Streams entering the Chagres in its lower reaches would be dammed back

or diverted--a considerable, but not momentous, undertaking. The three

great objections to the scheme appeared to be:--

1. The extra cost, and above all the extra time, required to complete

the immensely greater quantity of excavation required for the last 85

feet;

2. The fact that the artificial lake was to be above the Canal, so that,

if the dam burst, the Canal might be ruined; and,

3. That the velocity of currents in the Canal due to discharge of the

surplus waters might perhaps be a serious drawback to navigation in a

narrow channel.

It will be seen presently that the second disadvantage is offset by

corresponding disadvantages in the dam required for the high-level

canal.

As for the cost, that has always been an unknown quantity, and, I think,

has always been a secondary consideration. The fear of undue delay seems

to have been the principal deciding factor in favour of the high-level

scheme. Rival expert opinions that the majority of the Board of

Engineers had under-estimated the time required for the tide-level canal

were adopted by those in authority, and mainly on this account, I think,

the high-level scheme became law.

Since visiting the Isthmus a second time, and inspecting the work in the

great Cut between Empire and Paraiso, it has seemed to me that there is

an objection to the tide-level project which did not fully appear in

the early stages of the work, viz., that the behaviour of the rock

might involve the engineers in ever-increasing difficulties as the

depths increased. The opinion which had been held by many that the

difficulties would diminish with the depth did not seem to me to be

justified up to that time.

[Illustration: LIDGERWOOD UNLOADER, WINDING APPARATUS.]

[Illustration: _ANOPHELES_ BRIGADE OILING A DITCH.]

Next let us see what are the special difficulties of the high-level

project.

This also depends for its success mainly on the efficacy of one dam,

which is now being made at Gatun. It will hold up the waters not only of

the Chagres but of its tributaries, to a level of 85 feet above mean

tide, and the area of the lake thus to be formed is shown on the map.

The Chagres will be ponded back far above the point where it enters the

Canal, and thus will be effectually tamed. The flood-waters will be

spread over an area of about 164 square miles--for Lake Gatun will be

twice the size of Lago Maggiore and about four-fifths that of the Lake

of Geneva,[9] and ships, in the ample waterway, will not be troubled by

currents.

[9] The size, in fact, will not differ greatly from that of the

principal basin of the Lake of Geneva, all above the _petit lac_, or

narrow part at the Geneva end. A good idea of this area is obtained by

recalling the well-known view over the waters of this lake from the

_quai_ at Ouchy.

A flight of three locks at Gatun will raise ships to the level of this

lake in coming from the Atlantic, and one lock at Pedro Miguel and two

at Milaflores will lower them to the level of the Pacific.

It has been claimed that if the Gatun dam burst the consequences would

be less disastrous than if the Gamboa dam burst, but there is in reality

little to choose between the two catastrophes.

The great blot on the high-level scheme is that the great Gatun dam is

not founded on solid rock. The Gamboa dam of the tide-level project

would have been founded throughout on hard rock, from which it could

have been built up of masonry so that the structure should be part and

parcel of the rocky framework of the globe itself. The Gatun dam as

recommended in the minority report, on the other hand, was designed to

consist essentially of a mass of earth dumped upon an alluvial plain so

as to fill up a gap of 2,000 yards between two ranges of hills, the gap

through which the Chagres escapes to the Atlantic. Thus the Gatun lake

was to be held up as a glacier lake is held by a moraine blocking a

valley.

We shall presently describe the high-level canal as it is to be, from

which it will be seen that it will provide a magnificent waterway, but

before concluding the present section I must mention the special point

in which it will be inferior to a tide-level canal. This is for purposes

of defence. A fortress has to be preserved from capture, but not from

damage. The locks, however, must be preserved from serious damage, which

demands far more elaborate protection. Such protection, moreover, has to

be provided at two positions (Gatun and Milaflores) about 30 miles

apart.

_The High-level Canal as it is to be._

The Spooner Act, the law under which the Canal is being constructed,

enacts that it shall be "of sufficient capacity and depth as shall

afford convenient passage for vessels of the largest tonnage and

greatest draft now in use, and such as may reasonably be expected."

Accordingly the following dimensions have been selected:--

1. A minimum depth of 41 feet.

The Suez Canal has a depth of 31 feet[10] admitting of the passage of

ships with a draft of 27 feet.[11] The channel of this canal is now

being deepened, so that by 1915 it is hoped that a depth of 36 feet[12]

will be obtained. The Kiel Canal has a depth of 30 feet. The average

draft of the Cunard s.s. _Mauretania_, the largest ship now afloat, is

about 32 feet, but she is stated to draw, when fully laden, about 37

feet, and there are comparatively few harbours in the world which she

could enter fully loaded.

[10] Report, Board of Consulting Engineers, p. 175.

[11] "Four Centuries of the Panama Canal," p. 436.

[12] _Daily Telegraph_, June 18, 1908.

2. A minimum bottom width of 200 feet in the Culebra Cut.

The minimum bottom width, or width at a depth of 31 feet, in the Suez

Canal is 108 feet.

The bottom width of the Kiel Canal is 72 feet.[13]

[13] Report, Board of Consulting Engineers, p. 173.

3. Each lock will have a usable length of 1,000 feet and a width of 110

feet.

The locks of the Kiel Canal have an available length of 492 feet and

width of 82 feet.

The _Mauretania_ has a length of 790 feet and beam of 88 feet.

4. The minimum radius of the curves is 5,577 feet (1,700 metres).[14]

This curve, however, does not come in the Culebra Cut, where the bottom

width is to be 200 feet, but north of Bas Obispo, where the bottom width

is 500 feet. Most of the curves have a radius of 9,842 feet (3,000

metres).

[14] _Vide_ p. 205 of General Abbot's "Problems of the Panama Canal"

(1907). Slight changes in the projected course are made from time to

time, so that this figure is subject to slight modification.

In the Suez Canal,[15] outside Lake Timsah, there are five curves with a

radius of 2,000 metres, or a little more, which are being enlarged to

2,500 metres (8,202 feet). The usual bottom width in these curves was

184 feet, but this is being increased to about 230 feet. The Kiel Canal

has four curves with a radius of 1,000 metres (3,284 feet).

[15] Report, Board of Consulting Engineers, p. 178.

A reference to the accompanying plan (_vide_ Map, end of volume) of the

Panama Canal will show that most of the curves are situate in Gatun

lake, where the width of the canal proper is large, and where the spread

of shallower waters secures better steerage.

Thus the high-level Canal is not only deep and wide, but also much freer

from troublesome curves than might be supposed from a casual inspection

of its course. The details of the bottom width of the high-level Canal

in its different parts are as follows:--

Feet.

From the Atlantic entrance to Juan Grande (27 miles) 1,000

Juan Grande to Bas Obispo 500

Bas Obispo to a point about half-way between Empire and Culebra 300

Culebra Cut nearly to Pedro Miguel lock (about 4 miles) 200

Pedro Miguel to Pacific entrance 500

[Illustration: 100-TON WRECKING CRANE, GORGONA.]

[Illustration: INTERIOR OF MACHINE SHOP, GORGONA.]

Limon Bay being shallow, the deep water where a battleship can freely

navigate or manoeuvre lies outside a line joining Colon Lighthouse

with Toro Point, and at a distance of 7-1/2 miles from Gatun locks. From

this distance the lock-excavation can now be plainly discerned from the

deck of a ship without the aid of a glass. Here, when the Canal is

complete, a ship will enter the buoyed channel of the submarine portion

of the Canal, but this part of the channel does not lead directly

towards the locks, which are not visible upon the face of the water.

Moreover, they are presently hidden altogether by the land. Not until

Mile 5, near Mindi, is reached does the course of the Canal, by a slight

bend, open up the locks to uninterrupted view, and at this point the

ship is already confined between banks. When the foot of the flight of

three locks is reached a vessel will no longer proceed under her own

steam, but be warped through.

The length and width of the locks has already been stated. The maximum

lift will be 32 feet, or about 4 feet more than in any other locks at

present in use. As the width (110 feet) is much greater than that of

existing locks, it follows that the lock gates will be far larger than

any now in use. The vessel has to pass through a flight of three

succeeding locks. Parallel with this is a second flight of three locks,

so that two ships could be simultaneously put through either flight in

the same, or in opposite, directions. Each lock through which the vessel

passes on her upward course is provided with two pairs of mitre gates,

_i.e._, double-swinging doors, but the uppermost lock has in addition a

rolling gate near the lower end. This is a precaution against the

breaking through of the upper folding doors by a ship coming down,

_i.e._, from the Pacific side. An emergency gate is also being designed,

a sort of swing bridge, to close the upper entrance to the flight of

locks, for Gatun, Pedro Miguel, and Milaflores. It is hoped that a

vessel will be put through all three locks at Gatun in 50 minutes, to

which must be added some delay in approaching. Coming from the Atlantic

the water of the Canal will be smooth, and the vessel somewhat

sheltered, so that there should be no difficulty. Approaching from the

lake there may be some roughness, but anything more than a fresh breeze

is rare, and the lake will be practically free from currents, so that

the approach should present little difficulty. The Pacific side is

always calm, so that no difficulty of approach or exit is to be

anticipated there on account of either winds, waves, or currents.

Our vessel, having been locked up to the broad surface of Lake Gatun,

proceeds under her own steam and at a fair rate of speed across that

lake, slowing down to about 4-1/2 miles per hour for the 9 miles of

Culebra Cut, which will thus occupy two of the 8 or 10 hours in which it

is hoped to accomplish the whole transit. On this basis it is calculated

that 40 ships could be put through in 24 hours from the Atlantic to the

Pacific, or two fleets of 20 ships if passing simultaneously in opposite

directions.

A 10-hour transit of the 50-mile channel is about the same rate of

progress as that in the Suez Canal, where, though there are no locks,

the speed has to be kept low on account of the friable nature of the

banks.

It is evident that the time of transit cannot yet be certainly known to

an hour or two, but a considerable margin beyond the above estimate

would enable the passage to be made between dawn and dusk of the

tropical day.

At Pedro Miguel our vessel passes through one lock on her way down to

the Pacific, and at Milaflores through two locks. Each of these three

locks has, of course, a duplicate alongside, permitting, as at Gatun,

the simultaneous passage of a companion vessel, or of one passing in the

opposite direction. In case of repairs to one set of locks the parallel

set would maintain the waterway.

The lift of the lower lock at Milaflores is variable, depending upon the

level of the tidal water in the last reach of the Canal. The extreme

range of the tide at La Boca, the Pacific entrance to the Canal, is 20

feet; that is to say, low water during "spring" tides is 10 feet below

the average sea-level. During low tide on the Pacific side, therefore,

the water in the Canal stands 95, instead of 85, feet above that sea.

Hence the maximum lift of 32 feet already stated, for

32 x 3 = 96.

[Illustration: MACHINE SHOPS, GORGONA.]

[Illustration: CLUB HOUSE FOR EMPLOYEES, GORGONA.]

Beyond the Milaflores locks our vessel enters a reach of the Canal which

is exposed to the ebb and flow of the tide and _which will be confined

within banks or levees as far as La Boca_. In this respect the plan and

the section are both, unfortunately, misleading. The La Boca lock and

dam have been abandoned, and no Sosa lake will therefore come into

existence, the lowest lock being, as I have said, at Milaflores. I have

thought it better to reproduce the existing maps as they stand rather

than to attempt a re-draught which would necessarily be imperfect. Our

vessel, then, below Milaflores is in a tidal channel and will be subject

to some tidal current. By designing this channel so as to avoid a bottle

neck, and by giving it a width of 500 feet, the calculated current will,

however, not exceed 1 foot per second.

The La Boca site for locks was found to be much too exposed to gun fire

and other modes of attack from the sea, whereas the Milaflores site is

not only distant about 5 miles from the shore, but is well sheltered

both by hills near it and by the position of the hilly eminences of the

shore line.

It will be seen from the map that the dredged sea channel by which our

vessel will reach deep water on the Pacific passes to the west of the

Isle of Naos instead of to the east, as was proposed in the earlier

plans.

* * * * *

Returning now to the Gatun locks. The mitre sill of the top lock is 37

feet above mean sea-level, _i.e._, 48 feet below the surface of the

lake, which is 85 feet above mean sea-level. But the bottom of the lake

here is only about 5 feet above sea-level, the total depth of water

immediately above the locks and dam being 80 feet. It follows that, in

the extreme case of both gates of one of the top locks (as well as the

roller gate) being wrecked, the level of the water in the lake can only

fall to the level of +37, which would leave a depth of 32 feet

immediately above the dam. Ships of large draft could therefore lie

there without being stranded. Moreover, the lake is so large that the

outflow through the broken locks would only lower the level 2 feet _per

diem_, so that more than three weeks would elapse before the water sank

to the level of the mitre sill.

Again, the channel provided by the broken lock would be so small that in

the Canal below the calculated current which would result from the

outflow would have a velocity of only 3-1/2 miles per hour.

Above the Pedro Miguel and Milaflores locks there is not the same

surplus depth of water, so that vessels might be grounded if the locks

were broken. Moreover, as there is no wide-spreading lake above Pedro

Miguel, the outflow of water would generate a somewhat swift current

above the lock, which might be a source of danger to ships.

This circumstance serves to enforce the apparent paradox that the great

area of Lake Gatun is in several respects an element of safety, not, as

the layman might suppose, of danger. The hydrostatic pressure upon the

dam depends, of course, solely upon the depth of water, not upon the

area of the lake, while the greater the contents of the reservoir the

more nearly stagnant are its waters.

As there is to be no lock at La Boca, the dams shown there on the plan

and profile will not have to be constructed, so that it is not necessary

to deal with the questions to which they formerly gave rise.

In the vicinity of the locks at Pedro Miguel and Milaflores, however,

dams have to be constructed to hold up the water. At both places the

dams will be short, and will be founded upon hard rock,[16] and in each

case the head of water to be held up will only be about 40 feet, instead

of 80, as at Gatun. The construction of the dams at Pedro Miguel and

Milaflores is not, therefore, regarded with anxiety.

[16] "Canal Zone Pilot," pp. 316-317.

The great Gatun dam remains the one important experiment in the whole

scheme of the high-level Canal, and much attention is being devoted to

the planning of this work. The alluvial foundation is a disadvantage

shared by the Bohio site formerly chosen, and all other sites in the

lower Chagres valley; so that, having decided upon the Panama route, and

a high-level canal, there appears to be no alternative to the

construction of a dam upon this kind of bottom. The details of the

proposed structure, as elaborated in April, 1908, were as follows:--

The length of the great earthen dam at Gatun is 7,700 feet, its breadth

no less than 2,060 feet. The weight of the dam per linear foot is more

than 60 times the horizontal pressure of the water in the lake, so that

the pressure could not move the whole mass; and the weight of the dam is

spread over such a great width that it is not thought that the ground

will sink beneath it. The form of the plan and section is shown on the

map, and an idea of the topography may be obtained from the

photographs, which I took in April, 1908. The south-eastern end of the

dam abuts on the hill of hard, fine-grained, argillaceous sandstone in

which the lock-site is being excavated.

The dam, according to these plans, is not to be merely superposed upon

the surface, as originally proposed in 1905. Embedded in its earthy mass

there is to be a puddled core, and a trench will be excavated to a level

of 40 feet below the sea (-40 feet) for the lower part of this core. Nor

is this all that is to be done to check seepage beneath the earthen dam.

From the bottom of the trench excavated for the puddled core, sheet

piling, made of 4-inch timbers, is to be driven down for another 40

feet, so that sheet piling and puddled core together will form an

impervious barrier to -80 feet; that is to say, 80 feet below the

surface-level of the sea, or about 85 feet below the lowest natural

surface of the ground. The puddled core is carried up through the

earthen dam to the level of +90, that is to say, 5 feet above the level

of the lake, which is to be 85 feet above sea. The crest of the dam will

be +135 feet, _i.e._, 50 feet above the level of the lake; this excess

of height being to provide top weight for increased stability of the

whole structure, and also for the purpose of compacting the underlying

material. The underwater slopes of the earthy materials have been

reduced from the 1:3 of 1905 to 1:5. On the other hand, it has been

decided that the width of 2,625 feet given in 1905 was in excess of

utility, and that a reduction of between 500 and 600 feet can be made

without loss of strength or efficiency.

[Illustration: EXCAVATION IN THE CUT.]

[Illustration: PIPE FOR DIVERSION OF A RIVER, NEAR EMPIRE.]

About half way across the valley occurs a low hill, on which a house is

shown in the photograph. This hill is on the crest-line of the dam, and

is useful as giving support to the sides of the regulating channel which

will be excavated in it. The material of the hill, however, is not the

hard argillaceous sandstone of the lock site, but merely alluvial. The

regulating works themselves will be built of concrete: a solid mass

built up to +69 feet, and on this piers will be constructed 8 feet in

thickness, between which will be the sluice-gates. By their means the

level of the lake will be prevented from rising unduly in flood time.

The capability of the dam to maintain the waters of the lake at a

sufficient level in the dry season depends upon their not finding a

ready way either through the dam itself or below it. The construction of

the dam is believed to guarantee its own practical impermeability. Not

only is there a puddled core, but the mud, sand, and rocks of which the

principal mass will be composed will be laid down in the manner best

calculated to secure compactness. With regard to underground flow, there

is an underlying bed of indurated clay which is regarded as sufficiently

impervious, and wherever the puddled core and piling are imbedded in

that clay it may, I think, be assumed with some confidence that the

leakage will be unimportant. On referring to the section (map), however,

it will be seen that there are in the valley two old river gorges, which

to a depth of 200 and 260 feet are filled only with gravel, sand; sand,

shells, and wood; clayey sand, and so forth. These gorges, measured on

the section shown in the figure, have widths of about 1,200 and 500 feet

respectively at the depth to which the sheet piling goes, and extend

about 120 and 180 feet below. How much water may escape by these gorges

it is difficult to say. This leads us to the next division of our

subject.

_On the Supply of Water Available for the Needs of the High-level

Canal._

The construction of the Suez Canal was a work of excavation pure and

simple. The construction of any kind of canal across the Isthmus of

Panama involves another task, second only in importance to the primary

work of excavation, viz., that of regulating the rivers.

In the case of a sea-level canal the problem would have been how to get

rid of their waters, particularly in the rainy season.

In the actual case of an 85-foot-level canal, the regulation of the

rivers, particularly of the Chagres, presents two aspects, viz.:--

(1) In the wet season, disposing of the surplus waters.

(2) In the dry season, conserving water supplied by the rains so as to

meet the waste caused (_a_) by locking, (_b_) by evaporation, (_c_) by

percolation.

The arrangements for taming the torrents of the Chagres and its

tributaries have already been described. They are, briefly, the

construction of the Gatun dam and its spillway.

Turning to the other aspect of the problem, I have to answer the

question, What is the guarantee that there will be sufficient water in

the dry season?

[Illustration: IN THE CUT, WIDTH 500 FEET.]

[Illustration: IN THE CUT, LOOKING SOUTH TOWARDS CULEBRA.]

Probably there is no problem of the Panama Canal which has received more

prolonged and careful study than this. From the outset the French

engineers commenced collecting data relating to the hydrology of the

Isthmus, and when funds grew low, and the proposed level of the canal

began to rise, the matter received ever-increasing attention. The

_Comite Technique_ of the New Panama Canal Company commenced in 1894

elaborate investigations to determine the catchment area, the amount of

rainfall, and the discharge of rivers. Brigadier-General Henry L. Abbot

(late Corps of Engineers, U.S.A.), whose investigations upon the

Mississippi are known the world over, was a member of this Committee of

the New Panama Company until the work was taken over by the Government

of the United States, for whom he continued to act; and he was a member

of the Board of Consulting Engineers, signing the minority report in

favour of an 85-foot-level canal in January, 1906. A continuous study

for seven years is an advantage enjoyed by few of the American

engineers, and the book on "Problems of the Panama Canal" published by

General Abbot in 1905 (new edition 1907) deals very fully and ably with

the hydrology and meteorology of the Isthmus. The observations were

continued under the direction of Don Ricardo M. Arango, who has also a

long experience on the Isthmus. I shall not attempt to summarise the

mass of data upon which the authorities rely in their calculation that

there is a sufficient water supply for the needs of the Canal during the

dry season, contenting myself with showing, as above, that in this

department of study, which more than all others connected with the Canal

demands long experience, this requisite has in fact been secured. Yet

whatever depends upon climate is liable to unexpected accidents, and

personally I regard as an important safeguard the fact that at

Alhajuela, on the Chagres, 9 or 10 miles above Obispo, there is an

excellent site for a dam, which would form a reservoir where some of the

surplus water of the wet season could be stored, and supplied to the

Canal as required. The details for such a dam were elaborated in

connection with one of the earlier plans of the Canal, so that the

necessary data would be immediately available in case its construction

should become necessary in the future.

_Harbours and Fortifications._

There are no storms in the Bay of Panama, and but little additional

protection from weather is needed there for shipping. The entrance to

the Canal being at La Boca, a new city will grow up there. This will be

the second westward migration of the terminal port, the present city of

Panama lying between Old Panama and La Boca.

Colon is exposed to northers, and protection against the heavy sea which

then rolls in will have to be provided. Whether this will be done by

breakwaters or by forming an interior basin is not yet decided, and the

cost of this part of the Canal works is therefore not yet known.

The Canal, as already stated, is to be fortified; but I made no

inquiries as to the location or character of the proposed

fortifications, a matter which I regarded as outside my province. The

cost of fortifications is included in the provision made by Congress for

the Canal.