_Newfoundland reservoir_.--Pequanac River passes through a deep gorge

between Copperas and Kanouse mountains, just below the village of

Newfoundland. This point has been considered an excellent site for the

construction of a dam, and in the installation of the present

water-supply system of Newark it is proposed that the entire valley in

which Newfoundland is situated be overflowed. The site is one of the

most advantageous known for the creation of a flood-catchment basin. If

a dam 50 feet high were erected across this gorge, a lake would be

formed which would have a surface area of 3.15 square miles and a

capacity of 3,267,200,000 cubic feet, equal to a storage of about 30.5

inches on the 46.12 square miles of contributing drainage area. This

would afford complete protection in case of a sudden run-off of 12

inches, would provide for the supply of the city of Newark without

greatly disturbing the present storage system of that city, and would

still yield a large amount of water for compensating purposes in dry

seasons.

The construction of Newfoundland reservoir would be very expensive, as

it would involve the flooding of Newfoundland Village, in which there is

considerable improved property. About 3 miles of the track of the New

York, Susquehanna and Western Railroad would be submerged, as well as a

considerable mileage of macadamized highways. On the whole, however, the

Newfoundland reservoir project is the most favorable which can be found

on the Pequanac Basin. There are above this point numerous reservoir

sites, but their combined capacity would not be equal to that of the

proposed Newfoundland reservoir, and the construction would be probably

quite as expensive.

_Stickle Pond reservoir_.--Below Newfoundland there are few available

places at which water could be stored. Stickle Pond is probably the best

adapted of any of those available. If a dam 1,050 feet long and 80 feet

high were erected across the river about 1 mile below the present outlet

of Stickle Pond, a lake would be formed having a surface area of 422

acres and a storage capacity of about 800,000,000 cubic feet. The

drainage area above this dam would be approximately 4 square miles. This

is a comparatively small amount of storage, yet it would provide for all

flood catchment in that comparatively limited area and would be of

assistance at times in compensating the dry flow of the Pequanac.

ROCKAWAY SYSTEM.

Rockaway River offers a greater number of available reservoir sites than

either of the other highland tributaries of the Passaic. Some of the

reservoirs which could be constructed could be used solely as catchment

areas to hold back flood waters, while the capacity of others would be

so much greater than any single flood run-off that they might serve also

as compensating reservoirs. A large dam is now in process of erection at

Old Boonton, conserving a considerable amount for the water for the

municipal supply of Jersey City. This reservoir can not be depended upon

as a flood-catchment area, as it will be the aim of those in authority

to maintain the water in it as high as possible.

_Powerville reservoir_.--A short distance above Boonton the erection of

a comparatively small dam would flood a large, irregular, flat basin

having an area of a little more than 4-1/2 square miles and extending up

the Rockaway Valley to Rockaway Village, up Beaver Brook to Beech Glen,

and north and south for considerable distances. The probable capacity of

this reservoir has been estimated, and it is fairly certain that it is

considerably more than would be sufficient for flood catchment. Its

construction would, moreover, improve the entire valley and be of

advantage to many interests.

The northern New Jersey flood commission has selected for investigation

a reservoir site on Rockaway River at Powerville. By the erection of a

dam across the stream at this point, 28 feet in height and 470 feet

long, a reservoir 4.6 square miles in area, with a capacity of

1,565,000,000 cubic feet, would be afforded. The drainage area above

this point is 114 square miles. The cost of such a reservoir is

estimated at $600,000.

North from Powerville, near the confines of the proposed Powerville

reservoir, there is an available reservoir site along Stony Brook. By

the erection of a dam 1,100 feet long and 120 feet high a lake would be

formed 645 acres in extent, which would serve as a flood-catchment basin

and a compensating reservoir. This reservoir would hold approximately

850,000,000 cubic feet. The construction of a reservoir at this place

offers no engineering difficulties, and the project may be regarded as

extremely favorable.

Dixons Pond, west of Rockaway Valley and northwest of Powerville, is a

small sheet of water which lies in a valley which might be flooded to a

greater height. By the erection of a dam 450 feet long and 30 feet high

a lake of 136 acres would be created, which would form a part of the

flood catchment and compensating service.

_Longwood Valley reservoir_.--A large storage basin is afforded in

Longwood Valley which, if developed to its full extent, would extend

from a point about a mile below Lower Longwood 7 miles up the headwaters

and reach to about 1-1/2 miles above Petersburg. An alternative

proposition is afforded which involves the submerging of less than half

this area.

A dam 800 feet long and 55 feet high might be erected across a gorge

about 1 mile south of Petersburg. There would be formed a lake of about

1.247 square miles, or 800 acres in extent. The hamlet of Petersburg

would be submerged, but the damages from the destruction of improved

property would not be very great, as the improvements and the land are

not especially valuable. This reservoir would have a capacity of about

964,000,000 cubic feet and the surface would be at a height of 800 feet

above sea level.

The alternative plan, that of using a longer stretch of the valley for

reservoir purposes, would involve the construction about 1 mile below

Lower Longwood of a dam 1,300 feet long and 110 feet high. The reservoir

thus formed would be 1,900 acres in extent and contain approximately

3,447,000,000 cubic feet. The drainage area above this dam is limited,

and if the reservoir were drawn down to an amount equivalent to 15

inches upon the drainage area there would still remain an enormous

amount of water which could be used in a compensatory way to tide over

dry seasons.

_Splitrock Pond._--By erecting a dam 550 feet long and 30 feet high

across a gorge at the outlet of Splitrock Pond, a lake could be formed

having an area of 625 acres and adding to the present storage capacity

of the lake an amount approximately equal to 475,000,000 cubic feet,

equivalent to 38.75 inches on the drainage area.

Thus it is seen that if this reservoir were drawn down an amount

equivalent to 15 inches on the drainage area, which would without doubt

give sufficient protection from all floods, there would still remain a

storage capacity of 23.75 inches for compensating purposes in addition

to the amount now available in Splitrock Pond. This project is one of

the most attractive in the Rockaway Basin, as the damages which would be

caused by flooding would be, comparatively speaking, nil. The property

is, however, now owned by the East Jersey Water Company, and is prized

highly as a reservoir site by that corporation.

UPPER PASSAIC BASIN.

_Millington reservoir._--There is an area of swamp land, comprising a

part of the drainage area of upper Passaic River above Millington, which

is known as Great Passaic Swamp. It is bounded on the south by a long,

narrow trap ridge known as Long Hill, the summit of which ranges from

400 to 500 feet in elevation, or roughly 200 feet above the border of

this swamp. To the northwest the land rises gradually toward Trowbridge

Mountains, while to the northeast is the terminal moraine. The outlet of

Passaic River at Millington is by a narrow gorge, which offers natural

facilities for the erection of a dam.

The whole situation is exceptionally good, and the surface of a

reservoir might be fixed at any elevation between 240 and 300 feet above

sea level. With the surface of the reservoir at 300 feet a dam 1,600

feet long and 90 feet high would be required. This lake would have an

area of 28.46 square miles. The drainage area above Millington has,

however, an area of only 53.6 square miles, and the proposed reservoir

would therefore cover more than half of this. Therefore the conservation

of so large a quantity of water would not be necessary nor advisable,

unless the beautifying of the surrounding country were an object to be

taken into consideration, which might be profitable.

A better project, however, would be to construct a dam at Millington 900

feet long and 50 feet high, the crest being about 260 feet above sea

level. There would be formed a lake with an area of 19.41 square miles,

and a capacity of 1,477,600,000 cubic feet, equal to 9.864 feet on the

drainage area. This project is too great for the necessities here

presented, and would not be wisely considered unless it were found

advantageous to improve the country generally as a place of suburban

residence. The land which would be flooded with the reservoir crest at

260 feet is of a wet, swampy character, and its value for agricultural

purposes is somewhat doubtful. Such construction would involve the

flooding of 13 miles of road, which, however, would not involve a great

loss of invested capital, as the roads generally are of a poor

character.

A second alternative would involve the construction of a dam across the

Millington gorge, 550 feet long and 30 feet high, raising the water to

240 feet above sea level and creating a lake of 14.40 square miles. This

would conserve 4,026,000,000 cubic feet, equal to 2.69 feet on the

drainage area. This would be ample for flood purposes and would still

afford a large impounded area, as the drawing off of an amount equal to

10 or even 15 inches on the watershed would not reduce the size of the

lake to any great extent.

The whole project here presented involves few difficulties, and as the

drainage area above is of small extent, the mere question of conserving

the flood waters could be met without great difficulty. The natural

advantages, however, are so great and the land included within Great

Passaic Swamp is of so little value that the surrounding country would

be improved and beautified by the construction of such a reservoir. The

opportunity for varying the character of the reservoir to meet the ideas

of those interested seems unexampled, and as a whole it presents an

extremely interesting field which may be profitably exploited.

SADDLE RIVER.

This stream has been described in the report on the flood of 1902,

already referred to. It contributes a large amount of water to the main

artery of the Passaic below Dundee dam, and as the river channel at that

point is overburdened under the present conditions because of lack of

slope and numerous catchments, together with what is known as the

Wallington Bend, it increases very materially the damage caused by

floods.

The most effectual remedy in the case of Saddle River floods is that of

construction of flood catchments. No studies have been made of the

situation in the Saddle River drainage area, but a superficial

inspection of the basin shows that opportunities for the construction of

flood-catchment reservoirs are not numerous.

SUMMARY OF FLOOD-CATCHMENT PROJECTS.

By following the plans described in the preceding pages absolute flood

catchments may be provided above Little Falls on the Passaic Basin for

551.7 square miles, leaving only 221.2 square miles from which flood

run-off would flow immediately. The accomplishment of this would involve

the construction of Pompton reservoir, which would withhold all flood

waters from the northern tributaries. It would leave unprovided for 20.2

square miles on the Rockaway, 71.7 square miles on the Whippany, 46.2

square miles on the upper Passaic, and 83.7 square miles tributary to

the Central Basin and not included above.

Leaving Pompton reservoir out of consideration, and conserving flood

run-off on the Ramapo, Wanaque, and Pequanac rivers, there would be

absolute flood catchment up to a 12-inch run-off over 494.8 square miles

above Little Falls. This would leave 278.1 square miles unprovided for,

the run-off from which would not overburden the channel in the lower

valley, provided, of course, that channel were improved to a maximum

carrying capacity.

PREFERABLE RESERVOIR SITES.

The following table and discussion of preferable sites for flood

prevention are taken from the report of the engineering committee of the

northern New Jersey flood commission:

Table showing detailed facts regarding possible reservoir sites on

Passaic drainage basin.

KEY:

A: Area of watershed.

B: Area of reservoir.

C: Height of dam.

D: Length of dam.

E: Elevation of flow line.

F: Storage, watershed.

G: Storage capacity.

H: Total cost.

--------------+-----+------+-----+------+------+-------+-------+---------

Reservoir. | A | B | C | D | E | F | G | H

--------------+-----+------+-----+------+------+-------+-------+---------

| Sq. | Sq. |Feet.| Feet.| Feet.|Inches.|Million|

| mi. | mi. | | | | | c.f. |

Ramapo | 140 | 2.8 | 65 | 1,700| 280 | 5.5 | 1,768 | $900,000

Wanaque | 83 | 2.1 | 60 | 1,200| 275 | 7.7 | 1,491 |1,000,000

Newfoundland | 52 | 1.8 | 40 | 430| 780 | 8 | 966 |1,800,000

Rockaway | 114 | 4.6 | 28 | 470| 520 | 6 | 1,565 | 600,000

Millington | 56 | 15.8 | 25 | 220| 245 | 31 | 4,060 | 370,000

Great Piece | 773 | 37 | 21 | 1,500| 178.5| 9[C]| 8,950 |2,625,000

Mountain View | 380 | 13.4 | 42 | 2,150| 202 | 8 | 7,200 |3,340,000

Do. | 380 | 13.9 | 44 | 2,380| 204 | 9 | 7,900 |3,460,000

Do. | 380 | 14.3 | 46 | 2,470| 206 | 10 | 8,700 |3,590,000

Do. | 380 | 17.4 | 60 | 3,000| 220 | 17 |15,000 |5,260,000

--------------+-----+------+-----+------+------+-------+-------+---------

[Footnote C: Including water discharged through fixed openings,

in a flood similar to that of October, 1903.

Maximum discharge, 12,000 cubic feet per second.]

With the exception of the Millington reservoir site where the cost

of the dam is a small factor, the elevation of flow line in the

various reservoirs which determines the capacity was fixed so as to

afford an approximate storage equal to a run-off of about 8 inches

from the drainage area above each dam site. This amount is somewhat

in excess of the run-off for the flood of October, 1903. It was

found impracticable on the Rockaway reservoir site to provide for a

storage greater than 6 inches. On the Wanaque the amount which can

be stored falls slightly under 8 inches, while on the Ramapo it is

possible to obtain only 5-1/2 inches, by reason of the fact that

with a greater storage capacity the slack water would reach into

New York State. The economical height for a dam at the lower end of

the Great Piece Meadow, if such dam is provided with fixed

discharge openings which will carry a maximum outflow of 12,000

cubic feet per second, will provide a reservoir which will dispose

of a run-off of 9 inches on the drainage area above.

The following combinations of reservoir sites, with their

respective drainage areas, proportional storage, and estimated

costs, give the facts necessary for final deductions:

--------------+---------------+-----------+---------------+-----------

| Drainage | Water | Equivalent |

Site. | area. |collected. | area | Cost.

| | | retarded. |

--------------+---------------+-----------+---------------+-----------

|_Square miles._| _Inches._ |_Square miles._|

Ramapo | 140 | 5.5 | 96.25 | $900,000

Wanaque | 83 | 7.7 | 80 | 1,000,000

Pequanac | 52 | 8 | 52 | 1,800,000

Rockaway | 114 | 6 | 85.5 | 600,000

|---------------+-----------+----------------+----------

Total | 389 | | 313.75 | 4,300,000

|=======================================================

Ramapo | 140 | 5.5 | 96.25 | 900,000

Wanaque | 83 | 7.7 | 80 | 1,000,000

Rockaway | 114 | 6 | 85.5 | 600,000

Millington | 56 | 31 | 56 | 370,000

Total | 393 | | 317.75 | 3,870,000

|=======================================================

Great Piece | 773 | 4.5 | 435 | 2,625,000

Mountain View | 380 | 8 | 380 | 3,340,000

--------------+---------------+-----------+---------------+-----------

The necessity to retard the flow of or provide storage for

approximately 380 square miles of highland drainage area has been

determined after careful study, and there has been deduced an

amount which may safely be expected to represent the maximum for

the highest floods. When the highland tributaries are sufficiently

checked the natural storage on Great Piece Meadow in its effect

upon flood control becomes more apparent. Our investigations show

that the holding back of the flood flow--that is, 8 inches run-off

on approximately 380 square miles of flashy drainage area above

Great Piece Meadow--is necessary to reduce the discharge in the

river through the city of Paterson to 14,000 cubic feet per second

for a flood similar to that of 1903.

From the foregoing table, in which different reservoir projects are

compared, it is seen that only the reservoirs designated as Great

Piece and Mountain View will fulfill the requirements within a

reasonable limit of cost. It is also shown that a combination of

any other available sites would involve the expenditure of more

money for their construction and the control of less tributary

drainage area than is fulfilled by the demands of the Passaic

drainage basin. We are therefore brought to the conclusion that

only two of the projects above set forth will be effective. First,

the construction of a regulating dam on the main stream above

Little Falls, which we have called the "Great Piece" Meadow

Reservoir, and second, the building of a dam at Mountain View

across Pompton River. The relative cost of these reservoirs,

constructed for flood control exclusively, is $2,625,000 for that

on Great Piece Meadow and $3,340,000 for the Mountain View site.

Details of these estimates are as follows:

_Estimate of cost of Great Piece Reservoir, dam at Little Falls._

[Elevation of flow line, 178.5 feet. Storage and disposal of 9 inches

collected.[D]]

Earth excavation, 17,600 cubic yards, at 35 cents $6,160

Rock excavation, 8,800 cubic yards, at $2 17,600

Rubble masonry, 29,100 cubic yards, at $5 145,500

Ashlar masonry, 1,800 cubic yards, at $12 21,600

Facework of rubble masonry, 2,850 square yards, at $1.50 4,275

Concrete masonry, 250 cubic yards, at $6 1,500

Slope paving, 300 cubic yards, at $2 600

Crushed stone, 150 cubic yards, at $1.50 225

60-inch cast-iron pipe in place, 360 tons, at $35 12,600

Relocation of railroads, Erie, 5 miles, at $20,000;

Delaware, Lackawanna and Western, 4.5 miles, at $40,000 280,000

Relocation of highways 170,000

Real estate:

Above Mountain View 500,000

Additional for village of Singac 100,000

22,000 acres, at $50 1,100,000

----------

2,360,000

Add for engineering and contingencies 240,000

----------

2,600,000

Protection of pipe lines, Newark and Jersey City 25,000

----------

2,625,000

The effectiveness of a reservoir built upon the lines proposed in

the case of Great Piece Meadow depends upon the adjustment of

outflow so that the channel below will not be overborne, while at

the same time sufficient storage capacity is afforded to hold

temporarily the water which enters above the dam in amount greater

than the carrying capacity of the outflow apertures. The dam across

Passaic River above Little Falls would be provided with apertures

which would discharge 12,000 cubic feet per second under the

maximum head in the storage basin. As the flood rises these

apertures would discharge a constantly increasing amount of water

to the maximum, and for a considerable time thereafter the maximum

would be maintained, the discharge decreasing after the flood

according to the height of water remaining in the reservoir.

[Footnote D: Includes water discharged through fixed openings for a

flood similar to that of October, 1903. Maximum flow, 12,000 cubic feet

per second.]

_Estimated cost of Mountain View Reservoir._

[Elevation of flow line, 202 feet. Storage of 8 inches on watershed.]

Earth excavation:

Stripping dam base, 83,500 cubic yards, at $0.30 $25,050

Core wall trench, 24,900 cubic yards, at $1 24,900

Rock excavation, 10,100 cubic yards, at $2 20,200

Rock fill in dam, 197,000 cubic yards, at $1.25 246,250

Rubble masonry, 23,200 cubic yards, at $5 116,000

Concrete, 30,000 cubic yards, at $6 180,000

Gate chambers and tunnels 65,000

Reconstruction of highways 142,400

Reconstruction of railroads 815,000

Real estate 1,360,000

----------

2,994,800

Engineering and contingencies 325,200

----------

3,320,000

Protection of Newark pipe line 20,000

----------

Total cost 3,340,000

[Same for elevation of flow line, 204 feet. Storage of 9 inches on

watershed.]

Earth excavation:

Stripping dam base, 85,200 cubic yards, at $0.30 $25,560

Core wall trench, 26,000 cubic yards, at $1 26,000

Rock excavation, 10,600 cubic yards, at $2 21,200

Rock fill in dam, 214,000 cubic yards, at $1.25 267,500

Rubble masonry, 24,500 cubic yards, at $5 122,500

Concrete, 30,500 cubic yards, at $6 183,000

Gate chambers and tunnels 65,000

Reconstruction of highways 142,400

Reconstruction of railroads 815,000

Real estate 1,435,000

----------

3,103,160

Engineering and contingencies 336,840

----------

3,440,000

Protection of Newark pipe line 20,000

----------

Total cost 3,460,000

The final recommendation of the committee involves the

consideration of two projects for flood storage, one on Great Piece

Meadow and the other above Mountain View on the Pompton. In making

such recommendations the committee is of the opinion that it must

take into account matters of engineering policy with regard to

future needs and contingencies, as well as the bare necessities of

the present.

If there were none other than the single problem of prevention the

committee would advise the construction of the reservoir on Great

Piece Meadow by reason of its smaller probable cost and its equal

efficiency. It is plain, however, that there are many important

features of public policy involved in the subject at hand.

Population in the valley of the Passaic is developing so rapidly

that in only a few years the present sources of water supply will

be inadequate. The whole subject of water supply for northern New

Jersey demands immediate consideration, and it would not be wise to

take up the matter of prevention of flood damage in the Passaic

without basing the value of every project upon its adaptability

for use in future water-supply needs.

By expending $2,600,000 a great reservoir could be constructed upon

Great Piece Meadow which could not be adapted for any purposes

except to regulate floods; it would stand in season and out of

season a huge feature of the valley and entirely useless and

inoperative save on the occasion of high water. However great might

be the needs of the inhabitants of the Passaic Valley for a

conserved water supply, the construction on the meadows,

representing an enormous expenditure, would furnish no solution of

the problem. It would admit of no enlargement for water-supply

storage and would be available for no purpose except flood

regulation.

When we consider the Mountain View project, however, we find that

as a measure for the prevention of flood damages it fulfills all

the requirements and provides in addition all the possibilities and

advantages demanded inevitably in the near future. The Mountain

View site is an ideal one for the reservoir, and its initial

development for flood catchment does not involve the expenditure of

a dollar that would be lost in the development of the basin to

greater capacities for water supply. From its lowest level, at 202

feet above tide, to its maximum capacity, at a level of 220, there

would be no depreciation. Every dollar spent in the initial

construction would be effective in the maximum development.

The probable cost of Mountain View reservoir, estimated at

$3,340,000, exceeds that of Great Piece by $700,000. It is realized

that to many persons this margin may seem very wide. Let us

consider briefly just what it really represents.