The first plan involves the construction at selected localities of

reservoirs of sufficient size to hold all or a greater part of the

waters which run over the surface during and after storms. This plan is

not practicable except where valleys or plains are inclosed by high

ridges and these ridges approach sufficiently near each other to admit

of the economical construction of a bank or dam across the gorge or bed

of the stream which flows through, so that the inclosure will be

complete and form a water-tight basin. Where such a reservoir exists the

water can be held back and gradually let down through properly provided

gates so that the channel will not be flooded.

For flood purposes alone it would be necessary to provide reservoirs of

sufficient capacity to contain the run-off waters resulting from the

largest storms. With such provisions it would be necessary to entirely

empty the reservoir as soon as possible after a storm had passed and

leave its full capacity available for the next storm. It is therefore

better, wherever possible, to provide a reservoir capacity considerably

larger than that represented by the run-off from the heaviest storms, so

that water may be stored for use as power or domestic supply. With such

provision it is necessary merely to draw from the reservoir water to a

depth equivalent to the stream run-off in the drainage area above.

The second plan for prevention of flood damages involves provisions for

letting the flood water out rapidly by removing obstructions to its flow

by straightening and deepening the channels and providing long

embankments, dikes, or levees which rise above the ordinary river level

to a height exceeding that of the stream during its highest floods. This

plan is most generally followed in the case of large rivers like

* * * * *

U. S. GEOLOGICAL SURVEY WATER-SUPPLY PAPER NO. 92 PL. VI

[Illustration: _A._ DEVASTATION IN HEBREW QUARTER, PATERSON, N. J.]

[Illustration: _B._ A COMMON EXAMPLE OF FLOOD DAMAGE.]

U. S. GEOLOGICAL SURVEY WATER-SUPPLY PAPER NO. 92 PL. VII

[Illustration: _A._ INUNDATED LANDS AT PASSAIC, N. J.]

[Illustration: _B._ UNDAMAGED BRIDGE ACROSS PASSAIC RIVER AFTER PARTIAL

SUBSIDENCE OF FLOOD.]

* * * * *

the Mississippi, where the contributing area is enormous and the

conservation of the waters would be impracticable even if the nature of

the country would admit of the construction of reservoirs. In

Switzerland, where the torrents occasioned by the rapidly melting snows

are especially destructive, the flood waters are confined by a series of

parallel dikes on each side of the river, which have the effect of

dividing the flow into several parallel streams. As the main river

channel fills and overflows the inner dikes, the overflow water collects

into the first series of parallel channels, and when a height is reached

at which the second dikes are overflowed the water collects into the

third, and so on. This gives an enormous carrying capacity, the limit of

which is approached slowly, and therefore abundant opportunity is

afforded for preparation upon the part of the riparian owner.

The drainage basin of Passaic River is admirably adapted to the

development of the conservation system. At its headwaters in the

mountains of northern New Jersey are numerous sites for reservoirs. The

comparatively limited area draining into Passaic River makes such a

scheme relatively inexpensive. On the other hand there is abundant

opportunity for effective work in removing obstructions and

straightening and deepening the channel of the lower river. So that, all

things considered, the prevention of flood damages in the Passaic Basin

can be best accomplished by a combination of the two general methods

above outlined.

LOWER VALLEY IMPROVEMENTS.

The channel of Passaic River below Great Falls, at Paterson, is of

limited capacity. To anyone making an inspection, especially within the

city of Paterson, it is readily apparent that the river bed has for

years been considered a legitimate field for encroachment. Owners of

lands fronting on the river have increased their holdings by filling in

beyond the channel line. Buildings have been erected upon these tracts

and the builders have not hesitated to extend retaining walls still

farther into the river bed. Refuse from the city's streets, light and

unstable in character, has been freely deposited upon the bank to be

carried out into the river. Thus the channel has been constricted

laterally, the bottom raised, and there is left for the flood waters no

alternative than that of extending themselves in the upward direction.

It would seem that this, at least, should have been unobstructed. Such,

however, is not the case.

The bridges across the Passaic have apparently been erected without

reference to channel capacity. The authorities have evidently considered

it more important to retain established approach levels than to provide

proper capacity for river water. As an example the following instance

may be cited: During the flood of 1902 a steel truss bridge across the

river in Paterson was carried away. The point of crossing was one of

the narrowest places in the stream and it should have been clear to

everyone that the space beneath the bridge was not large enough to carry

flood waters. It should have been apparent that a new bridge, if erected

at that point, must be higher than the old one, to be thoroughly safe.

Notwithstanding, the new bridge was erected at the level of the old one,

and in addition to this, it was a concrete arch structure, and the great

piers and low arch springs reduced the former channel capacity about 15

per cent. This new bridge, as might be expected, collapsed during the

October flood.

Along the entire course of the stream in the lower valley we find a

continuation of instances of unreasonable encroachment and

ill-considered bridge engineering, and there is opportunity for

relieving a large part of the purely local obstructions by straightening

the channel at chosen points.

Although this matter has not been thoroughly investigated it is readily

apparent to one traversing the river bank that considerable relief may

be secured in this manner. Damage, however, can not be prevented by this

means alone. It would, of course, be possible to erect high and

resistant levees along the entire course of the river, but this would be

extremely expensive and would destroy the water front for commercial

purposes. In fact, such a plan is quite visionary. At the present time

there are no obstructions in lower Passaic River the removal of which

would give relief in the event of floods like those of 1902 and 1903.

When one considers the amount of water which was carried into the lower

valley, the heights which it reached, and the area which it inundated,

the futility of any local improvement except levee construction is

emphasized. The present channel of the river will not carry without

damage the amount of water recently thrown into it, and while it is

important to provide regulations which will in the future prevent

encroachment, and which will correct the evils now present along the

channel, these measures can not, operating of themselves, give relief

from flood devastation. Immunity from flood destruction in the Passaic

must come, if it ever comes, from the construction of flood-catchment

reservoirs in the uplands.

It is not necessary to spend any great amount of time in determining the

cause of floods upon the Passaic. A review of the flood history of this

river shows that in every case floods arise from extraordinary

precipitation. High waters occur through the melting of snows and during

periods of abundant rain. The heavy floods which have been regarded as

extraordinary are clearly the result of unusual conditions of

precipitation. The river carries the usual flood waters, and no damage

is done until the water poured into it is far beyond its carrying

capacity. Therefore the provisions which are made for preventing damage

by floods must, if they be effective, be designed to meet extraordinary

conditions, and means which would prove effectual in ordinary cases

will not stand the test. In order to appreciate the extent of the flood

in the lower valley it is necessary to visit the flooded area and

observe the points of flood height. Unless one does this he will be very

readily deceived when he considers means of flood prevention.

FLOOD CATCHMENT.

Among the highland tributaries of Passaic River there are three

principal areas where storage reservoirs for flood catchment may be

placed: (1) The Ramapo, Wanaque, and Pequanac drainage basins, from

which the waters are carried into the central basin by Pompton River;

(2) the Rockaway drainage basin, and (3) the upper Passaic drainage

basin. The remaining principal tributary of Passaic River, the Whippany,

is not well provided with storage reservoir sites. The combined capacity

of catchment reservoirs which could be constructed in these drainage

areas is considerably more than the volume of the heaviest known

rainfall, that of October 8-11, 1903.

In the description of reservoir possibilities in the following pages the

data with reference to many of the basins are computed from planimeter

and other measurements, the United States Geological Survey topographic

maps being used as a base. The measurements are therefore not of refined

accuracy but suffice for the purpose in view--that of showing flood

catchment possibilities.

POMPTON RESERVOIR.

There are in the Pompton system several sites on Ramapo, Wanaque, and

Pequanac rivers which, if utilized, would afford sufficient storage for

flood catchment purposes, but the entire flow of the river system may be

conserved in what has been described as the Pompton reservoir. This

project was first presented by Mr. C. C. Vermeule in the year 1884, the

details being described at some length in the Engineering News, of April

12 of that year, pages 169-171. In this article Mr. Vermeule presented

the possibilities of Pompton reservoir for use as an additional water

supply for the city of New York, at the time when the Quaker Bridge

reservoir on the Croton watershed was being considered. A few pertinent

quotations from this article may be of interest:

This basin, subdivided by minor ridges which cross it, furnishes

several admirable sites for large storage reservoirs, with

catchments from 50 to 400 square miles in area, lying above on the

primitive rock of the Highlands. About 6 miles of the northeastern

end of the basin is cut off by Hook Mountain, a small ridge of trap

which crosses it from east to west, inclosing a basin 21 square

miles in area, known as Pompton Plains, having its outlet at

Mountain View, 5 miles west of Paterson, at a pass in Hook

Mountain, through which the Pompton River flows to join the

Passaic, 2 miles below. This pass is the gateway by which the

Delaware, Lackawanna and Western Railroad, the New York and

Greenwood Lake Railway, and the Morris Canal enter the plains. The

basin is also crossed near its head, above Pompton, by the New

York, Susquehanna and Western Railroad.

The Pompton River has a drainage area above Mountain View of 420

square miles. It is formed near the head of the basin by the

confluence of the Pequanac from the northwest, the Wanaque from the

north, and the Ramapo from the northeast. * * *

The entire flow from this watershed may be stored by building a dam

across the gap at Mountain View and converting Pompton Plains into

a great lake covering an area of 21 square miles. The elevation of

the river at the gap is 168 feet. The slopes in the basin being

gentle up to an elevation of 220 feet and abrupt beyond it, it will

be advisable to take this as the minimum or low-water level of our

reservoir. It is generally estimated that 25 per cent of the volume

of the mean annual rain on a given catchment is sufficient

reservoir capacity to fully utilize the flood flows. We have long

series of observations of rainfall at three points, which may be

taken to fairly represent the Passaic catchment. At Newark the mean

annual rainfall is 46.2 inches, at Paterson, 50 inches, and at Lake

Hopatcong, 42. The last being on the Highlands, like most of our

watersheds, is perhaps the safest to use. Now, 25 per cent of 42.5

inches, 10.62 inches, which, on 420 square miles, give a volume of

10,362,000,000 cubic feet, the necessary capacity of reservoir.

By raising our reservoir to 240 feet when full we secure a capacity

of 10,493,000,000 cubic feet, or ample to utilize the heaviest

floods of the watershed. This gives a beautiful sheet of water 21.1

square miles in area, with bold, rocky shores, and a depth at dam

of 72 feet. We secure the above capacity by uncovering but 22 per

cent of the reservoir bottom; and, as we shall presently see, we

shall rarely need more than half this storage, and probably not

oftener than once in ten years will we expose over 10 per cent of

the area. By building side dams to keep certain flats always flowed

this may be reduced to 5 per cent; and this area will be pretty

evenly distributed around 36 miles of uninhabited shore line,

leaving the reservoir open to no valid sanitary objections. On the

contrary, by relieving the remainder of the Passaic Basin of the

flood waters of the Pompton, which now flow large areas of flat

land during wet seasons, the sanitary condition of the valley would

be much improved.

In constructing this reservoir Mr. Vermeule stated that the following

work would be necessary:

The removal of the Delaware, Lackawanna and Western Railroad from

the basin by changing the alignment for 6 miles. It may be done

without increase of length or detriment to the alignment.

Three and one-fourth miles of the Morris Canal must be rebuilt. No

engineering difficulties are involved.

Of the New York and Greenwood Lake Railway, 9 miles would have to

be rebuilt.

The New York, Susquehanna and Western Railroad would be slightly

shifted or raised for 3-3/4 miles.

A dam 2,400 feet long and 80 feet in height, with tunnels,

wasteweir, and accessory works would be required at Mountain View.

The situation is such that an ample wasteweir may be built at a

low-side dam on the solid rock of Hook Mountain remote from the

dam, and outlets may be had by tunneling the same ridge. Hence the

dam may be a plain, heavy earthen embankment; built, of course,

with every precaution but subject to less than the usual dangers of

such works. However, a masonry dam might readily be substituted.

There would be 14,000 acres of arable land, swamps, and rough

mountain land flowed.

The works are estimated to cost as follows:

Railroad and canal diversions $505,000

Dam and accessory works 1,162,000

Land damages 1,400,000

_________

Total 3,067,000

A recomputation of the drainage area above Mountain View, made by the

northern New Jersey flood commission, shows that it is 380 square miles

in extent. It was decided by this commission that the construction of

this reservoir would be the most approved method of preventing

disastrous floods in the lower valley of the Passaic. By raising a dam

to a height of 202 feet above tide, 8 inches of water on the drainage

area above might be held back, which, it was believed, would be a

sufficient maximum for flood catchment. With this amount of storage the

estimates of the flood commission showed that the remainder of the

drainage area would not turn a sufficient amount of water into the lower

valley channel to cause flood damages.

It was also demonstrated by the flood commission that by increasing the

height of the dam an opportunity would be afforded for conserving water,

and at the maximum height of 220 feet above tide sufficient storage

capacity would be available to provide 5,000 horsepower at Little Falls,

Great Falls, and Dundee dam throughout all dry seasons. The value of

such a storage reservoir for municipal water-supply purposes is

self-evident.

The cost of Mountain View reservoir would be about $3,340,000. Developed

for flood catchment with the spillway of the dam at 202 feet above sea

level the area of the reservoir would be 13.4 square miles, and the

storage capacity 7,200,000,000 cubic feet.

RAMAPO SYSTEM.

Along the Ramapo Valley there are alternative propositions, one of which

involves the construction of a dam below Darlington and another across

the head of Pompton Lake.

In either case the water might be raised to the 300-foot contour, and if

the dam across Pompton Lake were constructed a continuous lake would be

formed extending 10-1/2 miles to Hillburn, N. Y. The improvement in

either case would be positive, for as the country surrounding is hilly

or mountainous it affords excellent opportunity for the location of

summer homes and parks, the lake being a potent factor in beautifying

the situation and increasing the value of the surrounding region. There

are, nevertheless, several things to be taken into consideration, the

most important of which are the improvements which have been made by

wealthy residents along the valley where it has already been developed

as a summer resort.

By the construction of a dam at Darlington 1,100 feet long and 70 feet

high, the water would be raised to the 300-foot contour. The reservoir

would have a water area of 2,064 acres, and the approximate storage

capacity of 2,325,000,000 cubic feet.

A dam across the head of Pompton Lake 2,850 feet long and 100 feet high

would raise the surface of the proposed lake to the 300-foot contour.

This reservoir would have an area of 6.19 square miles and a capacity

of 6,300,000,000 cubic feet, equal to 17.5 inches run-off from the

drainage area. Here the measure of safety is wide, and if there were

drawn from the lake an amount of water equal to 12 inches on the

drainage area there would still be 5.5 inches which could be used for

compensating purposes.

The construction of either one of the above-described reservoirs would

involve interstate complications, as the 300-foot contour in Ramapo

Valley includes a considerable part of the State of New York. This

obstacle was deemed insurmountable by the northern New Jersey flood

commission, and that commission directed studies to a reservoir which at

the time of maximum flood would not back water into New York State to a

greater height than it already rises during such floods. The following

description is taken from the report of the engineering committee of the

flood commission:

An admirable dam site is offered on Ramapo River about 2 miles

above Oakland village. The drainage area tributary to this point is

about 140 square miles in extent, the country for the most part

being quick-spilling and upland. By constructing there a dam 700

feet long and 65 feet high a reservoir with a water surface of 2.8

square miles would be afforded, the flow-line elevation being 280

feet above tide. The capacity of such a reservoir would be

1,768,000,000 cubic feet, equal to about 5.5 inches on the drainage

area.

WANAQUE SYSTEM.

Near the headwaters of Wanaque River is Greenwood Lake, a large body of

water described in Water-Supply Paper No. 88. Its value as a flood

catchment basin is somewhat uncertain, as it is used as a storage feeder

for Morris Canal. The surface level of this lake is controlled by gates,

which naturally are operated by the canal authorities for the benefit of

the canal. Therefore it is the object to store as great a volume of

water as possible, and the water falls below the dam crest at the outlet

of the lake only when the dam opens in dry seasons and makes it

necessary. Under such conditions there is no certainty that storage

capacity will be available during the time of a great storm, and in fact

Greenwood Lake has been overflowing at the commencement of the storms

which caused both of the recent floods.

In view of the condition expressed above it will be necessary in

providing for flood catchment in the Wanaque drainage area to omit

entirely from consideration the possibility of assistance from Greenwood

Lake. Below this point in the basin are several sites at which could be

raised dams, which would effectually retain a large proportion at least

of storm run-off. They may be described as follows:

_Midvale reservoir_.--By building a dam 60 feet high and 1,200 feet long

across Wanaque River near Midvale, a reservoir would be formed which

would have a water surface of 2.1 square miles and a capacity of

1,491,000,000 cubic feet. The drainage area above this site is 83 square

miles, and the storage capacity would therefore be equal to about 7.7

inches on the drainage area. The construction of this project would

involve the relocation of about 4-1/2 miles of the New York and

Greenwood Lake Railroad; the damages apart from this would be nominal,

the cost of the entire reservoir construction being about $1,000,000.

_Ringwood reservoir_.--Ringwood Creek runs through a gorge about 1 mile

above its confluence with the Wanaque. Above this is a well-defined

basin. A dam about 70 feet high and 585 feet long would create a lake

having an area of 520 acres, the surface of which would be 380 feet

above sea level. The drainage area tributary to this point has an area

of about 20 square miles, and as the proposed reservoir would have a

capacity of 915,800,000 cubic feet, there could be conserved a run-off

of 20 inches. Allowing for a flood run-off of 12 inches there would

still be available for compensating purposes 8 inches on the basin,

equal to 373,550,000 cubic feet. The construction of this reservoir

would involve the relocation of about 2 miles of the Ringwood branch of

the New York and Greenwood Lake Railroad, and the condemnation of

comparatively valuable improvements in the proposed basin.

_West Brook reservoir_.--The drainage from 5.7 square miles might be

conserved by the erection of a dam on West Brook, a tributary of Wanaque

River, which enters it from the west. There is an available site at

which a dam 280 feet high might be erected. At this elevation the length

along the top would be about 1,150 feet and about 2,330,000,000 cubic

feet of water would be impounded. Little benefit would be derived from

such a reservoir, as the limited drainage area affords a comparatively

small proportion of flood run-off that might be well cared for at a

lower point. For compensating purposes, however, a reservoir might be

constructed here, the capacity of which could be adjusted to the actual

demands. If the dam were raised to a height of about 280 feet from the

base the storage afforded would be equal to 176 inches on the watershed,

or about four average years of precipitation, which is far beyond all

probable storage necessities. The maximum available storage capacity is

given in this case merely to show possibilities.

PEQUANAC SYSTEM.

There are few available reservoir sites of large size along the lower

reaches of Pequanac River. In the upper basin, however, there is a

sufficient available storage capacity to afford almost complete control

of destructive floods from that part of the drainage area. Large tracts

are already reserved by the city of Newark for collection of municipal

supply, and the storage capacity developed is sufficient to serve the

city throughout the driest seasons. The total capacity of Clinton,

Oakridge, and Canistear reservoirs is about 1,155,000,000 cubic feet.

These basins are not available for flood catchment, as the water is used

for city purposes and an endeavor is made to have in storage at all

times the largest possible amount. The condition is exactly similar to

that described in the case of Greenwood Lake. In considering the means

for the construction of flood-catchment reservoirs in Pequanac Basin

there must be taken into account the conservation and delivery of the

Newark supply. The adjustments with reference to the amount of water

available at Macopin intake would have to be met, and if the system were

interfered with compensation therefore would be taken into

consideration.