CONTRACTS.

The construction was done under the following contracts:

_1._--The principal contract, dated June 21st, 1904, was with the New

York Contracting and Trucking Company, later assigned by that company

to the New York Contracting Company-Pennsylvania Terminal, for the

performance of the following works:

(_a_).--The excavation for and construction of a retaining wall in

Seventh Avenue, 31st Street, Ninth Avenue, and 33d Street.

(_b_).--Excavation over the area enclosed by the retaining wall.

(_c_).--The building of sewers and the laying of water and gas pipes.

(_d_).--The building of a timber trestle to support the surface of

Eighth Avenue between the south side of 31st Street and the north

side of 33d Street, and also the surface of 31st and 33d Streets

between Seventh and Ninth Avenues. This refers to the trestles left

in place on the completion of the work.

(_e_).--The building of a trestle and bridging from a point near the

west side of Tenth Avenue on the south side of 32d Street, westward

to the outer end of Pier No. 62, at the foot of 32d Street.

_2._--The second contract, dated February 10th, 1905, was with the New

York Contracting Company-Pennsylvania Terminal, for the excavation for

and construction of retaining walls for the Manhattan Terminal Power

Station, and the excavation of the area thus enclosed.

_3._--The third contract, dated October 2d, 1907, was with the New York

Contracting Company-Pennsylvania Terminal, for the construction of two

twin tunnels under Ninth Avenue, and other work incidental thereto.

Sewers and gas mains laid outside the area covered by the foregoing

contracts were constructed under the following agreements:

An agreement, dated August 9th, 1904, between the New York Contracting

Company-Pennsylvania Terminal, and the New Amsterdam Gas Company, for a

20-in. gas main from Seventh Avenue and 31st Street to 30th Street, and

thence to Ninth Avenue, the New Amsterdam Gas Company being remunerated

for the cost by the Tunnel Company.

A contract, dated August 24th, 1904, with the New York Contracting

Company-Pennsylvania Terminal, for the construction of sewers in Seventh

Avenue and in 32d and 33d Streets east of Seventh Avenue.

A contract, dated November 24th, 1908, with the New York Contracting

Company-Pennsylvania Terminal, for the construction of a 16-in. gas main

from Seventh Avenue and 32d Street to 34th Street, and thence to Eighth

Avenue.

All these contracts required that the excavated material be delivered on

board scows to be furnished by the company at the pier at the foot of

32d Street, North River. These scows were furnished and the material

was disposed of from that point by Henry Steers, Incorporated, under a

contract, dated August 9th, 1904, which called for the transportation to

and placing of all material so delivered in the Pennsylvania Railroad

Company's freight terminal at Greenville, N.Y.

The disposal of the excavated material was one of the principal features

of the work, and, under the above contract, material from those portions

of the Terminal site east of Seventh Avenue and west of Ninth Avenue,

and from all substructures work, was disposed of, as well as from the

constructions herein described. The problem differed from that presented

by the usual foundation excavations in New York City in magnitude only,

and the methods were not unusual, but were adaptations of the usual ones

to exceptionally large work.

Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 The Site of the Terminal Station. Paper No. 1157 · 第 7 / 12 题