CHAPTER V

OPENING OF THE TRANSATLANTIC SERVICE

When once the ability of steam-ships to make open-sea passages such as

those between Liverpool, Belfast, and Glasgow had been demonstrated,

shipowners began to turn their attention to the possibility of steamers

crossing the Atlantic. The first steam vessel which is known to have

made the crossing is the _Conde de Patmella_. Unfortunately very little

is known about this boat. She sailed from Liverpool on October 20,

1820, for Lisbon, and arrived there in the remarkably short time of

four days. Thence she sailed for the Brazils, being the first steam

vessel to cross the Atlantic from east to west. In the year 1819 the

_Savannah_, a sailing vessel using an auxiliary steam-engine, crossed

the Atlantic, but as this vessel sailed nearly the whole of the way

and scarcely used her engines except when leaving or entering port,

she cannot be described as having made the first steam crossing,

although this claim is often put forward by American writers. But

this voyage of the _Savannah_ is of great historical interest, as

it proved what many had doubted, viz., the possibility of a sailing

vessel with steam auxiliary crossing the Atlantic, and carrying enough

coals for her purpose. This boat when built was not intended for a

steamer. Messrs. Scarborough and Isaacs of Savannah thought that a

sail-plus-steam crossing could be made, and they accordingly instructed

Moses Rogers (who, it has already been mentioned, had made the first

sea trip by steamboat from New York to the Delaware in 1807 with

Stevens’ _Phœnix_) to look out for a hull in which an engine could be

placed for the experiment. He found the _Savannah_ then being built by

Francis Ficket, of the firm of Ficket and Crocker, at New York, and she

was accordingly purchased for Scarborough and Isaacs. Her engine is

stated to have been built at Morristown, New Jersey, by Stephen Vail,

though Daniel Dod[45] of Elizabeth, New Jersey--one of the foremost

marine engineers of America at that time--who built the boilers and

paddle-wheels, is sometimes said to have been responsible for the

engines also. The paddle-wheels were constructed with eight radii,

which were hinged at the axle, so that they could be folded and removed

from the paddle-shaft, and stowed on deck in dirty weather. She was

a full-rigged ship of 350 tons burden, 130 feet in length by 26 feet

beam, and 16¹⁄₂ feet depth. Her trial trip in New York Bay in March

1819 was considered satisfactory, although the steam pressure employed

was only 2 lb., while the estimated pressure was 10 lb. On March 28,

1819, she sailed for Savannah. Her engines were not used until April 2,

when her wheels were placed on the paddle-shafts. They were shipped and

unshipped at intervals, until the conclusion of the voyage on April 6.

At Charleston, South Carolina, President Monroe, of “Doctrine” fame,

visited her. She then returned to Savannah, and sailed thence for

Liverpool on May 24 carrying neither passengers nor cargo.

[45] Dod was killed in 1823 by the explosion of a boiler on a steamer

whose engines he was testing after having made some experimental

alterations.

On this first voyage to Savannah, which occupied 207 hours, the engines

were running for only 4¹⁄₂ hours. On June 17 she arrived off the coast

of Ireland, where the revenue cruiser _Kite_ pursued her, under the

impression that she was a ship on fire, and three days later she was

off Liverpool. The voyage occupied 29 days 11 hours, and according to

the record kept by Rogers, which is now preserved in the United States

National Museum, steam was raised six times on the voyage and the

engines were run for a total of 80 hours. The reason the engines were

used so little was that she had a very insufficient supply of fuel. She

steamed up the Mersey, her arrival--the arrival of the first vessel

under steam from America--being witnessed by thousands of persons, some

of whom could hardly believe their eyes, so often had the voyage been

described as impossible of accomplishment.

Extracts from the _Savannah’s_ log read:

“_Saturday, May 22, 1819._--These twenty-four hours begins with fresh

breezes at N.E. at 7 A.M. got steam up, winded ship, and hove up the

anchor, at 9 A.M. started with the steam from Savannah, at 12 A.M.

anchored at Tybee stowed the boat and spars and lashed them. Latter

part light breezes at S.E. and flying clouds.

“_Sunday, May 23, 1819._--These twenty-four hours begins with fresh

breezes at east and clear, latter part light breezes and clear.

“_Monday, May 24, 1819._--These twenty-four hours begins with light

breezes and clear at 5 A.M. got under way off Tybee Light and put

to sea with steam and sails, at 6 A.M. left the pilot, at 8 A.M.

took off the wheels in twenty minutes, middle part pleasant. Course

E.N.E., wind S.S.E., the ship going 6.7.8. to 9 knots, and without

her wheels.

“_Tuesday, May 25, 1819._--These twenty-four hours begins with light

breezes and pleasant, all sail set to the best advantage at 12 A.M.

Tybee Light bore W. 6 S. 8 leagues distant from which I take my

departure.”

[Illustration: THE “SAVANNAH.”]

The ship continued under canvas until May 30, when at 8 A.M. steam

was got up for ten hours. And on June 18 the captain entered: “4 P.M.

Cork bore W. 6 S. 5 leagues distant. At 2 A.M. calm, no cole to git up

steam.”

A later entry on _Sunday, June 20, 1819_, reads: “5 P.M. shipped the

wheels, frld. the sails, and running to the River Mercer at 6 P.M. came

to anchor off Liverpool with the small bower anchor.”

The voyage was not without its humorous side. The sailing master,

Rogers, communicated to the New London (Connecticut) _Gazette_ an

account of their experiences. The Cape Clear telegraph station had

reported a ship on fire, and the Admiral at Cork despatched a cutter to

her relief.

“Great was their wonder at their inability,” says the paper, “with all

sail in a fast vessel, to come up with a ship under bare poles. After

several shots were fired from the cutter the engine was stopped, and

the surprise of her crew at the mistake they had made, as well as their

curiosity to see the singular Yankee craft, can be easily imagined.

They asked permission to go on board and were much gratified by the

inspection of this naval novelty. On approaching Liverpool hundreds of

people came off in boats to see her. She was compelled to lay outside

the bar till the tide should serve for her to go in. During this time

she had her colours all flying, when a boat from a British sloop of

war came alongside and hailed. The sailing master was on deck at the

time and answered. The officer of the boat asked him--‘Where is your

master?’ to which he gave the laconic reply, ‘I have no master, sir.’

‘Where’s your captain, then?’ ‘He’s below; do you wish to see him?’ ‘I

do, sir.’ The captain, who was then below, on being called, asked what

he wanted, to which he answered--‘Why do you wear that pennant, sir?’

‘Because my country allows me to, sir.’ ‘My commander thinks it was

done to insult him, and if you don’t take it down he will send a force

that will do it.’ Captain Rogers then exclaimed to the engineer--‘Get

the hot-water engine ready.’ There was no such machine on board, but

the order had the required effect and the boat sheered off.”

From Liverpool the _Savannah_ sailed for St. Petersburg, calling at

Elsinore and Stockholm. This voyage lasted thirty-three days, on ten

of which the vessel was under steam; and twice the machinery was run

for a spell of fifty-two hours. Eighteen hours was her longest spell

while crossing the Atlantic. The homeward voyage was made in the stormy

months of October and November. The paddles were unshipped throughout

that voyage and were not again used until November 30, when she arrived

at Savannah, the ocean journey having been made under sail only. The

cost of purchasing and fitting out the _Savannah_ for this experimental

voyage was £10,000. In December she returned to New York, her machinery

was removed, and she was then used as a sailer between New York and

Savannah until 1822, when she left her bones on the shores of Long

Island.

One of the earliest steamers to cross the Atlantic in a west-bound

direction was a little vessel called the _Rising Star_.[46] It was

decided in 1818 that she should be built, but it was not until 1820

that her construction was begun. It has even been disputed that

this vessel made the voyage at all, and many of the principal books

of reference do not mention her; nevertheless, it appears to be

indisputable that she existed, that she made the voyage to Chili, and

that she had an eventful career which lasted several years, and was

finally wrecked; and that the circumstances under which she left this

country for Chili in connection with the Chilian revolution in favour

of independence, and the events subsequent to her arrival as far as

paying for the steamer is concerned, reflect as little credit upon

the Chilian Government as upon that of Great Britain. Early in the

last century the relations between Chili and Spain became strained to

breaking-point. The Chilian people determined to free themselves from

the yoke of Spain and to establish a republic. Whatever may be the case

now, there is little question that one of the characteristics of all

the South American States at that time and for many years afterwards

was an extraordinary ingratitude towards those who had in any way

helped them. The history of that revolution and of the prominent part

which Lord Cochrane played in bringing it to a successful issue are too

well known to need recapitulation, but a short reference to it is not

out of place in considering the circumstances under which the _Rising

Star_ was sent on her journey.

[46] The “Dictionary of Dates” and the American “Universal Gazetteer”

give the name of the vessel as the _Rising Sun_, but this would

appear, from Lord Dundonald’s papers, to be incorrect.

In a recent letter to the writer Lord Dundonald says: “In 1817, when my

grandfather, the tenth Earl of Dundonald, was engaged by the Chilian

Government to create and take command of the Chilian Navy, he made a

stipulation that a steamboat should at once be constructed and sent

out to Chili to take part in the war, his opinion being that the great

disparity in numbers between the Chilian Navy and the Spanish Navy in

the Pacific would be neutralised by the advantage obtained in utilising

a steam vessel for purposes of war. The vessel was constructed on the

Thames at Rotherhithe, and my grandfather had anticipated going out in

her, but as she took longer in construction than was expected, he went

out with his wife and two children in the _Rose_ merchantman of 300

tons.

“It appears that the _Rising Star_ was taken out by my great-uncle,

Major the Hon. William Cochrane, but apparently she arrived in Chili

when my grandfather had practically swept the seas of the Spanish

fleet; a revolution had just taken place on her arrival and there was

no money available to pay for the _Rising Star_. The history of the

claim made against the Chilian Government by Major the Hon. William

Cochrane of course need not be gone into except in a word or two; as

you will understand, Chili was at that time a prey to revolution and

a poor country with little money and little credit; she repudiated

obligations at that time and would be much ashamed of her action now.”

Don José Alvarez, the Chilian agent, in a communication to Lord

Cochrane, had called attention to the “unfortunate delay,” and urged

him to embark immediately with his family in the ship _Rose_ to

proceed to Chili. The agent’s letter contained “the assurance that I

will attend to the affairs of the _Rising Star_, and take care that

everything is done to her.”

The memorial of the Hon. William Erskine Cochrane to the President of

the Chilian Republic many years later, in reciting the circumstance,

states that Mr. Edward Ellice, then an eminent English merchant and

a well-wisher to the independence of Chili, undertook the completion

and equipment of the _Rising Star_, but after having expended £8000

and the machinery being found defective, he declined making any

further advance, and being unable to obtain repayment of the sum he

had expended or the funds requisite for the necessary alterations and

equipment he advertised the vessel for sale. Don Alvarez then wrote to

Lord Cochrane on April 18, 1820, announcing Messrs. Ellice and Co.’s

intentions and solicited his assistance and added: “I shall, on the

part of the Government of Chili, agree to the following terms: The

ship, engines and stores to be sold or made over to any one of your

nomination for £6000; by that person and at his expense, the engines

must be altered in the following manner, viz., the pipes which convey

the steam from the boilers to be removed and larger ones provided.

Alterations to be made in the condensers. The paddle-blades to be

altered. The smoke apparatus to be completed and fitted, and the

effect of the engines tried. The ship must then undergo any necessary

repairs in her hull and rigging, when she must be manned, victualled,

insured, and conveyed to Chili at the expence of the purchaser; boats

and pumps of which she is now deficient must also be provided. The

amount of these various items, together with the interest of money

and profit, to be calculated at nine thousand pounds, so that on the

arrival of the vessel at Chili she will be purchased by Government at

fifteen thousand pounds.[47] In addition to which the licences formerly

granted to Messrs. Ellice for the importation of goods to the amount of

40,000 dollars[48] of duties shall be made over and transferred to the

person who undertakes this matter, and all property conveyed out in the

_Rising Star_ shall be admitted into Chili free of duties.”[49]

[47] This includes the £6000 paid for the ship.

[48] These were originally granted as a bonus.

[49] No goods were taken out in the ship.

The _Rising Star_ was completed, and arrived at Valparaiso in April

1822. But Lord Cochrane’s work was practically over and she was

therefore not required for the purpose originally intended of enabling

the Chilians to cope with the Spanish Navy. In June 1823 there was a

sudden change of government in Chili, and the O’Higgins Cabinet was

overthrown. The change was accompanied by the restless outbreaks which

have often marked political differences in the South American States,

and a good many of the papers relating to the building of the _Rising

Star_ and sending her to Chili were destroyed.

The new Chilian Government, being very short of money, took advantage

of the destruction of the papers and repudiated the obligation to Lord

Cochrane. It would take too much space to go into the details of this

lamentable affair, but it is sufficient to say that the vessel was

sold, that the Cochrane interest in her vanished, and the Hon. Wm. E.

Cochrane was called on for payment of a considerable additional sum

solely in consequence of the vexatious delay of the Chilian Government

in saying whether they would or would not fulfil their engagement.

[Illustration: THE “RISING STAR.”]

From a journal kept by Major W. E. Cochrane it appears that on May 31,

1820, he made his first payment of £50 on account of the vessel to Mr.

Kier, engineer. He seems to have visited very frequently the yard at

Deptford where the vessel was built, sometimes with the Chilian agent,

and payments on account of construction of £50 or so are frequent.

By the 14th of the following September the engines were sufficiently

advanced to undergo a trial, with what result is not stated. On October

6, he paid Mr. Ellice £2000 on account of the price of the ship. On the

17th he paid her another visit, when the engines were tried, and on the

18th he went again and tried the open paddles. Extensive alterations

to the engines were necessary, for on November 11 there appears the

item that he paid the balance of Kier’s account for that work, £163

4_s._ 11_d._ On January 30, 1821, he went and took dimensions for the

smoke-burning apparatus.

The _Rising Star_ left the dock on February 5, when the engineers

received £1 for working on Sunday. On the 7th, the wheels were tried

and one of them broke, and on the 8th he ordered the wheels to be

brought to town. On the 16th, a payment was made of £79 19_s._ “for the

deeds relating to the purchasing of the _Rising Star_.” On the 21st,

he paid a bricklayer for constructing the smoke-burning apparatus in

the flues of the boilers. Presumably the repairs were effected after

the ship had been returned to dock, for on February 22 she was taken

out of dock again. On March 20, the name of Captain Scott, as master,

first appears. On the 24th, Major Cochrane “went to the ship and got

the balance wheels fixed,” and on the 26th “tried the wheels, which did

not propel.” The weights were taken off the paddles on the following

day and reversed, and another trial was made of which the result is not

stated, and there was yet another trial on the 11th of the following

month. In April he paid to Mr. Brent, the builder, for docking the

_Rising Star_, £120 15_s._ 3_d._ On May 9 he ordered “my new vertical

paddles,” which were erected on the 29th. On this date there is a

curious entry: “Steward and boat 6_s._ 6_d._,” which is probably the

first recorded instance of a ship’s steward receiving a tip. The wheels

were tried while the vessel was in dock on June 8, and were found to

act well, and Don José Alvarez visited her the next day.

On the 11th of that month the first real trial of the ship took place,

for the entry reads: “Tried the ship with my vertical paddles. She went

from 5 to 6 knots, (standard broke).” A new standard was ordered and

on July 5, “tried my new paddles, went 20 miles at the rate of 5³⁄₄

knots an hour.” On the 18th of that month he paid Brent’s bill for

alterations and repairs, £193 3_s._ 8_d._ On September 4 the ship was

taken five miles down the river, and on the 11th he “ordered her into

dock to have her paddle-case closed (on account of insurance).” The

paddle-cases were fitted on the 13th, and on October 17 she went down

to Gravesend. Then comes a series of entries which are interesting as

showing the rates of pay at the time.

They are as follows, and are dated October 18:

Paid one month’s wages to Captain Scott £10 0 0

Paid William Ford, Carpenter, for the voyage 13 10 0

Mr. Cook, Mate, one month’s voyage[50] 4 0 0

To Cluly, 2nd Mate, one month’s wages 3 0 0

To Leach, Steward 6 0 0

Wages of Seamen 20 6 6

[50] Wages is probably meant.

The _Rising Star_ sailed from Gravesend on October 22, 1821. Numerous

heavy bills came in shortly afterwards, among which are “Insurance on

ship £800,” and Mr. Brown’s account, in which is included the heavy

expenses at Cork, when the ship put in there in distress, having sprung

a leak off the coast of Portugal, £913 9_s._ 1¹⁄₂_d._

Altogether the actual outlay in cash amounted to £13,295 4_s._ 4¹⁄₂_d._

The sum agreed upon in the arrangement with Don Alvarez was £15,000, to

which was added the interest to the year in which the claim was made

thirty-four years later, bringing the total amount of the claim of the

Cochrane family on account of this little steamer to £40,500.

Mr. W. Jackson went to Chili to join Lord Cochrane as secretary, and

remained with him in that capacity until his lordship’s return to

England. Mr. Jackson wrote on June 20, 1856, from Melton Mowbray: “I

sailed in her [the _Rising Star_] to Valparaiso, having been appointed

joint agent with Mr. Barnard, already at that place, for her transfer

to the Chilian Government. She arrived there in April 1822 in excellent

condition, having proved herself a very superior sea-boat, frequently

going twelve knots an hour. She was then tendered to the Government on

the terms of the contract, but they first claimed her in virtue of a

partial advance they had made for the building of the hull, and failing

to obtain possession on that ground they repudiated the contract with

Alvarez altogether, without assigning any valid reason for so doing.

The sum agreed to be paid on her delivery was £15,000, no part of which

was there received.”

Unfortunately, little is known as to the nature of her machinery or

means of propulsion. An illustration of the _Rising Star_, published

in 1821, represents her as a full-rigged ship and carrying two funnels

placed abreast and situated between the main and fore masts; but she

seems to have neither paddle-boxes nor uncovered paddle-wheels. The

description attached to the picture states that the _Rising Star_ was

“built under the direction of Lord Cochrane upon the principle of

navigating either by sails or by steam, the propelling apparatus being

placed in the hold and caused to operate through apertures in the

bottom of the vessel.”

From this it may be conjectured either that the paddles were discarded

or that she was also fitted with some modification of the jet system.

Although no further attempt was made to send a steamer across the

Atlantic for many years, the project was not lost sight of, and schemes

innumerable were formed and abandoned. Ten years after the _Savannah’s_

voyage some Dutch merchants purchased the _Curaçoa_, a Clyde-built

vessel of 320 tons, and despatched her to the West Indies from Antwerp.

Her engines were of 100 horse-power, and consumed slightly over seven

pounds of coal per indicated horse-power per hour, but there is no

record of her having attempted to make the voyage under steam.

The first steamer to cross the Atlantic from west to east depending

largely though not entirely on her own steam was the _Royal William_,

built by James Goudie for the Quebec and Halifax Steam Navigation

Company at Quebec, in the shipyard of Black and Saxton Campbell, upon

the lines of an early Clyde steamer, the _United Kingdom_, built by

Steele of Greenock in 1826 for the London and Leith service. She was

176 feet long, and 146 feet between perpendiculars. Her beam was 27

feet, and outside the paddle-boxes 43 feet 10 inches, and her depth

17 feet 9 inches. Her tonnage is variously given as 830 gross[51] and

1370 B.M.[52] She had side-lever engines of 180 horse-power[53] or 200

horse-power,[54] by Boulton and Watt. She was engined at St. Mary’s

foundry, Montreal. Her launch took place on April 29, 1831, and after

trading for a time between Quebec and Nova Scotian ports she was sold

to another company, which ultimately tried the experiment of sending

her across the Atlantic. Mr. Samuel Cunard was one of the directors

of this company, but there is nothing to show that he assisted in the

promotion of the scheme to send her over the ocean.[55] Nevertheless

it is a fact that “the idea of starting a line of steamers to connect

the two countries had occurred to his mind as early as 1830.”[56] On

August 4, 1833, the _Royal William_ sailed from Quebec, coaled at

Pictou, and began her journey. She is said to have steamed the greater

part of the way, some writers say the whole of it, and arrived at

Gravesend on September 11 after calling at Cowes. Probably owing to

there being another vessel of the same name a few years later, some

misconception has arisen as to her performance, for as a matter of

fact, the first _Royal William_ did not steam all the way, but made

a considerable portion of the voyage under sail alone. It is to the

credit of Canadians, however, that this steamer was despatched, and it

is upon this particular enterprise that the claim of the Canadians to

have made the first steam-ship voyage across the Atlantic is founded.

The subsequent history of this vessel is interesting. She stayed in

the Port of London for a few weeks, after which she was chartered

by the Portuguese, and while in their service her speed attracted

the attention of the Spanish Government. The Spaniards purchased her

towards the end of 1833 at the time of the first Carlist rebellion and

changed her name to the _Ysabel Secunda_. It was shortly after this

that she obtained the doubtful honour of being the first steamer to

fire a gun in war, the Spaniards having armed her with six cannon. Her

eventful career ended when she went to pieces on the Santander rocks.

[51] “The Atlantic Ferry.”

[52] Kennedy’s “History of Steam Navigation.”

[53] _Ibid._

[54] “The Atlantic Ferry.”

[55] _Ibid._

[56] “History of the Cunard Company.”

[Illustration: THE “DIEPPE” (L.B. & S.C.R.).]

[Illustration: THE “UNITED KINGDOM.”]

These two voyages stand in a class by themselves, and both mark a

distinct step forward in the progress of the modern mercantile marine.

The earliest steamboats, whether European, British, or American, were

smooth-water vessels only, and were admitted to be of an elementary and

experimental character. The _Charlotte Dundas_ and _Comet_ in Scotland

and the _Clermont_ and _Phœnix_ in America were much beyond anything

that had preceded them, and were significant as indicating a perception

of the possibility of extending the activity of steam-propelled boats

from the placid waters of canals or rivers to the greater waters

of harbours, ports, and estuaries. The four vessels first named

demonstrated, each in her own way, that it was necessary to build the

hull to suit the engine, instead of acquiring a hull and putting an

engine into it and trusting to luck. The _Phœnix_ showed in 1807 that

a vessel constructed to carry a steam-engine of a suitable size could

be trusted on the open sea, by steaming from New York to the Delaware.

A few years later, the Clyde shipbuilders showed that they could

construct steamers which should go down the Clyde estuary and even

essay the journey to Ireland.

It is true they used sails whenever possible, but when winds or tides

were against them the engines alone were depended on. Vessels with

two and three masts were employed, and as marine engines were made

of greater size, power, and weight, vessels of greater dimensions

were equipped with them, and the coastal service was inaugurated. By

this time the engine had become a powerful auxiliary to sail on short

voyages for which large bunker space was not required. The maintenance

of the coastal voyages in all weathers proved the thorough seagoing

qualities of the steamers. In estimating the value of the _Savannah’s_

voyage and its place in the history of steam navigation, it must not

be forgotten that she was a sailing vessel, was built to be one, that

the form of her hull was not altered in any way when she was engined,

and that on her return, when her machinery was taken out of her,

she resumed her place in her country’s trade as a sailer. Quebec’s

_Royal William_, on the contrary, was designed and built to be a steam

auxiliary vessel, and it was not until she had established herself in

that capacity that her voyage to the Mother Country was decided upon.

The performances of these two ships were thus of great importance; they

demonstrated, in the case of the _Savannah_, that a little sailing ship

could carry a small auxiliary engine which might help her in and out of

port, and at other times if it were necessary and fuel permitted; and

in the case of the _Royal William_ that a steam packet could essay an

ocean voyage and depend both upon her sails and steam-engines to enable

her to reach her destination in good time.

No further attempts were made, however, until 1838, which was destined

to become a memorable year.

Before this, various companies had been proposing to build steamers,

but nothing had been done. In 1828 an Act of Parliament was obtained

for the incorporation of the Valentia Transatlantic Steam Navigation

Company, which was to run a line of steamers from the west coast of

Ireland to America. The company proposed to build a steamer at a cost

of £21,000. She was to carry fifty cabin passengers and as many in

the steerage, and 200 tons of cargo in her hold. It was suggested

that she should be of about 800 tons displacement, with engines of

200 horse-power, and her speed was to be such that she could make six

voyages each way in twelve months. The company announced in 1828 that

it would commence operations immediately, but the public held aloof,

and seven years later matters were no further advanced.

Then the project was revived, and considerable interest was taken

in it because it was suggested that the enterprise should be worked

in connection with the new railway from London, the new Post Office

packets and the Valentia Railway.

It was at this time that Dr. Lardner, a man of recognised scientific

attainments, made his remarkable assertion regarding the impossibility

of establishing steam navigation between New York and Liverpool.

According to a report of a meeting at which Dr. Lardner was present,

that gentleman pointed out that “the only difficulty would be as to the

run from Valentia to St. John’s.” He continued: “As a last resource,

however, should the distance between Valentia and St. John’s prove too

great they might make the Azores a stage between, so there remained

no doubt of the practicability of establishing a steam intercourse

with the United States. As to the project of making a voyage directly

from New York to Liverpool, it was, he had no hesitation in saying,

perfectly chimerical, and they might as well talk of making a voyage

from New York or Liverpool to the moon.”[57]

[57] Liverpool _Albion_, December 14, 1835.

While England was listening to the depressing remarks of Dr. Lardner,

America was at work.

In 1835 Junius Smith[58] from Massachusetts began to consider the

navigation of the ocean by steamers, and in 1836 he proposed to form

the British and American Steam Navigation Company. The company was

actually established in 1837 by Mr. Macgregor Laird with a capital

of £1,000,000, but Smith’s connection with the scheme ceased, as he

saw himself unlikely to make as much out of the enterprise as he had

anticipated.

[58] The name is given as “Junius Smith” in Appleton’s “Cyclopædia of

National Biography.”

Mr. Kennedy’s “History of Steam Navigation,” however, states that

Doctor Julius Smith organised in 1836 “a transatlantic steam-ship

company bearing the title of the ‘British Queen Steam Navigation

Company,’ with a capital of £1,000,000, and Mr. Macgregor Laird as

secretary.” The most remarkable event in the annals of this company

is the voyage of the Sirius from London to New York in 1838. “The

_Sirius_! The _Sirius_! The _Sirius_! Nothing is talked of in New York

but about the _Sirius_. She is the first steam vessel that has arrived

here from England, and a glorious boat she is.... Lieutenant Roberts,

R.N., Commander, is the first man that has navigated a steam-ship from

Europe to America.”[59] The _Sirius_ was sent across the Atlantic

really as a desperate remedy against competition.

[59] New York _Weekly Herald_.

The Transatlantic Company had placed a contract as early as 1836 with

Messrs. Curling and Young of Blackwall, London, for the construction of

the _British Queen_ steam-ship, but the bankruptcy of Messrs. Claude

Girdwood and Co. of Glasgow, who had contracted to build the engines,

caused considerable delay. Enterprising rivals at Bristol, seizing the

opportunity, formed the Great Western Steamship Company to build and

equip the _Great Western_, which they determined to put on the service

before the _British Queen_ could be got ready. In this they were

successful, and to save the honour of their own company the _British

Queen_ directors hired the _Sirius_ from the Cork Steamship Company.

It was known at the time that she was too small to be employed as a

regular transoceanic trader, and even before she started on her first

voyage the announcement was made that she would make two voyages only.

She was 178 feet long, 25¹⁄₂ feet broad, 18¹⁄₄ feet deep, and of

703 tons register. Her engines, like those of all other vessels

of her time, were of the side-lever type; their cylinders were of

60 inches diameter, and had a stroke of 6 feet, and she carried a

surface condenser similar to those now in use. She was a two-masted

vessel, carrying three square sails on the foremast, her aftermast

being fore-and-aft rigged only. She had one funnel situated abaft the

paddle-boxes, which were about amidships. A picture of the vessel is in

existence which represents her as three-masted, and with her paddles

rather far forward, but this is inaccurate. She was almost a new ship

at this time, and it is not likely that a mast would have been taken

out of her between her launch and her Atlantic voyage. Her schooner

bows bore as figurehead a dog with a star between his front paws.

The _Sirius_ left London, sailing from East Lane Stairs, on March

28. She took no goods, as she was intended to be a passenger steamer

only. On going down the river she overtook the _Great Western_ “with

a respectable pleasure party on board,” and a trial of speed was the

consequence. When the _Sirius_ had reached Gravesend she was upwards

of a mile ahead of her rival. She had made the distance from Greenwich

to Gravesend against a strong tide in one hour and fifty-six minutes.

Both ships had their colours hoisted, and the banks of the river were

thronged with spectators. Soon after the departure of the _Sirius_

the American Line packet-ship _Quebec_ came down the river in tow,

and wagers were freely laid that the _Quebec_ would arrive before the

_Sirius_ at New York. But those who backed the _Quebec_ lost their

money.

The _Ocean_, a vessel belonging to the Irish Company, acted as tender

to the _Sirius_ when the latter called at Cork, and arrived there from

Liverpool on April 3, with mails and passengers for the venturesome

little craft. At a few minutes after ten o’clock on the morning of the

4th, the _Sirius_ proceeded on her voyage. The day was beautifully

fine, every vessel in the harbour was decked with flags in honour of

the event, a salute was fired from the battery on shore, and every

boat which could be pressed into service was crowded with enthusiastic

sightseers when, accompanied by the _Ocean_, the vessel left the

harbour. The _Ocean_ went with her as far as the entrance to the bay.

The _Watt_, which arrived at Liverpool on April 8, reported having

sighted on April 5, in latitude 51° N. and longitude 12° W., the

_Sirius_ bound for New York, bravely encountering a westerly gale.

“When it is considered,” the Liverpool _Standard_ of the day naively

remarked, “that this is the first steam vessel to cross the Atlantic,

this information may not be altogether unimportant.”

New York was reached at ten o’clock in the evening of April 22,

not without some adventure. Lieutenant Roberts, her commander, was

determined to carry the voyage through, but it was only “thanks to

stern discipline and the persuasive arguments of loaded firearms”

that he brought the crew round to his way of thinking, as they became

somewhat demoralised by continuous head-winds and declared that it was

utter madness to proceed in so small a vessel. There were 94 passengers

on board, of whom 30 were in the state-cabin, 29 in the fore-cabin, and

35 were steerage passengers.[60]

[60] It has been said the _Sirius_ carried no passengers. According

to _Notes and Queries_, the New York _Herald_, of April 28, 1838, in

reporting the arrival of the _Sirius_, says that forty-two passengers

were on board, of whom eleven were females, for whose accommodation a

stewardess was carried. A contributor to _Notes and Queries_ quotes

the authority of the Registrar-General of Shipping and Seamen for the

statement that the stewards’ department consisted of three stewards,

one assistant, two cooks, and a boy, and he asks whether this staff

would have been required in an ordinary boat of 412 tons if there

were no passengers.

[Illustration: THE “SIRIUS,” FROM A PRINT OF 1837.]

The passage occupied sixteen and a half days, and the average speed

was 8¹⁄₂ knots per hour; about twenty-four tons of coal per day being

consumed. Her arrival at New York was hailed with delirious enthusiasm,

and the excitement was yet further intensified when it became known

on the morning of the 23rd, only a few hours after the _Sirius_ had

anchored off the Battery, that another steam-ship was sighted making

its way to the port, and that the approaching vessel was greater than

any steam-ship ever seen in American waters.

This was the _Great Western_, and New York celebrated the double

arrival with that strenuous abandon attainable only in the Empire City.

The _Great Western_ was built at Bristol by Patterson. She was brought

round to London and left London again for the western port on March

31. Off Southend she was discovered to be on fire, and the heat and

smoke were so great that all the engine-room staff had to take refuge

on deck. Fortunately they had forgotten to stop her engines, and the

vessel was beached on the Chapman Sands, her decks were cut into,

and volumes of water were poured upon the flames. The fire was soon

extinguished, and the damage was found to be much less than was feared.

She floated on the tide and resumed her voyage under her own steam to

Bristol. The fire was due to the ignition of the felt packing round

the boilers. Owing to this adventure the _Great Western_ did not

sail from Bristol for New York quite as early as was expected, and it

was this delay which enabled the _Sirius_ to gain pride of place. The

_Great Western_ left for New York three days after the departure of

the _Sirius_ from Cork. Her average speed to New York was 208 knots

per day, and she used 655 tons of coal on the voyage. Another account,

published in 1840, says that of her 660 tons of coal only 452 were used

when she reached New York. On her homeward voyage her speed was nearly

9 knots an hour as against the 8·2 knots outward, but she burnt only

392 tons of coal, the difference being accounted for by the fact that

on the outward voyage she experienced very rough weather. Although

she made a much faster passage than her little rival, it is but fair

to remember that she was nearly twice her size, and with engines

developing more than twice the horse-power.

A contemporary writer thus describes the _Great Western_: “The

officers, crew, and engineers are about sixty in number. The saloon is

75 feet long, 21 feet broad, exclusive of recesses on each side, where

the breadth is 34 feet and the height 9 feet. The decorations are in

the highest degree tasteful and elegant, and the apartment may vie

with those of the club-houses of London in luxury and magnificence.

The splendour of a saloon is, however, a matter of very inferior

consequence, and it is higher praise to state that the more essential

parts of the vessel and all her machinery are examples of mechanical

skill and ingenuity which cannot be surpassed.”

[Illustration: THE “GREAT WESTERN.” FROM A PRINT OF 1837.]

The saloon was decorated with about fifty panels, the larger ones,

according to a contemporary description, representing “rural

scenery, agriculture, music, the arts and sciences, interior views

and landscapes, and parties grouped, or engaged in elegant sports

and amusements; the smaller panels contained beautifully pencilled

paintings of Cupid, Psyche, and other aerial figures.”[61] Every

berth and cabin had a bell communicating with the stewards’ room, the

method of communication being described as follows for the instruction

of travellers: “When the attendance of the steward is required, the

passenger pulls the bell-rope in his berth, which rings the bell in the

small box (in the stewards’ room) and at the same time by means of a

small lever forces up through a slit in the lid a small tin label with

the number of the room painted requiring the services of the steward,

and there remains, until the steward has ascertained the number of the

room and pushed it down again. Thus, instead of an interminable number

of bells there are only two. This arrangement, which is alike ingenious

as it is useful, is deserving the notice of architects.”[62]

[61] _The Mirror._

[62] _Civil Engineer and Architect’s Journal._

From the same publication it appears that the floors are of great

length and overrun each other. “They are firmly dowelled and bolted,

first in pairs and then together by means of 1¹⁄₂-inch bolts about 24

feet in length, driven in four parallel rows. The scantling is equal

in size to that of our line-of-battle ships; it is filled in solid

and was caulked within and without up to the first futtock heads

previously to planking, and all to above this height of English oak.

She is most closely and firmly trussed with iron and wooden diagonals

and shelf-pieces, which with the whole of her upper works are fastened

with screws and nuts to a much greater extent than has hitherto been

put in practice. Her engines are the largest marine engines yet

made. The boilers are constructed with several adaptations for the

economy of steam and fuel on an entirely new principle. There are four

distinct and independent boilers, any number of which can be worked

as circumstances require. The wheels have the cycloidal paddles. The

figure-head is a demi-figure of Neptune with gilded trident, and on

each side are dolphins in imitation bronze.”

The _Sirius_ made two transatlantic voyages as advertised, and was

utilised henceforward for the trade for which she was built, namely,

carrying passengers and goods between ports on the coast. She traded

chiefly between Liverpool, Cork, Glasgow, and London, and occasionally

to St. Petersburg, and at last, in June 1847, she was wrecked in

Ballycotten Bay.

While the _Sirius_ and _Great Western_ had been monopolising the

attention of the public, the directors of the City of Dublin Steam

Packet Company, who had already formed a company to join in the

transatlantic traffic, determined upon making their start with the

new paddle-steamer _Royal William_. This was not the Canadian _Royal

William_, but a boat built in 1836 by Wilson of Liverpool, with engines

by Fawcett and Preston, and one of a quartet intended to compete with

the Government steamers carrying the mails between Liverpool and

Kingstown. She was a faster vessel than any of the Government boats.

One voyage, in which she created a record which stood for some time,

was when she was engaged between London and Dublin, and did the 260

miles run from Falmouth to Kingstown in 23 hours. She was slightly

shorter than the _Sirius_, but her capacity was 817 tons gross, and

her engines of 276 horse-power. Although she had accommodation for

eighty passengers, she had on board only thirty-two when she started

from Liverpool on Thursday, July 5, 1838. She carried no cargo, all the

space apparently being used for fuel.

“Coal filled her bunkers, her holds, and even her well-deck, so that

her paddles were buried six feet, her sponsons were submerged, and

it was possible, by leaning over the bulwarks, to wash one’s hands

in the water that surged at the vessel’s sides.”[63] Her departure

from Liverpool was celebrated in a manner befitting the occasion; the

spectators gathered by thousands, and every cannon on either side of

the river that could be used to fire a salute was requisitioned, while

the steamers and large sailing ships anchored in the river, many of

which carried guns, joined in the salute. The outward voyage lasted

nineteen days, but she did the passage back in fourteen and a half days.

[63] Kennedy’s “History of Steam Navigation.”

While she was being got ready, the directors accepted an offer from

Sir John Tobin to run a steamer, which was built for him, alternately

with the _Royal William_. She was named the _Liverpool_, and was of

1150 tons, carrying engines of 404 horse-power. She sailed on October

20, 1838, and had got about one-third of the way across the Atlantic

when it was found necessary to turn back on account of bad weather. She

accordingly took refuge at Cork. A stay of ten days was made there, and

she eventually arrived at New York on November 23.

The _British Queen_, as befitted her name, was launched on the Queen’s

birthday in 1838, and made her first voyage from London to New York in

July 1839. She was commanded by Lieutenant Roberts, formerly of the

_Sirius_, and was at that time the largest and fastest steam vessel

afloat; and with Roberts in charge, it is not to be wondered at that

she did some good work. Lieutenant Roberts, writing to a friend from

New York, says in the course of a letter dated June 1, 1840: “I can

only state there is not a faster seagoing vessel in the World, and time

will tell. We have beat the _Great Western_ every voyage this year and

[word illegible] last year; therefore whoever gave you the idea of our

Speed and Power were perfectly ignorant of Steam and Steam Vessels. I

have made the passage from Portsmouth to New York shorter than ever

performed, only 13 d. 11 h. from Pilot to Pilot. Let _Great Western_

do that if she can, though she has ten hours’ shorter distance to run.

I sail at 1 P.M. this day with full cargo and every berth taken, and

sincerely do I wish to make a short passage.” He adds: “I intend trying

for some shore berth ... but will not leave till I command the first

iron vessel to steam across the Atlantic.” This was not to be, however,

for he was in command of the _President_ when that ill-fated vessel

left New York with one hundred and thirty-six passengers on March 12,

1841. No trace of her has been found from that day to this.

[Illustration: THE “PRESIDENT.”]

The _President_ was launched on December 7, 1839, on the Thames by the

same builders, Messrs. Curling and Young. She was almost a sister ship

to the _British Queen_, as far as appearance and general equipment

went, but the engines of the second vessel were slightly more powerful.

[Illustration: THE “BRITISH QUEEN.” FROM AN ORIGINAL PAINTING IN THE

POSSESSION OF THE AUTHOR.]

The following comparative table, showing the dimensions of these

vessels, was published in 1840:

+-----------------------------------+---------+--------+------------+

| | _Great |_British| |

| DIMENSIONS. |Western._|Queen._ |_President._|

+-----------------------------------+---------+--------+------------+

|Extreme length (feet) | 236 | 275 | 265 |

|Extreme length under deck (feet) | 212 | 245 | 238 |

|Extreme length keel (feet) | 205 | 225 | 220 |

|Breadth within the paddle-boxes | | | |

|(feet) | 35·4 in.| 40 | 41 |

|Breadth, including paddle-boxes | | | |

|(feet) | 59·8 in.| 64 | 64 |

|Depth of hold at midships (feet) | 23·2 in.|27·6 in.| 23·6 in. |

|Tons of space | 679¹⁄₂ | 1053 | -- |

|Tonnage of engine-room (feet) | 641¹⁄₂ | 963 | -- |

|Total tonnage (tons) | 1321 | 2016 | 1840 |

|Power of engines (horses) | 450 | 500 | 540 |

|Diameter of cylinders (inches) | 73 | 77¹⁄₂ | 80 |

|Length of stroke (feet) | 7 | 7 | 7¹⁄₂ |

|Diameter of paddle-wheels (feet) | 28·9 in.|30·6 in.| 31 |

|Total weight of engines, boilers, | | | |

|and water (tons) | 480 | 500 | 500 |

|Total weight of coals, twenty days’| | | |

|consumption (tons) | 600 | 750 | 750 |

|Total weight of cargo (tons) | 250 | 500 | 750 |

|Draught of water with the above | | | |

|weight of stores (feet) | 16·8 in.|16·7 in.| 17 |

+-----------------------------------+---------+--------+------------+

They were square-sterned vessels, barque-rigged, and carried a

long white funnel with a black top. The paddles were placed almost

amidships, with the funnel abaft the paddle-boxes. The _Great Western_

might be described as a four-masted barquentine. She had one funnel

carried between the fore and main masts, and the paddles were set abaft

the main-mast. All three vessels had engines of the side-lever type.

Those of the _British Queen_ were supplied by Napier from the Clyde,

and those of the _President_ by Fawcett and Preston of Liverpool. The

_Great Western’s_ engines were built by Maudslay, Son, and Field of

London.

The _President_ was built of oak with fir planking, her upper deck

being flush from bows to stern. The stern was ornamented with

the British and American arms, supported by the lion and eagle,

appropriately painted. And for a figure-head she had a bust of

Washington. The paddle-boxes were decorated with a five-point star.

The first attempt to float the _President_ was not a success owing to

the tide not being high enough. A second attempt the following day

also failed, but on the third day, Monday, December 9, 1839, she was

floated, and towed out of the dock and down to Blackwall, where she was

safely moored.

After the loss of the _President_ in 1841, the British and American

Steam Navigation Company sold the _British Queen_ to the Belgians

and retired from business altogether, leaving the _Great Western_

practically in sole possession of the Atlantic. But, as the next

chapter will show, this splendid isolation was not hers for long.

Steam-ships · 第 5 / 13 章