CHAPTER X.

Retrospect--London Bridge--Sheerness Dockyard--Plymouth

Breakwater and Victualling Yard--Steam Vessels for the

Navy--Harbours--Railways--Broad and Narrow Gauge--Atmospheric

Railway--Water Supply and Sewage.

I have thus endeavoured to give, in the foregoing narrative, an account

of my professional and private life as near as my memory would serve.

I have not had a single date, or note-book, or journal to refer to; so

that many inaccuracies may have occurred, particularly with regard to the

dates, although the facts and circumstances are, I believe, pretty fairly

narrated.

In my professional career I consider that I have executed the following

works:

I. London Bridge. This was designed by my father, as far as the general

outline and proportions, but he did not live long enough to design any

details, such as the depth of the arch-stones and those of the inverted

arches between the main arches, or the adjustment of them, so that the

whole might be placed in a perfect state of equilibrium, not only as

regards the individual arches, but also with each other; neither was the

width of the foundations of the piers and abutments given, nor the extent

of piling necessary, the cornice and parapets, stairs, pilasters of the

piers and abutments, the construction of the cofferdams and centres; the

specification as to what materials should be used, and how they were to

be put together; the approaches to the bridge on both sides, or how they

were to be designed and put together; all these had to be worked out

and executed by myself. It is true that my brother George gave me his

advice when I required it, but still I was the sole engineer, and the

whole responsibility rested with myself. The execution of these works was

rendered much more difficult than intended by my father, for at his death

the site was that of the old bridge. But the Committee of the Corporation

of London insisted that the new bridge should be built immediately above

the old one, the latter to be left standing during the construction of

the new bridge. I was therefore obliged to build it in the deep hole

above the old bridge, which was from 25 to 30 feet below the level of

low-water mark of spring tides.

II. The completion of the great works of Sheerness Dockyard. These, as

I have said, had been wholly designed by my father upon an entirely

original and novel plan of hollow walls, which he first carried into

effect at Great Grimsby Docks, in the year 1786. These walls, though

composed of a mass of materials of the same weight as ordinary dock

walls, were distributed over a wider area, and pressed less heavily upon

that surface in proportion to their extent, and therefore the soft, sandy

foundation upon which they were built was able to bear them without

yielding; the increased friction also produced by the increased surface

of their base enabled them to withstand with greater effect the lateral

pressure of the earth behind them; thus a double object was gained,

namely, security against both vertical and lateral pressure.

When my father died, on the 4th of October 1821, the northern half of

the new dockyard, including the sea wall, the great basin, the three

large dry docks at the west end, and the mast ponds and locks, had been

nearly completed; so that it only remained to fix iron gates for the

dry docks and those of the mast and boat ponds, which had been already

designed and ordered, and were put into their places under my direction.

This portion of the dockyard, although comprising the most extensive and

costly part, was not the most difficult. The most arduous task still

remained, namely, the construction of the northern portion. Here was

the greatest depth of water, varying from 25 to 30 feet at low water of

spring tides, the worst foundation, and the situation was much exposed

to northerly and easterly winds. These obstacles were felt so strongly

by my father, that he originally contemplated carrying out the works by

means of the diving bell; but as so much experience had already been

obtained by the employment of cofferdams in similar constructions, where

they had been very successful, it became a question for my serious

consideration whether it would not be better to use cofferdams for the

northern portion of the dockyard, instead of employing the diving bell,

which would necessarily require much more time. After consulting with

the enterprising contractors, Messrs. Jolliffe, Banks, and Nicholson,

who had completed the works already made, and Mr. John Thomas, the

experienced resident engineer, we came to the unanimous conclusion that

it was perfectly practicable to construct the remainder of the works by

means of cofferdams; and although it would be rather more expensive,

nevertheless they could be done much better and far more speedily than by

the diving bell; and, indeed, they told me that my father had expressed

the same opinion before he died; and that there was little doubt but

that if he had lived he would have recommended cofferdams instead of

the diving bell. I consulted my brother George upon the subject, and he

was of the same opinion. We resolved to recommend that the remainder of

the works should be completed by cofferdams, and the Admiralty approved

of our recommendation. Messrs. Jolliffe, Banks, and Nicholson therefore

undertook the contract for these works at the sum of 845,000_l._, and

gave ample security; and they were most successfully finished for the

sum of 854,000_l._ in round numbers, or at about 9000_l._ beyond the

contract price, our estimate being nearly 900,000_l._; so that they were

actually completed for about 45,000_l._ below our estimate, and fully

three years sooner than they would have been if the diving bell had been

used. Of course the real merit of these works is due to my father; but

I claim some credit for having successfully carried them into effect,

for if any failure had taken place--and there was very great difficulty

and risk--I should have been blamed for it, and probably been ruined at

the outset of my career, as the whole responsibility rested with me; my

brother never went near them.

III. I finished the Chatham dry docks, commenced by my father, at the

cost of 100,000_l._ In these there was nothing remarkable; after those of

Sheerness they were much less difficult, although of a somewhat similar

kind.

IV. The next great work was the finishing of the great breakwater in

Plymouth Sound. The chief merit I claim for this is in adding the

benching or berm on the outside, at the base of the sea slope, which

breaks the sea before it reaches the slope and prevents it from acting

injuriously upon it. I also claim a certain portion of the credit

for arranging and executing the paving of the upper surface, and the

dovetailed masonry of the two ends of the breakwater.

V. The design and execution of the Royal William Victualling

Establishment, at Stonehouse, near Devonport, I claim entirely as my

own, with the exception of the machinery, for which my brother George is

entitled to an equal share of credit with myself. This establishment,

including the cost of the land, amounted, I believe, to between

600,000_l._ and 700,000_l._

VI. The great basin, two building slips for first-rates, mast slip, and

the river wall in front, at the Royal Dockyard at Woolwich, costing

340,000_l._

VII. In company with Mr. Joseph Whidby, Mr. Walker, and Captain

Fullerton, of the Trinity House, I made a report for removing the bar,

by means of dredging, at the entrance of Portsmouth harbour, upon which

there was only 13 feet at low water of spring tides, which we estimated

at 55,000_l._; and it is singular that this important work was never

carried into effect until many years afterwards, when it proved to be

completely successful as far as it went. The bar was lowered 5 or 6 feet,

and it might be lowered 8 or 10 feet more, so as to enable the largest

class of vessels to enter and depart at low water of spring tides, which

would be of the greatest possible advantage to the public service; and

although the Admiralty have not carried the dredging far enough, still

there is now 18 feet at low water of spring tides, which enables the

largest class of vessels to pass the bar at half tide, instead of only

at high water as before. This fully proves the value and correctness

of our joint report; it only now requires that our recommendation

should be carried further, and there can be little doubt that it will

be successful. This great national harbour will be rendered accessible

at low water, and it ought to be, particularly after the enormous sums

that have been expended upon it, for unless the depth over the bar is

increased all improvements will be comparatively valueless. Mr. Murray

and myself wrote a joint report to the Admiralty, recommending that, in

order to assist the dredging operations over the bar, a sluice should

be erected across the entrance to Langston harbour, with the gates or

doors of the sluice pointing inwards, so that at high water they might be

shut, and all the water, or so much of it as might be required, should be

sent through Portsmouth harbour at ebb tide, to assist in scouring down

the bar. Of course, in order to render these works effective, it would

be necessary to enlarge the connecting channel between Portsmouth and

Langston harbour, so that all the Langston tidal water should flow out

through Portsmouth during the time of ebb.

The Admiralty up to the present time have not adopted this report. They

must, however, in order to preserve the requisite depth over Portsmouth

bar, do either the one or the other, or both; that is to say, they must

increase the dredging operations, or send more tidal water over it, and

the latter can only be obtained from Langston; as this harbour is of

little commercial value, supposing that any partial silting up should

take place, the depth could be restored by dredging; but if both the

dredging of Portsmouth bar and the additional quantity of tidal water

from Langston harbour should be resorted to, the bar might be kept down

to the depth required, and Langston would not be injured. If these two

operations are skilfully conducted, so as mutually to assist each other,

the result will be successful, and this success is the more necessary,

in consequence of the quantity of land which is now being reclaimed from

Portsmouth harbour for the new works.

VIII. The great flour mills and biscuit machinery at the Clarence

Victualling Yard, Portsmouth, were designed and executed by my brother

George and myself. The idea of the bread apparatus was proposed by M.

Grout, and worked out by ourselves. The great flour and biscuit mills at

Deptford were also designed and executed by my brother and myself.

IX. The Thames Tunnel shield; the rolling machinery of the Bombay, the

Calcutta, and the Mexican mints; the machinery at Constantinople for

manufacturing small arms; numerous locomotive engines and tenders for

different railways, amongst them the ‘Satellite,’ for the Brighton

Railway, which was one of the first that travelled at the rate of 60

miles an hour. The engines and machinery for several of Her Majesty’s

vessels of war, amongst which may be mentioned the ‘Bull Dog,’ the yacht

‘Elfin,’ and others; four iron vessels, engines, and machinery for the

Russian Government for the Caspian Sea, the first that were ever placed

there; two yachts for the Emperor Nicholas; the ‘Vladimir’ frigate; two

large screw vessels of war for the Baltic; three also for the Black Sea;

several for the Danube Company; cranes, sugar mills, diving bells, and

machinery; gantry cranes for the mahogany roofs of the West India Docks;

spinning and all kinds of machinery, from the year 1821 until the year

1852.

X. The first sea-going screw vessel that was constructed, namely, the

‘Archimedes;’ and also the ‘Dwarf,’ 1839, the first screw vessel of war

that was introduced into the navy.

XI. I recommended that the use of the Cornish high-pressure condensing

system should be introduced into the steam-vessels of the Royal Navy.

At that time they were entirely upon the system of Boulton and Watt,

when steam was only employed to the extent of 5 lb. pressure upon every

square inch. Now it was well known that the intensity of the power of

steam increased in a much greater ratio than the additional quantity of

fuel required to raise the temperature, so that high-pressure condensed

steam was much more economical than low pressure. There was a good deal

of prejudice against it, in consequence of the decided objections of

Boulton and Watt, and therefore it was not adopted at the time, but by

degrees this prejudice has been overcome, and now steam of 25 to 30 lb.

is employed in the Royal Navy, with great advantage and economy.

XII. I may also say that I was the means of introducing oscillating

engines into the navy. These I believe were invented by a Mr. Witté,

of Hull, but in consequence of the extreme accuracy required in making

them, and some degree of prejudice against the vibratory action of the

cylinder, this very valuable invention was laid aside. The able and

ingenious Mr. Maudslay took it up, but was dissatisfied with it, and

abandoned it. Mr. John Penn, who had a small establishment for making

machinery at Greenwich, then adopted it, and commenced manufacturing

these engines upon a small scale for the steamboats on the Thames. He

improved on the idea, acquiring the greatest experience in constructing

the engines, and he was convinced that they could be made upon any scale

with equally successful results. It happened about this time that the

Admiralty required new engines of greater power for their official yacht,

the ‘Black Eagle,’ whose speed averaged little more than 8 knots an

hour, and they applied to Boulton and Watt, who had made the old engines

for the ‘Black Eagle.’ They said they could easily make more powerful

engines, but that these would necessarily be heavier, and sink the vessel

lower in the water, when the resistance would be so much increased that

very little additional speed would be gained, and therefore it would be

better to have an entirely new vessel. The Admiralty did not wish to

incur the expense, and the matter was likely to fall to the ground. Penn

heard of this, and, quite uninvited, sent in a tender to make new engines

for the ‘Black Eagle,’ double the power of the old ones, of the same

weight, and occupying the same space, for a sum, not, I think, exceeding

the cost of engines of the same power on the old method. He further

offered, if the Admiralty officers were not satisfied, to take them out,

and replace the old engines at his own expense. I happened to be present

upon other business with the Comptroller of the Navy, Sir Thomas Byam

Martin, when Penn’s tender was sent in, and after reading it he threw it

to me, and said, “Rennie, what do you think of that; should I accept it

or not?” I read Penn’s tender carefully, and knowing something about the

oscillating engine, and having a good opinion of it, I said I thought he

should accept it. “Then,” said he, “I will do so, and if it turns out

badly you shall have the blame.” “Very well,” I replied, “if it turns out

badly I will take the blame.” Penn’s offer was accordingly accepted. The

engines were made and fixed on board; all the conditions of the tender

were fully complied with, and the Admiralty were perfectly satisfied

with their bargain. From that time forward Penn became one of the chief

manufacturers of the Admiralty engines, and has continued to be so up to

the present time.

The harbours which I made are described in my work on ‘British and

Foreign Harbours’; they were a portion of Kingstown, in Dublin Bay;

Donaghadee, Port Patrick, Port Rush, Warkworth, Sunderland, East

Hartlepool, Whitehaven; nearly rebuilding Ramsgate harbour; Ponta

Delgada, in the Azores. I designed harbours for Oporto; the Mattozenhas;

Viana, Aveiro, Figuera, and St. Ubes, for the Portuguese Government; also

for Douglas, Castleton, Peel, Ramsey, and Laxey, in the Isle of Man,

for the local authorities; and Redoubt Kalé, in the Black Sea, for the

Russian Government.

XIII. London Bridge; Hyde Park, Kensington Gardens, and Staines Bridges,

besides finishing those at Crammond and New Galloway, designed by my

father.

I laid out and carried through Parliament the Brighton Railway and the

Black wall Railway, in 1838; also the Manchester and Liverpool Railway,

in conjunction with my brother George, in 1827. In 1838 I designed the

Central Kent Railway, which, by passing through the centre of the county,

connected all the leading towns on the main line, besides reducing the

distance between the metropolis, Dover, and Folkestone to the minimum.

I also projected a line for the Great Northern in the years 1844-45,

which was admitted to be the best and shortest line; but it unfortunately

failed in consequence of the late Mr. Francis Giles not having completed

the parliamentary surveys. I laid down a railway between Leeds and

Carlisle, that would have materially shortened the distance between the

important manufacturing town of Leeds, Carlisle, Glasgow, and the north

of Scotland; a line between Leeds and Bradford, and another between York

and Scarborough. Another, called the North Wales Railway, between Bangor

and Port Dyllaen, where I designed a capacious harbour and docks, that

would have been of the greatest advantage to Liverpool, avoiding the

dangerous navigation between that place and Port Dyllaen, and affording

an excellent point of departure for Ireland. I also made a design for a

new port for Holyhead, upon the principles laid down by my father, that

would have answered the purpose far better, and have saved in a great

measure the expense that has been incurred by the present ill-contrived

harbour, and which has not answered the object intended.

In company with my friend Mr. George Remington, I designed the direct

London and Manchester Railway in the years 1844-45; this line would have

reduced the distance between London and Manchester to 176 miles, besides

affording railway communication to a number of the intermediate towns,

such as Bradford, Burton, Leicester, Congleton, and other places that

had not hitherto received the benefit of direct railway accommodation.

This line was pronounced by the Board of Trade to be the most important

and best laid down line that had been brought before Parliament, and

was strongly recommended by them; and it would have been carried, but

unfortunately there was another competing line by Mr. Rastrick, that was

ultimately abandoned by its promoters, who, before doing so, united with

us; but in doing this the reference books containing the names of the

owners and occupiers along both lines became mixed, and the result was,

that seven miles of the reference of the competing line was substituted

for seven miles of our line, and _vice versâ_. This was fatal, and the

Bill was consequently lost; and this valuable line, almost the best of

any in England, could never be resuscitated. The North-Western Railway,

thinking that they were safe from all competition, declined taking up

the line, though their interest imperatively called upon them to do so,

and further, would not unite with nor buy up the Midland from Leeds to

Rugby. The Midland Company then determined to make an independent line to

London, and took the identical course laid down by Remington and myself.

They have become a very formidable rival to the North-Western, and this

is precisely a similar case to that between the South-Eastern and the

London, Chatham, and Dover Companies. If the South-Eastern Company had

only adopted my Central Kent line, which was laid down in 1838, before

they had commenced their present line--and they promised to do so--the

London, Chatham, and Dover Railway would never have been made, and the

county of Kent would have been better served, many millions would have

been saved, and many thousand unfortunate shareholders would have avoided

ruin.

I laid down lines for the kingdoms of Sweden and Portugal, which have

been more or less adopted, and projected a line from Odessa to Moscow.

Also the London, Brighton, and South Coast as far as Salisbury, and from

thence to Warminster, which has since been adopted. A line from London

to Birmingham, Leeds, and Carlisle; Leeds and Bradford; Dumfries and

Port Patrick; Newry and Enniskillen, in Ireland; Bangor to Port Dyllaen,

North Wales; Cannock Chase line, in Staffordshire, through an undeveloped

coal district, another of my lines which has since been carried into

effect. The East Lincoln, from Lynn to Great Grimsby; the direct London

and Norwich, from Bishop’s Stortford to Thetford, which would have

shortened the distance between London and Norwich and Yarmouth. All these

lines were laid upon the direct principle, that is, taking the shortest

distance that the nature of the intervening country would permit between

the two termini; this principle is now proved to be the correct one, and

if it had only been acted upon before, we may readily conceive the vast

amount of capital which would have been saved, while the counties through

which railways have been made would have received a much greater benefit;

whereas, by the system which has hitherto been adopted, a great number of

unnecessary lines have been constructed, and a constant competition and

rivalry have taken place between the different companies, and now, with

reduced dividends and increased charges, they find out their error, when

it is too late to be remedied.

Another most important error has been committed by a too narrow gauge

having been adopted. My brother and myself, when we carried the Bill for

the Manchester and Liverpool through Parliament, in the year 1826--and

this may be considered almost the very commencement of the railway

system--after investigating the width between all the various carriage

wheels, whether for goods or passengers, we decided that the width of

gauge from centre to centre of the rails should be 5 feet 6 inches or 6

feet. When Mr. George Stephenson became the engineer for executing the

line, he decided that the gauge should be only 4 feet 8½ inches from

centre to centre of the railway, for no other reason than that the gauge

between the old colliery rails was 4 feet 8½ inches; hence arose all the

subsequent difficulties. It was quite clear that 4 feet 8½ inches was too

narrow. Brunel, seizing on this mistake, proposed at once to make the

gauge 7 feet from centre to centre of the rails for the Great Western

Railway. This was as evidently too much as Stephenson’s was too little.

The power of a locomotive engine is in proportion to its weight, and

the greater the weight the greater the power, acting as it does by its

adhesion to the rails; and to increase the power of an engine upon the

narrow gauge could only be done with safety by increasing its length;

for if it be done by increasing the height, the centre of gravity would

be raised also, and the motion of the engine would be rendered unsteady;

and by increasing the length the engine would be less adapted for going

round sharp curves. Now in the ordinary traffic of goods, such as

coals, &c., extraordinary velocity was not required, and therefore the

width of the gauge was not of so much consequence, but when it came to

carrying passengers the case was wholly altered. Latterly the coaches

and mails had travelled at the rate of 10 and 12 miles an hour, whereas

goods were seldom carried at the rate of more than 3 miles an hour. If

passengers were to travel by railway it would not be less than 12 miles

an hour, and therefore it was at length necessary to provide for this

velocity, and more; otherwise, as there was a certain prejudice on the

outset against railway travelling, the latter could not expect to have

the preference. But when it was ascertained, as it was at the trial of

engines upon the Rainhill plane of the Manchester and Liverpool Railway,

that the imperfect locomotives of that day could go at the rate of 30

miles an hour, the whole case was changed; the carriage of goods, which

at first was most important, gave way to that of carrying passengers,

and it was evident that the whole system of locomotion, whether of

goods or passengers, must be absorbed by railways. It was therefore

more especially necessary that the question of the gauge should be most

carefully considered. I may be answered, certainly, that the improved

locomotive engines upon the narrow gauge realize a speed of 50 to 60

miles an hour, and this is fast enough for anything; but then this cannot

be done without incurring greater risk than upon a broader gauge. The

Great Western realize a speed of 45 miles an hour without the least risk,

i.e. including stoppages, whereas the narrow gauge does not do more than

35 to 37 miles an hour, and that probably with a greater wear and tear of

the rails. A medium therefore between the two gauges, that is 5 feet 6

inches or 6 feet, instead of 4 feet 8½ inches or 7 feet, appeared to my

brother and self the proper gauge; and if such had been adopted we should

never have heard of the 7-feet gauge, and the 5 feet 6 inches or 6-feet

gauge would have been universally adopted, to the great advantage of all.

Before leaving railways, it may be proper to say something about the

atmospheric system. When an experiment was made on a large scale and

succeeded very well, it was subsequently reduced to practice upon the

Dublin and Bray Railway, between Kingstown and Dalkey, a length of

about 3 miles. Here it succeeded perfectly; the steepest incline was

completely mastered, and the smoothness and luxury of travelling were

unequalled. Brunel afterwards took it up, and employed it upon the South

Devon Railway. There it succeeded also perfectly as far as speed and

luxury of travelling were concerned. The difficulty however of making

the valve in the exhausting tube was so great that it was ultimately

abandoned, after having incurred great expense, and the locomotive system

was again resorted to. The Croydon Railway also adopted it, but gave it

up for the same reason as the South Devon. My brother and myself were

much taken with this system, and made several of the steam engines for

it, that answered their purpose perfectly, and we thought that by a

little more perseverance in it, the difficulties complained of might have

been overcome, but the proprietors would not listen either to Brunel

or ourselves. The Stephensons made a dead set against it, and, taking

the facts at the time, perhaps they were right; but it is very rarely

that a new invention succeeds at the first or second trial: it requires

time to ascertain the defects, and to study more minutely the remedy,

and, after a little while, the cure for the evil is found out. I should

not be surprised if ultimately the atmospheric system comes to life

again: indeed, the very strongest opponents of it have already adopted

it in London, with certain modifications, for conveying the mail bags

in London from the General Post Office to some of the railway stations,

with considerable success, and Mr. Rammell made an experimental line of

this kind at the Crystal Palace. The defects in the original lines were

principally those of workmanship, and can be remedied by degrees, as

is always the case whenever a principle is sound, for it only requires

perseverance to achieve ultimate success.

XIV. Drainage of lowlands upon a large scale I have carried into effect

in several instances already described. The completion of the Eau Brink

Cut, the designing and making the Norfolk Estuary Cut below Lynn, and the

Marshland works, by means of which from 350,000 to 400,000 acres of land

are drained; the Nene Estuary Cut, by which about 150,000 acres of land

are drained; the improvement of the Witham between Boston and the sea, by

which the drainage of about 250,000 acres has been materially improved;

the Ancholme drainage, by which 50,000 acres of lowlands have been well

drained; altogether amounting to between 800,000 and 900,000 acres.

XV. I may also say that I have embanked from the estuaries of the

Ouse, the Nene, and the Witham, about 6000 acres of fen land, which is

now more or less under cultivation. I have also laid down a plan, at

present being carried into effect, by which 32,000 additional acres

will be embanked from the estuaries of the Ouse and Nene; and another

plan for embanking 45,000 acres from the estuaries of the Welland and

Witham; indeed, my original plan of 1837 was for embanking from 150,000

to 200,000 acres of land from the estuaries of the Ouse, Nene, Welland,

and Witham, and the Great Wash; and I have no doubt that in time this

will be effected, and another large and most valuable county--all rich

agricultural land--will be added to the kingdom. I also obtained an Act

for embanking 32,000 acres from the north side of the estuary of the

Thames, near Shoeburyness. I believe that, in addition to this, three

times the amount may be taken from this and other parts of the Thames

estuary. Let to these be added the lands which may be saved from the

estuaries of the Humber, the Forth, the Tay, the Clyde, the Solway,

Morecambe Bay, and the Mersey, altogether from 500,000 to 600,000 acres

of land may be reclaimed, or three large new counties may be added to the

kingdom, capable of producing annually an additional supply of 3,500,000

quarters of corn, which, at 3_l._ per quarter, would, after deducting

20_s._ per quarter for the cost of production, add a revenue of about

6,000,000_l._ a year to the country. A great deal may be done in this

way also in Ireland. We should, however, deduct a million a year for the

first fifteen years to cover the cost of embankment. The clear annual

gain would be 5,000,000_l._ a year to the country; or, putting it in

another light, the land so acquired would maintain an additional number

of inhabitants. Besides this, large tracts of lowlands adjacent to these

estuaries might be greatly improved in their drainage, in connection with

the reclamation works, which would add considerably to their produce.

The execution of all these works, besides draining the quantity of land

I have stated, and more than doubling its value, has also very greatly

improved the navigation.

I also extended the Newry Ship Canal nearly two miles, which has a depth

of 16 to 18 feet, and is 130 feet wide, with an entrance lock 50 feet

wide. I deepened the old canal to Newry, so that large vessels, drawing

nearly 16 to 17 feet, can come up to the town.

XVI. Soon after my father’s death, in 1821, when I may be said to have

entered my professional career upon my own account, I began to consider

the water question; that is to say, the best mode of economizing water,

so that those districts where it might be most required could be

supplied, as far as the physical geography of those places would render

it practicable. Generally speaking, there falls a certain quantity of

rain in every district during the year, and this, with more or less

regularity, at particular seasons and times. In some places the rain is

periodical, and falls in the course of three or four consecutive months;

in other countries it falls at different times, principally, however,

in the winter and autumn months. Now after the periodical rain is over,

the whole country is deprived of water throughout the remainder, or

about three-fourths, of the year. The remedy for this is to construct

reservoirs in the most convenient places, upon such a scale as the wants

of the country may require; in these reservoirs the surplus waters

should be stored during the periodical rains, to serve as a supply in

the dry season, not only for domestic purposes, but for irrigation,

navigation, &c.; the reservoirs should, in some cases, be covered, and in

others open, even to the extent of making them large lakes. They should

be provided with proper sluices and culverts, open or covered, as may

be required, and best adapted for distributing the water in the most

beneficial manner.

Having obtained a sufficient supply, the next point to be attended

to is, to take care that the water shall not be polluted: in order to

effect this, in all thickly-peopled districts the sewage should not be

discharged into the river or watercourses, but into separate, isolated,

and well-ventilated tanks, and then be deodorized by mixing it with

earth, or subjecting it to any well-known process for this purpose, and

the refuse should be distributed for manure; thus the sewage, instead of

being a nuisance, will become valuable for agricultural purposes.

By these means, regulated according to the particular circumstances

of each case, the whole question, viz. economy of water, which is so

very important in every respect, is solved. I have long endeavoured to

make it clearly understood, but in England we are slow to move in a

new direction. The enemy must be at our doors before we are prepared

to meet him, and then we begin in earnest. Such has been the case with

the water question: we carried drainage almost to the utmost extent, so

that the rainwater was discharged into the adjacent watercourses and

rivers with the greatest rapidity and was carried off to sea, and we

thought not a moment that the day would come when we should want it.

The universal cry was, “Only get rid of the water, and all will go on

well.” At the same time all the sewage matter was discharged into the

watercourses, the cry being, “Only get rid of the sewage, and our cities

and towns will be healthy, and we shall hear no more of it;” little

thinking that the streams would be polluted, and that water when most

wanted would not be forthcoming, and that even the moderate quantity

that could be obtained would be unfit for domestic purposes. The Thames

and all the great rivers and streams were converted into common sewers,

threatening to spread pestilence around them. The water that was to be

obtained for domestic purposes was polluted to such an extent, that

the malaria caused by the foul state of the watercourses was increased

by drinking the contaminated water that we fondly expected we had

got rid of. At last the public opened their eyes, and asked how all

this had arisen; then commissioners of all kinds were appointed by the

Government to investigate these important questions; and what is the

result? Precisely that which I mentioned years ago, namely, 1. That means

must be established for economizing water and for affording an ample

supply at all times. 2. That all sewage matter must be diverted or be

prevented from being discharged into the watercourses. 3. That as far as

practicable the sewage matter must be utilized for manuring the land.

All these three propositions, which constitute the whole elements of

these important questions, are now being carried into effect by Acts of

Parliament; better late than never, for if these terrible evils had been

allowed to exist much longer the consequences would have been most fatal.

About four years ago I wrote two letters to ‘The Times,’ which were

printed in that journal, embodying my views upon this subject in a

detailed manner, according to the principles above described. I am

extremely glad that at the eleventh hour the subject is beginning to

be thoroughly understood, and it is to be hoped that now the proper

remedy will be employed; it is contained in the principles that I have

recommended for the last forty years. I may not perhaps claim the merit

of the whole; but this I must say in justice to myself, that I have

contributed in some degree to direct attention to the subject, and I most

sincerely trust that, having been made conscious of its importance, the

public will not be content until the question has been thoroughly sifted,

and the evils complained of successfully remedied. Up to the present

time neither compensating reservoirs for the due supply of water during

the dry seasons have been made, nor, with a few solitary exceptions, has

the sewage been excluded from the rivers, nor have the watercourses been

properly improved so as to prevent inundations of the adjacent lowlands.

In fact, the authorities have only just begun to get an idea of what

is required to obtain an ample supply of good water; but the more they

investigate the subject, the more they will find that only upon a right

understanding of the principles above recommended can this supply be

procured. Sewage matter has now been recognized as a fertilizing agent,

and the only points undecided with regard to it are the best modes of

deodorization, so as not to injure its manuring value, and the most

suitable method of applying it to the land, whether in a liquid or in a

solid state.

With regard to water for domestic use, considerable progress has been

made: the water is conducted into covered reservoirs, where it is

excluded from the action of the atmosphere; it is also filtered, so that

all the alluvial and tangible vegetable matters are excluded; and the

best method of separating from it those injurious ingredients with which

it is chemically combined has made great progress. These, no doubt,

are considerable advantages gained, but unless the means of obtaining

an ample supply be used, the other advantages will be comparatively of

little service. It is true they will be valuable as far as they go, but

if there be a deficient supply of water, there will remain a great deal

to be remedied, therefore it will be necessary to secure an ample supply

by means of open reservoirs.

Autobiography of Sir John Rennie, F.R.S., Past President of the Institute of Civil Engineers Comprising the history of his professional life, together with reminiscences dating from the commencement of the century to the present time. · 第 12 / 13 章