A RAILWAY THROUGH THE ANDES.

The railway system of the Argentine Republic is separated from the

Chilian system by the chain of the Andes. The English contractors,

Messrs. Clark & Co., have undertaken to connect them by a line which

starts from Mendoza, the terminus of the Argentine system, and ends at

Santa Rosa in Chili, with a total length of 144 miles. The distance

from Buenos Ayres to Valparaiso will thus be reduced to 816 miles. The

Argentine lines are of 5.4 foot gauge, and those of Chili of 4.6 foot.

The line in course of construction traverses an extremely hilly

region. The starting and terminal points are at the levels of 2,338

feet (Mendoza) and 2,706 feet (Santa Rosa) above the sea; the lowest

neck of the chain is at the level of 11,287 feet.

Study having shown that a direction line without tunnels, and even

with the steepest gradients for traction by adhesion, would lead to a

considerable lengthening of the line, and would expose it to

avalanches and to obstructions by snow, there was adopted upon a

certain length a rack track of the Abt system, with gradients of 8 per

cent., and the neck is traversed by a tunnel 3 miles in length and

1,968 feet beneath the surface. The number and length of the tunnels

upon the two declivities, moreover, are considerable. They are all

provided with rack tracks. The first 80 miles, starting from Mendoza,

are exploited by adhesion, with maximum gradients of 2½ per cent. Upon

the remaining 64 miles, traction can be effected either by adhesion or

racks.

[Illustration: FIG. 1.--REGION TRAVERSED BY THE RAILWAY THROUGH THE

ANDES.]

The track is of 3.28 foot gauge, and this will necessitate

trans-shipments upon the two systems. The rails weigh 19 pounds to the

running foot in the parts where the exploitation can be effected

either through adhesion or racks, and 17 pounds in those in which

adhesion alone will be employed.

[Illustration: FIG. 2.--DIRECTION LINE OF THE RAILWAY THROUGH THE

ANDES.]

The special locomotives for use on the rack sections will weigh 45

tons in service and will haul 70 ton trains over gradients of 8

percent. Those that are to be employed upon the parts where traction

will be by adhesion will be locomotives with five pairs of wheels,

three of them coupled. The weight distributed over these latter will

be 28 tons. These engines will haul 140 ton trains over gradients of 2

per cent.

The earthwork is now finished over two-thirds of the length, and the

track has been laid for a length of 58 miles from Mendoza. It is hoped

that it will be possible to open the line to traffic as far as to the

summit tunnels in 1891, and to finish the tunnels in 1893. These

tunnels will have to be excavated through hard rock. To this effect,

it is intended to use drills actuated by electricity through dynamos

driven by waterfalls. The Ferroux system seems preferable to the

Brandt and other hydraulic systems, seeing the danger of the water

being frozen in the conduits placed outside of the tunnels.--_Le Genie

Civil_.

* * * * *