GROUTING.

Except as previously noted, the voids outside of the tunnel lining were

filled with grout ejected through the grout holes in each segment. The

possibility was always present that Portland cement, if used for grout

in the shield-driven tunnels, would flow forward around the shield and

set hard, "freezing" the shield to the rock or the iron lining, or at

least forming excrescences upon it, which would render its control

difficult. With this in mind, the contractors proposed to substitute an

English Blue Lias lime as a grouting material. Grout of fresh English

lime containing a moderate quantity of water set very rapidly in air to

the consistency of chalk. Its hydraulic properties, however, were

feeble, and in the presence of an excess of water it remained at the

consistency of soft mud. It was not suitable, therefore, as a supporting

material for the tunnel.

An American lime, made in imitation of the Lias lime, but having greater

hydraulic properties, was tried, but proved unsatisfactory. Two brands

of natural cement were also tried and rejected, but a modified

quick-setting natural cement, manufactured especially for this work, was

eventually made satisfactory, and by far the largest part of the

river-tunnel grouting was done with this material mixed 1 to 1 by

volume. East of the Long Island shafts the work which was built without

shields was grouted principally with Portland cement and sand mixed 1 to

1 by volume.

In the river tunnels large quantities of the English lime were used neat

as grout over the top of the tunnel in attempts to stop losses of air

through the soft ground. It was not of great efficiency, however, in

this respect until the voids outside of the lining had been filled above

the crown. Its properties of swelling and quick setting in the dry sand

at that point then became of value. The use of dry lime in the face,

where the escaping air would carry it into the voids of the sand and

choke them, was much more promptly efficacious in checking the loss.

With the exception of the English lime, all grout was mixed 1 to 1 with

sand in a Cockburn continuous-stirring machine operated by a 3-cylinder

air engine. The grout machine was placed on the lower floor of the

trailing platform shown on Plate LXXII, while the materials were placed

on the upper platform, and, together with the water, were fed into the

machine through a hole in the upper floor. The sand was bagged in the

yard, and the cars on which the materials were sent into the tunnels

were lifted by an elevator to the level of the upper floor of the

trailing platform before unloading.

Great difficulty was experienced in preventing the waste of the fluid

grout ahead of the shield and into the tail through the space between it

and the iron lining. In a full soft ground section, the first condition

did not usually arise. In the full-rock sections the most efficient

method of checking the waste was found to be the construction of dams or

bulkheads outside the lining between it and the rock surface. For this

purpose, at intervals of about 30 ft., the leading ring and the upper

half of the preceding one were disconnected and pulled forward

sufficiently to give access to the exterior. A rough dam of rubble, or

bags of mortar or clay, was then constructed outside the iron, and the

rings were shoved back and connected up. In sections containing both

rock and soft ground, grout dams were built at the cutting edge at

intervals, and were carried up as high as circumstances permitted.

The annular space at the tail of the shield was at all times supposed to

be packed tight with clay and empty bags, but the pugging was difficult

to maintain against the pressure of the grout. For a time, 1/2-in.

segmental steel plates, slipped down between the jackets and the iron,

were used to retain the pugging, but their displacement resulted in a

number of broken flanges, and their use was abandoned. In their place,

2-in. segmental plates attached to the jack heads were substituted with

more satisfactory results. Notwithstanding these devices, the waste of

grout at the tail was very great.

The soft ground material on various portions of the work acted very

differently. The clay and "bull's liver" did not cave in upon the iron

lining for several hours after the shield had passed, sometimes not for

a day or more, which permitted the space between it and the iron to be

grouted. The fine gray or beach sand and the quicksand closed in almost

at once. The quicksand has a tendency to fill in under the iron from the

sides and in places to leave a cavity at about the horizontal diameter

which was not filled from above, as the sand, being dried out by the

air, stood up fairly well and did not cave against the iron, except

where nearly horizontal at the top.

The total quantity of grout used on the work was equivalent in set

volume to 249,647 bbl. of 1 to 1 Portland cement grout, of which 233,647

bbl. were ejected through the iron lining, an average of 14.93 bbl. per

lin. ft. The cost of grout ejected outside of the river tunnels was 93

cents per bbl. for labor and $2.77 for "top charges." East of the Long

Island shaft the corresponding costs were $0.68 and $1.63, the

difference being partly due to the large percentages of work done in the

normal air at the latter place.

Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 The New York Tunnel Extension of the Pennsylvania Railroad. The East River Tunnels. Paper No. 1159 · 第 31 / 35 题