the shell should be smooth, and for this reason the exterior rivet heads
must be countersunk. It is generally admitted, also, that the shell
should be perfectly cylindrical, and not conical. The conical form has
some advantage in reducing the frictional resistance to the advance of
the shield; but this is generally considered to be more than
counterbalanced by the danger of subsidence of the earth, caused by the
excessive void which it leaves behind the iron tunnel lining. For the
same reason the shell plate, which overlaps the forward ring of the
lining, should be as thin as practicable, but its thickness should not
be reduced so that it will deflect under the earth pressure from above.
Generally the shell is made of at least two thicknesses of plating, the
plates being arranged so as to break joints, and, thus, to avoid the use
of cover joints, to interrupt the smooth surface which is so essential,
particularly on the exterior. The thickness of the shell required will
vary with the diameter of the shield, and the character and strength of
the diametrical bracing. Mr. Raynald Légouez suggests as a rule for
determining the thickness of the shell, that, to a minimum thickness of
2 mm., should be added 1 mm. for every meter of diameter over 4 meters.
Referring to the illustrations, Figs. 128 to 132 inclusive, it will be
noted that the St. Clair tunnel shield, 21¹⁄₂ ft. in diameter, had a
shell of 1-in. steel plates with cover-plate joints and interior angle
stiffeners; the shell of the East River tunnel shield, 11 ft. in
diameter, was made up of one ¹⁄₂-in. and one ³⁄₈-in. plate; the
Blackwall tunnel shield, 27 ft. 9 ins. in diameter, had a shell
consisting of four thicknesses of ⁵⁄₈-in. plates; and the Clichy tunnel
shield, with a diameter of 2.06 meters, had a shell 2 millimeters
thick.
=Front-End Construction.=--By the front end is meant that portion of the
shield between the cutting-edge and the vertical diaphragm. The length
of this portion of the shield was formerly made quite small, and where
the material penetrated is very soft, a short front-end construction yet
has many advocates; but the general tendency now is to extend the
cutting-edge far enough ahead of the diaphragm to form a fair-sized
working chamber. Excavation is far more easy and rapid when the face can
be attacked directly from in front of the diaphragm than where the work
has to be done from behind through the apertures in the diaphragm. So
long as the roof of the excavation is supported from falling, experience
has shown that it is easily possible to extend the excavation safely
some distance ahead of the diaphragm. In reasonably stable material,
like compact-clay, the front face will usually stand alone for the short
time necessary to excavate the section and advance the shield one stage.
In softer material the face can usually be sustained for the same short
period by means of compressed air; or the face of the excavation,
instead of being made vertical, can be allowed to assume its natural
slope. In the latter case a visor-shaped front-end construction, such as
was used on some portions of the Clichy tunnel, is particularly
advantageous. The following figures show the lengths of the front ends
of a number of representative tunnel shields.
City and South London 1 ft.
St. Clair River 11.25 „
Hudson River 5²⁄₃ „
Mersey River 3 „
East River 3²⁄₃ „
Blackwall 6.5 „
Two general types of construction are employed for the cutting-edge. The
first type consists of a cast-iron or cast-steel ring, beveled to form a
chisel-like cutting-edge and bolted to the ends of the forward shell
plates. This construction was first employed in the shield for the
London Tower tunnel, and has since been used on the City and South
London, Waterloo and City, and the Clichy tunnels. The second
construction consists in bracing the forward shell plates by means of
right triangular brackets, whose perpendicular sides are riveted
respectively to the shell plates and the diaphragm, and whose inclined
sides slant backward and downward from the front edge, and carry a
conical ring of plating. The shields for the St. Clair River, East
River, and Blackwall tunnels show forms of this type of cutting-edge
construction. A modification of the second type of construction, which
consists in omitting the conical plating, was employed on some of the
shields for the Clichy tunnel. This modification is generally considered
to be allowable only in materials which have little stability, and which
crumble down before the advance of the cutting-edge. Where the material
is of a sticky or compact nature, into which the shield in advancing
must actually cut, the beveled plating is necessary to insure a clean
cutting action without wedging or jamming of the material.
=Cellular Division.=--It is necessary in shields of large diameter to
brace the shell horizontally and vertically against distortion. This
bracing also serves to form stagings for the workmen, and to divide the
shield into cells. The following table shows the arrangement of the
vertical and transverse bracing in several representative tunnel
shields.
+------------------+----------+-------+-------+-------+
| NAME OF TUNNEL. | DIAMETER.| HORI- |PLATES,| VERT. |
| | |ZONTAL.| DIST. |BRACES.|
| | | | APART.| |
+------------------+----+-----+-------+-------+-------+
| |Ft. | In. | No. | Ft. | No. |
|Hudson River |19 |11 | 2 | 6.54 | 2 |
|Clichy |19.4| 0 | 2 | 6.54 | None |
|St. Clair River |21 | 6 | 2 | 6.98 | 3 |
|Waterloo (Station)|24 |10¹⁄₂| 2 | 7.12 | None |
|Blackwall |27 | 8 | 2 | 6.0 | 3 |
|East River |11 | ³⁄₄| None | ... | 1 |
+------------------+----+-----+-------+-------+-------+
Referring first to the horizontal divisions, it may be noted that they
serve different purposes in different instances. In the Clichy tunnel
shield the horizontal divisions formed simply working platforms; in the
Waterloo tunnel shield they were designed to abut closely against the
working face by means of special jacks, and so to divide it into three
separate divisions; in the St. Clair tunnel they served as working
platforms, and also had cutting-edges for penetrating the material
ahead; and in the Blackwall tunnel shield they served as working
platforms, and had cutting-edges as in the St. Clair tunnel shield, and
in addition the middle division was so devised that the two lower
chambers of the shield could be kept under a higher pressure of air than
the two upper chambers. Passing now to the vertical divisions, they
serve to brace the shell of the shield against vertical pressures, and
also to divide the horizontal chambers into cells; but unlike the
horizontal plates they are not provided with cutting-edges. The St.
Clair, Hudson River, and Blackwall tunnel shields illustrate the use of
the vertical bracing for the double purpose of vertical bracing and of
dividing the horizontal chambers into cells. The Waterloo tunnel shield
is an example, of vertical bracing employed solely as bracing. The
vertical division of the East River tunnel shield was employed in order
to allow the shield to be dissembled in quadrants.
=The Diaphragm.=--The purpose of the shield diaphragm is to close the
rear end of the shield and the tunnel behind from an inrush of water and
earth from the face of the excavation. It also serves the secondary
purpose of stiffening the shell diametrically. Structurally the
diaphragm separates the front-end construction previously described from
the rear-end construction, which will be described farther on; and it is
usually composed of iron or steel plating reinforced by beams or
girders, and pierced with one or several openings by which access is had
to the working face. In stable material, where caving or an inrush of
water and earth is not likely, the diaphragm is omitted. The shield of
the Waterloo tunnel is an example of this construction. In more
treacherous materials, however, not only is a diaphragm necessary, but
it is also necessary to diminish the size of the openings through it,
and to provide means for closing them entirely. Sometimes only one or
two openings are left near the bottom of the diaphragm, as in the St.
Clair and Mersey tunnel shields; and sometimes a number of smaller
openings are provided, as in the East River and Hudson River tunnel
shields.
In highly treacherous materials subject to sudden and violent irruptions
of earth from the excavation face, it sometimes is the case that
openings, however small, closed in the ordinary manner, are
impracticable, and special construction has to be adopted to deal with
the difficulty. The shields for the Mersey and for the Blackwall tunnels
are examples of such special devices. In the Mersey tunnel a second
diaphragm was built behind the first, extending from the bottom of the
shield upward to about half its total height. The aperture in the first
diaphragm being near the bottom, the space between the second and first
diaphragms formed a trap to hold the inflowing material. The Blackwall
tunnel shield, as previously indicated, had its front end divided into
cells. Ordinarily the face of the excavation in front of each cell was
left open, but where material was encountered which irrupted into these
cells a special means of closing the face was necessary. This consisted
of three poling-boards or shutters of iron held one above the other
against the face of the excavation. These shutters were supported by
means of strong threaded rods passing through nuts fastened to the
vertical frames, which permitted each shutter to be advanced against or
withdrawn from the face of the excavation independently of the others.
Various other constructions have been devised to retain the face of the
excavation in highly treacherous soils, but few of them have been
subjected to conclusive tests, and they do not therefore justify
consideration.
=Rear-end Construction.=--By the rear end of the shield is meant that
portion at the rear of the diaphragm. It may be divided into two parts,
called respectively the body and the tail of the shield. The chief
purpose of the body of the shield is to furnish a place for the location
of the jacks, pumps, motors, etc., employed in manipulating the shield.
It also serves a purpose in distributing the weight of the shield over a
large area. To facilitate the passage of the shield around curves, or
in changing from one grade to another, it is desirable to make the body
of the shield as short as possible. In the Mersey, Clichy, and Waterloo
tunnel shields, and, in fact, in most others which have been employed,
the shell plates of the body have been reinforced by a heavy cast-iron
ring, within and to which are attached the jacks and other apparatus.
The latest opinion, however, seems to point to the use of brackets and
beams for strengthening the shell for the purpose named, rather than to
this heavy cast-iron construction. In the Hudson River, St. Clair River,
and East River tunnel shields, with their long and strongly braced
front-end construction to carry the jacks, the body of the shield, so to
speak, is omitted and the rear-end construction consists simply of the
tail plating. In the Blackwall shield, the body of the shield shell
provides the space necessary for the double diaphragms and the cells
which they inclose. In a general way, it may be said that the present
tendency of engineers is to favor as short and as light a body
construction as can be secured.
The tail of the shield serves to support the earth while the lining is
being erected; and for this reason it overlaps the forward ring of the
lining, as shown clearly by most of the shields illustrated. To fulfill
this purpose, the tail-plates should be perfectly smooth inside and
outside, so as to slide easily between the outside of the lining plates
and the earth, and should also be as thin as practicable, in order not
to leave a large void behind the lining to be filled in. In soils which
are fairly stable, the tail construction is often visor-shaped; that is,
the tail-plates overlap the lining only for, say, the roof from the
springing lines up, as in one of the shields for the Clichy tunnel. In
unstable materials the tail-plating extends entirely around the shield
and excavation. The length of the tail-plating is usually sufficient to
overlap two rings of the lining, but in one of the Clichy tunnel shields
it will be noticed that it extended over three rings of lining. This
seemingly considerable space for thin steel plates is made possible by
the fact that the extreme rear end of the tail always rests upon the
last completed ring of lining.
In closing these remarks concerning the rear-end construction, the
accompanying table, prepared by Mr. Raynald Légouez, will be of
interest, as a general summary of principal dimensions of most of the
important tunnel shields which have been built. The figures in this
table have been converted from metric to English measure, and some
slight variation from the exact dimensions necessarily exists. The
different columns of the table show the diameter, total length, and the
length of each of the three principal parts into which tunnel shields
are ordinarily divided in construction as previously described:
+---------------------+-----------------------------------+
| | LENGTH IN FEET. |
| NAME OF SHIELD. +---------+-----+-----+------+------+
| |DIAMETER.|TAIL.|BODY.|FRONT.|TOTAL.|
+---------------------+---------+-----+-----+------+------+
|Concorde Siphon | 6.75 | 2.51| 2.55| 1.16| 6.67|
|Clichy Siphon | 8.39 | 2.51| 2.55| 1.16| 6.16|
|Mersey | 9.97 | 5.61| 2.98| 2.98| 11.58|
|East River | 10.99 | 3.51| 0.32| 3.67| 7.51|
|City and South London| 10.99 | 2.65| 2.82| 1.01| 6.49|
|Glasgow District | 12.07 | 2.65| 2.82| 1.01| 6.49|
|Waterloo and City | 12.99 | 2.75| 2.98| 1.24| 6.98|
|Glasgow Harbor | 17.25 | 2.75| 2.98| 1.08| 8.49|
|Hudson River | 19.91 | 4.82| 2.98| 5.67| 10.49|
|St. Clair River | 21.52 | 4.00| 2.98| 11.25| 15.25|
|Clichy Tunnel |23.7-19.8| 4.00| 2.98| 6.88| 17.22|
|Clichy Tunnel |23.8-19.4| 7.44|11.90| 4.46| 23.65|
|Blackwall | 27.00 | 6.98| 5.90| 6.59| 19.48|
|Waterloo Station | 24.86 | 3.34| 5.51| 1.14| 10.00|
+---------------------+---------+-----+-----+------+------+
A shield of 60 or 100 tons weight can hardly be directed along the line
of the proposed tunnel and also through curves and grades, especially
when driven through loose or muddy soils. The tunnels of the New York
and Hudson River Railroad under the Hudson, and the tunnel of the New
York Rapid Transit Railway under the East River, show marked evidence of
how troublesome this work is. To avoid these and other inconveniences
encountered in every shield, the Author has designed a new shield which
was briefly described at page 251.
[Illustration: FIG. 136.--Elevation and Section of Hydraulic Jack, East
River Gas Tunnel.]
=Jacks.=--The motive power usually employed in driving modern tunnel
shields is hydraulic jacks. In some of the earlier shields screw-jacks
were used, but these soon gave way to the more powerful hydraulic
device. The manner of attaching the hydraulic jacks to the shield is
always to fasten the cylinder castings at regular intervals around the
inside of the shell, with the piston rods extending backward to a
bearing against the forward edge of the lining. In the older forms of
shield, having an interior cast-iron reinforcing ring construction, the
jack cylinder castings were always attached to this cast-iron ring; but
in many of the later shields constructed without this cast-iron
reinforcing ring, the cylinder castings are attached to the shell by
means of bracket and gusset connections. The number and size of the
jacks employed, and the distance apart at which they are spaced, depend
upon the size of the shield and the character of the material in which
it is designed to work. In stiff and comparatively stable clays, the
skin friction of the shield is comparatively small, and an aggregate
jack-power of from 4 to 5 tons per square yard of the exterior friction
surface of the shield has usually been found ample. The cylinders are
spaced about 5³⁄₄ ft. apart, and have a working diameter of from 5 to 6
ins., with a water pressure of about 1000 lbs. per sq. in. In soft,
sticky material, giving a high skin friction, the aggregate jack-power
required per square yard of exterior shell surface rises to from 18 to
24 tons; the jacks are spaced about 3 ft. apart; and the working
cylinder diameter and water pressure are, respectively, about 6 or 7
ins., and from 4000 lbs. to 6000 lbs. per sq. in. With these high
pressures, power pumps are necessary to give the required water
pressure; but where the pressure required does not exceed 1000 lbs. per
sq. in., hand pumps may be, and usually are, employed. Fig. 136 shows
the hydraulic jacks used in the East River Gas Tunnel at New York. The
number of jacks required depends upon the diameter of the shield, and,
of course, upon the distance apart which they are placed. In the City
and South London tunnel shield six jacks were used, and in the Blackwall
shield 24 were used. The mechanical construction of the jacks for tunnel
shields presents no features out of the usual lines of such devices used
elsewhere. The jacks used on the East River tunnel shield are shown by
Fig. 136.
Two general methods are employed for transmitting the thrust of the
piston rods against the tunnel lining. The object sought in each is to
distribute the thrust in such a manner that there is no danger of
bending the thin front flange of the forward lining ring. In English
practice the plan usually adopted is to attach a shoe or bearing casting
to the end of the piston rod, which will distribute the pressure over a
considerable area. An example of this construction is the shield for the
City and South London tunnel. In the East River and St. Clair River
tunnels built in America, the tail of the piston rod is so constructed
that the thrust is carried directly to the shell of the lining.
LINING.
Either iron or masonry may be used for lining shield-driven tunnels but
present practice is almost universally in favor of iron lining. As
usually built, iron lining consists of a series of successive cast-iron
rings, the abutting edges of which are provided with flanges. These
flanges are connected by means of butts, the joints being packed with
thin strips of wood, oakum, cement, or some other material to make them
water-tight. Each lining ring is made up of four or more segments, which
are provided with flanges for bolted connections similar to those
fastening the successive rings. Generally the crown segment is made
considerably shorter than those forming the sides and bottom of the
ring. The erection of the iron segments forming the successive rings of
the lining may be done by hand in tunnels of small diameter where the
weights to be handled are comparatively light, but in tunnels of large
size special cranes attached to the shield or carried by the finished
lining are employed. The construction of the iron lining for the Hudson
River tunnel is illustrated in Chapter XX., and that for the St. Clair
River tunnel is shown by Fig. 137.
[Illustration: ~Part Transverse Section.~
~Longitudinal Section.~
FIG. 137.--Cast-Iron Lining, St. Clair River Tunnel.]
CHAPTER XX.
SUBMARINE TUNNELING (Continued).
THE SHIELD AND COMPRESSED AIR METHOD. THE HUDSON RIVER TUNNEL OF THE
PENNSYLVANIA RAILROAD.
The shield and compressed air method of excavating subaqueous tunnels is
used when the distance is small between the roof of the tunnel and the
bed of the river. These tunnels are usually driven from the shafts sunk
from each shore. It is very seldom they can be driven also by an
intermediate shaft. This, however, was done in the case of the Belmont
tunnel under the East River. Here the tunnels passed under the
man-of-war reef where a working shaft was sunk.
The plant is located at some convenient point near the head shaft. It
consists of a set of boilers to provide the power for the different
machines. They are low and high pressure compressors, the former supply
the air through the tunnel; the latter, the air for working the drills,
in case rock is encountered, and power for hauling and hoisting
purposes. The various pumps force the water for the hydraulic rams that
drive the shield and work the erector. They also remove the water from
the tunnel which always collects in variable quantities at the bottom of
the excavation. Besides the machines for light and ventilation purposes,
the head shaft is provided with an overhead construction where are
housed the hoisting machines, the telephone and other means of
communication with the work at the front. Usually a long trestle is
built in connection with the head shaft, leading to the dumping place
and yard. On this inclined elevated structure are located, also, the
tracks upon which will run the small cars used inside the tunnel for
hauling purposes.
The shafts are excavated on a square, rectangular or circular plan and
are usually lined with masonry. It is only recently that shafts
excavated through loose soils have been lined with the same cast-iron
lining used in the tunnels, the only difference being that the rings
were laid flat on the ground and attached to those already sunk.
After the shaft has been sunk to the required level, the tunnel is
driven toward the river by any one of the methods used for land work. At
some convenient distance from the shaft, the dimensions of the tunnel
are enlarged for a length of 20 or 30 ft. In this larger space, called
the shield chamber, the shield is assembled, mounted, and, when
completed, it is slowly pushed toward the river. The tunnel is excavated
from the shield chamber on, with dimensions equal to the exterior shell
of the shield.
The construction of the shield and the hydraulic jacks used for its
advance are explained in a preceding chapter.
In very loose soils, a solid bulkhead of masonry is built across the
tunnel, after the shield has advanced to a certain distance and some
rings of the cast-iron lining have been erected. The bulkhead is
provided with three air locks--two near the floor of the tunnel, for
working purposes, and one near the roof, called the emergency lock,
which, as the name suggests, is used only in case of danger. The air
locks are steel cylinders from 10 to 15 ft. long and 6 ft. in diameter,
made up of boiler plates. They are provided with doors at each end,
besides the pipes for the admission and exit of compressed air. The
working locks also have narrow-gauge tracks for hauling purposes. In
rock or more consistent soil the bulkhead is constructed after the
shield is far ahead, since there is no immediate necessity, under these
conditions, to use the compressed air. In both the loose and good soils,
when the shield has been advanced over 500 ft. from the bulkhead, a
second bulkhead, with air locks, is erected in the tunnel. The first is
left in place but used only in case of emergency.
To direct the shield along the center line and through curves and
grades, accurate measurements are taken, and the distance between the
shield and the last ring inserted in the iron lining is regulated
accordingly. The alignment inside the tunnel is maintained in a very
simple way. For this purpose, points corresponding to the center line
are marked on the roof at distances of 100 ft. Nearly 100 ft. from the
shield, a transit is set up on a strong scaffold spanning the tunnel,
and it is supported by the flanges of the iron lining. A plumb-line is
hung from one of the points of the roof already determined, as
indicating the center line; and the transit man aligns his instrument
with this plumb-line; after this he “plunges” his telescope. A rodman
next places a horizontal rod of special construction between the flanges
of the last ring of the lining. This rod has in the center an open slot
which carries a glass with a black vertical line. The slot is graduated,
the zero of graduation remains in the center while the vertical line is
moved right and left. The rodman places a lamp behind the slot and the
transit-man tells him how to move the dark line until it coincides with
the axis of the tunnel. If the ring, just erected, be a little out of
alignment, it is readjusted by pushing the shield a little more on the
side that has swerved from the axis of the tunnel. As the shield is
pushed forward, it is kept in place by four men with graduated rods, one
man on each side of the shield, one on top and the other on the floor.
As the shield progresses, they repeat aloud in succession, the distance
indicated on the rods, which is the distance from the shield to the
outer circumferential flange of the last ring of the lining. When an
advance of one foot has been made, readings are taken at every inch; and
when very near the required distance, they are taken at every quarter of
an inch. In this way it is not difficult to bring the shield back into
line, in case it may have shifted a little to the right or left. When
curves are met, the rings are no longer cylindrical segments but tores,
so that the segments at one side are longer than those on the other. In
this case, the shield is advanced more on one side by a quantity equal
to the difference of the two sides of the ring to be erected. At each
advance the shield is moved 2 ft. or 2¹⁄₂ ft. ahead, the distance
corresponding to the length of the cast-iron rings of the lining. Within
the space now open between the shield and the lining another ring is
inserted. The ring is composed of different segments provided with
flanges and holes bored so they can be bolted together. The segments of
the lining are very heavy and difficult to handle but they are easily
set by means of the erector.
When the erector is not mounted on the shield, it is located in the
middle of a girder placed across the iron rings of the lining and just
at the rear end of the shield. The girder, at both extremities, has
flanged wheels resting on rails which are placed on brackets. These
brackets are attached temporarily to the flanges of the iron lining. The
erector is provided with an arm capable to swing in a full circle. Its
movements are regulated by two hydraulic jacks, located horizontally on
the spanning girder. On the extreme end of the revolving arm are
projections with holes for the bolts. Each segmental plate of the lining
has a kind of plug in the center which is cast together with the plate
and is provided with holes for the bolt. In placing the segmental plates
of the lining, the arm of the erector is swung over the plate to be
lifted, then two bolts are passed through the holes in the projection of
the erector, and through those in the plug. The arm of the erector is
then moved upwards until the plate, free from all obstacles, is swung
very near its intended position. There it is adjusted and held until
bolts are inserted to fix it to the plates of the preceding ring.
In connection with the method of excavating submarine tunnels by means
of shield and compressed air, the excavation varies with the quality of
soil encountered. In compact rock the usual heading and bench method, so
common in land tunnels, is also employed in this case. The shield is
left behind in presence of good rock.
The men at the front attack the rock with air drilling machines and
charges of dynamite. The holes are driven at a smaller depth than in
land work; very light charges of dynamite are used and only a few holes
fired at each round. Every precaution is taken in order not to disturb
the shield and the bed of the river any more than is possible, because
at a shallow depth the blast would tend to widen the existing crevices
in the rock and thus permit an inflow of water. When the rock is
fissured or disintegrated and the roof of the excavation at the front
requires timbering, the shield should be kept closer to the front. In
this way the quantity of timber for strutting is greatly reduced, so
lessening the probabilities of fires. It is very difficult, in
compressed air, to extinguish fires and in almost every instance the
only way is to flood the tunnel. This was done at the Manhattan end of
the tunnel under the East River for the extension to Brooklyn of the New
York Subway.
The excavation is made by hand in loose but compact soils such as clay.
The men work on platforms located at the front of the shield and they
are protected from the caving-in of the roof by a hood added for working
through loose soils. The men excavate the material which is shoveled
inside the tunnel and is carried away in small cars. The shield is very
close to the front of the excavation in loose soil. The East Boston
tunnel, under Boston Harbor, connecting with the Boston Subway, was
excavated through blue clay. The minimum distance between the bottom of
the water and the roof of the excavation was 18 ft. The tunnel was
excavated by means of compressed air and the shield which was only used
for the roof. It slid on top of concrete side walls built in two drifts
which were excavated nearly 100 ft. ahead of the shield. The tunnel was
lined with concrete, the arch being reinforced by longitudinal steel
rods which received the thrust of jacks used for advancing the shield.
The material in the drifts under the shield and the bench was removed by
hand and carried away in small cars.
Subaqueous tunnels driven through very loose soils can be excavated by
simply leaving the doors open while the shield is pushed ahead. The
material, dislodged by the cutting edge of the shield, is forced through
the doors and falls on the floor whence it is removed in small cars. In
very loose soils the excavation has been made in a still more economic
way; the shield with closed doors is simply squeezed through the soil.
This method is financially convenient, because all the excavating and
hauling operations are eliminated and the tunnel progresses from 40 to
50 ft. per day, but clearly indicates a lack of stability. In this
manner, the Hudson River tunnel of the New York and New Jersey Railroad
was constructed.
The pressure of the air in the tunnel depends upon the depth and as a
rule it varies between 20 and 40 or even more pounds per square inch
above atmospheric pressure. Working in compressed air causes a peculiar
disease commonly known as “bends” or “caisson disease” often proving
fatal. To prevent and remedy the disease, the engineers should order a
set of rules to be strictly observed. The preventative measures should
be, first, to employ only sober, strong and healthy men, never one who
has not successfully passed the examination of the attending physician;
second, to order the lock tenders never to allow any man in or out of
the tunnel unless he has spent at least ten minutes within the locks.
Both compression and decompression should be thorough and it cannot be
in less than this time. A stop of only a few minutes in the locks is not
sufficient and this incomplete compression or decompression is the real
cause of the bends. The men become careless after they have been in the
compressed air for some time, and they try to reduce this tiresome
operation to a minimum, hence the duty of the engineer to strictly
enforce this rule. The remedial measures should consist of constant
medical attendance near the shafts and the erection of a compressed air
hospital where the men affected by bends for lack of decompression may
be attended and cured.
THE HUDSON RIVER TUNNELS OF THE PENNSYLVANIA RAILROAD.[13]
The tunnels constructed under the Hudson River for the Pennsylvania
Railroad, consist of two parallel tubes driven side by side 14 ft.
apart. The tubes are of circular cross-section, 23 ft. exterior
diameter, and are lined with cast-iron rings. The tunnels were driven
from two shafts, one on the eastern shore of the Hudson River near 32nd
St. and 11th Ave., New York; the other at Weehawken, New Jersey, near
the piers of the Erie Railroad. The horizontal distance between the
shafts was 6550 ft. The permanent one at Weehawken was built on a square
plan, 130 ft. to a side. It was lined with concrete masonry and the
walls were battered in such a way as to become the shape of an inverted
frustum of a pyramid. It was provided with five openings at the bottom,
four of these are used by trains that run in the open, the fifth one
leads to a power house near by. During the construction of the tunnels
one-third of this shaft was used for the land portion of the tunnel
under Bergen Hill, while the remaining two-thirds were devoted to the
construction of the tunnel under the river. The working shaft on
Manhattan Island was a side shaft of rectangular plan 30 ft. by 22 ft.,
the tunnel proper being connected by two drifts 10 ft. by 10 ft. each.
The shield rooms 23 ft. long, were situated on both sides of the river
just in front of the shafts. On the New York side, the shields, one for
each tube, were built inside the iron lining of the shield chamber, and
the hoisting tackle was slung from the iron lining. The erection on the
Weehawken side was done in the bare rock excavation where timber
falsework was used. After the shields were finished and in position, the
first two rings of the lining were erected in the tail of the shield.
These rings were firmly braced to the rock and the chamber lining; then
the shields were shoved ahead by their own jacks, another ring was built
and so on.
[13] Condensed from paper by James Forgie, “Eng. News,” Vol. LVI, and
by H. B. Hewett and W. L. Brown, “Proc. Am. Soc. C. E.”, Vol. XXXVI.
[Illustration: ~Rear Elevation of Shield.~
~Vertical Section.~
~Half Section A-B.~
~Half Section C-D.~
~Horizontal Section.~
FIG. 138.--General Elevations and Sections of Shield.]
=Shield.=--The shields used in these tunnels were designed by Mr. James
Forgie, M. Inst. C. E. and M. Am. Soc. C. E., and were provided with
three innovations: the segmental doors, the sliding platforms and the
removable hood. The shields, Fig. 138, were circular, 23 ft. 6¹⁄₄ ins.
in external diameter, and were 16 ft. long, exclusive of the hood. The
tail of the shield overlapped the lining, the maximum being 6 ft. 4¹⁄₂
ins. during ordinary working; the minimum, 2 ft. during the operation of
taking any ram out for repairing. The shields had only one transverse
bulkhead made up of two continuous horizontal platforms and three
vertical partitions stiffening angular web plates fore and aft the ram
chambers. They were connected by angles and skin plates which formed a
ring-shaped frame 25 ins. thick radially and nearly 5 ft. long. Between
the vertical and horizontal partitions were left openings which either
were partially or entirely closed by segmental doors pivoted on an axis
parallel to the face of the shield bulkhead. There were nine of such
openings on each shield, the clear width being 2 ft. 7 ins., the height
varying from 2 ft. 2 ins. to 3 ft. 4 ins., according to the location.
The hood at the front of the shield was designed so as to be detached
underground and was made of complete segments to permit easy erection or
detachment. The hood was extended as far as the upper platform, thus
protecting only the roof of the excavation. It was attached to the
shield by means of bolts, and, when removed, it was replaced by the
cast-steel cutting-edge, built in 24 sections and placed all around the
shield. The eight sliding platforms, another characteristic of this
shield, could be extended 2 ft. 9 ins. in front of the shield by means
of hydraulic rams, and, when so extended, were able to stand a pressure
of 7900 lbs. per sq. ft. These sliding platforms were used as hoods for
the protection of the men working through loose soils, while in rock
they enabled the drilling and blasting to be carried on at three levels.
A water trap or bird fountain was constructed, at the rear of the
bulkhead of the shield, by means of angle irons to which steel plates
were bolted. The opening to the face was so spacious that in an
emergency the men could readily escape by getting over this trap into
safety. Besides, with the assistance of compressed air, it was
sufficient to perfectly trap the water-bearing ground, in case the face
collapsed. Including rams and erector, the total weight of the shield
was 193 tons.
=Hydraulic Rams.=--The shield was operated by hydraulic pressure. The
machines were designed for a maximum pressure of 5000 lbs., to a
minimum of 2000 lbs., while the average working pressure was 3500 lbs.
per sq. in. The forward movement of the shield was obtained by means of
24 single-acting rams 8¹⁄₂ in. in diameter and with 38 in. stroke. Each
ram exerted a pressure of nearly 100 tons, so that the combined action
of the 24 rams was equal to 2400 tons. Each sliding platform was
operated by two single-acting rams 3¹⁄₂ ins. in diameter and with 2 ft.
9 in. stroke. The rams were attached to the rear face of the shield and
the front ends of the cylinders to the front ends of the sliding
platforms, and since the cylinders were movable and free-sliding so also
were the platforms.
=Erector.=--The erector, a box-shaped frame mounted on a central shaft,
revolved in bearings attached to the shield. Inside this frame there was
a differential hydraulic plunger of 4 in. and 3 in. diameters and 48 in.
stroke. To the plunger head were attached two channels which slide
inside the box frame and to the projecting ends of which the grip was
attached. At the opposite end of the box frame was attached a
counter-weight which balances about 700 lbs. of the tunnel segment at 11
ft. radius. The erector was revolved by two single-acting rams fixed
horizontally to the back of the shield, above the erector pivot, through
double chains and chain wheels which were keyed to the erector shaft.
=Air Locks.=--Two bulkhead walls, forming the rear closure of the
pneumatic sections, were built in each end of each tunnel, one just
ahead of the shield chamber, the other about 1200 ft. ahead of the
first. The walls were built of Portland concrete 10 ft. thick, and they
were grouted with Portland cement, under a pressure of nearly 100 lbs.
per sq. in., to make them thoroughly air-tight. Each wall had in it
three locks; for man, material and emergency. Each was equipped with
hand valves arranged to be operated from either outer end or from
within. The floors of the man and material locks were on a level with
the working platform of the tunnel, about 3 ft. 6 ins. above the invert;
the floor of the emergency lock was about 5 ft. above the horizontal
axis of the tunnel. The locks were made of steel plates and shapes, with
iron fittings riveted and bolted together. The man lock was 11 ft. long
of elliptical cross-section, 6 ft. vertical diameter and 5 ft.
horizontal; the material lock was 25 ft. long, with circular
cross-section, 7 ft. diameter, and the emergency lock was 20 ft. long,
of elliptical cross-section, 4 ft. vertical and 3 ft. horizontal
diameters. Fig. 139 shows the elevation of the air lock used in the
Pennsylvania tunnel.
[Illustration: ~Sectional Elevation~
~Horizontal Section~
FIG. 139.--Plan and Elevation of First Bulkhead Wall in South Tube
Manhattan.]
=Excavation.=--In driving these tunnels almost any kind of material was
encountered, viz., rock, partly rock, and partly loose soil, sand and
gravel, and finally silt.
=Rock.=--Much of the rock excavation was made before the shields were
erected in order to avoid the handling of rock through the narrow
openings of the shield doors. Throughout the cross-section the shield
traveled on a cradle of concrete in which 2 or 3 steel rails were
imbedded. At the points where the excavation had been made for the full
section of the tunnel, it was only necessary to trim off the projecting
corners of rock. Where only the bottom heading had been driven the
excavation was completed just in front of the shield; the drilling below
the axis level being done from the heading itself, and above that from
the front sliding platforms of the shield. The holes were placed near
together and were drilled short; very light charges of powder were used
in order to lessen the chance of knocking the shield about too much.
=Mixed Face.=--When the rock dipped to such an extent that the front of
the tunnel was excavated partly in rock and partly in loose soil, the
compressed air was turned on, starting with a pressure varying from 12
to 18 lbs. When the surface of the rock was penetrated, the soft face
was held up at first by horizontal boards braced from the shield until
the shield was shoved. The braces were then taken out and, after the
shield had been shoved, were replaced by others. As the amount of soft
ground in the surface increased, the system of timbering was gradually
changed to one of 2-in. poling-boards. These rested on top of the shield
and were supported by vertical breast-boards which in turn were held by
6-in. by 6-in. walings, braced through the upper doors to the iron
lining and from the sliding platforms of the shield.
=Sand and Gravel.=--Sand and gravel were only met at Weehawken, where
two different methods were used. The first method was employed when the
roof of the excavation was through sand. It consisted of excavating the
ground 2 ft. 6 ins. ahead of the cutting-edge, the roof being held in
place by longitudinal poling-boards. These boards rested on the outside
of the skin at their back end, and at the forward end on vertical
breast-boards, braced from the sliding platforms and through the shield
doors to cross timbers in the tunnel.
The second method of timbering was used in the presence of gravel at the
upper part of the excavation. In such a case, the excavation was only
carried 1 ft. 3 ins. (half a shove) ahead of the cutting-edge, the roof
being supported by transverse boards held by pipes which rested in holes
left in the shield. After a small section of the ground had been
excavated a board supported by a pipe that was inserted underneath and
wedged to it was placed against the ground. These polings were kept
below the level of the hood, so that when the shield was shoved, they
would come inside of it; in addition they were braced with vertical
posts from the sliding platform. The upper part of the face was held by
longitudinal breast-boards braced from the sliding platform by vertical
pieces. The lower part of the face was supported by vertical sheeted
poling, braced to the tunnel through the lower doors. Straw and clay
were used in front of the boards to prevent the escape of air which was
very large, when the tunnel was excavated through sand and gravel. The
average rate of progress in these materials was 5.1 ft. per day.
=Silt.=--When silt was encountered, the shield was shoved into the
ground without any excavation being done by hand ahead of the diaphragm.
As the shield advanced the silt was forced through the doors into the
tunnel. Forcing the shield through the silt resulted in raising the bed
of the river, the amount that the bed was raised depending on the
quantity of material brought into the shield. When the whole volume of
the excavation was brought in, the surface of the bed was not affected;
when about 50% was taken in, the surface was raised about 3 ft.; if the
shield was driven blind, the bed was raised about 7 ft. When the shield
was driven blind, the tunnel began to rise for about 2 ins., and the
iron lining was distorted, the vertical diameter increasing and the
horizontal one decreasing by about 1¹⁄₄ ins. It was found, however, that
the tunnel was not affected when part of the excavation was taken, but
if all of it was taken in or the shield was shoved with open doors, the
tunnel was lowered. A powerful aid was thus found for the guidance of
the shield; for, if high, the shield could be brought down by increasing
the quantity of muck taken in, if low, by decreasing it.
The junction of the shields under the river was made as follows: When
the two shields of one tunnel, which had been driven from opposite sides
of the river, approached within 10 ft. of each other, they were stopped;
a 10-in. pipe was driven between them, and a final check of lines and
levels was made through the pipe. One shield was then started up with
all doors closed, while the doors of the stationary shield were opened
for the muck driven ahead by the moving shield. This was continued until
the cutting-edges came together. All doors in both shields were then
opened and the shield mucked out. The cutting-edges were taken off and
the shields moved together again, edge of skin to edge of skin. As the
sections of the cutting-edges were taken off, the space between the skin
edges was poled with 3-in. stuff. When everything except the skin had
been removed, iron lining was built up inside the skins; the gap at the
junction was filled with concrete and long bolts were used from ring to
ring on the circumferential joint.
=Lining.=--The tunnels were lined with cast-iron circular rings of the
segmental bolted type. In some special cases, cast steel was used
instead of cast iron. The rings were made 30 ins. long, with an internal
diameter of 21 ft. 2 ins. and an external one of 23 ft. The rings were
composed of nine equal segments of 77¹⁄₂ ins. external circumferential
length each, except the two segments adjoining the key which were equal
to the other segments with the difference, that one end joint was not
radial but formed so as to make an opening 12.25 ins. wide at the
outside and 12.60 ins. at the inside, which was closed by the key
segment. Each segment had six bolts in the circumferential joint, the
key had one, so that there were 67 bolts in one circumferential joint.
Each of the twelve longitudinal or radial joints had five bolts, in all
127 bolts per ring. The circumferential flanges of each plate were
strengthened by two transverse webs or feathers on each flange. Each
segment was provided with a 1¹⁄₂ in. grout hole closed with a screw
plug. In order to pass around curves, whether horizontal or vertical, or
to correct deviation from the line or grade, tapering was used; by this
is meant the placing of rings in the tunnels which were wider than the
standard rings, either at one side (horizontal tapers or liners), or at
the top (depressors), or at the bottom (elevators). Tapers ¹⁄₂, ³⁄₄ or
even 1 in. were used. The taper rings were made by casting a ring with
one circumferential flange much thicker than usual and then machining it
off to the taper.
=Grouting.=--From the exterior of the tunnel already lined with
cast-iron rings, grout was forced through the holes closed by
screw-plugs, at a pressure of 90 lbs. per sq. in. The grout was composed
of 1 Portland cement and 1 sand by volume and was forced in by a
specially constructed machine, so it formed a shell of cement nearly 3
ins. thick around the exterior of the iron lining. The grouting began at
the lower segment; the cement was forced in until it reached the hole
above, then the hole was plugged, and the grouting was carried on from
the consecutive hole and so on until all the tunnel was finally encased
in grout, as it filled every crevice between the outside of the lining
and the ground as excavated. The cast-iron rings of the tunnel were
covered with a concrete lining which was placed in the following order:
First, on the invert; second, on the duct benches; third, on the arch;
fourth, on the ducts; fifth, on the face of the bench. Before any
concrete was placed, the surface of the iron was cleaned by scrapers and
wire brushes and by washing it with water. The invert was built in
sections 30 ft. long and the duct benches were constructed soon after.
These duct benches were built with several steps for the ducts to be
laid later. They were built by means of a traveling stage on wheels
which ran on tracks on the working platform of the tunnel. The arch was
constructed soon after. First the portion from the duct benches to the
haunches, then the arch proper, was built on traveling centers on tracks
laid on the steps of the duct benches. The concrete was received in
³⁄₄-cu.-yd. dumping buckets, from the flat cars on which they were run;
the buckets were hoisted to the level of the lower platform of the arch
by a small Lidgerwood compressed air hoister. At this level the concrete
was dumped on a traveling car or stage and moved in that to the point
on the form where it was to be placed. For the lower part of the arch
the concrete was thrown directly into the form from this traveling part
of the stage. Fig. 140 shows the cross-section of the tunnel with the
iron lining and concrete.
[Illustration: Section in Sand and Gravel or Rock
Section in Hudson River Silt, with foundations
FIG. 140.--Typical Cross-Sections of One Tube of Pennsylvania Railroad
Tunnel Under the Hudson River.]
=Hauling.=--A working platform, made up of 5-ft. sections, was built
inside the tunnel and kept close to the shield. On this platform two
lines of industrial railway tracks with switches and sidings at the
locks, and a heading, were laid for hauling materials and spoils. These
lines converged into a single track in passing through the air locks. At
the shaft elevators, they terminated in a steel plate floor to avoid
switches. Between the locks of the bulkheads was installed an
electrically driven cable system, to haul the loaded muck up grade and
to empty the flat cars. From the first bulkhead to the shaft, the cars
were hauled up grade by a steam hauling engine. At the Manhattan end
there was one 10-H.P. engine for each tunnel, while at Weehawken one
25-H.P. engine served for both tunnels. Each shaft contained two
elevators driven by a double-cable, reversible single-drum
steam-hoisting engine. A grouty frame was built over the shafts, and on
the platforms over this frame were narrow-gauge tracks, extending from
the elevators to the muck-chutes and to points where the lining segments
were loaded on the cars. The elevators were arranged to stop at both the
ground and the grouty platform levels. The rolling-stock at each of the
tunnels consisted of 75 flat cars for moving the tunnel segments, and of
about 50 muck cars, each of 1¹⁄₄ cu. yd. capacity.
=Plant.=--The plants located at each end of the tunnel near the shafts
were almost identical. Each consisted of three 500-H.P. Stirtling
boilers, which supplied steam at 150 lbs. pressure. Feed water was
supplied by three 13¹⁄₂ metropolitan injectors, and two Blake duplex
pumps. Two Worthington surface condensers, each of 2250 sq. ft.
condensing surface, took care of the exhaust from the engines and
compressors. Condensing water was pumped from the river through a 16-in.
pipe. The high-pressure air was supplied by a duplex Ingersoll-Sergeant
compressor, with cross-compound steam end 14 × 26 × 30 ins. and simple
water-jacket air cylinders 13¹⁄₄ × 36 ins. Its capacity at 100 r.p.m.
was 1085 cu. ft. free air per minute. The maximum pressure was 130 lbs.
per sq. in. The air for the pneumatic working was supplied by three 14 ×
26 × 30 in. duplex Ingersoll-Sergeant compressors. The maximum capacity
of the three was 12,000 cu. ft. free air per minute at 125 r.p.m. and a
discharge pressure of 50 lbs. per sq. in. The suction air was taken from
the outside about 10 ft. above the roof of the engine house. Three
aftercoolers, 32¹⁄₂ ins. × 11 ft. 4 ins., each having 809 sq. ft.
cooling surface of tinned brass tubes, cooled the low-pressure discharge
to within 10° F. of the temperature of the cooling-water. From the
aftercoolers, the air passed into three steel receivers each 54 × 12
ft., placed outside the engine room and fitted with weighing safety
valves. The receivers were connected to two 10-in. mains; one serving
the north, the other the south tunnel. A fourth receiver of the same
size was built to receive the discharge of the high-pressure compressor,
through a 4-in. pipe. The high-pressure water required for the shield
was furnished by three Blake direct-acting, duplex pumps with outside
packed plungers. The steam end was 16 × 18 ins., the water end 2¹⁄₁₆ ×
18 ins. At 55 r.p.m. pumping against 5000 lbs. per sq. in., the capacity
of each pump was 57 gals. per minute. Two of them, one on each tunnel,
were sufficient to run the shields and the third was held in reserve.
The high-pressure water was conveyed to the front by means of a 2-in.
double, extra strong pipe which was buried between the engine room and
the shaft, in a trench, to prevent freezing in cold weather. The
electric current for light and power was supplied by two 100-K.W.
250-volt G.E. direct-current generators directly connected to Ball &
Wood high-speed engines running at 250 r.p.m. The switchboard had two
machine panels, two distributing panels and one panel carrying a circuit
breaker for the traction circuit.
=Illumination.=--The tunnel was lighted by electricity, there being two
rows of lamps, one in the crown and one in the south axial fine. The
lamps were 16-c.p., 240-volt, two-wire system, and were spaced 35 ft.
apart in the crown and 12¹⁄₂ ft. apart on the axial line. In addition,
five nests of 5 lamps each were used at the front. Candles were supplied
for miscellaneous and emergency uses. The sockets for electric globes
were fitted to a wooden reflector, coated with white enamel paint on the
inside.
CHAPTER XXI.
SUBMARINE TUNNELING (Continued); TUNNELS AT VERY SHALLOW DEPTH. THE
COFFERDAM METHOD. THE PNEUMATIC CAISSON METHOD. THE JOINING TOGETHER
SECTIONS OF TUNNELS BUILT ON LAND.
The tunnels on the river bed or at such a shallow depth that only a few
feet of material will remain between the bottom of the river and the
roof of the tunnel can be built in three different ways, viz., (1) by a
cofferdam; (2) by pneumatic caissons; (3) by sinking and joining
together whole sections of tunnels that were built on land.
=The Cofferdam Method.=--=The Van Buren Street Tunnel, Chicago
River.=--According to the cofferdam method, the work is attacked at one
of the shores, and the tunnel built in sections of such length as not to
interfere with the flow of water or the navigation of the river. Round
the entire exterior line of the first section a double-walled cofferdam
is built, and strongly braced transversely, so as to withstand the
pressure of the water. When the water is pumped out, a single-walled
cofferdam is built within the first, leaving sufficient distance between
the two to allow of the construction of the masonry. The soil is then
removed within the inner cofferdam, and the tunnel constructed from the
foundation. When the end of the tunnel reaches the channel end of the
cofferdam, a crib-wall is erected over the end of the completed tunnel.
This crib, in turn, forms the end wall of another cofferdam, built in
continuation of the first, so as to allow the second section to be
proceeded with, and at the same time to facilitate the removal of the
cofferdams of the first section. The work goes on continuously in this
way until the distant shore is reached.
VAN BUREN STREET TUNNEL, CHICAGO.
The Van Buren Street tunnel, built to carry a double-track street
railway under the Chicago River, was completed in 1894 by the cofferdam
method. The special features of the tunnel[14] are: (1) the unusually
large dimensions of the cross-section of 30 ft. × 15 ft. 9 ins.; (2) its
construction inside of cofferdams of great length and width; (3) the
construction under some very high buildings calling for great care and
very strong temporary and permanent supports.
[14] “Eng. News,” April 12, 1892.
The special feature of the work for our present purpose was the
construction of the tunnel across the river. To accomplish this a
cofferdam was built out from the west shore of the river to its middle,
and the tunnel constructed within it like the building of any other
structure within a cofferdam. Transverse and longitudinal sections of
this cofferdam are shown by Fig. 141. As will be seen, it was a simple
double-wall cofferdam, with a clear width between the walls of 58 ft.,
and braced transversely as shown. Inside of this a single-wall cofferdam
of piles was constructed, with a clear width just sufficient to allow
the construction of the masonry within it. When the tunnel end reached
the channel end of the cofferdam, a crib-wall was built over the end of
the completed tunnel, as shown by the drawings. This crib-wall was
intended to form the end wall of another cofferdam, which was built out
from the east shore, and within which the remaining half of the tunnel
was built as the first half had been. The drawings show the character of
the tunnel masonry and of the centering upon which it was built.
[Illustration: ~TRANSVERSE SECTION OF COFFERDAM AND TUNNEL~
~SECTION SHOWING METHOD OF CONSTRUCTING CRIB DAM.~
FIG. 141.--Sections of Cofferdam, Van Buren St. Tunnel, Chicago.]
The Van Buren Street tunnel was the last of the three tunnels under the
Chicago River, constructed according to the cofferdam method. At the
time the tunnels were constructed the bed of the river was 17 ft.
deep. In connection with the harbor and river improvements, the Federal
Government ordered the Chicago River to be lowered so as to give a depth
of 26 ft. of water. This necessitated the lowering of the tunnel roof
and the excavation for a deeper floor which was a very difficult
operation. This work was described in “Eng. News,” Sept., 1906.
THE PNEUMATIC CAISSON METHOD.--THE TUNNEL UNDER THE HARLEM RIVER.
In the early seventies Prof. Winkler proposed to construct a tunnel
under the River Danube to connect the various portions of the Vienna,
Austria, underground railway, and to use caissons in the construction.
Prof. Winkler proposed to build caissons from 30 ft. to 45 ft. long,
with a width depending upon the lateral dimensions adopted for the
tunnel masonry. The caisson was to be made of metal plates and angle
iron with riveted connections on all sides except those running
vertically transverse to the tunnel axis, whose connections were to be
bolted. In the middle of the roof an opening was to be left; this was
for the shaft having the air-locks to allow the passage of men,
materials, and compressed air.
Across the river two parallel rows of piles were to be driven into the
river bed, to fix the place where the caisson was to be sunk. Then the
first caisson near the shore was to be lowered in the ordinary way, and
a second caisson was to be immediately sunk very close to the first one.
When both caissons had reached the plane of the tunnel floor, the sides
which were in contact were to be unbolted and removed, and the small
space between made water-tight. The chambers of the two caissons were to
be opened into a single large one communicating above by means of two
shafts. At the same time that the masonry was being built in the first
two caissons, from the inverted arch up, a third caisson was to be sunk;
and when by excavation it had reached the plane of the projected tunnel
floor, the partitions were to be removed so that the three caissons were
in communication, forming a large single caisson. Then the outer
partition of the first caisson was to be removed, and the masonry of the
submarine tunnel connected with the portion of the tunnel built on land.
In a similar manner all the caissons were to be sunk; and when the last
one was placed, and the masonry lining constructed, and connected with
the portion of the tunnel built on the other shore of the river, the
partition walls were to be battered down, and the submarine tunnel
completely constructed and open to traffic.
=The Harlem River Tunnel.=--The pneumatic caissons method was employed
in the construction of the tunnel under the Harlem River for the New
York Rapid Transit Railway. The tunnel proper consisted of two parallel
tubes riveted to each other and surrounded by a cradle of concrete as
shown in Fig. 121, page 216. The tunnel was built in three
sections:--The first, from the Manhattan shore well towards the middle
of the river; the second, from the shore of the Bronx towards the middle
of the river; and the last, the section uniting the other two and
completing the tunnel.
Each section was built within a specially constructed working-chamber,
consisting of timber side walls forming a wooden caisson, so constructed
that compressed air could be used. This working-chamber of Mr. McBean
presented some novel features, inasmuch as the caisson was not built on
land, but under water.
In building the tunnel, the Harlem River was dredged to a certain depth,
so as to leave only 6 ft. or 8 ft. of excavation to be done before
reaching the line of sub-grade of the proposed structure. Two service
platforms were built on piles 10 ft. apart longitudinally, and cut off
at a point above mean high-water mark, braced in the usual manner, and
covered with heavy planks, to serve as the floor of the platform. On
this platform were placed rails for the trains used in the
transportation of materials. These platforms were also used in
maintaining the perfect alignment of the caissons.
Within the platforms and along the dredged channel four longitudinal
rows of piles were sunk. These piles were accurately brought to line by
beams bolted together, and placed across and above the water-level. A
few beams were also added for the purpose of bracing the piles
transversely, after which they were cut off under water and capped.
[Illustration: FIG. 142.--Showing Working Platforms and Piles Sunk in
the Dredged Channel.]
Fig. 142 shows the manner in which the working platforms were
constructed, and also the rows of piles sunk in the dredged channel.
Between the piles a very strong frame was placed, made up of waling
pieces and two transverse beams 14 ins. by 14 ins. each, placed one
below the other at a distance of 5 ft. 8 ins., and strongly braced
together. Guiding-beams were fixed on each side of the frame for the
sheeting piles. The frames were built in sections of different lengths,
and placed directly above the cap-pieces of the pile-bents sunk in the
dredged channel.
The longitudinal sides of the caisson were constructed by sinking two
rows of sheeting piles, each row being close to a service platform. The
sheeting piles were made up of yellow-pine timbers 12 ins. by 12 ins.;
three piles bolted together formed a section 3 ft. wide. Each section
was grooved and tongued, so as to be firmly connected with the adjacent
sections to be sunk. The lower ends of the piles were cut wedge-shaped,
with a sharp edge to offer a small resistance while penetrating the
soil. The sheeting-piles were then cut off under water, which operation
was successfully carried out by means of a circular saw operated by a
pile-driving machine. The sheeting was also extended between two
platforms to make a bulkhead, and in this way the four sides of the
caisson were built up. Particular attention was always given to the
alignment of the sheeting piles, which was obtained by guiding the piles
with the timbers placed longitudinally, one below the water-line in
connection with the frames located between the pile-bents, and the
second along the inner edge of the service platform, as shown in Fig.
143.
[Illustration: FIG. 143.--Showing Sheeting-Piles for the Sides of the
Caisson and Trussed Beam for the Roof.]
The caisson was completed by placing a roof covering the sides. This
roof was 40 ins. thick, made up of three layers of 12-in. beams placed
transversely to the axis of the caisson, while between the beams planks
2 ins. thick were placed lengthwise and bolted together, so as to make a
firm, solid structure. The roof was built ashore, in sections each
varying from 39 ft. to 130 ft. long. The edges of the roof fitted the
sides of the caisson perfectly; and when each section was towed to the
proper spot, it was sunk and made secure. Under the roof were placed six
longitudinal beams, 12 ins. by 14 ins., called “rangers,” resting on the
cap-pieces of the pile-bents that were laid across the space of the
proposed tunnel; while the extreme rangers were used for the purpose of
fitting above the sheeting-piles of the caisson, in order to make the
latter water-tight. The two extreme rangers were provided with
=T=-irons, the flat side being laid on the sheeting-piles, while the web
penetrated the ranger by reason of the weight of the load resting on the
roof, for the purpose of sinking it to the required point. Earth was
next heaped on the roof, and in this way a large working-chamber was
prepared, as shown in Fig. 144.
[Illustration: FIG. 144.--Showing the Caisson with the Working-Chamber.]
The working-chamber built on the Manhattan side of the Harlem River was
216 ft. long, provided with two rectangular shafts 7 ft. by 17 ft.,
rendered water-tight, and rising above the high-water mark of the river.
Within these shafts the air-locks of the tunnel tubes were placed, so
that the work could be carried on by means of compressed air. The
pressure of the air was used to expel the water, being sufficiently
intense to equilibrate a column of water equal to the depth of the
lowest point of the roof of the caisson.
When the working-chamber was constructed, the tunnel proper was begun by
excavating the soil down to the required level; the concrete was then
laid on. It was just at this point, when a large part of the roof was
constructed and supported only by the sheeting-piles of the sides of the
caisson, that the writer of this article feared that this novel method
of tunneling would prove a failure. The tendency of the timber to float,
aided as it was by the air pressure within the caisson, was counteracted
only by the weight of the earth heaped on the roof, and by the friction
of the soil against the feet of the sheeting-piles. This friction was
only a small quantity, as the soil was loose, so that it was considered
rather risky and dangerous to place reliance on such a feeble quantity.
This fear was, unfortunately, justified on two occasions, when on
cutting off a portion of the pile-bents some of the sheeting-piles got
loose and water flooded the whole chamber, but, happily, without loss of
life. As the chamber was one of large dimensions, the workmen had time
enough to effect their escape. It may be remarked that during these
troubles only a few of the sheeting-piles were displaced, while the
caisson itself offered a stout and successful resistance, due to its
being strongly braced transversely. The accidents were, therefore,
limited to a few piles, instead of affecting the entire caisson. On the
occasion of the first, the repairs were effected by sinking the piles to
a greater depth, continuing down until rock was encountered. After that,
the water was pumped out and the work resumed. In repairing the second
accident, the sheeting-piles were driven down to bed-rock, and the
surrounding soil strengthened by cement forced through the loose soil
around the piles. This remedy proved effective, and no further trouble
occurred to delay the work on the Manhattan side of the Harlem River.
[Illustration: FIG. 145.--Showing the Tunnel Constructed within the
Caisson.]
On the concrete bed of the tunnel the segments of the metal lining were
placed and surrounded by concrete, as required by the plans and
specifications (Fig. 145). The contractors had planned to unbolt the
roof from its holdings, to remove by means of dredgers the earth which
had been heaped on it, and thus set the roof afloat, after which it was
to be towed within the two working platforms already erected on the
Bronx shore. But Mr. McBean devised a simpler and more economic, but at
the same time more dangerous, way of constructing this second section of
the tunnel. He thought that the upper half of the tunnel proper could be
used instead of the timber roof, thereby reducing the capacity of the
working chamber, and limiting the use of compressed air. In this way he
dispensed with the removal of timber, and also of the earth heaped on
the roof.
In building this Bronx section, a channel was dredged along the line of
the tunnel to a depth of 5 ft. from the foundation-bed of the proposed
tunnel. The working platforms were constructed on both sides of this
channel, quite similar to those erected on the other half of the tunnel;
and between them pile-bents were sunk, capped with 12-in. by 12-in.
beams. Over the cap-pieces rangers were placed longitudinally, which
also rested on the sides of the wooden working caisson, Fig. 146. The
sheeting-piles were cut off at level, but much lower down than in the
first half of the tunnel.
The roof was built on floats made of 12-in. by 12-in. timber laid
transversely 4 ft. apart and supporting a floor of 3-in. by 12-in.
planks rendered water-tight. The sides of the floats were made by
verticals, 4 ins. by 6 ins., and planks, 3 ins. by 12 ins., carefully
caulked. A temporary floor was built on the base of the float,
consisting of transverse beams, 16 ins. by 16 ins., placed 8 ft. apart.
A center piece, 10 ins. by 16 ins., was laid so as to correspond with
the axis of the tunnel; and on each side of it, other parallel beams, 16
ins. by 16 ins., corresponding to each center of the circular metal
lining of the tunnel; the beams, longitudinal and transversal, were
strongly bolted together. The temporary floor was completed by boarding
the spaces left between the various beams.
[Illustration: FIG. 146.--Showing Sides of the Caisson and Supports for
the Roof.]
On this float, the upper half of the tunnel was constructed by erecting
the segments of the metal lining, which were strongly supported, so as
to prevent any settling or distortion; the concrete was then built up in
a large flange with vertical suspension rods, four to each bar. The
rings of the tunnel were 6 ft. each, the weight of each lining being
41,000 lbs., the concrete covering 618 cubic feet. The second part of
the tunnel was 300 ft. long, with roof constructed in three
sections--two of 90 ft. in length each and the third of 84 ft. Each of
these sections alternated with a smaller section, 12 ft. long, provided
with air-locks. The shortest of the three sections was the first one set
up, and was constructed close to the Bronx side of the Harlem River. For
this purpose the two extreme ends of the section were closed by means of
steel plates forming diaphragms, built 6 ft. inward, thus leaving one
ring projecting out at each end. Openings were left on the top of these
projecting rings for access by divers. The exterior of the upper half
section of the permanent tunnel was filled with water until it was
lowered into position. It was directed by means of tackles attached to
vertical eye-bars, which were strongly fixed to the flanges of the
springing line of the arch, and bolted to the beams of the temporary
floor. In this way the roof was towed into place, and lowered by means
of stone ballast, until it rested on the cap-pieces and frames of the
pile abutments, the sides of the roof remaining just on top of the
sheeting-piles that formed the sides of the caisson, as shown in Fig.
147. Perfect alignment was obtained by wires strung at each end and
along the side of the roof, corresponding to points fixed on the working
platforms and sighted with transits. Such accuracy was obtained that the
circumferential flanges of the outer 6-ft. ring were brought into
contact with those of the 12-ft. section already constructed. A diver
then entered by the opening left in the projecting ring, and bolted this
section of the roof to the preceding one. By removing the iron
diaphragm, the consecutive sections were united into one. When the diver
completed his work, the opening was closed up, and compressed air used
to keep the water out of the box included between the roof and the
temporary flooring.
[Illustration: FIG. 147.--Showing the Roof of the Caisson Formed by the
Upper Half of the Tunnel.]
The remaining sections of the tunnel roof were built in the same way,
until the last abutted against the part of the work constructed within
the caisson under the high wooden roof on the Manhattan side of the
river. The following method was adopted for the purpose of connecting
the few parts of the tunnel which had been differently constructed. The
diaphragm at the end of the last section of the tunnel roof was
constructed so as to abut against the last circumferential flanges of
the iron lining without leaving a projecting ring. It was continued
above the metal and concrete lining of the roof in a rectangular form,
and of the same height and width as the wooden bulkhead of the
working-chamber on the Manhattan side of the river. The diaphragm was
made of riveted plates and angles, with an opening 20 ins. by 30 ins.,
bolted so as to be removable at will. The diaphragm was of the same
height as the roof and was connected with a roof-plate to the rangers
supporting the thick wooden roof. Other steel plates, placed vertically,
were riveted to the diaphragm and bolted to the caisson. All this work
was carried on by divers. The wooden bulkhead was cut to the
springing-line of the arch; and between the two parts of the tunnel,
built by different methods, a bulkhead was placed, made of steel plates
14 ins. long, which prevented the entrance of water into the
working-chamber.
[Illustration: FIG. 148.--Showing the Tunnel Completed by Building the
Lower Half within the Caisson.]
When the different sections were joined together, and all the openings
closed and made water-tight, cement-grout was poured on the roof, and
earth was heaped up to a height of 5 ft. The 300 ft. of the roof,
resting on sheeting-piles and provided with diaphragms at the extreme
ends, formed a water-tight working-chamber, or caisson, communicating
with the exterior by means of the shafts and air-locks. The lower
portion of the tunnel was built under air-pressure. The pile-bents were
first cut off at the plane of the tunnel sub-grade, after which the
foundation-bed of concrete was laid. The lower segments of the iron
lining were then placed in position, and the structure made continuous
by building up the lateral walls, consisting of concrete (Fig. 148). No
accidents occurred while building the second part of the tunnel.
The Harlem River tunnel was completed in contract time, although the
opening of the subway was delayed by difficulties encountered in
tunneling through rock in the borough of the Bronx. The writer
endeavored to obtain information regarding the expense per linear foot,
but all his efforts were rewarded with a general assurance that it
proved to be the cheapest method.
SINKING AND JOINING TOGETHER SECTIONS OF TUNNELS BUILT ON LAND. THE
SEINE. THE DETROIT RIVER TUNNELS.
In the year 1896, Mr. Erastus Wyman secured a patent for building
subaqueous tunnels close to the river, by sinking and joining together
small sections of tunnels previously built on land. Each section would
have been provided with a long vertical tube for the air-lock when
compressed air was to be admitted to expel the water and permit the
construction of the lining within the sunken shell. Thus each section of
the tunnel would have acted as a pneumatic caisson; being, however, an
improvement on Professor Winkler’s suggestion inasmuch as the caisson
was a portion of the tunnel itself, instead of a simple inclosure for
facilitating the construction of the shield. Mr. Wyman proposed to use
this method in the construction of a tunnel between South Brooklyn and
Stapleton, Staten Island; a charter was granted him but the tunnel was
never built.
=The Tunnel under the Seine River.=--The caisson method of building
tunnels under water was used at Paris, France, in the construction of
the Metropolitan Railroad under the Seine River.
The caissons designed by Mr. L. Chagnaud were for a double track line.
They were sunk, ends to ends, and formed a portion of the tunnel lining
which was enveloped by a framework of metal embedded in concrete.
Built-up frames carried a shell of steel plating on the sides, from toes
to springing lines, and on the sides and roof of the working-chamber. A
temporary plate diaphragm closed the open ends. This construction formed
a vessel capable of floating with a very light draft.
The method of sinking the caissons was as follows: The caisson was
erected on the river bank and when completed it was launched and towed
into position between pile stagings which served the double purpose of
guiding the descent at the beginning of the sinking and of forming a
working platform. The caisson when launched and, consequently, before
the cast-iron lining had been put in place within it, weighed 280 metric
tons; but, beyond some difficulty in taking it under the bridges in the
way, the towing was accomplished without serious trouble.
[Illustration: FIG. 149.--Transversal Section of the Caissons for the
Tunnel under the Seine River.]
Previous to placing the caisson in position between the stagings, the
portion of the river bed it was to rest upon had been leveled by
dredging. Once in position, the first work was the erecting of the
cast-iron lining segments within the framework. Work was then begun by
filling the annular space between the lining and the shell with
concrete; this additional weight gradually sunk the caisson to the river
bottom. The working shafts, made up of steel cylinders, were placed as
the sinking progressed to this point.
[Illustration: ~Section A-B.~
~Section C-D.~
~Plan at Joint.~
FIG. 150.--Showing the Joining of the Caissons at the Pont Mirabeau
Tunnel under the Seine River.]
After the caissons had been sunk to the required place and in
continuation of one another, a space of nearly 5 ft. was left between
them. The construction of the tunnel within the bank of earth
separating the two caissons was as follows: A cofferdam was built around
this space. It was formed by two diaphragms closing the ends of the
tunnel, and by two longitudinal walls sunk as temporary caissons, one on
each side of the tunnel and inclosing their ends. This cofferdam was
covered with a metal working-chamber whose lower edges rested on top of
the four walls of the cofferdam. The joints were made tight by means of
rubber or packed clay. The water in the cofferdam was then pumped out,
the earth excavated, and the masonry built in continuation of the two
ends of the tunnel sections. The submerged sections of the tunnel which
were allowed to remain full of water to render them more stable and to
save effort in pumping them, were now made dry; the diaphragms were
removed from the ends of the caisson tunnels and the work made
continuous. Fig. 149 shows the cross-section of the caissons.
At the Pont Mirabeau crossing of the Seine, a slightly different method
was used, described in “Eng. News,” May 18, 1911. The caissons were sunk
to the required line and grade with an intervening longitudinal space of
15³⁄₄ ins. between two adjoining caissons. At each end of this space,
which was filled with the river marl, was sunk against the edges of the
caissons a hollow cylinder 20 ins. outside diameter. The interior of
these cylinders was excavated and filled with concrete, thus forming a
continuous wall on both sides of the two adjoining caissons. The earth
from the intervening space was then removed and concrete deposited from
bottom opening tremies up to the level of the top of the caisson. After
nearly one month the tunnel was entered from the shaft and an opening
the shape and size of the tunnel section cut through the diaphragms of
the 15³⁄₄-in. wall and the concrete tunnel lining made continuous
between the two sections. Fig. 150 shows the method of joining the
caissons.
=The Detroit River Tunnel.=[15]--With some modifications which permitted
dispensing with compressed air, the tunnel under the Detroit River was
built for the Michigan Central Railroad, connecting Detroit with
Windsor, Canada. The tunnel is 6625 ft. long; of this, however, only
2625 ft. are under the river, while the approach on the American side is
2000 ft. long and that on the Canadian side, 4000 ft. The tunnel
consists of two parallel circular tubes 23 ft. in diameter, built up of
³⁄₈-in. steel plate. They are placed 26 ft. apart, center to center, and
are connected by diaphragms at 12-foot intervals.
[15] Condensed from a paper by B. H. Ryder.
Each section of the subaqueous tunnel is approximately 262 ft. long.
There are ten of these sections and an eleventh a little over 60 ft.
long. These tubes were built at the shipyards of the Great Lakes
Engineering Works at St. Clair, about 30 miles from Detroit. After the
assembling was completed, the ends of each tube were closed by temporary
wooden bulkheads to make them float, and the outside sheathed
horizontally with heavy timbers bolted to the diaphragms. This sheathing
running lengthwise of the tube made a form or pocket, into which the
inclosing jacket of concrete was placed. The sections were then launched
and towed down to the tunnel site and sunk separately in a trench on the
river bottom that had been previously dredged to receive them. This
trench was dug to a width of 50 ft. and depth varying from 25 to 50 ft.
by clamshell buckets, swung from a scow, working to a depth below the
water level of 60 to 90 ft.
As a foundation for the sections, a grillage was constructed on the
surface and sunk in place in the trench by derricks swung from a scow.
The grillage was placed underneath each joint between the sections and
built up of I-beams imbedded in concrete. This grillage is the width of
the trench and about 30 ft. long, with posts projecting downward from
the four corners, and these were seated into the river bottom, by means
of pile drivers, to the desired grade.
Then the eleven sections of the tunnel were lowered and connected, one
at a time. By the aid of air tanks placed on each section the movement
was controlled until the final sinking upon the grillage in the trench.
This operation called into play the greatest engineering skill and
ingenuity. When it is considered that the current velocity at the river
bed is about 2 ft. per second and much higher along the surface, some
idea can be gained of the problems to be overcome. The movement of the
enormous sections must be absolutely under control. Thirty-five-ton
blocks of concrete were sunk in the river bottom up and down stream to
act as anchors, and through them cables were rigged and connected back
to the hoisting engines on the derrick scows. These were prevented from
moving by spuds at each corner, securely driven into the river bottom at
depths sometimes as great as 90 ft. Controlling cables were also run
from the sections to the tremie scow to pull one structure close to the
adjoining section previously sunk, and the divers made the necessary
connection. Fig. 151 shows cross-sections and plans of the tunnel as
given in “Eng. Record,” March 2, 1907.
[Illustration: ~HALF CROSS SECTION Y-Y~
~HALF CROSS SECTION Z-Z~
~HALF HORIZONTAL SECTION X-X~
~HALF TOP VIEW~
FIG. 151.--Cross-Sections and Plans of the Detroit River Tunnel.]
Steel masts had been previously attached to each end of the sections to
enable the engineers on shore to determine the alignment and locate the
exact position during the sinking.
Concrete was then deposited in the pockets, completely surrounding the
tubes, forming a solid monolithic structure from end to end.
This was done by means of the tremie process.
A 32-ft. by 160-ft. scow was equipped with a concrete mixing plant and
the tremie pipes, three in number, through which the concrete was
deposited. Each pipe is 12 ins. in diameter, of spiral riveted steel, 80
ft. long. These pipes could be raised or lowered, reaching from the
receiving hoppers on the scow to the bottom of the trench. When the
pipes were filled with concrete and lowered into position, a continuous
flow was maintained. As fast as the concrete escaped at the bottom end
of the pipe it was replenished at the top; this process continuing until
the entire space surrounding the section was filled to the desired
level, and under the pressure produced not only by the depth of water
under which it was submerged, but also by the weight of the long column
of concrete contained in the tubes. It is interesting to note that this
is the first time a large amount of concrete has been deposited at a
depth of 70 ft. by this method, and upon the accomplishment of this task
in a measure depended the successful building of the tunnel.
Inside the tubes was placed a lining of reinforced concrete 20 ins.
thick. Side walls were built up from this ring to provide ducts, which
carry the electrical cables for the distribution of power, lighting,
signal and telegraph wires. They also serve to provide a footwalk along
the side of the tunnel.
There are cross passages in the tunnel every 200 ft., and also various
niches for the different equipment needed in connection with the
signaling, telephone and fire alarm system. The tunnel is lighted with
800 16-candle-power incandescent lights.
The track construction is new. There is no ballast used, the ties being
laid in concrete. A ditch in the center of each track carries the
rainfall that will flow down from the summits to sumps which are drained
by centrifugal pumps.
One remarkable feature of its construction is that compressed air was
not used in the building of the subaqueous tunnel, but it was necessary
in building the approach tunnels. This is contrary to the usual program
where compressed air is required in subaqueous work, and not ordinarily
used in approach or land tunnel construction.
The trains are operated by very heavy electric locomotives, operated by
the third-rail system.
The tunnel was constructed under the supervision of W. S. Kinnear, Chief
Engineer of the Detroit River Tunnel Co.; Butler Bros. of New York were
the general contractors.
CHAPTER XXII.
ACCIDENTS AND REPAIRS IN TUNNELS DURING AND AFTER CONSTRUCTION.
In the excavation of tunnels it often happens that the disturbance of
the equilibrium of the surrounding material by the excavation develops
forces of such intensity that the timbering or lining is crushed and the
tunnel destroyed. To provide against accidents of this kind in a
theoretically perfect manner would require the engineer to have an
accurate knowledge of the character, direction and intensity of the
forces developed, and this is practically impossible, since all of these
factors differ with the nature and structure of the material penetrated.
The best that can be done, therefore, is to determine the general
character and structure of the material penetrated, as fully as
practicable, by means of borings and geological surveys, and then to
employ timbering and masonry of such dimensions and character as have
withstood successfully the pressures developed in previous tunnels
excavated through similar material. If, despite these precautions,
accidents occur, the engineer is compelled to devise methods of checking
and repairing them, and it is the purpose of this chapter to point out
briefly the most common kinds of accidents, their causes, and the usual
methods of repairing them.
=Accidents During Construction.=--Accidents may happen both during or
after construction, but it is during construction, when the equilibrium
of the surrounding material is first disturbed, and when the only
support of the pressures developed is the timber strutting that they
most commonly occur.
=Causes of Collapse.=--Collapse in tunnels may be caused: (1) by the
weight of the earth overhead, which is left unsupported by the
excavation; (2) by defective or insufficient strutting; and (3) by
defective or weak masonry.
(1) The danger of collapse of the roof of the excavation is influenced
by several conditions. One of these is the method of excavation adopted.
It is obvious that the larger the volume of the supporting earth is,
which is removed, the greater will be the tendency of the roof to fall,
and the more intense will be the pressures which the strutting will be
called upon to support. Thus the English and Austrian methods of
tunneling, where the full section is excavated before any of the lining
is placed, and where, as the consequence, the strutting has to sustain
all of the pressures, present more likelihood of the roof caving in than
any of the other common methods.
The character and structure of the material penetrated also influence
the danger of a collapse. A loose soil with little cohesion is of course
more likely to cave than one which is more stable. Rock where strata are
horizontal, or which is seamy and fissured, is more likely to break down
under the roof pressures than one with vertical strata and of
homogeneous structure. Soft sod containing boulders whose weight
develops local stresses in the roof timbering is likely to be more
dangerous than one which is more homogeneous. A factor which greatly
increases the danger of collapse, especially in soft soils, is the
presence of water. This element often changes a soil which is
comparatively stable, when dry, into one which is highly unstable and
treacherous. The liability of the material to disintegration by
atmospheric influences and various other conditions, which will occur to
the reader, may influence its stability to a dangerous extent, and
result in collapse.
(2) Collapse is often the result of using defective or insufficient
strutting. Of course, in one sense, any strutting which fails under the
pressures developed, however enormous they may be, can be said to be
insufficient, but as used here the term means a strutting with an
insufficient factor of safety to meet probable increases or variations
in pressure. Insufficient strutting may be due to the use of too light
timbers, to the spacing of the roof timbers too far apart, to the
yielding of the foundations, to insufficient bearing surface at the
joints, etc. Collapse is often caused by the premature removal of the
strutting during the construction of the masonry. The masons, to secure
more free space in which to work, are very likely, unless watched, to
remove too many of the timbers and seriously weaken the strutting.
(3) The third cause of collapse is badly built masonry. Poor masonry may
be due to the use of defective stone or brick, to the thinness of the
lining, to poor mortar, to weak centers which allow the arch to become
distorted during construction, to poor bonding of the stone or bricks,
to the premature removal of the centers, to driving some of the roof
timbers inside it, etc.
=Prevention of Collapse.=--Tunnels very seldom collapse without giving
some previous warning of the possible failure, and also of the manner in
which the failure is likely to occur. From these indications the
engineer is often able to foresee the nature of the danger and take
steps to check it. The danger may occur either during excavation or
after the lining is built. During excavation the danger of collapse is
indicated beforehand by the partial crushing or deflection of the
strutting timbers. If the timbers are too light or the bearing surfaces
are too small, crushing takes place where the pressures are the
greatest, and the timbers bend, burst, or crack in places, and the
joints open in other places. The remedy in such cases is to insert
additional timbers to strengthen the weak points, or it may be necessary
to construct a double strutting throughout. When the distance spanned by
the roof timbers is too great, failure is generally indicated by the
excessive deflection of these timbers, and this may often be remedied by
inserting intermediate struts or props. In some respects the best
remedy under any of these conditions is to construct the masonry as
soon as possible.
When collapse is likely to occur after the masonry is completed, its
probability is generally indicated by the cracking and distortion of the
lining. A study of the cause is quite likely to show that it is the
percolation of water through the material surrounding the lining which
causes cavities behind the lining in some places, and an increase of the
pressures in other places. When it is certain that this water comes from
the surface streams above, these streams may often be diverted or have
their beds lined with concrete to prevent further percolation. When
percolating water is not the cause of the trouble, a usually efficient
remedy is to sink a shaft over the weak point, and refill it with
material of more stable character. These, and the remedies previously
suggested, are designed to prevent failure without resorting to
reconstruction. When they or similar means prove insufficient,
reconstruction or repairs have to be resorted to.
=Repairing Failures.=--Tunnels may collapse in several ways: (1) The
front and sides of the excavation may cave in; (2) the floor or bottom
may bulge or sink; (3) the roof may fall in; (4) the material above the
entrances may slide and fill them up.
(1) One of the most common accidents is the caving of the front and
sides of the excavation. This may often be prevented by taking care that
the face of the excavation follows the natural slope of the material
instead of being more or less nearly vertical. When, however, caving
does occur it may usually be repaired by removing the fallen material,
strongly shoring the cavity, and filling in behind with stone, timber,
or fascines.
(2) The bulging or rising of the bottom of the tunnel may usually be
considered as a consequence of the squeezing together of the side walls.
It usually occurs in very loose soils, and is chiefly important from the
fact that the reconstruction of the side walls is made necessary. The
sinking of the tunnel bottom is a more serious occurrence. It seldom
happens unless there is a cavity beneath the floor, due either to
natural causes or to the fact that mining operations have gone on in the
hill or mountain penetrated by the tunnel. When the bottom of the tunnel
sinks, three cases may be considered: (_a_) when the sinking is limited
to the middle of the tunnel floor; (_b_) when only a portion of the
foundation masonry is affected; and, (_c_) when the entire lining is
disturbed. In the first case repairs are easily made by filling in the
cavity with new material. In the second case the unimpaired portion of
the masonry is temporarily supported by shoring while the injured
portion is removed and rebuilt on a firm foundation. The remaining
cavity is then filled. In the case of the complete failure of the
lining, the method of repairing employed when the roof falls, and
described below, is usually adopted.
(3) The most dangerous of all failures is the falling of the tunnel
roof. In such casualties two cases may be considered: (_a_) When the
falling mass completely fills the tunnel section, and (_b_) when it
fills only a portion of the section.
[Illustration: FIG. 152.--Tunneling through Caved Material by Heading.]
When the whole section is filled by the fallen material, the problem may
be considered as the excavation of a new tunnel of short length inside
the old tunnel, and under rather more difficult conditions. The first
task, particularly if men have been imprisoned behind the fallen
material, is to open communication through it between the two uninjured
portions of the tunnel. It is advisable to do this even when there is no
danger to life because of imprisoned workmen, since it enables the work
of repairing to be conducted from both directions. The excavation of a
passageway through the fallen material is rendered difficult, both
because the fallen material is of an unstable character, and also
because it is usually filled with the lining masonry, timbering, etc.
When, therefore, the accident has happened before the full section of
the original material has been removed, the first heading or drift is
driven through this original material rather than through the fallen
débris. Any of the regular soft-ground methods of tunneling may be
employed, but it is usually better to select one which allows the
masonry to be built with as little excavation as possible at first. For
this reason the German method of tunneling is particularly suited to
repair work of this nature. The Belgian method may also be used to
advantage, particularly when the caving extends to the surface of the
ground above, and the upper portion of the débris is, therefore,
practically the same material as that through which the original tunnel
was driven. The greatest defect of the Belgian method for making repairs
is that the roof arch is supported by a rather unstable mass of mingled
earth, stone, and timber, which constitutes the bottom layer of the
fallen material. The method of strutting the work when the German or
Belgian method is used is shown by Fig. 152. It sometimes happens that
the fallen débris is so unstable that it will not carry safely the arch
masonry in the Belgian method or the strutting in the German method, and
in these cases one of the full-section methods of excavation is usually
adopted. The nature of the strutting employed is shown by Fig. 153. When
the section has been opened and the new masonry built, great care should
be taken to fill the cavity behind the masonry with timber or stone; and
should the disturbance reach to the ground surface it is often a good
plan to sink a shaft through the disturbed material, and fill it with
more stable material.
[Illustration: FIG. 153.--Tunneling through Caved Material by Drifts.]
When the fallen débris fills only a part of the section, the first thing
to provide against is the occurrence of any further caving; and this is
usually done by building a protecting roof above the line of the future
roof masonry. Figs. 154 and 155 show two methods of constructing this
temporary roof, which it will be noticed is filled above with cordwood
packing. As soon as the temporary roof is completed, the lining masonry
is constructed.
[Illustration: FIGS. 154 and 155.--Filling in Roof Cavity Formed by
Falling Material.]
[Illustration: FIG. 156.--Timbering to Prevent Landslides at Portal.]
(4) Landslides which close the tunnel entrance are repaired in a variety
of ways. Fig. 156 shows a common method of preventing the extension of a
landslide which has been started by the excavation for the entrance
masonry. Fig. 157 shows a method often adopted when the slope is quite
flat and the amount of sliding material is small. It consists
essentially of removing the fallen material and building a new portal
farther back; that is, the open cut is extended and the tunnel is
shortened. When the amount of the sliding material is very large, the
contrary practice of lengthening the tunnel and shortening the open cut,
as shown by Fig. 158, may be adopted.
[Illustration: FIG. 157.--Shortening Tunnel Crushed by Landslide at
Portal.]
=Accidents After Construction.=--Accidents after the completion of the
tunnel may be divided into two classes: first, those which entirely
obstruct the passage of trains, of which the collapse of the roof is the
most common; and second, those which allow traffic to be continued while
the repairs are being made, such as the bulging inward of a portion of
the lining without total collapse. In the first case the first duty of
the engineer is to open communication through the fallen débris, so that
passengers at least may be transferred from one part of the tunnel to
the other and proceed on their way. This is done by driving a heading,
and strongly timbering it to serve as a passageway. If the tunnel is
single tracked this heading is afterwards enlarged until the whole
section is opened. In double-track tunnels the method generally adopted
is to open first one side of the section and timber it strongly, so as
to clear one track for traffic. While the trains are running through
this temporary passageway the other half of the section is opened and
repaired; the traffic is then shifted to the new permanent track, and
the temporary structure first employed is replaced with a permanent
lining. When the accident is such that the repairs can be made without
obstructing traffic entirely, various modes of procedure are followed.
In all cases great care has to be exercised to prevent accident to the
trains and to the tunnel workmen. The work should be done in small
sections so as to disturb as little as possible the already troubled
equilibrium of the soil; the strutting should be placed so as to give
ample clearing space to passing trains, and the trains themselves should
be run at slow speeds past the site of the repairs. To illustrate the
two kinds of accidents and the methods of repairing them, which have
been mentioned, the accidents at the Giovi tunnel in Italy and at the
Chattanooga tunnel in America have been selected.
[Illustration: FIG. 158.--Extending Tunnel through Landslide at Portal.]
=Giovi Tunnel Accident.=--In September, 1869, at a point about 220 ft.
from the south portal of the Giovi tunnel, a disturbance of the masonry
lining for a length of about 52 ft. was observed. Accurate measurements
showed that the lining was not symmetrical with respect to the vertical
axis of the sectional profile. It was concluded that owing to some
disturbance of the surrounding soil unsymmetrical vertical and lateral
pressures were acting on the masonry. Close watch was kept of the
distorted masonry, which for some time remained unchanged in position.
In 1872, however, new crevices were observed to have developed, and
shortly afterwards, in January, 1873, the injured portion of the masonry
caved in, obstructing the whole tunnel section. The fallen material
consisted chiefly of clay in a nearly plastic state. The surface of the
ground above was observed to have settled. Investigation showed also
that the cause of the caving was the percolation of water from a nearby
creek. The water had soaked the ground, and decreased its stability to
such an extent that the masonry lining was unable to withstand the
increased vertical and lateral pressures.