The Worcester Commission reports the figures for hogs sold to a packing

company during the last year from the Home Farm. Of the 2,276 hogs sold,

the Commission says only 11 were condemned by the United States

Government Meat Inspectors, an average of only 0.48 per cent. of one per

cent., which average is much lower than it is on hogs shipped in from

the West to the same packing house. It further says: “The feeding

method, however, has been practised with success in many cities,

especially those in New England, for many years. The great difference of

opinion is explained by the efficiency with which the sanitary

conditions at the farm are maintained.” It emphasizes the fact that

farms must be kept clean and in a sanitary manner, and that this method

of garbage disposal requires careful and intelligent supervision, as is

the case with any other method of disposal. No method of disposal will

run itself.

Following are comments received regarding this particular plan of

disposal:

Health Officer C. C. Slemons, of Grand Rapids, Michigan, says: “From

observation I am of the opinion that one of these farms (municipal

piggery), properly conducted, is a paying proposition, but I do not

think to the extent of paying for collection. From my observation I

would be rather skeptical of a city going into this business. It is a

business that needs very close supervision and unless a person is

financially interested in it I doubt very much if the experiment would

pay.”

Mayor Fred. W. Keller, South Bend, Indiana: “Some of this work was done

several years ago. However, there was some objection on the part of

taxpayers to it being hauled out of the city with municipal teams. It

should be fairly profitable, but the farm and hogs should be owned by

the city or the garbage disposed of to the concern that does own the

hogs and farm and this done by receiving competitive bids. I make this

latter suggestion in order to avoid criticism by taxpayers.”

Lawrence, Massachusetts, reports: “Those who have looked into this

question contend that the city swill can be utilized to support a

municipal piggery at considerable profit.”

In a recent report, the Iowa State College says of this method of

disposal: “The only advantage which may be stated in favor of this

method is that it probably costs less, under existing conditions about

most of our cities, than any other available method.”

In one of its annual reports, the Massachusetts State Board of Health

says: “It is objectionable and unsanitary in the extreme, as health

authorities are constantly pointing out. Prominent among the objections

to this method are the great nuisance it usually creates and the

uncertainty of its operation.” The Board says epidemics among pigs

create the uncertainty of operation. It also says that they are breeding

places for flies and rats.

The Chicago Waste Commission’s comment on this method is that it is not

applicable or desirable in a large city, except under inspection and for

restricted private collection.

The _New York Medical Journal_ reported that the garbage collected by

Grand Rapids, at cost of $26,320, is taken by a contractor who last year

paid 45 cents per ton and fed to hogs. It says that over 10,000 hogs are

sold yearly at a value of $135,000 and that 2,400 tons of fertilizer are

produced at a value of about $36,000.

Samuel A. Greeley, Sanitary Expert, says that 75 pigs are required to

dispose of a ton of garbage per day. The equipment at the farm

prescribed by him is: Tracks and cars for distributing the garbage along

concrete feeding platforms; substantial and well-kept sleeping and

warming pens; tanks for sterilizing garbage; apparatus for vaccinating

pigs against cholera; a means of disposing of unconsumed garbage by

burial or incineration and plenty of washing facilities. He further

says: “There should be some method of sorting the garbage before feeding

it to pigs so that the stale garbage may be discarded and buried or

burned. Some places disinfect it by boiling in large caldrons before

feeding. In such cases the cooked garbage is commonly used only as a

base for the feed given to pigs. The method is a most profitable one and

warrants consideration in small cities where isolated farm sites are

available.”

Dumping on Land

It is the consensus of opinion in all reports and of all experts that

this method is objectionable especially where there is a large quantity

to be disposed of. A long haul is necessitated by the location of the

dumps at a remote distance where the decomposition of any part of the

refuse will not be offensive to neighboring property owners. When the

garbage is deposited in sufficient quantity offensive odors due to

fermentation and decomposition may create a nuisance. Unless special

attention is given to the treatment of these dumps, this method will not

be found desirable. A thorough mixing of garbage with ashes and rubbish

will prevent the nuisance and the fires that are otherwise liable to

occur, creating odors and nuisance from the smoke and unconsumed gases.

A report of the Iowa State College states that dumps where ashes and

rubbish and other refuse are deposited are not only unattractive in

appearance, but are detrimental to the health of those living in the

immediate vicinity, and as a city grows, it usually becomes increasingly

difficult to find locations where these dumps can be maintained without

incurring the objections of those living in the neighborhood.

The _Scientific American_ says this method “is one that cannot be

defended either from an æsthetic or sanitary standpoint. The dumps

become an ideal breeding place for flies.”

Dumping in Large Bodies of Water

Only a few cities use this method. In most places where it has been

tried, it has been prohibited because the material is washed on the

neighboring shores.

Disposal by Sanitary Fill

This method is practised by some cities, among them Seattle, Davenport,

and New Orleans, which report its success. It is given more serious

consideration than heretofore by several large cities. The method is

different than that of burial, in that it is carried on by filling

excavations, vacant low lying ground and natural ravines.

The garbage, rubbish and ashes are dumped and then mixed with sufficient

earth to insure oxidation and thorough digestion of the decomposable

wastes. The activity of the bacteria of the soil breaks down and

mineralizes the organic matter and when there is sufficient oxygen, i.

e. air, no putrefaction or other odors result. Success depends upon the

following treatment:

(1) The garbage must not be buried so deep that bacterial activity is

reduced.

(2) The garbage must not be spread in a thick layer on the surface of

the ground.

(3) The ground must be sufficiently open and drained so that air can

penetrate to a sufficient depth.

(4) The garbage must not overload the soil, but must be sufficiently

diluted with earth, ashes and rubbish, so that putrefaction may take

place, due to the presence of an ample supply of air in the pores of the

soil.

The Chicago Waste Commission believes that this method “has been

demonstrated to be not only sanitary, free from nuisance when properly

carried out, but economical as well.” Incidentally, adds the Worcester

Commission, it adds valuable taxable property from which the city

subsequently derives an income.

At Davenport, 1.3 cubic yards of materials are required per ton of

garbage and the total cost of upkeep, including rent of land, labor,

etc., was 50 cents per ton. The garbage is received and buried by one

foreman and three men in summer and one foreman and one man in winter.

The city by this method is creating a valuable river front.

New Orleans seeds its dumping grounds as soon as a sufficient filled

area is available, and later trims and plants the land for use as small

parks and play grounds.

The Health Commissioner of Seattle, in a letter to the _Municipal

Engineering Journal_, describes the system and results as follows:

“This method of filling works very satisfactorily in this climate, but I

believe it necessary to include all waste materials, as ashes, boxes,

tin cans, etc. These all assist oxygenation and nitrification. I do not

believe pure garbage can be handled in this way.

“We also find that it is best to keep as little of the face of the fill

exposed as possible. It is always best to keep a man constantly on the

job, whose duty it is to rake down to the bottom of the fill all boxes,

rough materials, etc., thus leaving the ashes to form a covering on top.

When this is not sufficient, we cover with a layer of earth about five

inches thick.

“The success lies in the proper mixtures of waste materials, and next

the fill must be properly covered to protect from flies. Chemicals can

also be used to protect it. This covering also prevents the slight sour

odor of fresh garbage and by keeping out the sunlight, at the same time

encourages bacterial growth by increasing the warmth inside the fill.

People residing within one hundred feet of these fills make no

complaint, but the public has to be educated when you first adopt this

method. We aim to fill city property, as ravines, swampy lands or docks

on the lake or salt water front.

“Our laboratory findings show that the process is simply one of slow

incineration by nature, instead of the expensive method of burning by

incinerators, and at the same time help prove that there is nothing

detrimental to public health in these fills.

“We have eleven fills distributed over our city, thus making short

hauls, and these are taken care of by eleven laborers disposing of

approximately three hundred and fifty tons per day by this method alone,

while one incinerator with about an equal payroll will only dispose of

sixty to seventy-five tons per day, running twenty-four hours. A fill

increases the value of property, while the refuse from our incinerator

has to be hauled away at an added cost.”

After spreading, there is applied to the garbage an antiseptic spray of

crude carbolic acid, rosin and caustic soda to kill eggs and larvæ of

flies, mosquitoes and other insects that might breed.

Burial

Garbage may be buried by putting it in shallow trenches and covering

with the excavation from the trenches for the next day’s deposit, or by

plowing under. It digests and is thoroughly taken up by or oxidized by

the action of the soil. Experience has shown that for open soil 1.5

acres are required to handle each daily ton of garbage for one year, the

same soil being in shape to re-use after two years. For heavy soils and

those containing clay, about three acres are required and this can be

used again after three years.

The Worcester Commission reports that cities which have buried by

plowing have experienced more than occasional nuisance. Milwaukee and

Columbus successfully disposed of their garbage by burying in trenches,

before they constructed disposal plants. Milwaukee paid forty cents a

ton to dispose of its garbage by this method.

A summary of the opinions indicates that disposal by burying when

properly conducted and when the point of disposal is suitably located

gives no cause for objection from a sanitary standpoint. The principal

objections are the extremely long haul, the amount of land necessary and

no direct income. In small communities this method is entirely

satisfactory. It is usually not applicable to large communities.

Disposal Plants

There are two methods of disposing of garbage in plants—incineration and

reduction. There is a wide diversity of opinion among experts and city

officials as to which is the better from a sanitary and financial

standpoint. There is, however, nearly universal opinion upon the

following:

1. That the revenue from the by-products of municipally owned and

operated plants will not pay the combined cost of collection and

disposal.

2. That with only a few exceptions the revenue from the by-products of

municipally owned plants does not pay the cost of disposal.

3. That the price received by cities from contractors is, with very few

exceptions, not sufficient to pay the cost of collection.

4. That the disposal of garbage by the reduction process is uneconomical

for a city with a population of less than 100,000. Some experts increase

the size to 150,000 and one to 200,000.

5. That incineration is better than reduction for a city with a

population less than 100,000.

The reduction in the per capita production of garbage, due to less

wastage of food in the American home since the war, may make it

necessary in the future to increase the size of the city which can

profitably employ the reduction method, or should use the reduction

method.

In the report of the Chicago Waste Commission, some general rules are

laid down for the design of a disposal works, irrespective of method. It

says that the design should permit the plant to be operated as a whole,

or in part, so that each part can be operated as an independent unit.

This will permit one or more parts to receive attention and be repaired

during the season when the minimum quantity of refuse is to be disposed

of. The details of the plant should be such as to permit cleanliness at

all times and hosing and washing so as not to permit garbage dust or

dirt to accumulate, flies to breed and material to decompose. All

material, so far as possible, should be enclosed during the process of

disposal, and the odors eliminated or confined or deodorized. The

handling of material in the plants, so far as possible, should be

eliminated, where mechanical means can economically be adopted. Special

attention should be paid to ventilation and the elimination of dust

where men are required to work.

The odors or nuisances caused from disposal plants will usually arise

from one or more of the following sources: Garbage or refuse, incomplete

combustion or combustion temperatures not sufficient to eliminate odors,

congestion of carts in one locality and creation of dust. The odors

arising from raw garbage which are found in all plants are mostly local

and will not create a nuisance a short distance from the point of

handling and the housing of equipment used in hauling.

A method of determining the kind of a plant to be built and operated

which will meet with local conditions is described as follows by Rudolph

Herring, sanitary engineer.

“Locate suitable central points where incinerators can be built

convenient for reception of refuse and delivery of steam and clinker.

Estimate annual cost, including fixed charges and operation, as follows:

First, of wagons and other means of collecting from house to works all

garbage, ashes and rubbish combined; and, second, of the works for

incineration. The sum of these two estimated costs will give probable

annual cost of entire plant from origin to finish. This sum must then be

credited with the annual value of steam and clinker. The result will be

the net annual cost to the city of collecting and finally disposing of

the above parts of general refuse.

“A. Locate suitable place where reduction process can be carried on

economically and conveniently for reception of garbage and delivery of

products, with a capacity to serve, if practicable, the entire city.

Estimate annual cost, including fixed charges and operation, as follows:

First, of wagons and other means of collecting the garbage from house to

works; second, works for reduction. The sum of these two estimated costs

will be the probable annual cost to the city of the collection and

reduction of the garbage. This sum must be credited with annual value of

products of reduction, as derived from sale of oils, grease and

fertilizers. The result will be the net cost, perhaps profit, of

disposing of city garbage.

“B. Locate suitable central point where incinerator can be built, which

will be convenient for the reception of ashes and rubbish and the

delivery of steam and clinker. Estimate annual cost, including fixed

charges of operation as above of the collection and works for disposal

of ashes and rubbish, if these are to be incinerated together.

“If only rubbish is to be collected and delivered for incineration, then

there should be added the cost of collection and final disposal of ashes

by dumping. This cost should again be credited with annual value of

steam and clinker and perhaps of land-making by dumping of ashes.

“By adding results of A and B, we obtain the total net cost to a city of

collecting and finally disposing of the above parts of general refuse. A

comparison between these estimates of cost, of both collection and

incineration of garbage, ashes and rubbish as one project and of both

collection and reduction of garbage and the collection and incineration

of rubbish and dumping of ashes as the other project, will indicate the

most economical method in the city for which these cost estimates have

been made. It is necessary to analyze carefully local conditions to

determine the most economical method.”

Incineration

Two kinds of plants are used for this method of disposal—crematories and

destructors. Many destructors are in operation in America, but of the

crematories which have been built, many have been abandoned. Heat for

destruction must be obtained not only from the garbage itself, but also

from ashes and other combustible waste. It is here that the difference

between destructors and crematories enters. In the former, heat is

obtained from the refuse itself; in the latter, garbage is burned at the

expense of coal, wood or oil. It seems to be the prevailing opinion that

in order to make incineration a success the material must be burned at a

high temperature and rapid rate of combustion.

Morse claims that destructors require twenty per cent. less area of

ground, cost fifteen per cent. more for boiler and machinery; that the

construction is more durable; no addition of fuel; that the gases of

combustion are consumed, and that this method has by-products of clinker

and power and destroys all combustible refuse; and that the net cost of

operation is less per ton.

Crematories, Morse says, require more ground and more time for disposal,

but cost less. They are less durable, require addition of fuel, gases

are incompletely destroyed, cannot develop power, the residue has no

value and they can burn only garbage and rubbish. The gross cost of

operation is a trifle less, but the net cost is more.

Tests of garbage crematories in Ohio, according to the State Board of

Health, show that “the plants as operated fail usually to dispose of the

garbage at a temperature high enough to avoid the production of odors.”

This, says J. T. Fetherston, Commissioner of Street Cleaning of New York

City, is significant and conclusive.

Regarding mixed refuse destruction, Fetherston says: “Three features may

be noted: No added fuel is required, steam power is produced and quite a

residue (clinker) results. Compared with tests of garbage crematories

the average destructor temperatures in connection with the gas analyses

indicate freedom from odor due to unconsumed gas. Thus the mixed refuse

type of plant corrects the inherent defects of the garbage crematory.”

The cost of incineration plants depends upon the garbage to be handled.

The various incinerator companies usually estimate the capacity of the

plant at about one ton per 1,000 population.

Reports show that disposal by incineration in Ohio is confined to cities

of from 20,000 to 80,000 population, and that its success has been

confined to the very large and to the rather small cities of the

country. Some assert that it is applicable in the very large cities only

when the collection systems are suitable to provide for the burning of

mixed refuse. In small cities it is the custom to cremate the garbage

alone, the other classes of waste being dumped or buried.

The cost of construction, reports show, ranges from $600 to $1,000 per

ton capacity. The Worcester Special Waste Commission says that “from a

calculation based on some 30 incinerators it has been found that the

cost per ton daily capacity varies from $250 to $1,000, the average

being between $600 and $700.”

The by-products are clinker and the steam generated.

Robert W. Wylde claims that the cost of operating destructors “is in a

great measure offset and frequently quite overbalanced by the revenue”

from the sale of steam and clinker. One hundred tons of refuse burned

during 16 hours a day produces 800 engine H. P. Clinker from 100 tons

might amount to 30 tons per day and would bring $1.00 a ton in many

localities. Another expert says that one pound of refuse has been found

to produce one-half to one and three-fourths pounds of steam. The value

of refuse as a fuel is estimated by one expert to be 49 cents per ton.

The Chicago Waste Commission’s report points out, “that experience in

connection with the development of power from refuse furnaces

demonstrates that it is not easy to find an available use whereby the

power can be utilized regularly as produced and the furnace operated

continuously. In the majority of plants constructed, it has not been

possible to utilize all the power available, and in most cases the use

is limited to the operation of the plant. When power developed is used

in lighting and power stations, the demand only comes during a part of

the day. Supplementary coal-fired boilers are usually found in

connection with destructor-electric lighting stations, or else the

destructor is much larger than would be required to deal with the refuse

alone. The power produced from refuse furnaces will be best utilized by

some local industry, such as ice-making plants or electro-chemical

plants, which require continuous operation. When power is used in

connection with pumping plants, it is found good practise to operate the

refuse plant only as an auxiliary to the power plant of the pumping

station. The saving that results or credit that can be given the

destructor plant will amount to the value of the fuel equal to that

which it requires to produce the amount of steam developed and used. The

fluctuating amount of power developed in most cases can be depended upon

only for the average minimum production. In selecting a site for a

refuse disposal plant from which power is developed it is not always

profitable to utilize the power where the demand is not constant and

where the demand would be constant, suitable sites are not always

available.”

William M. Venable, sanitary engineer, believes that if a city has a

steam power plant, it will pay, but it will not pay to build one for

that purpose.

In a suburb of Montreal, the refuse destructor is constructed in

connection with a municipal electric light power station and power is

used in generating electricity for lighting purposes. The plant is

operated only during the time when lighting load is in demand, and the

material as delivered is stored during the day and burned at night. Only

a part of the power is furnished by the refuse furnaces, the remainder

being obtained from a coal-fired boiler plant.

In Savannah, Georgia, the water works boilers are kept in service, with

banked fires, to use in case of shortage of garbage.

The following are some of the reports from cities which receive a

revenue from by-products:

Minneapolis: The steam generated lights and heats hospital and workhouse

buildings, also lights 31 miles of streets. Estimated annual revenue,

heat $6,293.89; light $1,080.62; street lights ($60 per arc) $4,657.48;

total, $12,031.99.

Borough of Richmond, New York City: West New Brighton incinerator uses

clinker in manufacture of brick by mixing cement with ground clinker.

New Orleans, La.: Plans perfected to light streets and public buildings.

Claimed that from 500 tons of garbage daily 30,000,000 K. W. can be

generated a year.

Savannah, Georgia: Ninety-five per cent. of coal fuel previously used at

pumping station is now saved by destructor. To operate water works

pumping station it cost $81.90 per day. To operate the station and

destructor it costs $46.50 per day, or a difference of $12,921 per year,

this being 10 per cent. of the cost of the plant. This is expected to

provide for repairs and amortization charges. Besides, the city has all

of its refuse disposed of without cost at a central point and in a

sanitary manner with freedom from nuisance. The clinker is used for road

building and is estimated to have a value equal to the cost of hauling

it from the plant.

Municipal housecleaning · 第 16 / 20 段