CHAPTER VI

SAND-CLAY AND GRAVEL ROADS

In Chapter IV, mention was made of the variation in serviceability of

road surfaces composed of the natural soil existing on the

right-of-way of the road. It has been found that soils of a clayey

nature in which there is a considerable percentage of sand usually

afford a serviceable road surface for light or moderate traffic,

especially in areas where climatic conditions are favorable. A study

of these soils, together with the construction of experimental roads

of various mixtures of sand and clay, has led to a fairly

comprehensive understanding of the principles of construction and

range of capacity of this type of road surface, which is known as the

sand-clay road.

The sand-clay road surface consists of a natural or artificial mixture

of sand and clay, in which the amount of clay is somewhat greater than

sufficient to fill the voids in the dry sand. It may be assumed that

the sand contains 40 per cent of voids and that at least 45 per cent

of clay is required to fill the voids and bind the sand grains

together, because the clay spreads the sand grains apart during the

mixing, thus having the effect of increasing the voids. As a matter of

experiment, it is found to be impractical to secure by available

construction methods mixtures of sufficient uniformity to render it

necessary to exercise great exactness in proportioning the components,

but reasonable care in proportioning the materials is desirable.

Successful utilization of this type of surface requires considerable

study of available materials and investigations of their behavior when

combined. Extensive and exhaustive experiments have been conducted

with sand-clay mixtures in various places where they are widely used

for road surfaces and the following general principles have been

deduced.

=The Binder.=--In the sand-clay road, stability is obtained by

utilizing the bonding properties possessed to some degree by all

soils. Naturally this characteristic may be expected to vary widely

with the several types of soil. It is generally considered to be a

common property of clay, but the term clay is a general one that is

often applied to soils differing greatly in physical characteristics

and the term therefore loses its significance in this connection.

Those soils that are properly and technically called clay are

decidedly sticky when wet and are the best materials for sand-clay

construction. Of the clays, those that produce a tough sticky mud are

best. This can be tested by mixing a small quantity into a stiff mud

and molding it into a ball and immersing in water. If the ball retains

its shape for some little time, it is likely to prove a very

satisfactory binder, but, if it becomes plastic and loses its shape,

it will be an inferior binder, as a general rule. The ball clay, as

the former is called, may be of any color common to soils, not

necessarily yellow or reddish as is sometimes supposed. Likewise,

balls of mixtures containing varying percentages of sand and the

binder to be used may be made up and immersed in water. The mixture

that holds its shape longest is of course the best combination of the

materials and indicates the mixture to use in the construction.

An ideal, or even a fairly satisfactory soil for a binder may not

exist in the vicinity of a proposed improvement, and consequently an

inferior binder is frequently the only material available.

Sometimes deposits of clay or gravel contain a considerable percentage

of gypsum which serves as a binder and is particularly effective when

used in combination with clay and sand or gravel.

In many places a soil of the type used for adobe and called "caliche"

may be found and this is an excellent binder for sand or gravel.

=Top-Soil or Natural Mixtures.=--Deposits consisting of a natural

mixture of sand and clay in which the ingredients happen to exist in

about the correct relative proportions for sand-clay road surfaces are

found in many localities. These mixtures are commonly referred to as

top-soil. If the deposits are somewhat deficient either in sand or

clay, they can be utilized if the proper corrections in the

proportions are made during construction. Very satisfactory road

surfaces are sometimes constructed with mixtures that appear to be far

from ideal in composition, but experience and frequent trials are

needed to determine the best way in which to handle these mixtures.

=Sand-Clay Surfaces on Sandy Roads.=--Sand-clay surfaces may be

constructed on naturally sandy roads either by adding clay and mixing

it with the sand to secure the desired composition, or a layer of a

natural sand-clay mixture, caliche or sand-clay-gypsum may be placed

on top of the sand.

The most widely used method is to mix clay or other binder with the

sand. Since there is no need to provide for ditches to carry storm

water on a deep sand soil, the sand is graded off nearly flat across

the road and no ditches are provided. The clay is dumped on the road

in a layer about 8 inches thick and is then mixed into the sand. It is

desired to mix enough sand with the clay to produce a mixture composed

of approximately 1/3 clay and 2/3 sand. The mixing is accomplished in

various ways, the most common being to use a heavy plow at first and

to follow this with a heavy disc harrow. The mixing is a tedious and

disagreeable process, but its thorough accomplishment is

indispensable. The mixing is most readily done when the materials are

saturated with water and in practice it is customary to depend upon

rain for the water, although in the final stages water may be hauled

and sprinkled on the road to facilitate final completion of the

mixing. After the mixing has been completed, the surface is smoothed

with the blade grader and is kept smooth until it dries out. Repeated

dragging will be required, during the first year especially, and to

some extent each year in order to keep the surface smooth, but the

dragging can be successfully accomplished only when the road is wet.

[Illustration: Fig. 14.--Cross Sections for Sand-Clay Roads]

In regions where several months of continued hot, dry weather is to be

expected each year, the sand-clay mixture is likely to break through

unless it is of considerable thickness and generally the surface layer

is made much thicker than for regions where the annual rainfall is

fairly well distributed. This is especially necessary when the binder

is of inferior quality. It is not uncommon in such cases to make the

sand-clay surface as much as two feet thick.

As the mixing progresses it may appear that patches here and there are

deficient in either clay or sand and the mixture in these places is

corrected by the addition of a little sand or clay as may be

required.

If the top-soil is used it is deposited on the sand in the required

quantity and is remixed in place to insure uniformity. If either sand

or clay is needed to give a satisfactory mixture, the proper material

is added and mixed in as the work progresses. The surface is finally

smoothed by means of the grader and drag.

=Sand-Clay on Clay or Loam.=--If the existing road is of clay or loam,

ample drainage will be required as discussed in Chapter IV. The

surface may be constructed of a natural sand-clay mixture or of a sand

mixed with the natural soil. If the former, the surface of the

existing road is prepared by grading so as to insure good drainage and

the natural mixture is then deposited and the surface completed as

described in the preceding section.

If the surface is formed by mixing sand with the existing soil, the

sands may be deposited in a layer about six inches thick which will

gradually mix with the soil as the road is used. A second application

of sand may follow in a year or two if it is needed. Such a road

surface will lack uniformity of composition and it seems preferable to

mix the sand with the soil by plowing and discing as previously

described.

=Characteristics.=--Sand-clay road surfaces do not have sufficient

durability for heavily traveled highways, but will be satisfactory for

a moderate amount of traffic. These surfaces have maximum

serviceability when moist, not wet, and consequently are not as

durable in dry climates as in humid areas. They are likely to become

sticky and unstable in continued wet weather and to become friable and

wear into chuck holes in long continued dry weather. At their best,

they are dustless, somewhat resilient and of low tractive resistance.

GRAVEL ROAD SURFACES

[Illustration: Fig. 15.--Cross Sections for Gravel Highways]

=Natural Gravel.=--Gravel is the name given to a material consisting

of a mixture of more or less rounded stones, sand and earthy material,

which is found in natural deposits. These deposits exist in almost

every part of North America, being especially numerous in the

glaciated areas, but by no means confined to them. Gravel deposits

consist of pieces of rock varying in size from those of a cubic yard

or more in volume to the finest stone dust, but with pieces ranging in

size from that which will pass a 3-inch ring down to fine sand

predominating. The larger pieces are usually more or less rounded and

the finer particles may be rounded or may be angular. Many varieties

of rocks are to be found among the gravel pebbles, but the rocks of

igneous origin and possessing a considerable degree of hardness

generally predominate. Intermixed with the pieces of rock there is

likely to be clay or other soil, the quantity varying greatly in

different deposits and even in various places in the same deposits.

Often there are found deposits of material which are by the layman

termed gravel, which are really clayey sand or sand containing a few

pebbles, but which are of value to the road builder for the sand clay

type of surfacing. The term gravel is exceedingly general and unless

specifically defined, gives little indication of the exact nature of

to which it is applied.

TABLE 7

SHOWING CEMENTING PROPERTIES OF SEVERAL SAMPLES OF

GRAVEL

-----------------+----------------------------

| Cementing Value

Per Cent Clay by +---------------+------------

Weight | As Received | Washed

-----------------+---------------+------------

4.4 | 276 | 43

6.4 | 105 | 285

5.1 | 241 | 70

14.5 | 500 | 279

8.5 | 500 | 112

10.1 | 300 | 267

14.8 | 500 | 107

7.5 | 184 | 198

16.5 | 500 | 428

2.0 | 185 | 239

1.5 | 500 | 500

4.5 | 212 | 204

2.5 | 116 | 363

-----------------+---------------+------------

The value of any gravel for road surfacing depends upon the degree to

which it possesses the properties of an ideal gravel for road

surfacing. Ideal gravel is seldom encountered, but a consideration of

its characteristics serves to establish a measure by which to estimate

the probable value of any deposit.

=The Ideal Road Gravel.=--The ideal road gravel is a mixture of

pebbles, sand and earthy material, the pieces varying from coarse to

fine in such a manner that when the gravel is compacted into a road

surface the spaces between the larger pebbles are filled with the

finer material. The pebbles are of a variety of rock that is highly

resistant to wear so that the road surface made from the gravel will

have the quality of durability. The gravel possesses good cementing

properties, insuring that the pieces will hold together in the road

surface. The cementing property may be due to the rock powder in the

deposit or to earthy material mixed with the rock particles, or to

both. Table 7 shows the results of a number of tests made upon gravels

and indicates that the cementing property of the gravel does not

always depend upon the clay content.

=Permissible Size of Pebbles.=--The larger pebbles in the gravel are

less likely to crush under loads than smaller pebbles of the same sort

of rock, but if the rock is of some of the tougher varieties such as

trap, there is very little likelihood of even the smaller pebbles

crushing. If the pebbles are of rock of medium toughness, the smaller

pebbles might be crushed under the heavier loads. It is the usual

practice to permit gravel to be used for the foundation course in

which the pebbles are as large as will pass a 3-1/2-inch circular

screen opening, and for the wearing course, as large as will pass a

2-1/2-inch circular screen opening. If larger pebbles are allowed in

the wearing course, the surface is certain to become rough after a

time. If the gravel is to be placed in a single course as is a very

common practice, then the maximum size should not exceed that which

will pass a 2-1/2-inch circular screen opening.

The Wisconsin Highway Commission has constructed a very large mileage

of excellent gravel roads and the sizes specified for their roads are

as follows:

"_Bottom Course Gravel_.--Bottom course shall consist of a

mixture of gravel, sand and clay with the proportions and various

sizes as follows:

"All to pass a two-inch screen and to have at least sixty and not

more than seventy-five per cent retained on a quarter-inch

screen; at least twenty-five and not more than seventy-five per

cent of the total coarse aggregate to be retained on a one-inch

screen; at least sixty-five and not more than eighty-five per

cent of the total fine aggregate to be retained on a two

hundred-mesh sieve."

"_Top Course Gravel_.--Top course shall consist of a mixture of

gravel, sand and clay with the proportions of the various sizes

as follows:

"All to pass a one-inch screen and to have at least fifty and not

more than seventy-five per cent retained on a quarter-inch

screen; at least twenty-five and not more than seventy-five per

cent of the total coarse aggregate (material over one-fourth inch

in size) to be retained on a one-half-inch screen; at least

sixty-five and not more than eighty-five per cent of the total

fine aggregate (material under one-fourth inch in size) to be

retained on a two hundred-mesh sieve."

"_Screened Gravel and Sand Mixtures_.--Where it is impossible to

obtain run of bank gravel containing the necessary binder in its

natural state, screened gravel shall be used and the necessary

sand and clay binder added as directed by the engineer. Gravel

and sand shall be delivered on the work separately. Clay binder

shall be obtained from approved pits and added as directed by the

engineer."

"_Run of Bank Gravel_.--When run of bank gravel is permitted

either for one course or two course work, the size shall not

exceed that specified for bottom or top course. If necessary, the

contractor shall pass all the material through a two-inch screen

for the bottom course, and through a one-inch screen for the top

course. When the work consists of only one course, the material

shall be of the sizes as specified for the top course. The

necessary binder shall be contained in the material in its

natural state, excepting that a small percentage of clay binder

may be added as directed by the Engineer."

=Wearing Properties.=--A certain amount of grinding action takes place

on the road surface under the direct action of wheels, especially

those with steel tires. Where rubber tired traffic predominates, this

action is much less severe than where steel tired vehicles

predominate, but the tendency exists on all roads. In addition, there

is distortion of the layer of gravel under heavy loads which causes

the pieces of stone in the surface to rub against each other and to

wear away slowly.

The gravel road in the very best condition is slightly uneven but

there is comparatively little jar imparted to vehicles, and,

consequently, little impact on the surface. When somewhat worn, the

impact becomes a factor of some importance and the pounding of

vehicles has a very destructive action on the surface. Soft pebbles

will be reduced to dust in a comparatively short time.

The degree to which any gravel resists the destructive action of

traffic depends upon the varieties of rock represented by the pebbles

in the gravel. If the pebbles are mostly from rocks of good wearing

properties, that quality will be imparted to the road surface. If

mostly from rocks of little durability, the same characteristic will

be imparted to the road surface. A very good general notion of the

probable durability of gravel can therefore be obtained by a careful

visual examination of the material and classification of the rock

varieties represented by the pebbles.

=Utilizing Natural Gravels.=--Gravel road construction is advantageous

only when it can be accomplished at low first cost. This usually

presupposes a local supply of gravel that can be utilized, or at any

rate a supply that need not be shipped a long distance. In the nature

of things, such deposits are likely to be deficient in some of the

desirable characteristics, and may be deficient in most of them. By

various means, the defects in the materials can be partially corrected

while constructing the road.

If the gravel deposit consists of layers of varying composition as

regards size and clay content, the material may be loosened from the

exposed face and allowed to fall to the bottom of the pit thereby

becoming mixed to a sufficient extent to produce a reasonably uniform

product. If deficient in clay, it often proves feasible to add a small

part of the clay over-burden, thereby insuring enough binder.

Sometimes adjoining deposits will consist one of relatively fine

material, the other of relatively coarse. These may be mixed on the

work by first placing the coarse material in a layer about 5 inches

thick and adding the finer material in a similar layer. The two will

mix very rapidly during the operations of spreading and shaping.

When deposits contain pebbles larger than will pass a 3-1/2-inch ring,

these larger stones will prove to be undesirable if placed on the

road, as they are almost sure to work to the surface of the gravel

layer and become a source of annoyance to the users of the road.

Oversize stone can be removed while loading the gravel or while

spreading it, if care is exercised and not too large a proportion is

oversize. It is preferable however to remove the oversize by means of

screens at the pit. Usually on large jobs the oversize is crushed and

mixed with the supply so as to utilize what is really the best part of

the material.

Gravels deficient in bonding material are often encountered in

deposits where there is insufficient overburden to give enough

additional binder or where the overburden is of a material unsuitable

for binder. Such materials may be utilized by adding binder in the

form of clay after the gravel has been placed on the road.

Almost any gravel deposit can be utilized in some way if the material

is of a durable nature, regardless of other characteristics. The

serviceability of a gravel road will depend largely on how nearly the

gravel approaches the ideal, but variations in the manipulations will

do much to overcome deficiencies in materials.

=Thickness of Layer.=--The thickness of the layer of gravel required

depends both upon the type of soil upon which it is placed and the

nature of the traffic to which the road will be subjected. Gravel

surfaces should not ordinarily be constructed on highways carrying

heavy truck traffic, but if gross loads of three or four tons are the

heaviest anticipated, the gravel will be reasonably stable. On such

roads, a layer of well compacted gravel ten inches thick will support

the loads if a well drained earth foundation is provided. If but

little truck traffic is anticipated and loads up to three tons on

steel tires are the average, a layer 8 inches thick will be

sufficient. In dry climates, a layer six inches thick will be

adequate if it can be kept from raveling.

On secondary roads, carrying principally farm-to-market traffic, and

not a great volume of that, the above thicknesses may be reduced about

one-fourth.

The exact thickness needed for any particular road is a matter for

special study on account of the variations in the gravels and in the

supporting power of the soil upon which they are placed.

PLACING GRAVEL

=Preparation of the Road.=--The roadway that is to be surfaced with

gravel is first brought to the desired grade and cross section. It

would be advantageous if this could be done a year before the gravel

is placed so that no settlement of the earth foundation would occur

after the gravel surface is completed. But if that is impractical, the

grading may be done just prior to placing the gravel, providing

appropriate methods are adopted for securing compacted fills.

=Trench Method.=--Two distinct methods of placing the gravel are in

general use, known as the trench method and the surface or feather

edge method respectively. The method to adopt for any particular road

will depend largely on certain conditions that will be explained

later.

In the trench method, a trench of the proper width and depth for

receiving the gravel is excavated in the earth road surface and the

gravel is placed therein.

The trench is formed by plowing a few furrows and scraping out the

loosened earth with a blade grader. The loose material is generally

moved out laterally to build up earth berms or "shoulders" alongside

the gravel. Into this trench the gravel is dumped in the proper

quantity to give the required thickness after being compacted.

The greatest care must be exercised in spreading the gravel to

eliminate unevenness where the loads were deposited. An ordinary blade

grader is one of the best and most economical implements to use for

spreading the gravel. When the gravel has been deposited in the trench

for a distance of a thousand feet or more, the spreading is

accomplished by dragging the surface repeatedly with the blade grader,

the work being continued until all waviness disappears. The gravel is

then thoroughly and repeatedly harrowed with a heavy stiff tooth

harrow to mix thoroughly the fine and coarse gravel so as to produce

as nearly a uniform mixture as may be. The gravel is then finally

smoothed with the blade grader.

The gravel may be compacted by rolling or may be allowed to pack from

the action of traffic. The former is greatly to be preferred where

practicable. The rolling is performed with a three-wheeled

self-propelled roller weighing about 8 tons and must be done while the

gravel is wet. Generally a sprinkling wagon is used to wet down the

gravel, but advantage is always taken of rains to facilitate the work.

The gravel must be spread in layers not over 5 or 6 inches thick to

get the desired results, which means that for an ordinary gravel road

about 10 inches thick, the gravel will be placed in two layers of

about equal thickness, each of which will be rolled.

The gravel will compact slowly even if it is not rolled, but generally

does not become stable until the material is thoroughly soaked by

rains. Then it will begin to pack, but will become badly rutted and

uneven during the process. During this period the surface must be kept

smooth by means of the blade grader. The drag does not suffice for

this purpose, tending to accentuate the unevenness rather than to

correct it.

If gravel is placed in a trench in dense soil and rainy weather

ensues, sufficient water will be held in the trench to cause

unevenness from foundation settlement and the gravel will become mixed

with the soil to some extent and be thereby wasted. Trenches cut from

the road bed upon which the gravel is placed, to the side ditches,

will relieve this condition by affording an outlet for the surplus

water. Nevertheless some difficulty may be expected if the trench

method is used and wet weather prevails. If it is possible to close

the road against traffic until the road is dry the method is

applicable. Moreover, in long-continued dry weather, the dispersion

and loss of considerable gravel from the action of automobile traffic

is avoided because the gravel is held between substantial earth berms

and the gravel will pack better and hold its shape longer when

constructed by the trench method than otherwise.

=Surface Method.=--The surface method is one in which the gravel is

placed on the graded earth road surface without earth shoulders to

hold the gravel in place. It is also sometimes called the feather-edge

method. Except for the manner of placing as just mentioned, the

several operations are conducted in the same general manner as for the

trench method. The gravel does not compact as quickly as in the trench

method and a considerable loss of material is likely to result from

the effect of automobile traffic while the gravel is loose. But it has

the advantage of being free from difficulties in wet weather and in

some locations is therefore preferable to the trench method. It is

particularly applicable to those projects on which the placing of

gravel continues throughout the winter, the gravel being dumped and

spread, to be finally smoothed and finished in the early summer.

=Bonding.=--Where gravels deficient in binder are utilized, clay for

binder is sometimes added as the gravel is placed on the road. This

may be done by spreading the clay on top of the lower course of

gravel, placing the upper layer and sprinkling and rolling until the

clay squeezes up through the surface layer. It may also be

accomplished by spreading dry clay on the upper course before it is

harrowed and then harrowing to mix it with the gravel. Both methods

are practiced, but the former is believed to be preferable. A third

method is to separate the sand and pebbles and to mix the clay binder

with the sand and then spread the sand on top of the pebbles and mix

by harrowing.

=Maintenance.=--Gravel surfaces require careful maintenance,

especially during the first season the road is used. The gravel will

compact slowly and during the process will be rutted and otherwise

disturbed by traffic. It is important during this period to restore

the shape once a week or at least twice a month. The light blade

grader is usually employed for the purpose so long as the gravel is

somewhat loose. Later a drag of the type known as the planer will

prove to be the most effective. Figure 16 shows a type of drag that is

very satisfactory for use on gravel roads.

[Illustration: Fig. 16.--Road Planer]