CHAPTER IV

ROAD DESIGN

=Necessity for Planning.=--Sometimes highway improvement is the result

of spasmodic and carelessly directed work carried out at odd times on

various sections of a road, finally resulting in the worst places

being at least temporarily bettered. The grade on the steepest hills

is probably reduced somewhat and some of the worst of the low lying

sections are filled in and thereby raised. Short sections of surfacing

such as gravel or broken stone may be placed here and there. From the

standpoint of the responsible official, the road has been "improved,"

but too often such work does not produce an improvement that lasts,

and sometimes it is not even of any great immediate benefit to those

who use the roads. In nearly every instance such work costs more in

money and labor that it is worth.

Lasting improvement of public highways can be brought about only

through systematic and correlated construction carried on for a series

of years. In other words, there must be a road improvement policy

which will be made effective through some agency that is so organized

that its policies will be perpetuated and is clothed with enough

authority to be capable of enforcing the essential features of good

design and of securing the proper construction of improvements.

Details of highway construction and design must vary with many local

conditions and types of surface. The limits of grades and the many

other details of design may properly be adopted for a specific piece

of work only after an adequate investigation of the local requirements

and in the light of wide experience in supervising road improvement.

New ideas are constantly being injected into the art of road building,

but these are disseminated somewhat slowly, so that valuable devices

and improvements in methods remain long unknown except to the

comparatively few who have the means for informing themselves of all

such developments.

It follows then that the logical system of conducting road improvement

is through an agency of continuing personnel which will supervise the

preparation of suitable plans and direct the construction in

accordance with the most recent experience.

=Road Plans.=--The information shown on the plans prepared for road

improvement varies somewhat with the design and with the ideas of the

engineer as to what constitutes necessary information, but in general

the plans show the existing road and the new construction contemplated

in an amount of detail depending principally upon the character of the

construction. Simple plans suffice for grade reduction or reshaping an

earth road surface, while for the construction of paved roads, the

plans must be worked out in considerable detail. The essential

requirement is that there be given on the plans all information

necessary to enable the construction to be carried out according to

the intentions of the engineer, that all parts of the work fit

together, that the culverts are of the proper size and located at the

proper places, ditches drain properly, grades are reduced to the

predetermined rate, that excavated material is utilized and that an

exact record of the work done is retained. Plans are indispensable to

economical road construction and the preparation of the plans is the

work of the expert in road design, that is, the highway engineer.

=Problem of Design.=--The problem of road design is to prepare plans

for a road improvement with the various details so correlated as to

insure in the road constructed in accordance therewith the maximum of

safety, convenience and economy to the users thereof. The degree to

which the design will be effective will depend to a considerable

extent upon the financial limitations imposed upon the engineer, but

skill and effort on the plans will do a great deal to offset financial

handicap and no pains should be spared in the preparation of the

plans. Moreover, the plans must afford all of the information needed

by the contractor in preparing a bid for the work.

=Preliminary Investigation.=--The first step in road improvement is to

secure an adequate idea of the existing conditions on the road or

roads involved. The detail to which this information need go will

depend entirely upon the purpose of the preliminary investigation, for

before a definite plan is prepared, it may be necessary to choose the

best from among several available routes. For this purpose, it is not

always necessary to make an actual instrument survey of the several

routes. A hasty reconnaissance will usually be sufficient. This is

made by walking or riding over the road and noting, in a suitable book

or upon prepared blanks, the information needed. The items of

information recorded will usually be as follows: distances, grades,

type of soil on the road and nature of existing surface, character of

drainage, location of bridges and culverts and the type of each with

notes as to its condition, location of railway crossings and notes as

to type, location of intersecting roads, farm entrances, and all

similar features that have a bearing on the choice of routes. These

data can be obtained in a comparatively short time by a skilled

observer who may drive over the road in a motor car. Sometimes it may

be desirable to make a more careful study of some certain sections of

road and this may be done by waking over the section in question in

order to make a more deliberate survey of the features to be

considered than is possible when riding in a motor car.

Factors other than relative lengths of routes will obviously determine

the cost of improvement and the comparative merits of the improved

roads. Some special characteristic of a road, such as bad railroad

crossings or a few bad hills, may eliminate a route, or availability

of materials along a route may offset disadvantages of alignment or

grade.

In special cases, complete surveys of routes may be required finally

to select the best route, but these instances are few in number.

=Road Surveys.=--When a road has been definitely selected for

improvement, a careful survey is made to furnish information for the

preparation of the plans. This will consist of a transit survey and a

level survey.

The transit survey is made by running a line between established

corners following the recorded route of the road, or if no records are

available or the road is irregular in alignment, by establishing

arbitrary reference points and running a line along the center line of

the existing road or parallel thereto. The topography is referenced to

this line in such completeness that it can be reproduced on the plans.

The level survey consists in taking levels on cross sections of the

road at one hundred foot intervals, and oftener if there are abrupt

changes in grade. Special level determinations are made at streams,

railroad crossings, intersecting roads or lanes and wherever it

appears some special features of the terrain should be recorded.

From the surveys and such other information as has been assembled

relative to the project, a plan is prepared which embodies a design

presumed to provide for an improvement in accordance with the best

highway practice.

THE PROBLEM OF DESIGN

It will be convenient to consider separately the components of a road

design, although in the actual design the consideration of these

cannot be separated because all parts of the plan must fit together.

=Alignment.=--The alignment of the road is determined to a

considerable extent by the existing right-of-way, which may follow

section lines, regardless of topography, as is the case with many

roads in the prairie states, or it may follow the valleys, ridges, or

other favorable location in hilly country. In many places the roads of

necessity wind around among the hills in order to avoid excessive

grades. In designing an improvement, it is generally desirable to

follow the existing right-of-way so far as possible. But the element

of safety must not be lost sight of, and curves should not preclude a

view ahead for sufficient distance to insure safety to vehicles. The

necessary length of clear view ahead is usually assumed to be 250

feet, but probably 200 feet is a satisfactory compromise distance when

a greater distance cannot be obtained at reasonable cost. To secure

suitable sight distance, the curves must be of long radii, and where

possible the right-of-way on the inside of the curve should be cleared

of trees or brush that will obstruct the view. Where the topography

will not permit a long radius curve and the view is obstructed by an

embankment or by growing crops or other growth, it is desirable to

separate the tracks around the curve to eliminate the possibility of

accidents on the curve. This is readily accomplished if the road is

surfaced, but if it is not surfaced, the same end is accomplished by

making the earth road of ample width at the curve.

Relocations should be resorted to whenever they shorten distances or

reduce grades sufficiently to compensate for the cost.

=Intersections.=--At road intersections, it is always difficult to

design a curve that entirely meets the requirements of safety because

there is not enough room in the right-of-way, and enough additional

right-of-way must be secured to permit the proper design. It is not

necessary to provide an intersection that is adapted to high speed

traffic, where main roads cross, but, on the contrary, a design that

automatically causes traffic to slow up has distinct advantages.

Where a main route, improved with a hard surface, crosses secondary

roads, it is satisfactory to continue the paved surface across the

intersecting road at normal width and make no provision for the

intersecting road traffic other than a properly graded approach at the

intersection.

=Superelevation.=--On all curved sections of road, other than

intersections, account is taken of the tendency of motor cars to skid

toward the outside of the curve. This tendency is counteracted by

designing the cross section with superelevation.

[Illustration: Fig. 6]

In Fig. 6, _F_ represents the tangential force that tends to cause

skidding. _W_ represents the weight of the vehicle in pounds, THETA

= the angle of superelevated surface _c-d_, with the horizontal _c-a_.

_R_ represents the radius of the curve upon which the vehicle is

moving. _w_ is the component of the weight parallel to the surface

_c-d_, _v_ = velocity of the vehicle in feet per second. _m_ = mass

of vehicle = _W/g THETA_

_w_ = _W_ tan _THETA_

_mv^2_ _wv^2_

_F_ = ------- = ------

_R_ _gR_

If _F_ = _w_ there will be no tendency to skid; hence the rate of

superelevation necessary in any case is as follows:

_Wv^2_

_W_ tan _THETA_ = -------

_gR_

_v^2_

tan _THETA_ = -------

_gR_

The amount of superelevation required, therefore, varies as the square

of the velocity and inversely as the radius of the curve.

Theoretically, the amount of the superelevation should increase with a

decrease in the radius of the curve and should also increase as the

square of the speed of the vehicle. On account of the variation in

speeds of the vehicles, the superelevation for curves on a highway can

only be designed to suit the average speed. At turns approaching

ninety degrees, the curve is likely to be of such short radius that it

is impossible to maintain the ordinary road speed around the curve,

even with the maximum superelevation permissible. It is good practice

to provide the theoretical superelevation on all curves having radii

greater than 300 feet for vehicle speeds of the maximum allowed by

law, which is generally about 25 miles per hour. Where the radii are

less than 300 feet, the theoretical superelevation for the maximum

vehicle speeds gives a superelevation too great for motor trucks and

horse drawn vehicles and generally no charge is made in superelevation

for radii less than 300 feet, but all such curves are constructed with

the same superelevation as the curve with 300 foot radius.

The diagram in Fig. 7 shows the theoretical superelevation for various

curve radii.

[Illustration: Fig. 7. Curves showing Theoretical Superelevation for

Various Degrees of Curve for Various Speeds of Vehicle]

At the intersection of important highways, the problem is complicated

by the necessity for providing for through traffic in both directions

and for traffic which may turn in either direction and the engineer

must provide safe roadways for each class of traffic.

=Tractive Resistance.=--The adoption of a policy regarding the grades

on a road involves an understanding of the effect of variation in the

character of the surface and in rate of grade upon the energy required

to transport a load over the highway. The forces that oppose the

movement of a horse drawn vehicle are fairly well understood and their

magnitude has been measured by several observers, but comparatively

little is known about the forces opposing translation of rubber tired

self-propelled vehicles.

The resistance to translation of a vehicle is made up of three

elements: resistance of the road surface to the rolling wheel,

resistance of the air to the movement of the vehicle and internal

friction in the vehicle itself.

=Rolling Resistance.=--When the wheel of a vehicle rolls over a road

surface, both the wheel and the surface are distorted. If the wheel

has steel tires and the road surface is plastic, there will be

considerable distortion of the road surface and very little of the

wheel. A soft rubber tire will be distorted considerably by a brick

road surface. Between these extremes there are innumerable

combinations of tire and road surface encountered, but there is always

a certain amount of distortion of either road surface or wheel, or of

both, which has the same effect upon the force necessary for

translation as a slight upward grade. When both the tire and the road

surface strongly resist distortion (as steel tires on vitrified brick

paving), the resistance to translation is low but the factor of impact

is likely to be introduced. Where impact is present, energy is used up

in the pounding and grinding of the wheels on the surface, and this

factor increases as the speed of translation, and may be a

considerable item. Impact is especially significant on rough roads

with motor vehicles, particularly trucks, traveling at high speed.

These two factors (impact and rolling resistance) combined constitute

the major part of the resistance to translation for horse drawn

vehicles.

=Internal Resistance.=--For horse drawn vehicles, the internal

resistance consists of axle friction, which is small in amount. For

self-propelled vehicles, the internal resistance consists of axle

friction and friction in the driving mechanism, of which gear

friction and the churning of oil in the gear boxes is a large item.

Internal friction is of significance in all self-propelled vehicles

and especially so at high speeds.

=Air Resistance.=--At slow speeds, the resistance of still air to

translation is small, but as the speed increases, the air resistance

increases rapidly and at the usual speed of the passenger automobile

on the road becomes a very considerable part of the total resistance

to translation. This factor has no significance in connection with

horse drawn vehicles, but is to be taken into account when dealing

with self-propelled vehicles at speeds in excess of five miles per

hour.

Many determinations of tractive resistance with horse drawn vehicles

have been made from time to time and these show values that are fairly

consistent when the inevitable variations in surfaces of the same type

are taken into account. Table 4 is a composite made up of values

selected from various reliable sources and Table 5 is from experiments

by Professor J. B. Davidson on California highways.

TABLE 4

AVERAGE TRACTIVE RESISTANCE OF ROAD SURFACES TO STEEL TIRED

VEHICLES

Surface Tractive force per ton

Earth packed and dry 100

Earth dusty 106

Earth muddy 190

Sand loose 320

Gravel good 51

Gravel loose 147

Cinders well-packed 92

Oiled road--dry 61

Oiled road--wet 108

Macadam--very good 38

Macadam--average 46

Sheet asphalt 38

Asphaltic concrete 40

Vitrified brick--new 56

Wood block--good 33

Wood block--poor 42

Cobblestone 54

Granite tramway 27

Asphalt block 52

Granite block 47

TABLE 5

TRACTIVE RESISTANCES TO STEEL TIRED VEHICLES[1]

----------+-----------------+-----------------+-----------+-----------

| | Condition | Tractive | Resistance

Test No. | Kind of Road | of Road | Total lb. | per ton lb.

----------+-----------------+-----------------+-----------+-----------

29-30-31 | Concrete |Good, excellent | 83.0 | 27.6

| (unsurfaced) | | |

[2]11-12 | Concrete |Good, excellent | 90.0 | 30.0

| (unsurfaced) | | |

26-27-28 | Concrete 3/8-in.|Good, excellent | 147.6 | 49.2

| surface | | |

| asphaltic oil | | |

| and screenings| | |

13-14 | Concrete 3/8-in.|Good, excellent | 155.0 | 51.6

| surface | | |

| asphaltic oil | | |

| and screenings| | |

9-10 | Macadam, |Good, excellent | 193.0 | 64.3

| water-bound | | |

22-23 | Topeka on |Good, excellent | 205.5 | 68.5

| concrete | | |

8 | Gravel |Compact, good | 225.0 | 75.0

| | condition | |

[3]45-48 | Oil macadam |Good, new | 234.5 | 78.2

[4]46-47 | Oil macadam |Good, new | 244.0 | 81.3

38 | Gravel |Packed, in | 247.0 | 82.3

| | good condition | |

18-19-20 | Topeka on plank |Good condition, | 265.0 | 88.3

| | soft, wagon | |

| | left marks | |

34 | Earth road |Firm, 1-1/2-in. | 276.0 | 92.0

| | fine loose dust| |

24-25 | Topeka on plank |Good condition, | 278.0 | 92.6

| | but soft | |

1-2-5 | Earth road |Dust 3/4 to 2 in.| 298.0 | 99.3

3-3 | Earth |Mud, stiff, firm | 654.0 | 218.0

| | underneath | |

6-7 | Gravel |Loose, not packed| 789.0 | 263.0

----------+-----------------+-----------------+-----------+-----------

[1] Prof. J. B. Davidson in _Engineering News-Record_, August 17,

1918.

[2] Graphic record indicates that the load was being accelerated

when test was started.

[3] Drawn with motor truck at 2-1/2 miles per hour.

[4] Drawn with motor truck at 5 miles per hour.

Comparatively few data are available showing the tractive resistance

of motor vehicles, but the following tables are based on sufficient

data to serve to illustrate the general trend.

These data on the tractive resistances of an electric truck with solid

rubber tires on asphalt and bitulithic, wood, brick and granite block,

water-bonded and tar macadam, cinder and gravel road surfaces were

obtained by A. E. Kennelly and O. R. Schurig in the research division

of the electrical engineering department of the Massachusetts

Institute of Technology, and are published in Bulletin No. 10 of the

division.

An electric truck was run over measured sections, ranging from 400 to

2600 feet in length, surfaced with these various materials, at certain

speeds per hour, ranging from about 8 to about 15.5 miles per hour.

The result of the observations of speeds, tractive resistances,

conditions of surfaces, etc., were collected and studied in various

combinations.

TABLE 6

----------------------+-----------------------+-----------+----------

| | Tractive | Tractive

| |Resistance |Resistance

Type of Surface | Condition of Surface | in lbs. | in lbs.

| | per ton | per ton

| | 10 miles |12.4 miles

| | per hr. | per hr.

----------------------+-----------------------+-----------+----------

Asphalt | Good | 20.4 |

Asphalt | Poor | 22.6 | 25.5

Wood block | Good | 24.2 | 25.3

Brick block | Good | 24.6 | 26.6

Granite block | Good | 40.3 | 45.75

Brick block | Slightly worn | 25.1 | 28.0

Granite block with | | |

cement joints | Good | 25.5 | 30.2

Macadam, water bonded | Dry and hard | 23.3 | 25.8

Macadam, water bonded | Fair, heavily oiled | 35.9 | 38.7

Macadam, water bonded | Poor, damp, some holes| 36.3 | 41.6

Tar macadam | Good | 25.7 | 28.0

Tar macadam | Very soft | 36.8 | 38.7

Tar macadam | Many holes, soft, | |

| extremely poor | 52.4 | 60.6

Cinder | Fair, hard | 27.5 | 30.6

Gravel | Fair, dusty | 30.4 | 33.0

----------------------+-----------------------+-----------+----------

[Illustration: Fig. 8]

=Effect of Grades.=--Grades increase or decrease the resistance to

translation due to the fact that there is a component of the weight of

the vehicles parallel to the road surface and opposite in direction to

the motion when the load is ascending the hill and in the same

direction when the vehicle is descending. In Fig. 8 _W_ represents the

weight of the vehicle, acting vertically downward, _w_ is the

component of the weight perpendicular to the road surface and _W_{2}_

is the component parallel to the road surface.

_W_{2}_ = _W_ tan _THETA_.

tan _THETA_ = 0.01 x per cent of grade.

_W_{2}_ = 0.01 _W_ x per cent grade.

_W_{2}_ = 0.01 x 2000 x per cent of grade, for each ton

of weight of vehicle.

Hence _W_{2}_ = 20 lbs. per ton of load for each one per cent of

grade.

The gravity force acting upon a vehicle parallel to the surface on a

grade is therefore 20 lbs. per ton for each one per cent of grade and

this force tends either to retard or to accelerate the movement of the

vehicle.

Let _F_ = the sum of all forces opposing the translation of a vehicle.

_F = f_{r} + f_{i} + f_{p} + f_{a} + f_{g}_ (1)

where

_f_{r}_ = rolling resistance of road surface.

_f_{i}_ = resistance due to internal friction in the vehicle.

_f_{p}_ = resistance due to impact of the road surface.

_f_{a}_ = resistance due to air.

_f_{g}_ = resistance due to grade, which is positive when

ascending and negative when descending.

All of the above in pounds per ton of 2000 lbs.

Let _T_ = the tractive effort applied to the vehicle by any means.

_T_ >= must be greater than _F_ in order to move the vehicle.

By an inspection of (1), it will be seen that for a given vehicle and

any type of road surface, all terms are constant except _f_{a}_ and

_f_{g}_. _f_{a}_ varies as the speed of the vehicle and the driver can

materially decrease _f_{a}_ by reducing speed. _f_{g}_ varies with the

rate of grade. For any vehicle loaded for satisfactory operation on a

level road with the power available, the limiting condition is the

factor _f_{g}_. If the load is such as barely to permit motion on a

level road, any hill will stall the vehicle. Therefore, in practice

the load is always so adjusted that there is an excess of power on a

level road. If draft animals are employed the load is usually about

one fourth of that which the animals could actually move by their

maximum effort for a short period. With motor vehicles, the excess

power is provided for by gearing.

If it be assured a load of convenient size is being moved on a level

road by draft animals, there is a limit to the rate of grade up which

the load can be drawn by the maximum effort of the animals.

Tests indicate that the horse can pull at a speed of 2-1/2 miles per

hour, an amount equal to 1/8 to 1/10 of its weight, and for short

intervals can pull 3/4 of its weight. The maximum effort possible is

therefore six times the average pull, but this is possible for only

short intervals. A very short steep hill would afford a condition

where such effort would be utilized. But for hills of any length, that

is, one hundred feet or more but not to exceed five hundred feet, it

is safe to count on the draft animal pulling three times his normal

pulling power for sustained effort.

The limiting grade for the horse drawn vehicle is therefore one

requiring, to overcome the effect of grade, or _f_{g}_, a pull in

excess of three times that exerted on the level.

A team of draft animals weighing 1800 lbs. each could exert a

continuous pull of about 1/10 of their weight or 360 lbs. If it be

assumed that the character of the vehicle and the road surface is such

that _f_{r}_ + _f_{i}_ + _f_{p}_ + _f_{a}_ = 100 lbs. per gross ton on

a level section of road, then the gross load for the team would be 3.6

tons. The same team could for a short time exert an additional pull of

three times 360 lbs. or 1080 lbs. For each 1 per cent of grade a pull

of 20 lbs. per ton would be required or _f_{g}_ for the 3.6 tons load

would be 72 lbs. for each per cent of grade. At that rate, the

limiting grade for the team would be fifteen per cent.

If, however, the character of the vehicle and the road surface were

such that _f_{r}_ + _f_{i}_ + _f_{p}_ + _f_{a}_ = 60 lbs. per gross

ton on a level section of road, the gross load for the team on the

level would be 6 tons, and the limiting grade 9 per cent.

The above discussion serves to illustrate the desirability of adopting

a low ruling or limiting grade for roads to be surfaced with a

material having low tractive resistance and the poor economy of

adopting a low ruling grade for earth roads or roads to be surfaced

with material of high tractive resistance.

It may be questioned whether horse drawn traffic should be the

limiting consideration for main trunk line highways, but it is

certain that for a number of years horse drawn traffic will be a

factor on secondary roads.

In the case of motor vehicles, excess power is provided by means of

gears and no difficulty is encountered in moving vehicles over grades

up to 12 or 15 per cent, so that any grade that would ordinarily be

tolerated on a main highway will present no obstacle to motor

vehicles, but the economy of such design is yet to be investigated.

=Energy Loss on Account of Grades.=--Whether a vehicle is horse drawn

or motor driven, energy has been expended in moving it up a hill. A

part of this energy has been required to overcome the various

resistances other than grade, and that has been dissipated, but the

energy required to translate the vehicle against the resistance due to

grade has been transformed into potential energy and can be partially

or wholly recovered when the vehicle descends a grade, provided the

physical conditions permit its utilization. If the grade is so steep

as to cause the vehicle to accelerate rapidly, the brakes must be

applied and loss of energy results. The coasting grade is dependent

upon the character of the surface and the nature of the vehicle. In

the cases discussed in the preceding paragraph, the coasting grades

would be five per cent and three per cent respectively. For horse

drawn vehicles then the economical grades would be three and five per

cent, which again emphasizes the necessity of lower grades on roads

that are surfaced than on roads with no wearing surface other than the

natural soil.

The theory of grades is somewhat different when motor vehicles are

considered, since it is allowable to permit considerably higher speed

than with horse drawn vehicles before applying the brakes and the

effect of grade can be utilized not only in translating the vehicle

down the grade, but also in overcoming resistances due to mechanical

friction and the air. On long grades, a speed might be attained that

would require the use of the brake or the same condition might apply

on very steep short grades. There is at present insufficient data on

the tractive resistance and air resistance with motor vehicles to

permit the establishing of rules relative to grade, but experience

indicates a few general principles that may be accepted.

If a hill is of such rate of grade and of such length that it is not

necessary to use the brake it may be assumed that no energy loss

results so far as motor vehicles are concerned. Where there is no turn

at the bottom of the hill and the physical condition of the road

permits speeds up to thirty-five or forty miles per hour grades of

five per cent are permissible if the length does not exceed five

hundred feet and grades of three per cent one thousand feet long are

allowable. It is a rather settled conviction among highway engineers

that on trunk line highways the maximum grade should be six per cent,

unless a very large amount of grading is necessary to reach that

grade.

=Undulating Roads.=--Many hills exist upon highways, the grade of

which is much below the maximum permissible. If there are grades

ranging from 0 to 4 per cent, with a few hills upon which it is

impracticable to reach a grade of less than six per cent, it is

questionable economy to reduce the grades that are already lower than

the allowable maximum. It is especially unjustifiable to incur expense

in reducing a grade from two per cent to one and one-half per cent on

a road upon which there are also grades in excess of that amount. The

undulating road is not uneconomical unless the grades are above the

allowable maximum or are exceptionally long or the alignment follows

short radius curves.

=Safety Considerations.=--On hills it is especially desirable to

provide for safety and curves on hills are always more dangerous than

on level sections of road. Therefore, it is desirable to provide as

flat grades as possible at the curves and to cut away the berm at the

side of the road so as to give a view ahead for about three hundred

feet. Whether a road be level or on a hill, safety should always be

considered and the most important safety precaution is to provide a

clear view ahead for a sufficient distance to enable motor vehicle

drivers to avoid accidents.

[Illustration: Fig. 9.--Types of Guard Rails]

=Guard Railing.=--When a section of road is on an embankment, guard

rails are provided at the top of the side slope to serve as warnings

of danger, and to prevent vehicles from actually going over the

embankment in case of skidding, or if for any reason the driver loses

control. These are usually strongly built, but would hardly restrain a

vehicle which struck at high speed. But they are adequate for the

protection of a driver who uses reasonable care. A typical guard rail

is shown in Fig. 9, but many other designs of similar nature are

employed. At very dangerous turns a solid plank wall six or eight feet

high is sometimes built of such substantial construction as to

withstand the severest shock without being displaced.

Trees, shrubs and the berms at the side of the road in cuts are

particularly likely to obstruct the view and should be cleared or cut

back so far as is necessary to provide the proper sight distance.

=Width of Roadway.=--For roads carrying mixed traffic, 9 feet of width

is needed for a single line of vehicles and 18 feet for 2 lines of

vehicles. In accordance with the above, secondary roads, carrying

perhaps 25 to 50 vehicles per day, may have an available traveled way

18 feet wide. Those more heavily traveled may require room for three

vehicles to pass at any place and therefore have an available traveled

way 30 feet wide. Greater width is seldom required on rural highways,

and 20 feet is the prevailing width for main highways.

=Cross Section.=--The cross section of the road is designed to give

the required width of traveled way, and, in addition, provide the

drainage channels that may be needed. In regions of small rainfall the

side ditches will be of small capacity or may be entirely omitted, but

usually some ditch is provided. The transition from the traveled way

to ditch should be a gradual slope so as to avoid the danger incident

to abrupt change in the shape of the cross section. The depth of ditch

may be varied without changing to width or slope of the traveled part

of the road as shown in Fig. 10.

[Illustration: Fig. 10]

=Control of Erosion.=--The construction of a highway may be utilized

to control general erosion to some extent, particularly when public

highways exist every mile or two and are laid out on a gridiron

system, as is the case in many of the prairie states. The streams

cross the highways at frequent intervals and the culverts can be

placed so as effectually to prevent an increase in depth of the

stream. This will to some extent limit the erosion above the culvert

and if such culverts are built every mile or two along the stream,

considerable effect is produced.

Where small streams have their origin a short distance from a culvert

under which they pass, it is sometimes advisable to provide tile for

carrying the water under the road, instead of the culvert, and, by

continuing the tile into the drainage area of the culvert, eliminate

the flow of surface water and reclaim considerable areas of land.

Erosion in the ditches along a highway can be prevented by

constructing weirs across the ditch at frequent intervals, thus

effectually preventing an increase in the depth of the ditch.

Wherever water flows at a velocity sufficient to produce erosion or

where the drainage channel changes abruptly from a higher to a lower

level, paved gutters, tile or pipe channels should be employed to

prevent erosion.

=Private Entrances.=--Entrance to private property along the highway

is by means of driveways leading off the main road. These should

always be provided for in the design so as to insure easy and

convenient access to the property. The driveways will usually cross

the side ditch along the road and culverts will be required to carry

the water under the driveway. Driveways that cross a gutter by means

of a pavement in the gutter are usually unsatisfactory, and to cross

the gutter without providing a pavement is to insure stoppage of the

flow at the crossing. The culvert at a driveway entrance must be large

enough to take the ditch water readily or it will divert the water to

the roadway itself. Generally end walls on such culverts are not

required as in the case of culverts across a highway.

=Aesthetics.=--Much of the traffic on the public highways is for

pleasure and relaxation and anything that tends to increase the

attractiveness of the highways is to be encouraged. Usually the

roadside is a mass of bloom in the fall, goldenrod, asters and other

hardy annuals being especially beautiful. In some states wild roses

and other low bushes are planted to serve the two-fold purpose of

assisting to prevent erosion and to beautify the roadside. In humid

areas trees of any considerable size shade the road surface and are a

distinct disadvantage to roads surfaced with the less durable

materials such as sand-clay or gravel. It is doubtful if the same is

true of paved surfaces, but the trees should be far enough back from

the traveled way to afford a clear view ahead. Shrubs are not

objectionable from any view-point and are to be encouraged for their

beauty, so long as they do not obstruct the view at turns.