PART III.

REEVING RUNNING RIGGING.

=209.=--FORE BOWLINES.

The fore bowlines have an eye in one end, to go over the toggle, and

are rove through a single block, seized into a single strap, and

secured to the fore-stay collar with a seizing passed through an eye

left in the strap, and the other end led in on the forecastle.

The fore and main clue-garnets are hitched to the yards, then rove

through a block lashed in the clews of the sail, up through a block on

the quarter of the yard, down to the fife-rail.

=210.=--FORE-TOPSAIL CLEWLINES.

Topsail clewlines are fitted the same as clew-garnets, and sometimes

with a whip; they come on deck through lubber’s hole.

When fitted with a whip, a piece of rope nearly equal to the double

clewline, is rove through the quarter-block, and an eye spliced in one

end, which is secured with a seizing round the clew, when the sail is

bent. In the other end, splice a single block, and reeve a fall through

it; one end splice into a bolt in the deck, and the other reeve through

a leading-block, well apart from the standing-part.

_Note._--The disadvantage of double clewlines, is, the points getting

in the clew-blocks when clewing up, or sheeting home.

=211.=--TOPSAIL BUNTLINES

Are toggled to the foot of the sails, and rove through single blocks

at the mast-head, underneath the rigging, and through lubber’s hole on

deck. Cheeks or sheaves set in the foremost end of the trestle-trees

are best, as they keep the buntlines clear of the belly of the sails.

Blocks in bolts will do equally as well, but do not look so neat.

I would recommend fitting a shoe-block underneath the eyes of the

rigging, on each side, in preference.

Buntline-spans are short pieces of rope, with a thimble in one end, and

the other end whipped; the buntlines are rove through these thimbles,

before being bent to the sail, or rove at the mast-head. At sea these

spans are knotted together, abaft the tye-blocks on the yard, and

stopped to them. When in harbor, they are let go, to allow the sails

being triced well-up to furl, or hauled out to dry, by the bowlines,

when toggled to the foot of the sail.

=212.=--FORETOP BOWLINES

Have an eye spliced in one end to go over the toggle on the bridle;

the other is rove through a block at the bowsprit-cap, strapped into a

bolt, or a sheave cut in the after end of the bees and led in on the

forecastle.

=213.=--MAIN BUNTLINES.

There are two on each quarter, and reeve on the bights. Reeve first

through the large sheave in a shoe-block, then reeve both ends, from

forward, through the double block under the fore part of the main-top,

and bend or clinch both ends to the holes in the foot of the sail for

the purpose. Sometimes toggles are fitted into the holes, with double

straps, and an eye spliced into each end of the buntlines. If no

shoe-block is to be got, seize two single ones into one strap. Through

the other sheave of shoe-block, reeve a fall; clinch one end to the

main-stay by the foremast, or splice an eye and seize it round it. The

other end reeve through a leading block, seized into a single strap,

leaving an eye to seize it to the stay, or through a sheave or leading

block in the fore-bitts.

=214.=--FORE BUNTLINES

Generally toggle to the foot of the sail, and are sometimes clinched;

then rove through a double block under the fore part of the fore-top,

and through fair leading sheaves in the racks to the bulwarks. The

buntline should be long enough to allow the sail to belly. The outside

leg of the buntline is sometimes rove through a thimble strapped

into the foot of the sail, and clenched into a cringle put into the

bolt-rope, a few feet above the clew.

=215.=--MAIN BOWLINE

Is a runner and tackle, and is rove and unrove as required. It is rove

through the thimble seized on the bowline bridle; the end of the runner

is secured round the fore-bitts, or to a cleat. The lower block of the

gun-tackle purchase is fitted with a hook, and hooked to a strap close

to the end of the runner, for the purpose. I have seen the main-bowline

boused up to the weather-forecastle bulwarks, which I think preferable,

not seeing any very great advantage from its being hauled amidships;

particularly when it is considered that the main-topsail yard, on a

wind, is braced abaft the main-yard.

=216.=--TOPGALLANT SHEETS

Are rove through the sheave in the topsail-yard, then through the after

sheave in the double block in the quarter of the topsail-yard, and

through a leading sheave or block on deck. The upper end is bent to the

clew of the topgallant-sail; sometimes a long-eye is spliced, which

goes over a toggle in the clew of the sail. They are also fitted with

sister-hooks, which is the latest and most improved plan.

[Illustration]

=217.=--TOPGALLANT CLEWLINES

Are bent through the clew of the sail, and secured with a sheet-bend;

it is then rove through the foremost sheave on the quarter-block on the

yard, and sent down through lubber’s hole on deck.

=218.=--FORE TOPGALLANT BOWLINES

Are toggled to the bridle of the sail. The fore one is rove through

a single block at the jib-boom end, one on each side, and led in

on the forecastle through fair leaders. These blocks are strapped

like span-blocks, and lashed together on the upper side with two

lashing-eyes; they are sometimes strapped singly, and go over the

boom-end, or seized to the guys. Double blocks are also sometimes put

in these straps, and the two inner sheaves used as jib-brail-leaders.

=219.=--MAIN TOPGALLANT BOWLINES

Are toggled to the bridle of the sail, then rove through sheaves

cut in the after part of the fore-topmast-crosstrees, and through

lubber’s hole, through fair leading sheaves on deck. Single tail-blocks

are sometimes used, clove-hitched round the after shroud in the

fore-topmast rigging, close up to the futtock-stave, or seized.

=220.=--MIZEN TOPGALLANT BOWLINES

Are toggled to the bridle of the sail, and rove through single blocks

on each side of the main-mast head, and through fair leading blocks on

deck. A double block is often used instead of two single ones on each

side, one sheave for the brace, the other for the bowline. They should

be led from lubber’s hole abaft all, between the cat-harpen legs, or

futtock-shrouds.

=221.=--TOPGALLANT BUNTLINES

Are seldom used in light weather, although very necessary in taking in

sail, when blowing fresh, as they save much time, and in some instances

a man’s life. On a wind it spills the sail, and prevents its getting

over the lee yard-arm; and going free enables the men to furl it much

easier. A strong proof of their utility may be inferred from the fact

that merchant vessels, who have as little rope rove as possible, and

are generally weak-handed, have their sails fitted with buntlines.

They are fitted as follows:--A piece of rope with a thimble on it, is

spliced into two eyelet-holes, worked in the foot of the sail, about

a third from each clew.[22] Splice the end of the buntline round the

thimble; reeve the other end through a single block, seized into a

single strap, and secured round the topgallant mast-head by a lashing

passed over all; send the end of the buntline through lubber’s hole, on

deck before all to the fife-rail.

[22] This piece of rope is called a span.

=222.=--ROYAL BOWLINES.

The fore royal-bowline is rove through a block at the flying-jib-boom

end, and led in on the forecastle, through a fair leader, the same as

the topgallant-bowline, and the main-royal bowlines through the chock

at fore-topmast head.

=223.=--REEF-TACKLES

Are sometimes double, and also fitted with a whip, as clewlines, or

pendant and burton. When double, a single block is seized into a single

strap, having a thimble in it, and the seizing passed between the block

and thimble. This block goes on the bridle, or cringle, in the leech of

the topsails. One end of the reef-tackle is clinched round the neck of

the boom-iron, the other rove through the block, up through the sheave

in the yard-arm, and through the upper sheave in the sister-block,

through lubber’s hole, and through a leading block or sheave on deck.

When single, an eye is spliced in the end of the pendant, to go over

a toggle fitted to a bridle, as above; the other end rove through the

yard and sister-block, a single block spliced into the end, and a whip

rove, as on the clewline.

_Note._--The generality of naval ships use their top-burtons with

short hide-pendants; some object to this, as the top-burtons may be

wanted, when they are in use as reef-tackles.

=224.=--LEECH-LINES.

The forward leech-lines are rove through the upper sheave-hole of a

shoe-block; both parts are then rove through a double block, hooked

with a pendant to the lower cap, then through two single blocks seized

to the jackstays on the yards, and are clinched to the leeches of the

courses, forward of the sail.

The lower legs are rove through the other sheave-hole in the

shoe-block, and the standing-part made fast to the fife-rail; the other

end being used to haul up the sails.

The after leech-lines are rove through blocks on the underneath part

of the yard, and clinched to the courses abaft the sail, to the same

places as the forward ones.

_Note._--Shoe-blocks are now pretty much out of fashion--when they

are not used, both parts of the leech-lines are led on deck and the

whip-purchase dispensed with.

=225.=--SLAB-LINES

Are bent to the middle of a span at the foot of the sail, led up abaft,

and rove through a block lashed to the grommet or span, around the

straps of the quarter-blocks of the lower yards, and down on deck.

These are very necessary in light weather, and in rough weather, may be

converted into spilling-lines.

=226.=--ROYAL CLEW-LINES

Are bent to the clews of the sail, rove through the quarter-blocks on

the yard, and led either in the tops, or on deck.

=227.=--FITTING TACKS AND SHEETS, BUMKIN-GEAR, &c.

A single block is seized into a single strap, leaving an eye to fit the

bumkin; this block is made with a shoulder, which lays on the bumkin

when the block is on.

Bumkin-braces are now generally chain; one is hooked to the bow,

and two to the cutwater; and set up with a lanyard rove through

span-shackles in their ends, and others on the bumkin, or with a

turnbuckle.

_Reeving the tack._--Clinch the large end round the bumkin, outside

the block, having been well wormed, parceled, and served, far enough

towards the small end to take the block on the bumkin, when the sail

is reefed. Reeve the small end through the block in the sail, then

through that on the bumkin, and in on the forecastle through a hole

in the bulwarks, for the purpose.

_Fore sheet._--The large end is served the same as the tack, and is

hooked into a bolt in the side for the purpose; the small end is rove

through the block in the sail, and through a sheave in the side, or

gangway bulwarks. Large ships generally work the fore-sheet in the

waist (main-deck), but it is often worked on the gangway, (spar-deck).

=228.=--YARD TACKLE TRICING-LINES.

If no cheek on the yard, take the pendants taut along from the

yard-arm, and then secure a single tail-block. On the foremost shroud,

well up, seize another single block, fitted with a single strap,

leaving room when seized-in, for the seizing with which it is secured

to the shroud. Round the fiddle-block in the pendant, between both

sheaves, secure the tricing-line with a running-eye; then reeve the

other end through the cheek, or tail-block, and then through the single

block on the shroud, and on deck.

=229.=--TO REEVE AND TOGGLE ROYAL-HALLIARDS.

Take a round-turn with the yard-rope, well up round the strap of the

block, with the long-eye; reeve the bight through the eye and put the

toggle in it; then bring the end up from the block seized to the eye

of the shroud, and reeve it through the one on the yard-rope, send the

end on deck, and reeve it through a leading block.

When half-hitched, the lower block is fitted as described, and secured;

the upper one is strapped with a thimble in the strap--reeve the

yard-rope through the thimble, and then through the lower block, up

through the upper one, and on deck through a leader.

=230.=--FORE STORM-STAYSAIL GEAR.

_To fit the stay._--Take a piece of good rope of proportionable size

to the sail; fit one end with two legs as a stay, and lash them abaft

the foremast-head, the legs being placed underneath those of the

standing-stay. Take a piece of rope the round of the bowsprit, inside

the fore-stay collar; splice an eye in each end, and seize a thimble in

the bight--splice a lashing in one eye, and secure the strap round the

bowsprit, by passing it through both eyes, until sufficient turns are

taken to secure it. Reeve the end of this stay through the hanks for

the sail, then reeve it through the thimble in the strap, and set it

well up with a luff-purchase; the double block hooked to a strap well

up the stay, the single one to another strap on the end; then pass a

round-seizing round both parts, close to the thimble--come up the luff,

and pass another seizing between it and the end, but not at too great a

distance, as it will prevent the sail from coming close down.

_Halliards._--Have a good strap to go round the foremast-head, close

to the stay. It can be fitted with two lashing-eyes, and when so

fitted can be easier taken off, and put on. When the sail is to be

set, hook the double block of a luff-tackle to this strap, and the

single one to the head of the sail; the hauling-part being sent down

abaft the fore-yard, and through a leading block on deck.

_Downhaul._--A single block is secured to the parts of the strap

round the bowsprit--the downhaul is spliced to the head of the sail,

then rove through the hanks, through the single block, and led in on

the forecastle. When a stay is fitted, the downhaul block is seized

to the strap round the bowsprit.

The downhaul is often double; if so, a single block is secured to the

head of the sail, the standing-part of the downhaul secured to the

strap on the bowsprit, and the hauling-part led in as before.

_Sheets._--Deck-tackles are generally used, one on each side; they

are hooked to the clew of the sail, and the hooks well moused. When

the sheet is aft, the weather one is overhauled. The after blocks

are hooked to eye or ring-bolts, as convenient, and should not be

too high or too low; if too much up and down, they slack the foot of

the sail; if too high, the after leech. The falls are rove through

leading blocks, and all the hooks should be well moused.

_Note._--These stays when set up, may be secured cutter-stay-fashion,

instead of seizing the end up, which will allow the sail to haul

close down on the bowsprit.

=231.=--MAIN STAYSAIL GEAR.

The stay is fitted the same as the fore, and sets up round the

cross-piece in the fore bitts, after being rove through the hanks.

The halliards are fitted the same as the fore.

The downhaul is rove through a block strapped round the bitts for the

purpose. If rove double they are fitted in the same manner.

Instead of iron hanks, I have seen grommets used, made of pieces of

rope, with a wall-knot worked on one end, and an eye spliced in the

other; these are long enough to go round the stay and becket. They are

secured to eyelet-holes in the sail with a seizing, and are always kept

to it. I have seen the sails set on the spring-stays, when fitted in

this way, but prefer separate stays.

There are also other ways of setting storm-staysails, but those I have

mentioned are in most general use. When a main-trysail can be got,

mizen-staysails should never be drawn, as a ship will keep much better

to windward with trysails and fore-staysail, than under the staysails

alone.

=232.=--MIZEN-STAYSAIL GEAR.

The halliards are hitched to the collar of the staysail-stay, rove

through a block in the head of the sail, then through a leader, and led

down on deck.

The downhaul is clinched to the head of the sail, and rove through

the hanks down the mizen-stay. The mizen staysail-sheet is a runner,

leading through a snatch-block and thimble. A gun-tackle purchase is

most commonly used, which answers all purposes.

=233.=--TOPMAST STAYSAILS, &c., &c.

_Fore._--The standing part of the halliards is seized or hitched to the

fore topmast spring-stay, then rove through a block in the head of the

sail, up through a leading block under the eyes of the topmast rigging,

then down on the larboard side of the deck abaft the foremast. The

downhaul is hitched to the head of the sail, rove through the hanks,

then through a block seized to the tack of the sail, and led in on the

forecastle, through a fair leader. The tack is a simple lashing.

The fore topmast staysail and jib-sheets are pendants lashed to the

clew of the sail, with a block in the end, through which the sheets are

rove; the standing part is hooked to an eyebolt in the bows, and the

running part is led in on the forecastle.

_Main._--The standing part of the halliards is hitched to the collar

of the main-topmast spring-stay, reeving through a block at the head

of the sail, then through a block at the main-topmast head, and

led down on deck. The downhaul is fitted the same as the fore, and

led down by the fore-mast. The tack is rove through a block in the

weather fore-rigging, or top.

The main topmast staysail-brails are seized to the leech of the sail,

led up through the hanks to a block seized to the upper hank, and can

also be used as a downhaul.

The middle, lower, and upper topgallant-staysails and jackstays,

may be fitted in one. In this case a double block is turned in,

and lashed to the after part of the fore-topmast crosstrees, or

mast-head; the lower part is set up in the fore-top, and the upper

part at the fore-topgallant mast-head.

The middle staysail-stays are rove through a single block, strapped

to the topmast, down on the cap.

The lower and upper topgallant staysail-stays, are rove through

blocks fitted to traverse the jackstay, with lock-thimbles, the

former being rove through the other sheave of the double block

at the topmast cross-trees; the latter through a block at the

fore-topgallant mast-head, and both led on deck.

The downhaul blocks are single, and are seized to the straps of the

tricing-line blocks. The halliards are whips hitched to the collars

of the stays, rove through blocks in the head of the sail, through

leading blocks at the mast-head, and down on deck. The tacks are

single and led in the fore-top; the sheets are also single, leading

in the gangways.

_Note._--The principle object to be attended to, in reeving

running-rigging, is to avoid the ropes being too much crowded in one

place, crossing or chafing each other, or any part of the standing

rigging, as it not only destroys it, but also decreases the desired

purchase to be obtained by their running clear of each other.

=234.=--SETTING UP RIGGING FOR A FULL-DUE.

[Illustration]

Have all the luffs on deck; fore, main, and mizen pendant-tackles

hooked, and tackle-falls laid along for pulling up; new lanyards

ready for reeving, seizings, marling-spikes, levers, mallets, grease,

small spars for ratling-down, triangles rigged ready for hoisting

up the mast, to secure the futtock-shrouds and cat-harpen legs, (if

used;) burton-falls sent on deck and rove--all the temporary ratlines

cast-off--spars got up underneath the bowsprit with the gratings for

the men to work on--topgallant-masts and flying jib-boom housed;

and also men stationed at the dead-eyes to turn in if required. Let

everything go abaft the masts, commence turning in the dead-eyes, and

reeve the lanyards--set up the bowsprit-rigging and secure it. Then

man the pendant-tackles, set taut the after-swifters--(if wedges in)

get the mast well forward in its place, and secure the stays. Cast off

the cat-harpen legs (if fitted), and futtock-shrouds.[23] Set up the

rigging for a full-due, observing the same precautions as when it was

first set up.

The lanyard is now rove full, and when racked, take the end and form a

clove-hitch above the dead-eye, then rack the surplus-end to the inside

parts of the lanyard, until the end is expended. The hitch is formed

between the dead-eye and shroud, around both parts, in the space left

by stretching--some use a half-hitch taken over all round the shroud,

hove well back, the lanyard expended, and the end seized. The ends of

the shrouds are then cut square and capped, and the mats laced on.

Rigging-mats are made with small rope, three-quarter-inch, and are

called sword-mats. They are generally the breadth of the dead-eye, and

long enough to take in both--the lanyards are laced inside. They are

hardly ever used on topmast rigging; they look heavy, and are of no

use, except on the forward shrouds and backstays.

[23] Vessels having their futtock-rigging set up to bands round the

mast, use no cat-harpen legs, and have therefore no occasion of

coming up either of the above.

=235.=--STAYING MASTS.

The practice of “staying masts with the wedges in,” has been already

denounced as contrary to every received system of seamanship. The

stays may be set taut with the wedges in, but the masts should be

always free in the partners, whenever there is occasion to alter the

position of their _standing_; because it is impossible but that the

precise situation of the mast must be altered a little, rendering

necessary corresponding alterations in the wedges. When these are made

and the wedges firmly fixed, there can be no inequalities of play

or pressure--the whole becomes a solid mass, yielding naturally and

uniformly to the motion of the ship. Whereas, if in setting up the

rigging the wedges be kept fast, the mast pressing unequally against

them, having too much play in one part, and too little in another, it

must inevitably get crippled.

In preparing to set up the rigging, though the stays may not appear

to require a pull, it is well to have the luffs and tackle ready; for

after lifting the wedges, there is great probability of its being found

necessary.

=236.=--BLACKING RIGGING.

The most convenient method of blacking rigging, is with the topgallant

masts on deck, but royal and topgallant rigging placed at the

mast-heads; for then men who ride down and black the topmast-stays, can

then at the same time easily black the topgallant and royal-stays; or,

what is handier still--let the men at the mast-head haul over and black

these small stays, and pay them down forward when done. The men also

who black down the topmast-backstays, can carry on at the same time

with the topgallant and royal-backstays. By this method the masts are

kept clean.

[Illustration: Scale-draft of a First-Class Frigate.]

If, on the other hand, topgallant-masts be kept up when blacking, the

small stays and backstays must be let go, in order that they may be

got at by the men on the topmast-stays and backstays; consequently the

masts must be adrift, are likely to be daubed over with blacking, and

if it should come on to blow fresh, so as to render it necessary to get

the topgallant-masts on deck, much injury must result to the blacking.

The topsail and lower lifts should be blackened first, the men having

to stand on the yards to do them.

Previous to commencing, the decks should be well sanded, and the

paint-work and head covered with old canvass. The quarter-tackle should

be clapped on one side of the main-yard, and also a burton hooked,

ready for clearing boats.

The finer and warmer the day, the better--the blacking will lay on so

much the smoother and thinner; but commencement should be delayed until

the dew is well dried off. A dry calm day is the best; for the blacking

will not take effect, unless the surface it is laid upon be dry.

=237.=--STATIONING THE CREW.

In dividing the crew into watches, care should be taken that the

physical force is as equally distributed as possible, and that there be

as many seamen, ordinary seamen, boys, and marines, in one watch as in

another.

Petty officers should be chosen from among the seamen, and those

selected who have been long in the service, and have proved faithful.

Forecastle men should be middle-aged seamen, with a few ordinary seamen

and landsmen. Young active seamen should be selected for topmen, also

a few ordinary seamen, landsmen and boys. After-guard, a few elderly

seamen, with ordinary seamen and landsmen. Waisters are chiefly

landsmen, with a few ordinary seamen; in single-decked vessels, where

there are no waisters, more men should be stationed on the forecastle

and in the after-guard, in proportion to the number of the crew of

the different classes of vessels. Idlers are excused from keeping

watch--they are officers’ servants, cooks, &c., &c.

Divide each watch into first and second parts, and appoint a captain

to each part; number the men belonging to the forecastle, having all

the larboard watch even, as two, four, six, and the starboard odd; have

the numbers painted on canvass, and let each man sew it on his bag and

hammock; having also for greater distinction, the larboard painted red,

and the starboard black. The men should be below alternately, so that

when one watch is below, there should be an equal number of the other

watch on deck.

[Illustration]

=238.=--STATIONING THE CREW AT QUARTERS.

Captains of the guns should be chosen from among the seamen who have

been long accustomed to them, steady, with good sight, and quick

motion. The largest and stoutest men should be chosen to man the long

guns, the others the cannonades. The boarders should be stout men--the

firemen and sail-trimmers, active young men. Be particular to station

them as near where they are accustomed to do their duty as possible, in

order to prevent confusion. Let all the first part of the gun’s crew be

in one watch, and the second part in the other, so that in the event of

going to quarters in the night, the watch on deck can clear away the

guns, while the watch below will clear away the hammocks.

To a twelve-pounder cannonade are stationed four men and one boy. All

the men stationed at the long guns of a double-decked ship, should be

armed with cutlasses, and called “boarders”--the first of the gun’s

crew to be called second boarders, and _vice versa_. They are only to

be called on when required to “board,” or in a case of great emergency

to “repel boarders,” and then every man will repair to the upper-deck,

except the firemen, quarter-gunners, and powder boys, who will remain

below to protect the ports, or to assist in extinguishing a fire.

All the men stationed at the cannonades should be boarders and

sail-trimmers. As boarders, the first part should be armed with pikes;

the second part with small-arms, who are to repel the boarders, but not

to quit the ship.

In a single-decked ship, all the men stationed are boarders; the first

part to be armed with cutlasses, and the second with pikes.

The battery being manned, distribute the rest of the crew as

follows:--have a quarter-master at the signals, when in a

squadron--topmen and marines in the tops, to repair damages, and

act as small-arm-men--a quarter-master and two men at the relieving

tackles--men stationed at the passages, to pass full and empty

boxes; also others at the shot-lockers. Mastmen to see the rigging

clear--cook, and armorer at the galley--the carpenter and his mates at

the pumps and wings--the master-at-arms, and ship’s corporal in the

light-room--the gunner, his mates, quarter-gunners, and cooper, in the

magazine, and the surgeon and assistants in the cock-pit.

=239.=--STATIONING THE CREW FOR MOORING AND UNMOORING.

In stationing the men, place the same number of men, of each watch, to

perform a piece of duty. When in a squadron, have quarter-masters at

the signals, and also in the chains--men at the wheel--quarter-gunners

to overhaul the fish, and grapple the buoys--men to overhaul and hook

the cat, and attend the back-ropes; also others at the mast, to see

the rigging clear. Boatswain’s mates in the gangways; carpenter’s

mates to ship and unship the capstan bars, and attend the stanchions,

with the music at the capstan--some fore-topmen to put on nippers,

or selvagees, some main-topmen to take them off, and boys to carry

them forward. Hands to rouse up and veer away the cable, to attend

the stoppers, and light forward the messenger. The yeoman in the

store-room--master-at-arms, and ship’s corporal on the berth-deck, and

cook at the galley--tierces in each tier, or chain-locker, and the

remainder of the men at the capstan.

=240.=--LOOSING AND FURLING.

Take the same number of men from each watch, and station them at the

same rope, &c. The topmen are to man their respective yards--hands

are to attend the boom-jiggers and tricing-lines--forecastle men to

attend head-sails, trysail and foresail--main-yard men to look out for

the main-sail--after-guard, for the spanker and main-trysail--for the

main-topmast staysail, the fore-top-men--for the main-staysail, the

gunner’s crew--hand stationed to sheet home, and hoist the topsails,

and when coming to an anchor, the same men to man the clew-lines,

bunt-lines, and weather-braces; and when loosing sails to dry, to man

bowlines, or buntlines. In furling, the captains are to be in the

bunt, in reefing, at the earings.

=241.=--STATIONING THE CREW FOR TACKING AND VEERING.

Station the men from the “watch bill”--have hands at the jib-boom end,

to overhaul the jib-brails, and light over flying-jib sheets. On the

bowsprit end to light over jib-pendants--hands on the bumkins, and

in the chains, to overhaul tacks and sheets, and backstay-falls. On

deck, at the wheel, spritsail-braces, jib-sheets, jib-brails, braces,

bow-lines, clew-garnets, tacks and sheets, backstay-falls, lifts,

trusses, spanker-sheets, guys, vangs, and topping-lifts. Aloft, to

overhaul lifts and trusses--attend outriggers, and bear the backstays

abaft and abreast--the mast-men to see the rigging clear, &c., &c.

_For reefing._--The men are stationed as in furling, with the

exception of the captains, who are stationed at the earings. When the

yards are down, the men from the clew-lines and bunt-lines will haul

out the reef-tackles.

=242.=--GETTING READY TO BEND SAILS.

It is customary to bend the light sails first, such as jibs, spankers,

and trysails. Overhaul the jib and flying-jib stay, and halliards, in

on the forecastle. Have the lashing spliced into the sheets ready for

passing, and seizings to the hanks.

Overhaul down into the top the reef-tackles, and stop the blocks to the

foremost shrouds, (or the end if single.) Overhaul the topsail-sheets

from the yard-arm, and half-hitch them round a dead-eye, or foremost

futtock-plate. Bunt-lines into the top, and stop them to the foremost

shroud, above the topsail-yard, or to the tye-blocks--clew-lines

into the top, and stop them to the eye of a shroud, and get the

harbor-gaskets on the yards. A rope-yarn stop will be quite sufficient

for all these purposes. Both burtons should be overhauled on deck

before all.

Overhaul down the leech-lines, slab-lines, bunt-lines and clew-garnets,

and stop them so as to prevent their flying about.

Take two selvagee-straps, put them round the neck of the boom-irons,

and to them hook the double-block of a long jigger; the single one

overhaul down, and hook to a ring or eye-bolt in the bulwarks, and the

fall led through a leading block a-midships.

[Illustration: United States’ Ship-of-the-Line COLUMBUS, at Anchor.]

Lower down the gaffs--overhaul the brails, and have seizings of

two-yarn spun-yarn ready, to secure them to the sails. If hoops,

seizings should also be put on them, with both ends rove through the

bight.

Topgallant yards should be got out of the rigging, and laid on deck out

of the way, ready for bending the sails. Top-burtons overhauled down

forward of all, for the topsails.

_Note._--When the preparations above stated are made, it is intended

to bend all the sails together.

=243.=--BENDING SAILS.

Call all hands to bend sails--get the courses, jib, topsails, and

spanker, on deck. Open them out, and see that they are whole and

complete; with the bowline-bridles, head and reef-earings, rope-bands,

reef-points, sheet, clew-line, and reef-tackle blocks all in their

proper places. Bight the topsails down in their respective places

forward of the masts, with the clews out. Hook the lower block of the

burton to the slings passed round the centre of the sail, and mouse the

hook--reeve the fall through a snatch-block or leader, and keep the

sail clear of the top as it goes up.

Overhaul the courses athwart the deck, shackle on the sheet, and

also the tack, and clew-garnet blocks--reeve and bend the gear--stop

the head of the sail to the bunt-lines, use the clew-jiggers for

yard-ropes, hooking to the first reef-cringle, and stop the head

earings to the block.

The end of the jib-stay having been brought in on the forecastle,

reeve in the hanks, and stop the luff of the jib--hook on the

halliards--reeve the downhauls--fit the brail-block and reeve the

brails--hook on the sheet-blocks, or pendants, and reeve the sheets.

Lower the spanker-gaff--pass the throat and peak-earings, and lace

the head to the gaff--seize on the brails, and reeve them and the

outhauler. All being ready,

_To man the gear._--First, man the top-burtons and sway the topsails

clear of the deck--man the jib-halliards and downhaul--yard-ropes,

clew-garnets, clew-lines, bunt-lines, reef-tackles, and

gaff-halliards: at the word run out the jib, reeve and set up the

stay, and seize the tack. Sway the topsails and courses up to the

yards, where some hands are ready to receive them. Bend the gear

and haul out; then take a turn with the earings--ride down the heads

and pass the earings exactly; make fast the rope-bands, fit the

leech-line block of the courses--seize on and reeve the leech-line.

In the mean-time some hands are employed in seizing on the hoops of

the trysails and spanker, as they go aloft. After the sails are all

bent, it would be well to let them fall, to see that all the gear is

bent clear, if so, clew up and furl the courses and topsails, and

stow the jib, spanker and trysails.

The topgallant-sails, royals, and studding-sails are bent on deck.

Send the staysails into the tops, fit the jackstays and tricing-line

blocks, seize the head of the luff; reeve the halliards, downhauls,

and brails, bend the tacks and sheets; stow the staysails and haul

all taut.

_Note._--The staysails are not _all_ allowed by the new Book of

Allowances.

=244.=--BENDING SMALL SAILS.

By small sails are meant topgallant-sails, royals, flying-jib,

studding-sails and staysails.

It is only in ships in good order where the men go through this

manœuvre with smartness and method, after being exercised, and having

become familiar with the ship and their stations.

First, all the yards, topgallant, royal, and studding-sail, should be

got out of the rigging, and down on deck at the same time. Next, a

proportion of hands should be sent to each sail, and all bent together,

including flying-jib and staysails.

When the topgallant-sails, royals, and studding-sails, are all bent,

they should be swayed into the rigging all together, and not one after

another.

If the topgallant-yards happen to be across, the best plan, if

circumstances will permit, is to bend all the other small sails first,

except the flying-jib, and then to wait until the yards are sent down

at sunset, to bend topgallant-sails and flying-jib.

Topgallant sails ought not to be bent while the yards are across,

because the earings must then be hauled out, and passed _over_ the

lifts and braces, which precludes the possibility of unrigging the yard

afterwards, without unbending the sail. Sometimes one of the two sets

of topgallant-yards are appropriated in harbor to exercise, (sending up

and down) while the other is kept below, with the sail bent, ready for

crossing.

In bending topgallant-sails, the earings are passed the same as the

topsail, and the sail seized to the jackstay, the yard-rope bent, the

sails furled, and the yard got into the lower rigging. In furling,

bring the leeches taut along the yard, and keep the clews in the bunt,

then roll the sail up from the yard-arm, and pass the gaskets. Put

the grommet over the yard-arm, man the yard-rope and sway the yard up

and down; put the lower yard-arm into the snotter, over the foremost

dead-eye; secure the upper yard-arm with a lanyard spliced round the

shroud for the purpose; it is called a stop. The lizard should be

singled, ready for going aloft, by reeving it once through the thimble

on the yard-arm, and half-hitch round the yard-rope with the bight.

Trysails and storm-staysails should be bent at this time, if they are

to be bent at all before leaving harbor.

_Note._--Good rope-yarns answer very well for robins for

topgallant-sails and royals. You are never at a loss for them in

bending, and in unbending they are easily cut.

=245.=--BENDING A SPANKER.

Overhaul the brails well, and pass the sail through their bights. Haul

the earing in the jaws out first; then the outer one. Splice the lacing

into the outer eyelet-hole, lacing, and secure the lacing in the jaws.

Bring the after-leech taut, along the gaff, and within a few inches of

the blocks; mark the place for the throat-brails, also for the peak,

opposite their respective cheeks on the gaff, and seize the brails to

the leech-rope, by passing the seizing between the strands and round

the brails. Eyelet-holes, worked close to the leech-rope, are far

preferable for seizing the brails to.

The throat-earing is generally passed through an eye-bolt in the lower

part of the jaws; but this never brings the sail close to the mast, and

looks very bad. In preference, I would recommend having a score cut

under the leather in the jaws, and the earing passed from the cringle

through this score, and an eye-bolt on the upper side of the jaws,

back through the cringle, and so on, until sufficient turns are taken

to secure the sail. Large staples also are fitted to the jaws for the

purpose, and keys on top, which answer better, and are more secure;

also bending battens, instead of lacing round the gaff.

The outer earing is passed round a cleat on the upper side of the

gaff, for the purpose. Take the earing from the cringle, pass it round

outside the cleat, back through the cringle, and round the cleat, until

sufficient turns are taken; then take several inner turns round the

gaff and cringle; frap all the outer turns together, with the remaining

part of the earing, to bring the parts close, and prevent any chance of

their slipping over the cleat; take two half-hitches, expend, and seize

the end.

To haul out this earing, and stretch the head of the sail well, use a

small jigger; secure the double block to an eye-bolt in the end of the

gaff, pass three turns of the earing, cat’s-paw the end, to which hook

the other block, and pull the earing well out. I have frequently seen

only one earing used; but would prefer two, as all inner turns, when

much strain is on them, should have a separate earing. If a new sail,

and requires much stretching, it is hauled well out before passing the

earing, by hooking the inner block of the jigger to the cringle. Man

the throat and peak-halliards, hoist the sail up gradually, seize the

hoops, and reeve the lacing.

_Note._--Trysails are bent in the same manner. Some fit them to haul

_in_ and _out_ on the gaff, with hoops.

=246.=--FITTING SEA-GASKETS.

Gaskets are made with foxes, or small spun-yarn, and platted, like

making sennit. The spun-yarn is middled over the bolt, and platted

together, the bight forming the eye; sometimes a piece is platted for

the eye, then all worked together; if not, the eye is served over

afterwards. Sea-gaskets are long enough to have only two on each

yard-arm, and to furl the sail over booms and all, when close-reefed,

as there will be no more sail on the yard-arms than at any other time.

They are secured round the jackstay, by reeving the end through the

eye; sometimes round the yard.

=247.=--FITTING HARBOR-GASKETS.

In making, the eye is left large enough to take a small thimble, then

platted broader in the centre, and tapered to a small end. The broad

part should be long enough to make the sail in when furled with two

reefs. They may be (to look well) about two-and-a-half inches wide,

but this is quite a matter of taste. When put on the yard, the thimble

is put underneath the jackstay from forward, and secured to it by a

seizing passed round the neck of the gasket and jackstay, close to the

thimble, and when the sail is ready for their being passed, it is taken

up and rove through the thimble, and the sail tossed well up; the end

then shoved underneath between the sail and gasket, once or twice.

These always look better than any other, are easier passed and secured,

and keep the sail well up. There is generally one harbor-gasket to

every other seam.

=248.=--BUNT-GASKETS.

These are always, as to fitting, a matter of taste, but at present

they are generally made of wove mat, two or three inches wide, with

the two legs crossed, and an eye in each end. I have seen them made

of rope, in the following manner:--Take the distance between the two

quarter blocks, and measure it off on deck; drive a nail slightly into

the deck at each end; then measure from the centre the height the

bunt is intended to be, and there drive another nail. Take a piece of

rope, from two and a half to three-inch, and measure off sufficient to

go over these nails, forming a triangle; splice both ends together,

and seize a thimble in each corner; put these thimbles over the nails

again, and fill the space in diamonds or squares, according to fancy.

The thimbles in each end are secured by the quarter-blocks to the

jackstay, and also in the centre. It is not necessary to have thimbles

in each end, as an eye will answer every purpose. A long sennit-gasket

is middled and seized by the upper thimble; it should be sufficiently

long to go round the mast, when the gasket is boused up, to secure it

and the bunt well into the mast.

=249.=--HAMMOCK GIRTLINES.

Whips are rove at the yard-arms. If rope is not used on purpose for

girtlines, the studding-sail halliards will answer; they are rove as

follows:--A tail block is put on each side of the jib-boom end, and

another on the spanker-boom. Overhaul down the whips, and bend them

round the girtlines with a bowline knot, allowing room for their

rendering through. Belay the foremost ends of the girtlines and trice

up; haul upon the after-part, and get all taut. A man lays out on each

yard-arm, and marks the girtline with rope-yarns where the tricing

line, or a whip, should be bent; then lower away, cast off the bowline

knot, and bend the tricing lines round the girtlines with a rolling

hitch.

The whips are led from the lower yards to the lower caps, through

blocks hooked to the bolts, and on deck. The lower end of the

tricing-line is often bent to the girt-line as an inhaul or downhaul;

but it is best to have them separate, as it prevents walking the

hammocks up, and laying across the deck; and there are plenty of other

ropes’ ends which will answer the same purpose.

When one girt-line of a side is not enough, others are rove inside in

the same manner. The generality of ships reeve them inside of the lower

rigging, as they are much easier got down, and the hammocks are not so

likely to get dirty, or overboard.

=250.=--STOPPING ON HAMMOCKS.

Every man should be obliged to have three knittle-stops at the head,

and two at the foot of his hammock. When stopping on, they should

overlay at each side about two or three inches, and be stopped together

at the foot--numbers up and in.

The forecastle-men should stop their hammocks on forward, next

foretop-men, next maintop-men, next mizentop-men, next after-guard,

idlers, and boys. Boatswain’s mates abreast of each hatchway.

=251.=--FURLING OR STOWING THE BUNT OF A SAIL.

When the sail is nearly rolled up, hook the bunt-jigger, bouse it

well up, lower the buntlines, and _shove_ the sail well into the

skin, taking pains to keep the bunt square; pass and secure the

bunt-gasket--take off the jigger--lower and square the studding-sail

booms, and pass the heel-lashings.

=252.=--FURLING COURSES.

The leeches are handed in along the yard, then the sail rolled up snug,

with the ends of the points passed in towards the bunt, to give the

sail a gradual increase in that direction. Pass the gaskets, lower the

booms, and, if required, stop up the gear.

Bowlines are stopped to the slings close down, and hauled taut on the

forecastle.

The bowline-bridles of all sails, in furling, are laid with the toggle

towards the bunt, and bridles taut along the yard.

When a sail is neatly furled, it appears neither above nor below the

yard--earings well slewed up--sail smooth under the gaskets, bunt

square, and a _taut_ skin. The heels of the booms should be square, and

every thing necessary completed, previous to _squaring_ the yards.

=253.=--MAKING UP SAILS.

In making up a course, stretch the head of the sail well taut along

the deck or loft; bring up to the head the belly-band, then the foot,

leaving the clew-blocks out at each end; also the bowline-bridles, and

roll taut up; pass the head-earing round the sail close inside the

bolt-rope, and put a stop of good spun-yarn to every seam. The reef

earings are made up in the sail.

In making up a topsail, stretch the head of the sail taut along; bring

the second reef up to the head, and lay all the points and earings

snugly along; then bring up the belly-band, and then the foot. The

clew-blocks, bowline-bridles, reef-tackles, and toggles or span,

should be left out, so that when the sail is sent aloft for bending,

the sheets can be rove, reef-tackles and bowlines toggled, without

loosing the sail, which will be found of great advantage when blowing

fresh. Roll well up, stop with spun-yarn at each seam, and expend the

head-earings round the ends of the sail.

Topgallant-sails are made up with the clews out, and bowline-bridles,

(if wished,) but they are always bent to the yards on deck; so the

neater, they can be made up the better.

_Note._--The reef-earings of the topsails should be secured to the

cringles, before rolling up; bowline-hitch the end of the first

reef-earing to the head, second to the first, third to the second,

and fourth to the third reef cringles; as there is sometimes much

trouble in getting hold of an earing when it is not secured as above.

All spare sails should be _tallied_, before being stowed in the

sail-room, as it will prevent all mistakes; but if a sail is properly

stowed, and the _master_ and _sailmaker_ take a list when they are

stowing, there never can be any difficulty in finding what may be

wanted.

Royals are made up the same as topgallant-sails.

=254.=--TO MAKE UP A TOPMAST STUDDING-SAIL.

Stretch the sail taut along, and overhaul the downhaul through the

thimble and block, and bight it along the whole length of the leech.

Then roll up towards the inner leech, lay the sheets along the whole

length of the sail, roll up over all, and stop the sail well up with

spun-yarn or foxes. The earings are expended round the head of the sail

when bent to the yard.

_Note._--The topgallant studding-sail is also made up in the same

manner.

=255.=--FURLING FORE AND AFT SAILS, (WITH CLOTHS OR COVERS.)

The jib is hauled close down, and the sea-gasket passed round it. The

cloth is then placed over, and the stops tied. Eyelet-holes are made in

each edge for the stops. Jib-sheets and halliards stopped, and hauled

taut.

_Furling Spanker._--It is also furled best with a cover; it can be

furled in the two after cloths, the same as a jib, but it never looks

so well, takes time, and in most instances has to be loosed two or

three times before it gives satisfaction.

In furling with a cover, the sail is brailed close up, and the cover

stopped round, commencing from the end of the gaff, and working in to

the mast, and down on deck.

Trysails are stowed in the same manner as spankers.

The fore-topmast staysail is stowed as a jib, in the netting.[24]

_Note._--Stowing fore and aft sails requires more handy-work than

seamanship, the principal thing being to furl them in the smallest

compass, and in the after cloths, as it brings the seams up and down.

I have seen staysails admired for their neatness from the deck,

when the greater part of the sails were lying loose in the top.

This should be avoided as much as possible, as something should be

sacrificed in appearance, to preserve a sail from injury. Taking a

little trouble will get all the sail in the skin; and although it may

be larger, it can be made to look neat.

Jibs require more pains taken in stowing, than any of the other fore

and aft sails. There is no necessity of stowing them in their own

cloths, when furling cloths are allowed. (_See allowance_).

[24] Canvass bottoms are used instead of nettings, for staysails.

=256.=--REEFING COURSES TO JACKSTAYS.

When this plan is adopted there is only one point requisite, and that

on the fore side of the sail; some use two, but it is unnecessary.

Reeve the point through the eyelet-hole from the after side, the points

being made with eyes. Through the eyes reeve a small sized rope; this

is called the jack-line. Between every four eyelet-holes, stitch the

rope well to the sail, on each yard-arm, leaving three points out.

Take a piece of small rope, splice one end to the eyelet-hole in the

head of the sail, reeve it through that left in the reef, and splice

the other end into the same eyelet hole in the head, leaving about two

feet slack. This will be found of much use in gathering the sail up for

reefing--it is called a _grab-rope_, or _reef-line_.

=257.=--REEF-EARINGS

Are fitted the same as the head--an eyelet-hole is worked below the

cringle, large enough to take the earing; through this put the earing,

reeve the end through the long-eye, and haul it taut through. The

earings are sometimes put in the cringles, but the cringle cannot be

so well hauled up on the yard, and consequently will not be so well

secured for carrying sail; and it not only puts more strain on the

yard-arm points, but also injures the sail. They are also fitted on the

bight, and passed on both ends; one end for the outer turns, and the

other the inner turns.

_To pass a reef-earing._--For the first, second, and third reef,

take it from the sail, on the foreside of the yard, round the cleat

for the purpose, through the cringle, round the yard and through the

cringle, until three or four outer turns are passed; then reeve the

bight through the cringle from aft forward--take a round turn in the

cringle; then take the end from the latter under the yard up abaft

over, and through the bight; then back over the yard on the foreside,

through the cringle, from underneath the yard; slew the cringle well

up, and leech off the sail, and pass sufficient turns to secure;

then expend the end round the yard and half-hitch round all, or a

clove-hitch to the lift.

A close reef-earing is passed the same way, but hauled out on the

after side of the yard. Being hauled out abaft, it covers all the

other reefs, and there being so much sail on the fore-side, it would

never keep up.

In passing the outer turns for each reef, take two for the first;

three for the second and third, and four for the fourth. For the

inner turns, expend the earing, except your earings are fitted on the

bight.

=258.=-BENDING STUDDING-SAILS.

All are bent to the yard alike, and the same precautions used as in

other sails, keeping the rope next the yard. The earings are rove

through the holes in the yard-arms, and cringle in the head of the

sails; two or three outer turns are taken, and the earing nearly

expended in inner turns, then frap the outer turns together with the

end, and half-hitch, if the sail is laced to the yard--the lacing is

spliced into one eyelet-hole, rove through the other, and passed round

the yard.

They are sometimes bent by half-hitching the lacing, which plan keeps

the sail up, and much closer to the yard. A round turn is also used, by

being passed round the yard-arm and through the eyelet-hole twice, and

from the latter through the next eyelet-hole, round the yard. They are

then made up--the topmast studding-sail to the foremost shrouds of fore

and main rigging; topgallant, in foremost part of the topmast rigging;

and lower, on the booms. The topmast studding-sail is also sometimes

kept on the booms, and tarpaulin covers fitted for them.

These sails are sometimes bent with long rope-bands, and unbent when

taken in and stowed away, if dry.

[Illustration]

In making up a topmast studding-sail, when bent, overhaul the downhaul

the length of the luff or outer leech; then take the foot up to the

yard, and place the tack block out. Bight the downhaul along the yard,

also the sheets; roll the sail snugly up, and stop it with yarns.

Lower studding-sails are bent and made up in the same manner as topmast

studding-sails, with the sheet in.

I have seen these sails when placed in the rigging ready for setting,

with the sheets and downhaul left out and stopped to the yards; the

tack stopped from the lower yard, up and down the foremost shroud and

bent to the sail. This was done with the idea that the sail could be

set much quicker; but it was found that the sail on the opposite side

(which was set in the general way), was set with less trouble, and in

less time. There will be plenty of time to bend the tack and halliards

(when the order is given to get ready), while getting burtons up,

jiggers on topsail-lift, weather-braces taut, and rigging the booms out.

_Note._--The topgallant studding-sail tack is generally kept bent,

and slacked when bracing the yards up.

It has frequently occurred to me, when I have heard the order from

the quarter-deck, in the event of setting studding-sails, “to rig out

and hoist away;” how can it be possible to rig out the fore-topmast

studding-sail booms, when probably there may be fifty men clapped on

the lower studding-sail halliards, hauling the booms in, and seldom

more than six or eight men at the most, on the in-and-out jigger,

trying to get the boom out.

I should recommend to rig-out and secure first, then hoist away.

=259.=--PREPARATIONS FOR LEAVING THE WHARF AND HAULING OUT IN THE

STREAM.

_To haul off and moor ship._--Before hauling off, all the spare

spars should be hoisted in and secured, boat’s chocks placed,

all the stores, provisions, and water got on board; it would be

also well to see that there is a sufficient quantity of brooms,

bath-brick for cleaning bright-work, lime and size for whitewash,

and everything that is allowed and requisite for the ship. The

complement of men from the receiving ship should be got on board,

and the boats provided with crews, oars, and sails. When everything

necessary is completed, make preparations for hauling off. Get up

kedges and hawsers ready for instant service; have the ends of the

hawsers pointed up each hatchway, ready for handing out if wanted.

Run out a kedge, and drop it where the first, or weather-anchor is

to be planted; have lines from the ship to the shore--single the

fasts--hang over fenders and outriggers--man the hawser, cast off the

fasts, and warp off; checking her as may be necessary by the lines.

When warped out to the kedge, run it up to the bows, and let go the

weather anchor; veer as fast as she will take it, assisting her in

going astern by the mizen-topsail, if necessary. If to shoot her to

either side, use the helm, jib, or spanker, and in case there is no

wind, use kedges and hawsers.

When a double scope is out, stopper the cable, and let go the second

anchor--furl the mizen-topsail--bring-to on the weather cable, and

heave in to the moorings; moor a little taut, to allow for veering.

If a hemp-cable, clap on the service, and veer to the hawse-hole.

=260.=--CARRYING OUT AN ANCHOR WITH A BOAT.

Hang the anchor to the stern of the boat by good stoppers, and have the

buoy and buoy-rope attached to it; pass the end of the cable or hawser

out through the hawse-hole, and coil away enough of it in the bows

of the boat, to reach the bottom. Now capsize the coil in the stern

sheets, and then the end will be uppermost; bend on to the anchor.

There should also be a sufficient length of the hawser coiled away in

the boat to reach the place destined for the anchor. When in the right

place, heave over the buoy, and see that the buoy-rope is clear--stand

clear of the cable, and slip the stoppers. In case of making a

guess-warp, _vice versa_.

=261.=--MARKING THE LEAD-LINE.

At two fathoms, two strips of leather; at three fathoms, three strips

of leather; at five fathoms, a white rag; at seven fathoms, a red rag;

at ten fathoms, a piece of leather with a hole in it; at thirteen, the

same as three; at fifteen, the same as five; at seventeen, the same as

seven; at twenty fathoms, two knots.

Deep-sea lead-lines are marked the same, as far as twenty fathoms, then

add one knot for every ten fathoms, and a strip of leather for every

five fathoms.

[Illustration]

=262.=--HEAVING THE LEAD

A hole is made in the upper part of the lead, a piece of rope rove

through it, and both ends spliced together;[25] an eye is spliced in

the end of the line, put through this strap, the lead shoved through

the bight, and hauled taut.

[Illustration]

Breast ropes are fitted in the chains, for the men to lean against when

heaving the lead. They are made as sword-mats, tapered at each end, and

secured to two shrouds, with seizings passed round them, and through

the eyes in each.

Heaving the lead is generally performed by a man who stands in the

main chains to windward. Having the line all ready to run out, without

interruption, he holds it at a distance of nearly a fathom from the

lead, and having swung it backwards and forwards three or four times,

in order to acquire a greater velocity with the swing, he then swings

it over his head, and thence as far forward as is necessary; so that

by the lead sinking whilst the ship advances, the line may be almost

perpendicular when it reaches the bottom. The person sounding then

proclaims the depth of water, in a kind of _singing manner_. Thus:

if the mark of five fathoms is close to the surface of the water, he

_sings out_, “by the mark 5!” and, as there are no marks at 4, 6, 8,

&c., he estimates those numbers, and sings, “by the deep 4!” &c. If

he considers it to be a quarter, or a half, more than any particular

number, he sings out, “and a quarter 5!” “and a half 4!” &c. If he

conceives the depth to be three quarters more than a particular number,

he calls it a quarter less than the next; thus, at four fathoms and

three-quarters, he calls, “a quarter less 5!” and so on, according to

the depth of the water.

[25] A leather becket may be used for light leads, instead of a rope

strap.

=263.=--MARKING A LOG-LINE.

[Illustration]

Allow twelve fathoms for stray line, where stick in a white rag; then

at every forty-seven feet and six-tenths, mark the line as follows,

viz.: at one, one leather; at two, two knots; at three, three knots;

and also having a mark at every half-knot. The glasses should be proved

with a good watch, having a second-hand.

The principle of the log-line is, that a knot is the same part of a

sea-mile, that half-a-minute is of an hour; therefore the length of a

knot should be one-hundred-and-twentieth the length of a sea mile, or

fifty-one feet; but as it is more convenient to have the knot divided

into eight parts, of six feet each, the proportional reduction is

necessary in the glass. Therefore as 51 feet : 30 seconds :: 48 feet :

28, 4.17 seconds; but as the fraction can be more easily allowed in the

line than the glass, another proportion is necessary, viz., as 28, 4.17

seconds : 48 feet :: 28 seconds to 47.6 feet, or the length of a knot.

_Note._--Log-lines are kept on reels for the purpose.

The length of the stray-line is regulated by the size of the ship.

=264.=--GETTING READY FOR SEA.

Observe and note the exact line of flotation. See that all the rigging

is properly up, alow and aloft. See that the preventer-gear is on, as

well as breast-ropes for leadsmen, and leads and lines in the chains.

If requisite, grease the masts, jib and staysail-stays, lifts and

trusses, and reef-pendants--sheet-anchor stowed--guns secured--boats

hoisted in and secured. Care should be taken that the harness-casks are

lashed--chests and tables properly cleated, and binnacles secured. Let

the armorer examine the slip-stoppers, and see that they are oiled,

and in proper condition--get the swinging-booms fore and aft--awnings

below, and awning ridge-ropes down--down jack-staff--see that the

tiller-ropes are all clear, and that the tiller moves freely; also that

the relieving-tackles and spare tiller-ropes are at hand.

Cross topgallant yards, bend the gear; take the covers off the jibs,

staysail, spanker, and trysails, and coil every rope down clear, for

running--have the studding-sails stopped, ready for going aloft, and

the royal-halliards down on the weather side. Cat and fish overhauled

down. Timenoguys in their respective places. Life-buoys in order.

Accommodation-ladder unshipped and stowed away. Pendants and ladders

taken off the swinging-booms--head-cranes unshipped--chafing-gear on

its respective places. It would also be well to see that there is a

sufficiency of sand on board.

=265.=--CLEAR HAWSE.

[Illustration:

A Cross.

An Elbow.

A Round-turn.]

Call all hands to “clear hawse.” Lash a stout single-block to the

bowsprit, through which reeve the clear hawse-pendant; haul the launch

under the bows, or if there is too much sea on, or she is not out, send

a hand down in a bowline, and hook the pendant to the riding-cable,

below the turn; bouse them up clear of the water, after which pass a

stout lashing round both cables.

If there should be a heavy sea on, or the wind flawey and variable, it

would be well to pass the end of a hawser out of the hawse-hole, and

hitch it to the cable,[26] to relieve the lashing. Reeve ropes through

blocks on each side of the bowsprit end, for bow-lines, and pass them

in at the hawse-hole, so as to take out an elbow; for instance--suppose

the starboard was the clearing cable, take the larboard bow-line down

under the cable, up into the starboard hawse-hole, and the starboard

one over to the larboard side of the cable; then follow the lead of the

larboard bow-line, bend on several fathoms inside, and stop along to

the hawse-hole; draw the splice, or unshackle, bend on the hawse-rope,

off-stoppers, and run out; hang the bights to the bowsprit (if

hemp-cable), with slip-ropes, and send in the bow-lines again, the same

way as before. When the end is out, “cast off,” dip it fair, and bend

on again to the cable; rouse in, slack down the slip-ropes, and splice

or shackle the cable; haul it taut with a deck-tackle, and bitt, and

stopper as before. Cast off the hawser, unlash the cable, unreeve the

clear hawse-pendant, unlash the block from the bowsprit end, and clear

up the deck.

_Note._--If there is a round turn and an elbow in the hawse after

rousing the cable, repeat the operation as before; it is always well

to prevent confusion, by taking out one elbow at a time. A cross, is

when the cables lay across each other, or when the ship has _swung

foul once_; an elbow is two crosses, and a round turn is three

crosses; a round turn and elbow is five crosses. It can readily be

seen thus, in clearing hawse with a round turn, a cross will be left

in the cables.

The anchor is fouled in the very operation of _letting it go_; the

weight of the chain-cable causing the running out part to fall over

and foul the stock. To avoid this, some officers pursue the practice

of “letting go” the anchor with the cable _bitted_, which plan is

strongly recommended.

From the weight of the chain-cable, compared with that of the hempen,

the former is less liable than the latter to foul the anchor; but no

speculation should induce an officer to depart from that practice

which can alone ensure a clear anchor.

[26] See clear hawse-shackle and pendant.

=266.=--WEIGHING AN ANCHOR WITH THE LAUNCH.

This may be done by under-running, when the ship has slipped the cable,

or weighing by the buoy-rope, when the anchor is lying in too shoal

water for the ship to be hove up to it.

Ship the roller on the stern of the launch, have strong tackles with a

jigger also, and some good rope for stoppers. Get the end of the cable

over the roller; pass a strap round it, to which hook the double block

of the tackle, and the single one to a bolt in the bows; man the fall,

and as the cable comes in, French-flake it along the thwarts; when the

tackle comes two blocks, “stopper and fleet;” when the cable is “up

and down,” clap the jigger on the fall of the tackle, and heave the

boat’s stern well down in the water, and stopper securely. Send all the

men in the bows of the boat; jump the boat and break the anchor out of

the ground; then man the fall again, off stopper, and heave up; when

the ring of the anchor is above water, pass a short ring-stopper, haul

the buoy on board, and bring the boat to the ship; when alongside,

hook the cat, and cat the anchor. Get the end of the cable unclinched,

passed into the hawse, and the remainder hauled out of the launch. (If

chain-cable, unshackle.)

=267.=--WEIGHING AN ANCHOR WITH A BUOY-ROPE.

[Illustration]

Get the buoy-rope over the roller, clap on a tackle, and weigh the

anchor as before. When it is secured, man the capstan, heave the launch

in under the bows, and cat the anchor.

Anchors are generally weighed with the buoy-rope when the cable has

parted, and the end cannot be grappled; when this is the case, the

anchor may be weighed with launch, brought under the bows and catted,

and the cable unclinched and hove in; or the ship might be warped over

the buoy, and the cat-fall taken to the buoy-rope.

=268.=--BOATING AN ANCHOR.

[Illustration]

Place the flukes perpendicularly over the stern, and the stock

a-thwart-ships in the stem sheets, resting horizontally upon a loose

thwart, placed there previously for the purpose, and steady all by one

or two lashings.

In letting go, nothing more is required than to cant the anchor over

the quarter, by means of the thwart, taking care previously that the

buoy, buoy-rope, and cable, be perfectly clear.

Light anchors should be boated contrary to this, _i. e._, flukes

inboard, and stock out.

=269.=--TAKING IN A LAUNCH.

Brace and secure the yards the same as when getting up the anchors, and

also rig the same purchases; place the chocks, pass everything out of

the launch, and hook the purchases to spans; have a few hands in the

boat to keep her clear of the ship’s side. Man the yard tackle falls;

have some hands to take in the slack of the stay fall; “walk away;”

when the boat leaves the water, take out the plug. When high enough to

clear the waist anchor stock, haul over on the main stay, easing away

the fore and main yards; when the stem is over the deck, haul over the

fore stay, lower, and place her in the chocks.

The other boats may be got on board by the same purchases. The launch

is stowed on the larboard side; the first cutter on the starboard

side;[27] the second cutter, inside the launch, and the third cutter

inside the first. When all are in, unrig the purchases, square the

yards, and set up the gripes.

The quarter and stern boats are hoisted up to their davits, and secured

to them by stoppers, and the gripes set up.

[27] _i. e._, if the ship be a frigate or larger. Single-deck ships

have but one nest of boats.

=270.=--TAKING IN BOATS BOTH SIDES AT ONCE.

The yards are kept square, and secured on both sides by the lifts,

burtons, and quarter lifts. Use the winding and stay tackles for the

heaviest boats, and the yard tackles for the lightest ones; the topsail

halliards forward, and the main pendant tackle aft, acting as stays

to bring them on board. It may be necessary to come up the forward

backstays, as they would be likely to interfere with the bows of the

boats; after which proceed as before.

_Taking in a boat at sea._--Back the main-topsail, get the boat to

leeward, secure the lower yards as before directed, and hoist her in.

The boat coming in to leeward, tackles will be necessary to get her

to windward sufficiently to lower away.

When before the wind, a boat might be got in by securing the yards

as before, and taking a hawser from aft to the stern of the boat, to

keep her from sending or pitching forward when leaving the water, and

thereby endangering the yards.

_Note._--Some of our large vessels have two sets of yard and stay

tackles, for the purpose of taking in boats both sides at once; but

the above mentioned gear will answer all purposes in any case of

emergency, where the manœuvre is not considered as exercising.

[Illustration]

The kedge-anchor · 第 4 / 16 章