SUMMARY OF TABLE 11.

+------------------------+-------------+------------+------------+

| DIAMETER | Total labor | Materials. | Total cost |

| OF PIPE : | cost. | Pesos. | per linear |

+--------------+---------+ In pesos. | | meter, in |

| Centimeters. | Inches. | | | pesos. |

+--------------+---------+-------------+------------+------------+

| 10 | 4 | 0.8725 | 3.30 | 4.1725 |

| 15 | 6 | 1.0725 | 4.51 | 5.5825 |

| 30.5 | 12 | 1.565 | 21.35 | 22.915 |

| 38 | 15 | 1.9125 | 22.30 | 24.2125 |

| 45.7 | 18 | 2.2775 | 25.42 | 27.6975 |

| 61 | 24 | 3.665 | 33.20 | 36.865 |

| 76 | 30 | 4.22 | 55.77 | 59.99 |

+--------------+---------+-------------+------------+------------+

The flood destroyed about 1,200 houses in the neighborhood of the river.

In a number of blocks the smaller mains were scoured away, but

considerable salvage was done afterward, and, as it is the intention of

the authorities not to permit rebuilding along the flood-path of the

river, these mains do not require reconstruction.