| DIAMETER | Total labor | Materials. | Total cost |
| OF PIPE : | cost. | Pesos. | per linear |
+--------------+---------+ In pesos. | | meter, in |
| Centimeters. | Inches. | | | pesos. |
+--------------+---------+-------------+------------+------------+
| 10 | 4 | 0.8725 | 3.30 | 4.1725 |
| 15 | 6 | 1.0725 | 4.51 | 5.5825 |
| 30.5 | 12 | 1.565 | 21.35 | 22.915 |
| 38 | 15 | 1.9125 | 22.30 | 24.2125 |
| 45.7 | 18 | 2.2775 | 25.42 | 27.6975 |
| 61 | 24 | 3.665 | 33.20 | 36.865 |
| 76 | 30 | 4.22 | 55.77 | 59.99 |
+--------------+---------+-------------+------------+------------+
The flood destroyed about 1,200 houses in the neighborhood of the river.
In a number of blocks the smaller mains were scoured away, but
considerable salvage was done afterward, and, as it is the intention of
the authorities not to permit rebuilding along the flood-path of the
river, these mains do not require reconstruction.