=Description of Plants.=--This chapter is devoted to a description of

several types of plants.

=Plant No. 1.=--A moderate sized beef, mutton, and pork producing plant

capable of slaughtering six hundred cattle, fifteen hundred sheep

and fifteen hundred hogs daily, and taking care of the products of

manufacture resulting therefrom. This design was developed upon the

principle of gravity for movement of products with as little use of

elevators as possible; the avoidance of excessive use of mechanical

conveyors and contrivances; the grouping of buildings intended for

hot or cold temperatures; economy of operation, and for minimum car

movement.

_Loading Facilities._--The general arrangement provides for wagon and

dray loading facilities fronting the main thoroughfare. The garage and

office are at the left and right sides of the court. Three tracks are

situated between the two groups of buildings to take care of the car

loading. Usually the refrigerated products are loaded upon the east

track, and non-refrigerated products, such as hides and bones, and the

oleo department products, upon the west track. The intermediate track

is used for the storing of cars. By use of the connecting platform

at the south end either kind of cars can be loaded on either track. A

separate non-interfering railroad spur is provided for unloading coal,

and cotton seed oil, and for loading tallow, while a distinct track is

provided for loading cars of dry salt meats from the pork warehouse.

[Illustration: FIG. 5.--PLANT NO. 1, MODERATE SIZE PACKING HOUSE.]

_Producing Department_--The abattoir is made the center of

distribution, with the refrigerated buildings and departments directly

communicative, situated nearby. The rendering and manufacturing

departments--users of steam and power--are grouped near to the abattoir

and to the power plant, while the buildings requiring refrigeration

are grouped together and isolated from the manufacturing buildings.

The stock pens connected with the plant are to the left of the

manufacturing groups, but are not shown on the plan.

_Abattoir Building_--This building, six stories high, is given over to

the following uses: Fourth floor, slaughtering; third floor, treatment,

separation and cooking of by-products and manufacture of casings;

second floor, oleo oil manufacturing; first floor, oleo oil storage,

and shipping purposes; basement and sub-basement, storage of tallow and

curing of hides.

[Illustration: FIG. 6.--EXTERIOR VIEW BEEF, SHEEP AND PORK PLANT.]

_Rendering Building_--Divided into two sections and separated by

partitions, one side is used for the refining of cotton seed oil and

the manufacture of edible tallows; the other side for cooking blood

and rendering inedible tallows. The floors are used as follows:

Second floor, level with viscera separating floor in abattoir, from

whence raw stock is trucked to the filling floor without requiring

use of elevators for filling of tanks; first floor, tank bodies and

receptacles for collection of tallow. The skimming vats to which the

tank residue, after drawing off the tallows, is passed, are level with

this floor, enabling the separation and floating of the tallow and

its collection; basement for press room, and sub-basement for drying

tankage. The tank water to be evaporated is collected and passed to a

separate building for treatment and evaporation.

_Live Stock_--The live stock pens are situated to the left of the

rendering department extending north of the oil storage tanks from

which position leads an incline, delivering the live stock into an

elevated storage pen covering the area between the rendering house and

the abattoir, and over the dressing room.

_Icing Department_--Facilities for manufacturing ice for cooling cars

are provided in the space directly north of the abattoir building. The

three railroad tracks between the two groups of buildings are covered

with a protecting shed, and from the bottom member of the trusses are

suspended trolley rails for handling buckets of ice to be dumped into

the tanks of the refrigerator cars.

_Cooler Building_--The dressed beef, mutton and pork is transferred

via bridge with chain conveyors, carrying the carcasses from the

slaughtering house floor to the cooling rooms situated upon the third

floor of the cooler building. From this floor the carcasses are

conveyed for storage purposes to the second and first floor, and from

there they are passed to the cutting room, city sales department, or

cars. The basement and sub-basement are used for curing beef and pork

joints. The fourth floor of this building is set aside for freezing

products which, after being frozen, are shipped for storage to other

premises owned by the same company.

[Illustration: FIG. 7.--SECTIONAL VIEW INDICATING LEVELS AND

COMPARATIVE LEVELS OF DEPARTMENT FLOORS.]

_Pork House_--The fourth floor of the pork house is utilized for

chilling hogs; the third for cutting them, and all floors below for

curing purposes. Note, the arrangement whereby the pork house and the

cooler building are each connected with the team-loading platform and

also closely arranged for car loading.

_Manufacturing Building_--A manufacturing building given over to the

production of sausage, smoked meats, lard and the packing and shipping

of same is immediately north of the cooler and pork buildings, and

connected thereto at all floors where necessary. The city shipping

department has its allotted space on the ground floor of the cooler

building and the products finished in the manufacturing building move

south toward the team loading platforms.

_Salt Spaces, etc._--In this instance, but which rarely occurs, the

city’s main sewer system is located at a deep level, which affords

proper drainage and permitted the construction of two cellars. There

are, therefore, two stories practically under ground. This is a decided

advantage from the standpoint of radiation exposure, and it also

affords an opportunity to provide salt storage and cooperage stowing

spaces on two levels adjacent to the railroad tracks. It further

provides a means for securing a connecting tunnel below the track

level, thus providing facilities for a perfect interchange from all

cellar departments. Of equal consequence is the opportunity to pass all

pipes for water, steam and refrigeration, power and lighting wires, as

well as products, from one department to another. This makes for a low

upkeep cost, little exposure, less radiation and greatly reduces the

annual upkeep.

_Power Department_--The boilers were placed on a floor level with the

basement. The coal pocket into which coal is dropped extends to the

sub-basement level, providing a comparatively large coal storage. At

the sub-basement level are the ash collecting bins. From this level are

provided elevators of the continuous bucket type for raising the coal

and ashes to tanks provided for storage, from which the coal and ashes

gravitate to the furnaces and disposal cars respectively.

The engine foundations extend to the sub-basement level, with the main

engine situated upon the basement level. The pumps are located in part

on the lower level. All pipes and wires leading to the operating

department are carried through the sub-basement, permitting the

arrangement of all exhaust and steam piping beneath the engine room

floor.

_Gravity System_--Attention is called to the fact that in the rendering

department, for example, the products in their steps of manufacture

are handled by gravity entirely until the finished dried fertilizer

is produced, which has to be elevated to the ground level for car

shipment, or for wagon delivery. The same features are true of the

abattoir, hides and tallow in casks only, requiring the use of

elevators for shipment.

[Illustration: FIG. 8.--PLANT NO. 2, GROUND PLAN FOR COUNTRY PACKING

HOUSE.]

=Plant No. 2.=--This plant was designed for a country point where the

shipping by local freight cars or the city delivery was quite limited;

where the major part of the product would be shipped by car, and

where provision was made for quite an extensive growth. The capacity

as designed being four hundred hogs and fifty cattle daily, with a

complementary quantity of calves and sheep.

_Loading Facilities_--Again the three railways are provided for

convenience in loading and for facilitating switching and icing.

[Illustration: FIG. 9.--PLANT NO. 2, SECTION THROUGH SLAUGHTERING AND

RENDERING BUILDING.]

[Illustration: FIG. 10.--PLANT NO. 2, SECTION THROUGH MANUFACTURING

BUILDING.]

[Illustration: FIG. 11.--PLANT NO. 2, SECTION THROUGH COOLER BUILDING.]

_Producing Department_--In this plant the slaughter of hogs is the

predominant business. The hog killing department was consequently

designed amply large and for a growth to upwards of fifteen hundred

hogs daily, while the rendering department provides for additional

tanking facilities to be added as required. In this building, near to

the source of production is placed a small air blast type of meat and

leaf lard cooling space.

_Rendering Department_--Owing to abattoir being isolated it was

possible to set aside a portion of the building for the rendering

department, and make the construction comply with the sanitary

requirements as to light, air and ventilation. These features are

illustrated by the sectional views.

_Live Stock_--The live stock receiving pens for cars and wagons are

located on the ground as shown on plans, and a long ramp is arranged

for the slow driving of hogs. Again, all products are passed downward

in the process of manufacture.

_Icing Department_--Facilities are provided for harvesting ice from a

stream situated north of the premises. The railroad tracks extend to

the ice storage houses where facilities are provided for icing cars.

_Pork Building_--Advantage was taken of the relative grouping and the

space available to provide an open air hanging or drying room for

hogs at a level of the killing floor and hog chill rooms. The hogs

pass through this space on their way to the cooler. The pork building

is arranged with chilling rooms on the upper floor and curing rooms

beneath on all floors to and including the basement.

_Manufacturing Building_--Adjacent to the cooler building, space is

provided for the making of sausage, cutting hogs, and trimming of

sausage meat, processing of meats for smoking, packing and shipping.

_Power Department_--This is a minor matter since the electric current

is purchased from a municipal lighting corporation, and the plant being

in a cold climate, advantage is taken of these conditions.

Note that in this plant every department except the killing department,

which was made as large a unit as appeared to be necessary, may be

extended without in any manner disturbing the relative situation of the

departments. The uses of the several floors are shown in the sectional

drawings.

=Plant No. 3.=--Type of plant. The diagram (Fig. 12) is illustrative

of a small local plant situated in a southwestern city, and built

principally for a local mixed business. The plant will properly

take care of one hundred hogs and fifty cattle daily, the necessary

by-products and the manufacturing departments, therefor. An ice

business is operated in conjunction with this plant. The buildings are

chiefly two stories in height. The plan and sectional drawings are

sufficiently explicit to require no description.

[Illustration: FIG. 12.--PLANT NO. 3, GROUND PLAN OF SMALL LOCAL

PACKING HOUSE.]

=Plant No. 4.=--The accompanying vignette and ground plan are

illustrative of an alongside deep water export plant. The photograph

of front view illustrates the loading facilities which show ramps

or inclines upon which conveyors are operated. These endless chains

convey beef in quarter to the wharf at right angles thereto, where it

is picked off the rail by ship’s tackle and lowered into the ship’s

chambers.

Discussing the plant arrangement, note the position of the slaughter

house with relation to the coolers and trace the movement of the

products to the coolers, rendering, wool house. Also the further

movement of the products to shipment. Particular attention is called

to the arrows indicating the direction of growth of every department

without disarranging the first intention as to movement, and minimizing

the labor on the extended plant.

[Illustration: FIG. 13.--PLANT NO. 4, SHOWING DEEP WATER EXPORT PLANT.]

The steam producing department is in close proximity to the steam

using buildings, viz: Power Department, Rendering House, Fertilizer

and Slaughter House. Preference being given over electricity or

refrigeration which can be transmitted longer distances at less loss.

=How to Build.=--The question of design being settled the next

matter of importance is the one involving the materials to be used

in construction. That becomes a matter of investment and permanent

size or location of the buildings. Fireproof buildings are desirable

on account of low cost of upkeep and a lower insurance rate. They

are permanent in every way, but the difficult question is that of

modifying, provided changes become necessary.

[Illustration: FIG. 14.--PLANT NO. 4, GROUND PLAN FOR EXPORT PACKING

HOUSE.]

=Fireproof Design.=--If decision is made for a fireproof building,

re-inforced concrete is the first suggestion owing to its universal

use as a building material, but there are several points to be given

serious consideration before reaching a decision. One of these points

being how to insulate so as to prevent losses. This matter will be

taken up in a subsequent chapter describing a cold storage warehouse of

eminent design. It is one of great importance.

=Advantages of Fireproof Construction.=--The fireproof buildings have

naturally a very great advantage in permanence from a standpoint of

cost of upkeep and insurance charges, and from the greater loss of a

cessation of business incident to destruction by fire. In most plants

there are sufficient departments of such staple character so unlikely

to be changed that it appears judicious to make them fireproof.

=Slow Burning Construction.=--Many people are quite content with

buildings of moderate height of slow burning construction; otherwise,

a modified type of “mill construction” and with the use of sprinkler

systems which minimize the insurance costs.

=Approval of Plans.=--There are many points in building construction

to take care of in the matter of design, to meet the requirements of

the insurance interests and local city building department regulations,

which in the main coincide. Before entering into a contract to

construct, it is well to have the drawings approved by the insurance

boards and the city inspection bureau. It obviates expensive changes

and additions. To build in such a manner as to bring the insurance

rates to a minimum is certainly desirable. It is an advantage, too,

to have the plant divided so that in case of fire the spread of the

flames can be retarded and the fire confined to the building where it

originated, or if some of the buildings are burned the balance can be

saved. Fires invariably represent, to a well managed business, a far

greater loss than is collectible on the insurance policies.